CN114753591B - Bathtub construction process - Google Patents
Bathtub construction process Download PDFInfo
- Publication number
- CN114753591B CN114753591B CN202210536570.7A CN202210536570A CN114753591B CN 114753591 B CN114753591 B CN 114753591B CN 202210536570 A CN202210536570 A CN 202210536570A CN 114753591 B CN114753591 B CN 114753591B
- Authority
- CN
- China
- Prior art keywords
- bathtub
- floor drain
- layer
- height
- accommodating groove
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 13
- 238000000034 method Methods 0.000 title claims abstract description 13
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 41
- 239000011248 coating agent Substances 0.000 claims abstract description 11
- 238000000576 coating method Methods 0.000 claims abstract description 11
- 239000010410 layer Substances 0.000 claims description 73
- 238000007789 sealing Methods 0.000 claims description 6
- 239000012790 adhesive layer Substances 0.000 claims description 3
- 230000000694 effects Effects 0.000 abstract description 3
- 238000005034 decoration Methods 0.000 abstract description 2
- 238000009825 accumulation Methods 0.000 description 8
- 230000004308 accommodation Effects 0.000 description 5
- 239000000853 adhesive Substances 0.000 description 3
- 230000001070 adhesive effect Effects 0.000 description 3
- 239000000919 ceramic Substances 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 229920002635 polyurethane Polymers 0.000 description 2
- 239000004814 polyurethane Substances 0.000 description 2
- 239000011083 cement mortar Substances 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000007599 discharging Methods 0.000 description 1
- 229920000642 polymer Polymers 0.000 description 1
- 238000007790 scraping Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/12—Flooring or floor layers made of masses in situ, e.g. seamless magnesite floors, terrazzo gypsum floors
-
- A—HUMAN NECESSITIES
- A47—FURNITURE; DOMESTIC ARTICLES OR APPLIANCES; COFFEE MILLS; SPICE MILLS; SUCTION CLEANERS IN GENERAL
- A47K—SANITARY EQUIPMENT NOT OTHERWISE PROVIDED FOR; TOILET ACCESSORIES
- A47K3/00—Baths; Douches; Appurtenances therefor
- A47K3/02—Baths
- A47K3/04—Built-in baths
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03C—DOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER; SINKS
- E03C1/00—Domestic plumbing installations for fresh water or waste water; Sinks
- E03C1/12—Plumbing installations for waste water; Basins or fountains connected thereto; Sinks
- E03C1/122—Pipe-line systems for waste water in building
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
- E03F5/04—Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
- E03F5/0407—Floor drains for indoor use
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
- E03F5/04—Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
- E03F5/0407—Floor drains for indoor use
- E03F5/0409—Devices for preventing seepage around the floor drain
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/66—Sealings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/18—Separately-laid insulating layers; Other additional insulating measures; Floating floors
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/18—Separately-laid insulating layers; Other additional insulating measures; Floating floors
- E04F15/182—Underlayers coated with adhesive or mortar to receive the flooring
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Health & Medical Sciences (AREA)
- Public Health (AREA)
- Civil Engineering (AREA)
- Hydrology & Water Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- Water Supply & Treatment (AREA)
- Environmental & Geological Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Epidemiology (AREA)
- General Health & Medical Sciences (AREA)
- Floor Finish (AREA)
Abstract
The invention discloses a bathtub construction process, which relates to the technical field of interior decoration and comprises the steps of coating a waterproof layer on a ground structure layer; coating a leveling layer on the waterproof layer; installing a containing body on the leveling layer, wherein both ends of the containing body are connected with the wall surface, so that the leveling layer, the containing body and the wall surface are surrounded to form a containing groove; a floor drain is arranged at the bottom of the accommodating groove; the bathtub is arranged in the accommodating groove, and the water outlet of the bathtub is communicated with the water draining pipeline. Aiming at the technical problems that the ground structure, the accommodating body, the bathtub and the like of the bathroom are easy to damage, the invention has the technical effect that the ground structure, the accommodating body, the bathtub and the like of the bathroom can be effectively prevented from being damaged.
Description
Technical Field
The invention relates to the technical field of interior decoration, in particular to a bathtub construction process.
Background
The bathtub is a water pipe device for bath or shower, and the related bathtub is generally arranged in a containing groove of a bathroom, so that the stability of the bathtub can be effectively ensured.
The splash splashed from the bathtub can flow through the floor drain in other areas of the bathroom, so that water leakage is effectively prevented, however, water leakage is easily caused at the joint of the water outlet of the bathtub and the water drainage pipeline, so that water leakage is caused at the bottom of the bathtub, water accumulation is caused in the accommodating groove of the bathroom, and finally the ground structure, the accommodating body, the bathtub and the like of the bathroom are damaged.
Disclosure of Invention
1. Technical problem to be solved by the invention
Aiming at the technical problems that the ground structure, the accommodating body and the bathtub of the bathroom are easy to damage, the invention provides a bathtub construction process which can effectively prevent the ground structure, the accommodating body and the bathtub of the bathroom from being damaged.
2. Technical proposal
In order to solve the problems, the technical scheme provided by the invention is as follows:
a bathtub construction process comprising:
coating a waterproof layer on the ground structure layer;
coating a leveling layer on the waterproof layer;
installing an accommodating body on the leveling layer, wherein both ends of the accommodating body are connected with the wall surface, so that the leveling layer, the accommodating body and the wall surface are surrounded to form an accommodating groove;
a floor drain is arranged at the bottom of the accommodating groove;
the bathtub is arranged in the accommodating groove, and the water outlet of the bathtub is communicated with the water draining pipeline.
Optionally, after the floor drain is installed at the bottom of the accommodating groove, a ground finish surface is paved on the leveling layer in the accommodating groove, and the height of the floor drain is lower than that of the ground finish surface.
Optionally, an adhesive layer is arranged between the leveling layer in the accommodating groove and the ground finishing surface.
Optionally, the ground finishing surface includes:
a finishing surface I paved on the leveling layer in the accommodating groove;
a second finishing surface paved on the leveling layer in the accommodating groove;
the floor drain is positioned in the channel, and the height of the floor drain is lower than that of the finishing surface II.
Optionally, the height of the first finishing surface is equal to the height of the second finishing surface, and the height of the floor drain is lower than the height of the first finishing surface.
Optionally, the height of the end of the first finishing surface close to the second finishing surface is higher than the height of the end of the first finishing surface far from the second finishing surface.
Optionally, the height of the first finishing surface is equal to the height of the floor drain, and the height of the first finishing surface is lower than the height of the second finishing surface.
Alternatively, a completion layer is applied to the outside of the housing body before the bathtub is mounted on the housing body, wherein the bathtub is located on the completion layer.
Optionally, after the bathtub is mounted in the containment body, a seal assembly is mounted between the bathtub and the containment body.
Optionally, after the waterproof layer is coated on the ground structural layer, a water-blocking test is performed.
3. Advantageous effects
Compared with the prior art, the technical scheme provided by the invention has the following beneficial effects:
1) The waterproof layer is used for preventing water from the leveling layer from entering the ground structural layer and preventing water from the ground structural layer from entering the leveling layer, wherein the concrete mode of coating and scraping the waterproof layer is to sequentially coat and scrape 2-3 layers of polyurethane waterproof coating on the ground structural layer; because the floor drain is positioned in the accommodating groove, the floor drain is convenient for timely discharging water in the accommodating groove, and water accumulation in the accommodating groove is prevented, so that the damage to the leveling layer, the accommodating body, the wall surface and the like is prevented; in sum, through the floor drain and the waterproof layer, the water accumulation in the accommodating groove can be effectively prevented, and even if the water accumulation is generated, the damage degree of related structures can be effectively reduced by the waterproof layer;
2) The first finished surface and the second finished surface are combined together to form a ground finished surface, so that the integrity of the ground finished surface is guaranteed, and the first finished surface and the second finished surface are identical in material in order to further guarantee the integrity of the ground finished surface;
3) The sealing assembly can effectively prevent external water from entering the accommodating groove from a gap between the bathtub and the accommodating body, so that the drainage requirement of the floor drain is reduced, and the smoothness of the drainage of the floor drain is ensured.
Drawings
FIG. 1 is a flow chart of a bathtub construction process according to an embodiment of the present invention;
FIG. 2 is a schematic view of a bathtub according to an embodiment of the present invention;
FIG. 3 is a schematic view of a floor drain according to an embodiment of the present invention;
FIG. 4 is a second schematic diagram of a floor drain according to an embodiment of the present invention;
FIG. 5 is a third schematic view of a floor drain according to an embodiment of the present invention;
in the figure: 1. a ground structural layer; 2. a waterproof layer; 3. a leveling layer; 4. a bonding layer; 5. a floor drain; 6. finishing the surface of the ground; 61. finishing the first surface; 611. a channel; 62. finishing the second dough; 7. a housing body; 8. a wall surface; 9. a receiving groove; 10. a bathtub.
Detailed Description
For a further understanding of the present invention, the present invention will be described in detail with reference to the drawings and examples.
The present application is described in further detail below with reference to the drawings and examples. It is to be understood that the specific embodiments described herein are merely illustrative of the invention and are not limiting of the invention. It should be noted that, for convenience of description, only the portions related to the invention are shown in the drawings. The first, second, etc. words are provided for convenience in describing the technical scheme of the present invention, and have no specific limitation, and are all generic terms, and do not constitute limitation to the technical scheme of the present invention. It should be noted that, in the case of no conflict, the embodiments and features in the embodiments may be combined with each other. In the description of the present invention, it should be noted that the directions or positional relationships indicated by the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. are based on the directions or positional relationships shown in the drawings, are merely for convenience of describing the present invention and simplifying the description, and do not indicate or imply that the devices or elements referred to must have a specific orientation, be configured and operated in a specific orientation, and thus should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance. Unless specifically stated or limited otherwise, the terms "mounted," "connected," and "coupled" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the above terms in the present invention will be understood in specific cases by those of ordinary skill in the art. The technical schemes in the same embodiment and the technical schemes in different embodiments can be arranged and combined to form a new technical scheme without contradiction or conflict, which is within the scope of the invention.
Example 1
1-5, the embodiment provides a bathtub construction process, which comprises the following steps:
a waterproof layer 2 is coated and scraped on the ground structure layer 1;
coating a leveling layer 3 on the waterproof layer 2;
the accommodation body 7 is arranged on the leveling layer 3, and two ends of the accommodation body 7 are connected with the wall surface 8, so that the leveling layer 3, the accommodation body 7 and the wall surface 8 are enclosed into an accommodation groove 9;
a floor drain 5 is arranged at the bottom of the accommodating groove 9;
the bathtub 10 is installed in the accommodation tub 9, and the drain port of the bathtub 10 is communicated with the drain pipe.
Specifically, the waterproof layer 2 is used for preventing water from the leveling layer 3 from entering the ground structural layer 1 and preventing water from the ground structural layer 1 from entering the leveling layer 3, wherein the specific mode of coating the waterproof layer 2 is to sequentially coat 2-3 layers of polyurethane waterproof coating on the ground structural layer 1; the leveling layer 3 is used for leveling to increase flatness, wherein the leveling layer 3 is made of cement mortar and the like; the containing body 7 can ensure stability through the support of the leveling layer 3 and the wall surface 8, the containing body 7 is used for enclosing the containing groove 9 with the wall surface 8 and the leveling layer 3 and is used for containing the bathtub 10, so that the stability of the bathtub 10 is ensured; because the floor drain 5 is positioned in the accommodating groove 9, the floor drain 5 can conveniently drain water in the accommodating groove 9 in time, and water accumulation in the accommodating groove 9 is prevented, so that the screed 3, the accommodating body 7, the wall surface 8 and the like are prevented from being damaged; the bathtub 10 is accommodated by the accommodating groove 9, and water generated in the bathtub 10 is sequentially discharged through a water outlet and a water discharge pipeline of the bathtub 10; in sum, through floor drain 5 and waterproof layer 2, can effectively prevent to produce ponding in the holding tank 9, even produce ponding, waterproof layer 2 can also effectively reduce the damage degree of relevant structure.
Further, after the floor drain 5 is installed at the bottom of the accommodating groove 9, the floor finish surface 6 is paved on the leveling layer 3 in the accommodating groove 9, and the height of the floor drain 5 is lower than that of the floor finish surface 6.
Specifically, the ground finishing surface 6 can effectively increase the performances of water resistance, wear resistance and the like of the bottom of the accommodating groove 9, wherein the ground finishing surface 6 can be specifically a vitrified tile, a polished tile, a matte tile or the like; the floor drain 5 is further enabled to drain water in the accommodating groove 9 in time due to the fact that the floor drain 5 is lower than the floor finish surface 6.
Further, there is an adhesive layer 4 between the screed 3 and the floor finish 6 within the receiving groove 9.
Specifically, the bonding layer 4 can effectively increase the connection strength between the leveling layer 3 and the ground finishing surface 6 in the accommodating groove 9, and ensure the connection firmness of the leveling layer 3 and the ground finishing surface 6, wherein the bonding layer 4 can be specifically made of a polymer type ceramic tile adhesive, a common type ceramic tile adhesive or a heavy type ceramic tile adhesive.
Further, the ground finishing surface 6 includes:
a finish 61 laid on the screed 3 in the accommodating groove 9;
a second finish 62 laid on the screed 3 in the accommodating groove 9;
wherein the second finish surface 62 is enclosed outside the first finish surface 61, a channel 611 is provided in the first finish surface 61, the floor drain 5 is positioned in the channel 611, and the height of the floor drain 5 is lower than the height of the second finish surface 62.
Specifically, the first finishing surface 61 and the second finishing surface 62 are combined together to form the ground finishing surface 6, which is beneficial to ensuring the integrity of the ground finishing surface 6, and in order to further ensure the integrity of the ground finishing surface 6, the first finishing surface 61 and the second finishing surface 62 are the same in material; the channel 611 carries through the finished face one 61 and serves to accommodate the floor drain 5.
Further, the height of the finish surface one 61 is equal to the height of the finish surface two 62, and the height of the floor drain 5 is lower than the height of the finish surface one 61.
Specifically, the water on the first finishing surface 61 and the second finishing surface 62 flows into the channel 611 and then flows into the floor drain 5, so that the floor drain 5 can conveniently drain the water in the accommodating groove 9 in time, and the water accumulation in the accommodating groove 9 is effectively prevented.
Further, the height of the end of the first finishing surface 61 close to the second finishing surface 62 is higher than the height of the end of the first finishing surface 61 far from the second finishing surface 62.
Specifically, the first finish surface 61 has a certain inclination, so that water on the second finish surface 62 can pass through the first finish surface 61 and the channel 611 in sequence, finally flow into the floor drain 5, and the floor drain 5 can timely drain water in the accommodating groove 9, thereby effectively preventing water accumulation in the accommodating groove 9.
Further, the height of the finish surface one 61 is equal to the height of the floor drain 5, and the height of the finish surface one 61 is lower than the height of the finish surface two 62.
Specifically, the water on the finish surface two 62 enters the finish surface one 61, and after a certain time of residence in the finish surface one 61, the water is discharged into the channel 611 and the floor drain 5 in sequence, so that the floor drain 5 can timely discharge the water in the accommodating groove 9, and the water accumulation in the accommodating groove 9 is effectively prevented.
Further, before the bathtub 10 is mounted on the housing 7, a completion layer is laid outside the housing 7, wherein the bathtub 10 is located on the completion layer.
Specifically, the finishing layer can effectively increase the waterproof performance and the wear resistance of the accommodating body 7, wherein the finishing layer can be a vitrified tile, a polished tile, a matte tile or the like.
Further, after the bathtub 10 is mounted in the housing 7, a sealing assembly is mounted between the bathtub 10 and the housing 7.
Specifically, the sealing component can effectively prevent external water from entering the accommodating groove 9 from the gap between the bathtub 10 and the accommodating body 7, thereby reducing the drainage requirement of the floor drain 5 and ensuring the smoothness of the drainage of the floor drain 5, wherein the sealing component can be a sealing strip.
Further, after the waterproof layer 2 was applied to the floor structure layer 1, a water-blocking test was performed.
Specifically, the time of the water closing test is about 24 hours, and the time is used for judging whether the waterproof effect of the waterproof layer 2 reaches the standard.
The invention and its embodiments have been described above by way of illustration and not limitation, and the invention is illustrated in the accompanying drawings and described in the drawings in which the actual structure is not limited thereto. Therefore, if one of ordinary skill in the art is informed by this disclosure, the structural mode and the embodiments similar to the technical scheme are not creatively designed without departing from the gist of the present invention.
Claims (5)
1. A bathtub construction process, comprising:
coating a waterproof layer on the ground structure layer;
coating a leveling layer on the waterproof layer;
installing an accommodating body on the leveling layer, wherein both ends of the accommodating body are connected with the wall surface, so that the leveling layer, the accommodating body and the wall surface are surrounded to form an accommodating groove;
a floor drain is arranged at the bottom of the accommodating groove;
installing a bathtub in the accommodating groove, and communicating a water outlet of the bathtub with a water discharge pipeline;
after the floor drain is arranged at the bottom of the accommodating groove, paving a ground finishing surface on a leveling layer in the accommodating groove, wherein the height of the floor drain is lower than that of the ground finishing surface;
the ground finish comprises:
a finishing surface I paved on the leveling layer in the accommodating groove;
a second finishing surface paved on the leveling layer in the accommodating groove;
the floor drain is positioned in the channel, and the height of the floor drain is lower than that of the finishing surface II;
the floor drain comprises a floor drain body, a floor drain and a floor drain, wherein the height of the first completion surface is equal to the height of the second completion surface, the floor drain is lower than the height of the first completion surface, the height of one end of the first completion surface, which is close to the second completion surface, is higher than the height of one end of the first completion surface, which is far away from the second completion surface, or the floor drain is equal to the height of the first completion surface, and the floor drain is lower than the height of the second completion surface.
2. A bathtub construction process as claimed in claim 1, wherein said screed in said receiving groove is provided with an adhesive layer between the screed and the floor finish surface.
3. A bathtub construction process as defined in claim 1 or 2, in which a completion layer is applied outside the housing body before the bathtub is mounted on said housing body, wherein said bathtub is located on said completion layer.
4. A bathtub construction process as claimed in claim 1 or claim 2, in which, after the bathtub has been mounted in the enclosure, a sealing assembly is mounted between the bathtub and the enclosure.
5. A bath construction process according to claim 1 or claim 2 wherein the water-blocking test is performed after the waterproof layer has been applied to the floor structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210536570.7A CN114753591B (en) | 2022-05-12 | 2022-05-12 | Bathtub construction process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210536570.7A CN114753591B (en) | 2022-05-12 | 2022-05-12 | Bathtub construction process |
Publications (2)
Publication Number | Publication Date |
---|---|
CN114753591A CN114753591A (en) | 2022-07-15 |
CN114753591B true CN114753591B (en) | 2024-03-29 |
Family
ID=82335878
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210536570.7A Active CN114753591B (en) | 2022-05-12 | 2022-05-12 | Bathtub construction process |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114753591B (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006125134A (en) * | 2004-11-01 | 2006-05-18 | Inax Corp | Waterproof pan for prefabricated bath, and prefabricated bath |
CN202184661U (en) * | 2011-06-29 | 2012-04-11 | 广州贝泰卫浴用品有限公司 | Independent straight-tube type bathtub |
CN203000708U (en) * | 2012-12-07 | 2013-06-19 | 安平县冀星卫浴制品有限公司 | Skirt rim double-deck bathtub |
CN106821083A (en) * | 2017-03-27 | 2017-06-13 | 金螳螂精装科技(苏州)有限公司 | Waterproof construction is installed by toilet bathtub basic unit |
CN215127762U (en) * | 2021-04-06 | 2021-12-14 | 东易日盛家居装饰集团股份有限公司 | Embedded bathtub |
-
2022
- 2022-05-12 CN CN202210536570.7A patent/CN114753591B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006125134A (en) * | 2004-11-01 | 2006-05-18 | Inax Corp | Waterproof pan for prefabricated bath, and prefabricated bath |
CN202184661U (en) * | 2011-06-29 | 2012-04-11 | 广州贝泰卫浴用品有限公司 | Independent straight-tube type bathtub |
CN203000708U (en) * | 2012-12-07 | 2013-06-19 | 安平县冀星卫浴制品有限公司 | Skirt rim double-deck bathtub |
CN106821083A (en) * | 2017-03-27 | 2017-06-13 | 金螳螂精装科技(苏州)有限公司 | Waterproof construction is installed by toilet bathtub basic unit |
CN215127762U (en) * | 2021-04-06 | 2021-12-14 | 东易日盛家居装饰集团股份有限公司 | Embedded bathtub |
Also Published As
Publication number | Publication date |
---|---|
CN114753591A (en) | 2022-07-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7490371B2 (en) | Shower receptor | |
CN114753591B (en) | Bathtub construction process | |
WO2019075995A1 (en) | Bathroom | |
CN107237395B (en) | Modularized same-floor drainage device for high-rise building and installation method thereof | |
CN210887906U (en) | Caisson formula bathroom floor antiseep structure | |
CN109864644B (en) | Bathroom shower room chassis and construction method thereof | |
CN217399823U (en) | Indoor appliance drainage connecting disc | |
CN207646973U (en) | A kind of vacation wall heel row formula co-layer draining waterproof system and the building including the system | |
CN214220002U (en) | Waterproof chassis of integrated bathroom of assembled | |
CN211080295U (en) | Window well waterproof structure with basement bottom plate being flush | |
CN114856259B (en) | Shower room construction process | |
CN207499072U (en) | toilet | |
CN206554180U (en) | A kind of integrated water-proof chassis of toilet pipeline | |
KR200431681Y1 (en) | Panel Waterproof | |
CN208917976U (en) | A kind of no ponding drainage system | |
CN110984308A (en) | Anti-leakage process for removing deposited water in toilet | |
CN220747184U (en) | Shower room drainage structure | |
CN216640692U (en) | Anti-leakage structure layer for basement side wall leakage repairing construction | |
KR100918448B1 (en) | Bathroom water valve box | |
CN109487864A (en) | A kind of architectural engineering basement anti-leakage structure | |
CN215519264U (en) | Waterproof layer structure of toilet | |
CN113585438B (en) | Kitchen drainage construction method | |
CN204531282U (en) | Leakproof washroom base plate | |
CN219974012U (en) | Assembled bathroom | |
CN216195544U (en) | Assembled construction integrated bathroom |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |