CN113585438B - Kitchen drainage construction method - Google Patents
Kitchen drainage construction method Download PDFInfo
- Publication number
- CN113585438B CN113585438B CN202110953183.9A CN202110953183A CN113585438B CN 113585438 B CN113585438 B CN 113585438B CN 202110953183 A CN202110953183 A CN 202110953183A CN 113585438 B CN113585438 B CN 113585438B
- Authority
- CN
- China
- Prior art keywords
- drainage
- layer
- trench
- floor
- stainless steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
- E03F5/04—Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
- E03F5/04—Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
- E03F5/06—Gully gratings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/66—Sealings
- E04B1/665—Sheets or foils impervious to water and water vapor
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/60—Planning or developing urban green infrastructure
Abstract
The invention provides a kitchen drainage construction method, which relates to the technical field of building drainage construction and comprises the following steps: s1, laying a first waterproof layer on the surface of a structural floor slab, and forming a sinking drainage part on the first waterproof layer; s2, arranging a drainage trench on the sunken drainage part, wherein the drainage trench is communicated with a drainage port of the structural floor slab; s3, paving a floor brick layer on two outer sides of the drainage trench respectively; s4, arranging seepage seams at intervals of one or more floor tiles in the floor tile layer; s5, arranging drainage channels between the floor brick layer and the outer walls of the two sides of the drainage trench; s6, communicating the seepage seam with a drainage groove, and communicating the drainage groove with a drainage outlet; the invention can dredge the seepage water of the waterproof construction layer under the ground seepage and guide the seepage water to the drainage outlet on the basis of keeping all functions of the traditional drainage system, thereby avoiding the accumulation of the seepage water in the underground cavity, effectively preventing the ground of the kitchen from being corroded, collapsed and the like, and effectively ensuring the service life of the drainage engineering.
Description
Technical Field
The invention relates to the technical field of building drainage construction, in particular to a kitchen drainage construction method.
Background
In special areas with large drainage quantity and wide drainage area, such as restaurants, the drainage structures of the prior buildings are all used for drainage by building a trench, and in addition, a grate is arranged on the trench to filter sundries.
The defects of the prior art are that although the ground is subjected to waterproof and anti-seepage treatment through tiles and the like, kitchen residual water on the ground still leaks to the underground due to construction careless leakage or use loss, and is accumulated in an underground cavity, so that the ground is corroded for a long time, the ground sinks, pits are formed, and the water leakage effect of a slope layer is influenced.
Disclosure of Invention
The invention aims to provide a kitchen drainage construction method, which can dredge and guide the seepage water leaked from the ground into a construction layer to a drainage outlet instead of accumulating in an underground cavity, and effectively prevent the ground from being corroded, collapsed and the like.
The invention provides a kitchen drainage construction method, which comprises the following steps:
s1, paving a first waterproof layer on the surface of a structural floor slab, and forming a sunken drainage part on the first waterproof layer;
s2, arranging a drainage trench on the sunken drainage part, wherein the drainage trench is communicated with a drainage port of the structural floor slab;
s3, paving floor brick layers on two outer sides of the drainage trench respectively;
s4, seepage seams are arranged at intervals of one or more floor tiles in the floor tile layer;
s5, arranging a drainage channel between the floor brick layer and the outer walls of the two sides of the drainage trench;
s6, the seepage seams are communicated with the drainage grooves, and the drainage grooves are communicated with the drainage outlets.
Further, in S1, the method further includes the following steps:
s1.1, paving a cement mortar slope-finding layer on the surface of the structural floor slab;
s1.2, paving the first waterproof layer on the cement mortar slope layer;
and S1.3, paving a cement mortar protective layer on the first waterproof layer.
Further, in S2, the method further includes the following steps:
s2.1, the drainage trench is a prefabricated finished stainless steel trench;
s2.2, fixedly connecting stainless steel supporting legs to the outer sides of two ends of the stainless steel trench respectively, and arranging stainless steel backing plates at the bottoms of the stainless steel supporting legs;
s2.3, filling expansion cement between the bottom of the stainless steel trench and the structural floor slab;
s2.4, arranging a stainless steel grate at the top of the stainless steel trench;
s2.5, a lower water filtering barrel penetrates through the bottom of the stainless steel trench and is inserted into the drainage port.
Further, in S4, the method further includes the following steps:
s4.1, fixedly connecting a plurality of vertical fixed side plates to two sides of the drainage trench respectively;
s4.2, fixing angle steels are fixedly connected to the vertical fixing side plates respectively;
s4.3, inserting the first plane of the fixed angle steel downwards into the brick joints of the floor brick layer.
Further, the method also comprises the following steps:
s7, laying a second waterproof layer on the top of the floor tile layer;
and S8, paving a tile layer on the second waterproof layer.
Further, in S7, the method further includes the following steps:
s7.1, laying a perforated plate on the floor tile layer, wherein one side of the perforated plate is attached to the outer wall of the drainage trench, and the bottom surface of the perforated plate is fixedly connected with the second plane of the fixed angle steel;
s7.2, a water guide pipe penetrates through the perforated plate and is located above the water drainage groove.
Further, in S7, the method further includes the following steps:
s7.3, paving a reinforcing mesh on the perforated plate;
and S7.4, pouring a concrete layer on the steel bar net, and paving the second waterproof layer on the concrete layer.
Further, in S7, the method further includes the following steps:
s7.5, filling a ceramsite backfill layer on one side of the floor brick layer, which is far away from the drainage trench;
and S7.6, arranging an anti-blocking net between the floor brick layer and the ceramsite backfill layer.
Further, in S4.3, the method further includes the following steps:
s4.3.1, the floor tile layer comprises at least two layers of floor tiles, and the first plane of the fixed angle steel is inserted into a brick joint of the floor tiles on the top layer of the floor tile layer.
Further, the method also comprises the following steps:
and S9, filling sealant between the tile layer and the outer edge of the drainage trench.
According to the technical scheme, the drainage grooves are formed in the two outer sides of the traditional drainage trench, the seepage seams are reserved in the floor tiles, plugging can be changed into dredging on the basis of keeping all functions of the traditional drainage system, seepage water of a waterproof construction layer under ground seepage is dredged and guided to be discharged to a drainage outlet, the seepage water is prevented from accumulating in an underground cavity, the situations of corrosion, collapse and the like of the ground of a kitchen are effectively prevented, and the service life of drainage engineering is effectively guaranteed.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the embodiments or the prior art descriptions will be briefly described below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and other drawings can be obtained by those skilled in the art without creative efforts.
FIG. 1 is a schematic structural view of example 1 of the present invention;
FIG. 2 is a schematic structural diagram of example 2 of the present invention;
FIG. 3 is an enlarged view of a portion of FIG. 2 in accordance with the present invention;
FIG. 4 is a schematic view of a prefabricated stainless steel trench of the present invention;
FIG. 5 is a cross-sectional view of a drain opening according to the present invention;
FIG. 6 is a cross-sectional view of a non-drainage port of the present invention;
FIG. 7 is an enlarged view of a portion of FIG. 6 of the present invention;
description of reference numerals:
1-structural floor slab, 2-first waterproof layer, 201-sunken drainage part, 3-drainage trench, 4-drainage port, 5-floor brick layer, 501-floor brick, 6-seepage seam, 7-drainage groove, 8-cement mortar slope layer, 9-cement mortar protective layer, 10-stainless steel trench, 11-stainless steel supporting leg, 12-stainless steel backing plate, 13-expansion cement, 14-stainless steel grate, 15-drainage filter barrel, 16-vertical fixed side plate, 17-fixed angle steel, 18-second waterproof layer, 19-tile layer, 20-concrete layer, 21-perforated plate, 22-water guide pipe, 23-ceramsite backfill layer, 24-anti-blocking net, 25-reinforcing mesh and 26-sealant.
Detailed Description
The technical solutions of the present invention will be described clearly and completely with reference to the following embodiments, and it should be apparent that the described embodiments are some, but not all, embodiments of the present invention. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", and the like, indicate orientations and positional relationships based on those shown in the drawings, and are used only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be considered as limiting the present invention.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, features defined as "first", "second", may explicitly or implicitly include one or more of the described features. In the description of the present invention, "a plurality" means two or more unless specifically defined otherwise. Furthermore, the terms "mounted," "connected," and "connected" are to be construed broadly and may, for example, be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood in a specific case to those of ordinary skill in the art.
Example 1
As shown in FIG. 1, the invention provides a kitchen drainage construction method, comprising the following steps:
s1, paving a first waterproof layer 2 on the surface of a structural floor slab 1, and forming a sunken drainage part 201 on the first waterproof layer; s2, arranging a drainage trench 3 on the sunken drainage part 201, wherein the drainage trench 3 is communicated with a drainage port 4 of the structural floor slab 1; s3, paving a floor brick layer 5 on two outer sides of the drainage trench 3 respectively; s4, arranging seepage seams 6 at intervals of one or more floor tiles 501 in the floor tile layer 5; s5, arranging a drainage channel 7 between the floor brick layer 5 and the outer walls of the two sides of the drainage trench 3; and S6, communicating the seepage seam 6 with a drainage groove 7, and communicating the drainage groove 7 with the drainage port 4.
Specifically, in S1, the first waterproof layer 2 may be a combination of two polypropylene layers, which is paved on the whole surface of the waterproof construction to prevent water from permeating into the structural floor 1, and when the first waterproof layer 2 is paved, a sunken drainage portion 201 is simultaneously formed, the sunken drainage portion 201 is a long groove and is wider than the drainage trench 3, so that when the drainage trench 3 is installed in the sunken drainage portion 201, drainage grooves 7 are formed on two sides of the bottom of the drainage trench 3, i.e., the two sides of the bottom of the sunken drainage portion 201 and the side walls of the sunken drainage portion 201; the floor brick layer 5 is laid on both sides of the sunken drainage part 201; in S2, the drainage trench 3 is communicated with the drainage port 4, and it should be understood that the flowing water in the drainage trench 3 can smoothly flow to the drainage port 4 to be drained, specifically, the flowing water can be connected through a pipeline, or the flowing water can be drained by setting the slope of the drainage trench 3; in S3, the floor tile layer 5 is formed by building brick blocks in a combined mode, the floor tile layer 5 can increase the height of the ground, the whole ground is flush with the drainage trench 3, ground water can flow to the drainage trench 3, and it should be noted that the upper surface of the floor tile layer 5 can be closed by laying tiles; in S4, for example, in the floor tile layer 5, a gap of 20mm is reserved for every 1 (or 4, etc.) tile, and cement mortar is not used for filling, so that the gap is a seepage gap 6, and water seeping into the floor tile layer 5 from the ground can flow into the drainage channel 7 from the seepage gap 6 and cannot be accumulated in the floor tile layer 5; in S5, the drainage channel 7 can be a U-shaped channel additionally arranged along with the drainage trench 3; or the sunken drainage part 201 is utilized, specifically, when the floor brick layer 5 is laid, the floor brick layer 5 is not in direct contact with the outer side wall of the drainage trench 3, but a certain distance is reserved, so that a partial cavity is formed between the whole floor brick layer 5 and the outer wall of the drainage trench 3, the bottom of the cavity is the sunken drainage part 201, namely, the outer wall of the drainage trench 3 and the floor brick layer 5 are used as the side wall of the drainage groove 7, and the sunken drainage part 201 is used as the bottom surface of the drainage groove 7; in S6, the seepage seam 6 is communicated with a drainage groove 7, and the drainage groove 7 is communicated with the drainage port 4, wherein the communication is understood as connection through a pipeline or natural flow guide through gradient; it should be noted that on the structural floor 1, two separate drainage openings 4 may be provided depending on the position of the two drainage channels 7 (left and right), and are dedicated to the drainage of seepage water, without using the same drainage opening 4 as the drainage trench 3.
Example 2
As shown in fig. 2 and 3, the present embodiment 2 is a more specific technical solution performed based on the embodiment 1.
In S1, the method also comprises the following steps: s1.1, paving a cement mortar slope finding layer 8 on the surface of a structural floor slab 1; s1.2, paving a first waterproof layer 2 on the cement mortar slope layer 8; s1.3, paving a cement mortar protective layer 9 on the first waterproof layer 2.
Specifically, before first waterproof layer 2 is laid on the surface of structural floor slab 1, cement mortar is fully laid first and is looked for slope layer 8, carries out gentle slope construction to whole ground, and cement mortar protective layer 9 is laid to the upper surface of first waterproof layer 2 and comes the protection to first waterproof layer 2, can effectively prolong first waterproof layer 2's life.
As shown in fig. 4, S2 further includes the following steps: s2.1, the drainage trench 3 is a prefabricated finished stainless steel trench 10; s2.2, fixedly connecting stainless steel supporting legs 11 to the outer sides of two ends of the stainless steel trench 10 respectively, and arranging stainless steel backing plates 12 at the bottoms of the stainless steel supporting legs 11; s2.3, filling expansion cement 13 between the bottom of the stainless steel trench 10 and the structural floor slab 1; s2.4, arranging a stainless steel grate 14 at the top of the stainless steel trench 10; s2.5, a lower water filtering barrel 15 penetrates through the bottom of the stainless steel trench 10, and the lower water filtering barrel 15 is inserted into the water outlet 4.
Specifically, in the step S2.1, the drainage trench 3 adopts a finished product assembling mode, the stainless steel trench 10 is an integrally formed U-shaped water tank, and two L-shaped outer edges extend outwards from two sides of an opening on the top surface, and are used for installing the stainless steel grate 14 in the step S2.4; in S2.2, the stainless steel supporting legs 11 are finished prefabricated parts, and the stainless steel backing plates 12 (100 x 5 mm) are fixedly connected (welded) with the stainless steel supporting legs 11, so that the stainless steel trench 10 can be stable, and the fixing box of the stainless steel trench 10 can be conveniently leveled; in S2.3, the expansive cement 13 is 1; s2.5, the lower water filtering barrel 15 is made of stainless steel punched holes, a plurality of holes are formed in the surface of the lower water filtering barrel, a reserved gap is inserted into the water outlet 4, flowing water in the stainless steel trench 10 is discharged through the holes, impurities are blocked, the water outlet 4 is prevented from being blocked, and the stainless steel grate 14 is taken out of the lower water filtering barrel 15 to be cleaned during cleaning.
As shown in fig. 4, S4 further includes the following steps: s4.1, fixedly connecting a plurality of vertical fixed side plates 16 to two sides of the drainage trench 3 respectively; s4.2, fixedly connecting fixed angle steels 17 to the vertical fixed side plates 16 respectively; and S4.3, the second plane of the fixed angle steel 17 is parallel to the floor tile layer 5, and the first plane of the fixed angle steel 17 is perpendicular to the floor tile layer 5 and is downwards inserted into the brick joints of the floor tile layer 5.
Specifically, in S4.1, the vertical fixed side plates 16 are fixedly connected (welded) with the outer walls of the two sides of the drainage trench 3, and the distance between every two vertical fixed side plates 16 is 500mm; in S4.2, the fixed angle steel 17 is horizontally level with the vertical fixed side plate 16; in S4.3, the first plane of fixed angle steel 17 inserts in the brickwork joint, and drainage trench 3 improves drainage trench 3' S stability through fixed angle steel 17 and the indirect fixed connection of ceramic tile layer 5 promptly, prevents effectively that drainage trench 3 is not hard up, and fixed angle steel 17 specifically is 40 × 4mm hot-galvanize angle steel of length 600 mm.
As shown in fig. 5 and 6, S7, laying a second waterproof layer 18 on top of the floor tile layer 5; and S8, paving a tile layer 19 on the second waterproof layer 18.
Specifically, the second waterproof layer 18 is selectively coated with a JS waterproof layer with the thickness of 1.5mm, and 3 dry and hard cement mortars with the thickness of 35mm and 1 are paved on the upper surface of the second waterproof layer 18 to prevent water diversion and leakage of the tile layer 19.
As shown in fig. 5, 6 and 7, S7 further includes the following steps: s7.1, arranging a concrete layer 20 between the top of the floor tile layer 5 and the second waterproof layer 18; s7.2, arranging a perforated plate 21 between the top of the floor tile layer 5 and the concrete layer 20, wherein one side of the perforated plate 21 is attached to the outer wall of the drainage trench 3, and the bottom surface of the perforated plate 21 is fixedly connected with the second plane of the fixed angle steel 17; and S7.3, a water guide pipe 22 penetrates through the perforated plate 21, the top end of the water guide pipe 22 is located between the second waterproof layer 18 and the outer wall of the drainage trench 3, and the bottom end of the water guide pipe 22 is located between the floor tile layer 5 and the outer wall of the drainage trench 3.
Specifically, in S7.1, before the second waterproof layer 18 is coated, a 45mm thick pea concrete layer 20 is integrally formed on the upper surface of the floor tile layer 5 and is leveled; in S7.2, the perforated plate 21 is a prefabricated finished part with a thickness of 1mm and a width of 600mm, and is preferably formed by steel punching (although other materials may be fixed as long as the second plane of the fixed angle steel 17), and the aperture is 4mm; in S7.3, since there is a gap between the floor tile layer 5 and the outer wall of the drainage trench 3, but the perforated plate 21 is attached to the outer wall of the drainage trench 3, a part of the perforated plate 21 near the drainage trench 3 is suspended, and a water conduit 22 (with a diameter of 10mm, placed every 500 mm) is provided on the part of the perforated plate 21 in a penetrating manner for guiding the running water flowing down from the tile layer 19 into the drainage channel 7, it should be noted that the lower end of the water conduit 22 penetrates through the perforated plate 21 and the upper end thereof is at the same height as the second waterproof layer 18 to be manufactured (one section may be reserved before tiling), and the upper opening of the water conduit 22 cannot exceed the outermost edge of the drainage trench 3 to prevent tiling and covering.
As shown in fig. 5 and 6, S7 further includes the following steps: s7.4, filling a ceramsite backfill layer 23 on one side of the floor brick layer 5, which is far away from the drainage trench 3; s7.5, arranging an anti-blocking net 24 between the floor tile layer 5 and the ceramsite backfill layer 23.
Specifically, in S7.4, the ceramsite is filled in the part which cannot be covered by the whole floor brick layer 5, and when water flows into the inside of the ceramsite, the water can flow to the seepage seams 6 of the floor brick layer 5 along the gaps among the ceramsite and further flow to the drainage grooves 7; s7.5, the anti-blocking net 24 is used for preventing the ceramic particles from entering the seepage gaps 6 to block the seepage gaps 6; it should be noted that the ceramsite is as high as the floor tile layer 5, and the concrete layer 20 is laid on the top surface, so that 4mm reinforcing mesh 25 pieces are laid on the top of the ceramsite, the stability of the concrete is increased, and the ceramic tile can be prevented from being damaged due to uneven sinking of the ceramic tile base layers on the two sides of the water tank.
S7.2, the method also comprises the following steps: s7.2.1, and a reinforcing mesh 25 is laid between the perforated plate 21 and the concrete layer 20.
Specifically, the reinforcing mesh 25 pieces increase the stability of concrete, and can avoid the uneven sinking of the ceramic tile base layers on the two sides of the water tank to damage the ceramic tiles.
S4.3, the method also comprises the following steps: s4.3.1, the floor tile layer 5 comprises at least two layers of floor tiles 501, the seepage seams 6 are arranged between the bottom floor tiles 501 of the floor tile layer 5, and the first planes of the fixed angle steels 17 are inserted into the brick seams of the top floor tiles 501 of the floor tile layer 5.
Specifically, 60mm of space (a drainage groove 7) is reserved on two sides of the drainage trench 3, then two layers of 240 red bricks are built, the short narrow surfaces of the red bricks are horizontally placed opposite to the trench, 20mm of natural seams are reserved every four red bricks on the lower layer, cement mortar is not filled in the natural seams, 10mm of natural seams are reserved in the middle of each red brick on the upper layer, and the natural seams are used as seepage seams 6 to meet the flowing water requirement; the first plane of the fixing angle steel 17 is inserted into the gap between the red bricks on the upper layer and is used for fixing the whole drainage ditch 3.
And S9, the tile layer 19 is flush with the top of the drainage ditch 3, and sealant 26 is filled between the tile layer 19 and the outer edge of the drainage ditch 3.
Specifically, gaps of 6mm are reserved between the edges of the two sides of the top of the drainage trench 3 and the ceramic tiles, and flexible weather-resistant sealant 26 is filled in the gaps to reduce the amount of underground seepage of the ground.
The concrete process of the construction method for draining water is that the first drainage route flows into the drainage trench 3 from the ceramic tile ground and then flows into the drainage outlet 4 for drainage; the second drainage route penetrates into the floor 5 under the tiles from the tile floor, flows into the drainage channel 7 through the flow guide pipe or the seepage seam 6, and further flows into the drainage outlet 4 to be discharged.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solution of the present invention, and not to limit the same; while the invention has been described in detail and with reference to the foregoing embodiments, it will be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some or all of the technical features may be equivalently replaced; and the modifications or the substitutions do not make the essence of the corresponding technical solutions depart from the scope of the technical solutions of the embodiments of the present invention.
Claims (8)
1. A kitchen drainage construction method is characterized by comprising the following steps:
s1, paving a first waterproof layer on the surface of a structural floor slab, and forming a sunken drainage part on the first waterproof layer;
s2, arranging a drainage trench on the sunken drainage part, wherein the drainage trench is communicated with a drainage port of the structural floor slab;
s3, paving floor brick layers on two outer sides of the drainage trench respectively;
s4, arranging seepage seams at intervals of one or more floor tiles in the floor tile layer;
s5, arranging a drainage channel between the floor brick layer and the outer walls of the two sides of the drainage trench;
s6, the seepage seam is communicated with the drainage groove, and the drainage groove is communicated with the drainage port;
s7, laying a second waterproof layer on the top of the floor brick layer, and specifically comprising:
s7.1, laying a perforated plate on the floor tile layer, wherein one side of the perforated plate is attached to the outer wall of the drainage trench; s7.2, a water guide pipe penetrates through the perforated plate and is positioned above the drainage groove; s7.3, paving a reinforcing mesh on the perforated plate; s7.4, pouring a concrete layer on the steel bar net, and paving the second waterproof layer on the concrete layer;
and S8, paving a tile layer on the second waterproof layer.
2. The kitchen drainage construction method according to claim 1, wherein the step S1 further includes:
s1.1, paving a cement mortar slope-finding layer on the surface of the structural floor slab;
s1.2, paving the first waterproof layer on the cement mortar slope finding layer;
and S1.3, paving a cement mortar protective layer on the first waterproof layer.
3. The kitchen drainage construction method according to claim 1, wherein the step S2 further comprises the steps of:
s2.1, the drainage trench is a prefabricated finished stainless steel trench;
s2.2, fixedly connecting stainless steel supporting legs to the outer sides of two ends of the stainless steel trench respectively, and arranging stainless steel backing plates at the bottoms of the stainless steel supporting legs;
s2.3, filling expansion cement between the bottom of the stainless steel trench and the structural floor slab;
s2.4, arranging a stainless steel grate at the top of the stainless steel trench;
s2.5, a lower water filtering barrel penetrates through the bottom of the stainless steel trench and is inserted into the drainage port.
4. The kitchen drainage construction method according to claim 1, wherein the step S4 further includes:
s4.1, fixedly connecting a plurality of vertical fixed side plates to two sides of the drainage trench respectively;
s4.2, fixing angle steels are fixedly connected to the vertical fixing side plates respectively;
s4.3, inserting the first plane of the fixed angle steel downwards into the brick joints of the floor brick layer.
5. The kitchen drainage construction method according to claim 4, wherein the step S7 further includes the steps of: the bottom surface of the perforated plate is fixedly connected with the second plane of the fixed angle steel.
6. The kitchen drainage construction method according to claim 1, wherein the step S7 further includes the steps of:
s7.5, filling a ceramsite backfill layer on one side of the floor brick layer, which is far away from the drainage trench;
and S7.6, arranging an anti-blocking net between the floor brick layer and the ceramsite backfill layer.
7. The kitchen drainage construction method according to claim 4, wherein in S4.3, the method further comprises the steps of:
s4.3.1, the floor tile layer comprises at least two layers of floor tiles, and the first plane of the fixed angle steel is inserted into a brick joint of the floor tiles on the top layer of the floor tile layer.
8. The kitchen drainage construction method as claimed in claim 1, further comprising the steps of:
and S9, filling sealant between the tile layer and the outer edge of the drainage trench.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110953183.9A CN113585438B (en) | 2021-08-19 | 2021-08-19 | Kitchen drainage construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110953183.9A CN113585438B (en) | 2021-08-19 | 2021-08-19 | Kitchen drainage construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN113585438A CN113585438A (en) | 2021-11-02 |
CN113585438B true CN113585438B (en) | 2023-01-31 |
Family
ID=78238297
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110953183.9A Active CN113585438B (en) | 2021-08-19 | 2021-08-19 | Kitchen drainage construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113585438B (en) |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202706064U (en) * | 2012-06-12 | 2013-01-30 | 浙江城建建设集团有限公司 | Basement and semi-basement waterproof structure |
KR101696908B1 (en) * | 2016-02-29 | 2017-01-17 | 삼창엔지니어링(주) | Leakage prevention method and apparatus of underground parking lot |
CN207176870U (en) * | 2017-06-02 | 2018-04-03 | 华中威特(大连)科技有限公司 | Drain pipe connecting structure |
CN210288585U (en) * | 2019-04-30 | 2020-04-10 | 三明学院 | Be applied to waterproof drainage structures in bathroom |
CN110080353A (en) * | 2019-05-16 | 2019-08-02 | 中国一冶集团有限公司 | A kind of anti-ponding discharge structure in toilet |
CN111305400A (en) * | 2020-04-01 | 2020-06-19 | 重庆竹蜻蜓商贸有限公司 | Backfill drainage structure of integral toilet and implementation process of backfill drainage structure |
CN212984124U (en) * | 2020-05-28 | 2021-04-16 | 深圳时代装饰股份有限公司 | Kitchen drainage ground structure |
-
2021
- 2021-08-19 CN CN202110953183.9A patent/CN113585438B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN113585438A (en) | 2021-11-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207512745U (en) | A kind of caisson device and its foundation pit structure | |
CN111691467B (en) | Construction method for basement water prevention and drainage combination | |
CN109488371B (en) | Waterproof system of full-enclosed waterproof station and dynamic setting and quantity-limiting drainage method | |
EP2811075A1 (en) | Tunnel drainage arrangement | |
CN112538989A (en) | Integrated bathroom of ready-package assembled | |
CN110777856A (en) | Back water-proof structure of basement bottom plate and construction method thereof | |
CN113585438B (en) | Kitchen drainage construction method | |
CN113833021A (en) | Waterproof drainage facility for underground building engineering and construction process thereof | |
CN103410318A (en) | Construction method for preventing leakage of restroom tubular well | |
CN215406460U (en) | Kitchen drainage structure | |
CN107740708A (en) | A kind of constructing structure and its construction method of tunnel arch wall pin anti-seep water | |
CN210151748U (en) | Foundation pit water collection surface drainage dewatering system | |
CN216865222U (en) | Bearing platform foundation structure | |
KR20090029531A (en) | Underground water catchment and drainage of lower part basement | |
CN111058467B (en) | Basement backwater surface waterproof drainage structure and construction method | |
CN112942432A (en) | Construction method of anti-leakage brick inspection well | |
CN210288282U (en) | Prefabricated ditch | |
CN110805113A (en) | Construction method of basement roof outer side drainage ditch | |
CN111441367A (en) | Strong permeable stratum bottom sealing concrete separate-bin pouring structure and construction method | |
CN111075228A (en) | Sink built on stilts water absorption formula prefabricated plate lavatory in pond | |
CN218643404U (en) | Hidden drainage structure for basement | |
CN216920471U (en) | Waterproof structure of post-cast strip of basement bottom plate | |
CN117230902B (en) | Basement outer wall seepage prevention structure | |
CN211547829U (en) | Waterproof structure of basement coincide wall | |
CN217460670U (en) | Subway station plate wall structure for staged construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |