CN114781988A - Power grid operation safety control system based on digital derivative technology - Google Patents

Power grid operation safety control system based on digital derivative technology Download PDF

Info

Publication number
CN114781988A
CN114781988A CN202210033212.4A CN202210033212A CN114781988A CN 114781988 A CN114781988 A CN 114781988A CN 202210033212 A CN202210033212 A CN 202210033212A CN 114781988 A CN114781988 A CN 114781988A
Authority
CN
China
Prior art keywords
module
management platform
data
power grid
transformer substation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210033212.4A
Other languages
Chinese (zh)
Inventor
任戈
李柯
王振伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Slython Technology Co ltd
Original Assignee
Beijing Slython Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Slython Technology Co ltd filed Critical Beijing Slython Technology Co ltd
Priority to CN202210033212.4A priority Critical patent/CN114781988A/en
Publication of CN114781988A publication Critical patent/CN114781988A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T17/00Three dimensional [3D] modelling, e.g. data description of 3D objects
    • GPHYSICS
    • G07CHECKING-DEVICES
    • G07CTIME OR ATTENDANCE REGISTERS; REGISTERING OR INDICATING THE WORKING OF MACHINES; GENERATING RANDOM NUMBERS; VOTING OR LOTTERY APPARATUS; ARRANGEMENTS, SYSTEMS OR APPARATUS FOR CHECKING NOT PROVIDED FOR ELSEWHERE
    • G07C1/00Registering, indicating or recording the time of events or elapsed time, e.g. time-recorders for work people
    • G07C1/20Checking timed patrols, e.g. of watchman
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B17/00Fire alarms; Alarms responsive to explosion
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N5/00Details of television systems
    • H04N5/76Television signal recording
    • H04N5/78Television signal recording using magnetic recording
    • H04N5/781Television signal recording using magnetic recording on disks or drums
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N7/00Television systems
    • H04N7/18Closed-circuit television [CCTV] systems, i.e. systems in which the video signal is not broadcast
    • H04N7/183Closed-circuit television [CCTV] systems, i.e. systems in which the video signal is not broadcast for receiving images from a single remote source
    • H04N7/185Closed-circuit television [CCTV] systems, i.e. systems in which the video signal is not broadcast for receiving images from a single remote source from a mobile camera, e.g. for remote control
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W4/00Services specially adapted for wireless communication networks; Facilities therefor
    • H04W4/02Services making use of location information
    • H04W4/021Services related to particular areas, e.g. point of interest [POI] services, venue services or geofences
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W4/00Services specially adapted for wireless communication networks; Facilities therefor
    • H04W4/02Services making use of location information
    • H04W4/029Location-based management or tracking services

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Human Resources & Organizations (AREA)
  • Signal Processing (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Theoretical Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Multimedia (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Data Mining & Analysis (AREA)
  • Emergency Management (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Computer Graphics (AREA)
  • Geometry (AREA)
  • Software Systems (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention relates to the technical field of power grid operation safety control, in particular to a power grid operation safety control system based on a digital derivative technology, which comprises a management platform, a transformer substation is subjected to 3D modeling, the transformer substation is subjected to panoramic simulation and three-dimensional visual real-time presentation through the digital derivative technology, the management platform based on the physical environment of the transformer substation subjected to digital derivative is established, an active safety database is established by respectively butting an equipment online monitoring module, a D5000 module, a PMS module and a video monitoring module through the management platform, and safety control is realized by combining a personnel access module, a UWB personnel positioning module, a digital work ticket and an operation ticket data integration module. The power grid operation safety control system based on the digital derivative technology optimizes operation and inspection work and corrects habitual violation based on digital management, achieves the purposes of drilling and reviewing that real operation cannot be realized, and grasps dynamic and static information of transformer substation equipment and personnel position and field operation information at any time and any place in real time.

Description

Power grid operation safety control system based on digital derivative technology
Technical Field
The invention relates to the technical field of power grid operation safety control, in particular to a power grid operation safety control system based on a digital derivative technology.
Background
The traditional patrol maintenance technical means of the transformer substation falls behind. At present, the routine patrol of the transformer substation is mainly carried out by operators and is influenced by artificial subjective factors, and the patrol efficiency needs to be improved; a transformer substation largely adopts GIS combined electrical appliances, and a front-line worker cannot comprehensively master the internal structure condition of equipment; in addition, the internal structure of the 10kV and 35kV switch cabinet is compact, and a line of personnel can not master the internal structure of the equipment comprehensively before working.
The monitoring mode of the equipment is old, the specific position and the electrification condition of the equipment are checked in a chart display mode, and the equipment is not visual and is easy to ignore the operation hidden danger of field equipment. When equipment accidents, abnormalities, out-of-limit and other problems occur, the related equipment influence cannot be timely positioned and analyzed, and the accident risk and the influence range are easily analyzed mistakenly. The power grid operation safety control system based on the digital derivative technology is provided, and through the research and development and application of a new technology and new equipment, automatic state sensing, intelligent data analysis, active equipment early warning and intelligent safety control are achieved, so that the intrinsic safety is further improved, and the equipment management efficiency is improved.
Disclosure of Invention
The technical problem to be solved by the invention is to provide a power grid operation safety management and control system based on a digital derivative technology, which optimizes operation and inspection work, corrects habitual violation, achieves the purposes of exercise and copy recovery that real operation cannot be realized, and masters dynamic and static information of transformer substation equipment, personnel position and field operation information in real time at any time and any place based on digital management.
In order to solve the technical problem, the invention adopts the following technical scheme:
a power grid operation safety control system based on digital derivative technology comprises
Establishing a management platform, performing 3D modeling on the transformer substation, performing panoramic simulation and three-dimensional visual real-time presentation on the transformer substation through a digital derivative technology, and establishing a management platform of a physical environment of the transformer substation based on digital derivative;
an equipment online monitoring module; the management platform collects data through the equipment online monitoring module and can display the data on the three-dimensional model of the corresponding equipment in real time;
a D5000 module; the management platform is integrated with the D5000 module, and the real-time data of the running states, the tide and the load of the primary and secondary equipment of the power grid are displayed by developing and dispatching the D5000 interface;
a PMS module; the management platform is integrated with the PMS module data, and the defect information and fault information data of the transformer substation equipment are displayed by implementing an interface with the PMS module;
a video monitoring module; the management platform is integrated with the video monitoring module in a data mode, and is in butt joint with a hard disk video recorder at a transformer substation end, so that the monitoring camera can be accurately positioned on a three-dimensional map and a click display of a real-time monitoring picture can be realized;
and establishing an active safety database, integrating the management platform with the active safety database, and calling information through the active safety database.
A personnel admission module; the management platform is in butt joint with the personnel access module, and the monitoring and the alarming of personnel safety access information are realized through the data access of the personnel access module;
a UWB personnel positioning module; the management platform is in butt joint with a substation UWB personnel positioning base station, so that personnel positioning, electronic fence and other scene applications are realized;
a digital work ticket and operation ticket data integration module; the digital work ticket and operation ticket data integration module is communicated with the UWB personnel positioning module, so that the work ticket and operation ticket information operation process display and the scene application of the electronic fence are realized.
And furthermore, the system comprises a microclimate data integration module, and the management platform is in butt joint with the microclimate data integration module to realize real-time meteorological data display.
Furthermore, the system comprises an inspection robot module, wherein the management platform is in butt joint with the inspection robot module, so that the inspection track of the inspection robot is realized, and the real-time display of the inspection result of visible light and infrared video is realized.
And furthermore, the fire alarm system comprises a fire alarm module, and the management platform is in butt joint with the fire alarm module to realize fire alarm information linkage and scene application.
And the management platform is in butt joint with the risk control module, and realizes the whole-process management and control of the work plan and the scene application through the data access of the work plan.
The invention has the beneficial effects that: when the system is actually used, key data of service systems such as a transformer substation three-dimensional model, an equipment online monitoring module, a D5000 module, a PMS module, a video monitoring module, a personnel admittance module, a UWB personnel positioning module, a digital work ticket and an operation ticket data integration module are fused, on-site positions are divided and positioned on a transformer substation basic three-dimensional model according to safety types and safety levels on the basis of transformer substation three-dimensional space modeling, video monitoring and positioning, safety precautions and danger prevention measures corresponding to each position are associated with information such as safety levels, notices, operation standards and the like corresponding to equipment at the position, safety content decomposition is carried out according to human, machine, material, method and ring five elements, an active safety database is established, and active safety database data are called through a management platform to realize safety control on the operation of a power grid, when the inspection personnel perform inspection or maintenance work on the site and reach the corresponding positions, the management platform automatically positions the positions of the inspection personnel and actively pushes information such as running operation, maintenance work, current position safety information, risk pre-control measures, historical accident records and the like which are performed nearby to mobile equipment carried by the inspection personnel, so that active safety comprehensive information prompt and closed-loop management of site safety production of the site inspection personnel are realized, and unnecessary safety accidents are reduced. The power grid operation safety control system based on the digital derivative technology optimizes operation and inspection work and corrects habitual violation based on digital management, achieves the purposes of drilling and re-recording which cannot be realized by real operation, and masters dynamic and static information of transformer substation equipment, personnel positions and field operation information at any time and any place in real time.
Drawings
FIG. 1 is a schematic structural diagram of the present invention.
Detailed Description
In order to facilitate understanding of those skilled in the art, the present invention is further described below with reference to the following examples and the accompanying drawings, which are not intended to limit the present invention.
As shown in FIG. 1, the invention provides a power grid operation safety control system based on digital derivative technology, which comprises
Establishing a management platform, performing 3D modeling on the transformer substation, performing panoramic simulation and three-dimensional visual real-time presentation on the transformer substation through a digital derivative technology, and establishing the management platform of the physical environment of the transformer substation based on digital derivative;
an equipment on-line monitoring module; the management platform collects data through the equipment on-line monitoring module and can display the data on the three-dimensional model of the corresponding equipment in real time;
a D5000 module; the management platform is integrated with the D5000 module, and the real-time data of the running states, the tide and the load of the primary and secondary equipment of the power grid are displayed by developing and dispatching the D5000 interface;
a PMS module; the management platform is integrated with the PMS module data, and the defect information and fault information data of the transformer substation equipment are displayed by implementing an interface with the PMS module;
a video monitoring module; the management platform is integrated with the video monitoring module in a data mode, and is in butt joint with a hard disk video recorder at a transformer substation end, so that the monitoring camera can be accurately positioned on a three-dimensional map and a click display of a real-time monitoring picture can be realized;
and establishing an active security database, integrating the management platform and the active security database, and calling information through the active security database.
A personnel admittance module; the management platform is in butt joint with the personnel access module, and the monitoring and the alarming of personnel safety access information are realized through the data access of the personnel access module;
a UWB personnel positioning module; the management platform is in butt joint with a substation UWB personnel positioning base station, so that personnel positioning, electronic fence and other scene applications are realized;
a digital work ticket and operation ticket data integration module; the digital work ticket and operation ticket data integration module is communicated with the UWB personnel positioning module, so that the work ticket and operation ticket information operation process display and the scene application of the electronic fence are realized.
When in actual use, key data of service systems such as a transformer substation three-dimensional model, an equipment online monitoring module, a D5000 module, a PMS module, a video monitoring module, a personnel access module, a UWB personnel positioning module, a digital work ticket and an operation ticket data integration module are fused, on the basis of transformer substation three-dimensional space modeling, video monitoring and positioning, on-site positions are divided and positioned on a transformer substation basic building three-dimensional model according to safety types and safety levels, safety cautions and danger prevention measures corresponding to each position are associated with information such as safety levels, cautions and operation standards corresponding to equipment at the position, safety content decomposition is carried out according to human, machine, material, method and ring five elements, an active safety database is established, active safety database data is called through a management platform, and safety control on power grid operation is realized, when the inspection personnel perform inspection or maintenance work on site and reach corresponding positions, the management platform automatically positions the inspection personnel, and actively pushes information such as running operation, maintenance work, current position safety information, risk pre-control measures, historical accident records and the like which are performed nearby to mobile equipment carried by the inspection personnel, so that active safety comprehensive information prompt and closed-loop management of site safety production of the site inspection personnel are realized, and unnecessary safety accidents are reduced.
The power grid operation safety control system based on the digital derivative technology optimizes operation and inspection work and corrects habitual violation based on digital management, achieves the purposes of drilling and re-recording which cannot be realized by real operation, and masters dynamic and static information of transformer substation equipment, personnel positions and field operation information at any time and any place in real time.
As shown in fig. 1, in this embodiment, the system includes a microclimate data integration module, and the management platform is docked with the microclimate data integration module to implement real-time meteorological data display.
As shown in fig. 1, in this embodiment, including patrolling and examining the robot module, management platform and patrolling and examining the robot module butt joint, realize patrolling and examining the robot and patrol the orbit, the real-time demonstration of visible light and infrared video inspection result.
As shown in fig. 1, in this embodiment, the management platform includes a fire alarm module, and is in butt joint with the fire alarm module to implement fire alarm information linkage and scene application.
As shown in fig. 1, in this embodiment, the management platform includes a risk control module, and the management platform is in butt joint with the risk control module, and implements work plan full-flow management and control and scene application through work plan data access.
All the technical features in the embodiment can be freely combined according to actual needs.
The above embodiments are preferred implementations of the present invention, and other implementations are also included, and any obvious substitutions are within the scope of the present invention without departing from the spirit of the present invention.

Claims (5)

1. The utility model provides a power grid operation safety control system based on digit derivative technique which characterized in that:
establishing a management platform, performing 3D modeling on the transformer substation, performing panoramic simulation and three-dimensional visual real-time presentation on the transformer substation through a digital derivative technology, and establishing the management platform of the physical environment of the transformer substation based on digital derivative;
an equipment on-line monitoring module; the management platform collects data through the equipment online monitoring module and can display the data on the three-dimensional model of the corresponding equipment in real time;
a D5000 module; the management platform is integrated with the D5000 module, and the real-time data display of the running state, the trend and the load of the primary equipment and the secondary equipment of the power grid is realized by developing and dispatching a D5000 interface;
a PMS module; the management platform is integrated with the PMS module data, and the defect information and fault information data of the transformer substation equipment are displayed by implementing an interface with the PMS module;
a video monitoring module; the management platform is integrated with the video monitoring module in a data mode, and is in butt joint with a hard disk video recorder at a transformer substation end, so that the monitoring camera can be accurately positioned on a three-dimensional map and a click display of a real-time monitoring picture can be realized;
and establishing an active security database, integrating the management platform and the active security database, and calling information through the active security database.
A personnel admission module; the management platform is in butt joint with the personnel access module, and the monitoring and the alarming of personnel safety access information are realized through the data access of the personnel access module;
a UWB personnel positioning module; the management platform is in butt joint with a UWB personnel positioning base station of the transformer substation, so that the application of scenes such as personnel positioning and electronic fences is realized;
a digital work ticket and operation ticket data integration module; through data communication of the digital work ticket and the operation ticket data integration module with the UWB personnel positioning module, the work ticket and operation ticket information operation process display and the scene application of the electronic fence are realized.
2. The power grid operation safety control system based on the digital derivative technology as claimed in claim 1, characterized in that: the system comprises a microclimate data integration module, wherein the management platform is in butt joint with the microclimate data integration module to realize real-time meteorological data display.
3. The power grid operation safety control system based on the digital derivative technology as claimed in claim 1, characterized in that: including patrolling and examining the robot module, management platform and the butt joint of patrolling and examining the robot module realize patrolling and examining the robot and patrol and examine the orbit, the real-time demonstration of visible light and infrared video inspection result.
4. The power grid operation safety control system based on the digital derivative technology as claimed in claim 1, wherein: the fire alarm system comprises a fire alarm module, wherein the management platform is in butt joint with the fire alarm module, so that fire alarm information linkage and scene application are realized.
5. The power grid operation safety control system based on the digital derivative technology as claimed in claim 1, wherein: the management platform is in butt joint with the risk control module, and through work plan data access, work plan full-flow management and control and scene application are achieved.
CN202210033212.4A 2022-01-12 2022-01-12 Power grid operation safety control system based on digital derivative technology Pending CN114781988A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210033212.4A CN114781988A (en) 2022-01-12 2022-01-12 Power grid operation safety control system based on digital derivative technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210033212.4A CN114781988A (en) 2022-01-12 2022-01-12 Power grid operation safety control system based on digital derivative technology

Publications (1)

Publication Number Publication Date
CN114781988A true CN114781988A (en) 2022-07-22

Family

ID=82424030

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210033212.4A Pending CN114781988A (en) 2022-01-12 2022-01-12 Power grid operation safety control system based on digital derivative technology

Country Status (1)

Country Link
CN (1) CN114781988A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116207865A (en) * 2023-05-05 2023-06-02 上海华建电力设备股份有限公司 On-line monitoring system and method for integrated transformer substation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116207865A (en) * 2023-05-05 2023-06-02 上海华建电力设备股份有限公司 On-line monitoring system and method for integrated transformer substation

Similar Documents

Publication Publication Date Title
CN111091609B (en) Transformer substation field operation management and control system and method based on three-dimensional dynamic modeling
CN107193375B (en) Electric power safety production scene interaction system based on virtual reality
CN111611855B (en) Intelligent inspection system for three-dimensional visual robot of transformer substation
CN205029436U (en) Robot system is patrolled and examined to intelligence in centralized control formula transformer substation
CN108805441A (en) power emergency command system
CN110533771A (en) A kind of intelligent polling method of substation
CN103441571A (en) Integrated monitoring system information platform for transformer substation
CN111597231B (en) Intelligent substation inspection system based on multi-source heterogeneous system data mining
CN110652684A (en) Electric fire safety integrated management system
WO2021114856A1 (en) Multisource data-based uninterruptible power supply system
CN110991670A (en) Power cable management method
CN112001310A (en) Transformer substation operation field safety control system based on visual perception and space positioning
CN113988633A (en) Anti-misoperation system of digital twin transformer substation
CN110957704B (en) Intelligent inspection method and system for protection action tripping of transformer substation
CN107272634A (en) A kind of virtual coal mining Exercise Control system based on three-dimensional VR and data server
CN112152314A (en) Centralized monitoring transformer substation risk identification early warning system and working method thereof
CN214704735U (en) Comprehensive pipe rack wisdom system of patrolling and examining
CN107544383A (en) A kind of residential property apparatus monitoring method and system
CN112598815A (en) Distribution network inspection method based on Internet
CN112414469A (en) Power patrol inspection and rush repair safety monitoring system based on Beidou space-time data sensing
CN114781988A (en) Power grid operation safety control system based on digital derivative technology
CN201846134U (en) Automatic inspecting system for transformer substation
CN111510685A (en) Information output method and device based on three-dimensional model
CN116667533A (en) Intelligent dog inspection system
CN114357762A (en) Wisdom power equipment high in clouds control automatic system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination