CN114750878A - Long room of sailor and boats and ships - Google Patents

Long room of sailor and boats and ships Download PDF

Info

Publication number
CN114750878A
CN114750878A CN202210362309.XA CN202210362309A CN114750878A CN 114750878 A CN114750878 A CN 114750878A CN 202210362309 A CN202210362309 A CN 202210362309A CN 114750878 A CN114750878 A CN 114750878A
Authority
CN
China
Prior art keywords
platform
chamber
sailor
long
floating platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210362309.XA
Other languages
Chinese (zh)
Inventor
马丹
任平
首志平
何建晖
张丹丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Shipyard International Co Ltd
Original Assignee
Guangzhou Shipyard International Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Shipyard International Co Ltd filed Critical Guangzhou Shipyard International Co Ltd
Priority to CN202210362309.XA priority Critical patent/CN114750878A/en
Publication of CN114750878A publication Critical patent/CN114750878A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B29/00Accommodation for crew or passengers not otherwise provided for
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B29/00Accommodation for crew or passengers not otherwise provided for
    • B63B29/20Arrangements or adaptations of ladders

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Ladders (AREA)

Abstract

The invention relates to the technical field of ship construction, in particular to a sailor chamber and a ship. The top of the long water basin chamber is provided with an inlet communicated with the main deck, and the inner wall of the long water basin chamber is provided with a manhole communicated with the chain locker. The long water hand chamber comprises a first floating platform, a first inclined ladder, a second inclined ladder and a second floating platform, wherein the first floating platform is arranged on the front wall of the long water hand chamber and divides the long water hand chamber into a compound cabin. One end of the first inclined ladder is lapped on the inlet of the long water hand chamber, and the other end of the first inclined ladder is lapped on the first floating platform. One end of the second inclined ladder is lapped on the bottom deck of the sailor chamber, and the other end of the second inclined ladder is lapped on the first floating platform. The second platform that wafts sets up in the back wall of the long room of sailor and is located the below of manhole to waft the platform through the second and get into the manhole, the first platform that wafts links to each other with the second platform that wafts. The ship comprises the long water hand chamber, so that personnel can safely and conveniently reach the bottom deck and the manhole of the long water hand chamber, the internal layout of the long water hand chamber is optimized, and the internal space utilization rate of the long water hand chamber is improved.

Description

Long room of sailor and boats and ships
Technical Field
The invention relates to the technical field of ship construction, in particular to a sailor chamber and a ship.
Background
As shown in fig. 1, in the outfitting of the conventional marine vessel's sailor's trunk 10 ', an inclined ladder passage 2 ' is provided to the main deck 20 '. For comfort and safety of passage, the angle of the ramp channel 2' generally does not exceed 55 °. In addition, the bottom deck of the longeron 10 'is provided with shelves, cable storage areas, drop ports, hydraulic power unit 3', manholes 1 'leading to chain locker, etc., so that the longeron 10' is required to have a sufficiently large space.
With the continuous optimization of the ship type, the area of the long room 10 'of the sailor is continuously extruded, the height is gradually increased to six meters from about three meters, the manhole 1' is positioned at the position of the long room 10 'of the sailor close to the top of the long room, and personnel can climb to the position of the manhole 1' by the vertical ladder 4 'from the bottom deck of the long room 10' of the sailor and then enter the chain locker through the manhole 1 ', so that the distance from the long room 10' of the sailor to the chain locker is longer and the safety is lower. Meanwhile, due to the increase in the height of the hydroturbine parlor 10 ', the inclined ladder channel 2 ' is difficult to extend from the main deck 20 ' into the bilge deck of the hydroturbine parlor 10 ', and is easy to interfere with the hydraulic pump station 3 '. In addition, the bottom deck of the sailor chamber 10' is severely insufficient in storage space due to linear shrinkage of the outer plates, and cannot meet the requirements for placement and installation of outfitting equipment (shelves and the like).
Therefore, a long water closet and a ship are needed to solve the above problems.
Disclosure of Invention
The invention aims to provide a sailor chamber and a ship, so that the sailor chamber and a manhole can be safely and conveniently accessed, the internal layout of the sailor chamber is optimized, and the internal space utilization rate of the sailor chamber is improved.
In order to achieve the purpose, the technical scheme adopted by the invention is as follows:
the top of the long water basin is provided with an inlet communicated with a main deck, and the inner wall of the long water basin is provided with a manhole communicated with a chain locker; the long room of sailor includes:
the first floating platform is arranged on the front wall of the long water dispenser chamber and divides the long water dispenser chamber into a duplex cabin;
one end of the first inclined ladder is lapped on the inlet of the long water hand chamber, and the other end of the first inclined ladder is lapped on the first floating platform; one end of the second inclined ladder is lapped on the bottom deck of the sailor chamber, and the other end of the second inclined ladder is lapped on the first floating platform; and
the second platform that wafts, set up in the back wall of the longshoring room of sailor is located the below of manhole, in order to pass through the second platform that wafts gets into the manhole, the first platform that wafts with the second platform that wafts links to each other.
Preferably, the long water-holding chamber is positioned at the bow part of the ship, and an outer plate aggregate of the bow part horizontally extends inwards to form the first floating platform; and the horizontal truss of the rear wall of the sailor chamber extends inwards horizontally to form the second floating platform.
Preferably, the first floating platform is located at the middle position of the long water hand chamber along the height direction of the long water hand chamber.
Preferably, the length of the horizontal girder along the length direction of the ship is 1350mm, and the horizontal girder extends to two sides along the width direction of the ship.
Preferably, the long room of said sailor further comprises:
and the two ends of the outfitting platform are respectively connected with the edge of the first floating platform and the edge of the second floating platform.
As a preferred scheme, the height of the first floating platform is lower than that of the second floating platform, the outfitting platform is horizontally installed between the first floating platform and the second floating platform, the upper surface of the outfitting platform is flush with the second floating platform, and the bottom of the outfitting platform is arranged on the first floating platform.
Preferably, the second inclined ladder and one end of the outfitting platform are arranged on the outer edge of the first floating platform side by side.
Preferably, the long water hand chamber further comprises:
the bottom deck of the sailor chamber and the first floating platform are all provided with a plurality of the shelves.
As a preferred scheme, a hydraulic pump station is arranged on a bottom deck of the long water hand chamber, a hanging opening is further formed in the inner wall of the long water hand chamber, and the hydraulic pump station moves in or out of the long water hand chamber through the hanging opening;
the bottom of the first floating platform is provided with a hoisting eye plate, and the hydraulic pump station is hoisted to or lifted away from the object hoisting port through the hoisting eye plate.
A ship comprises the sailor chamber.
The beneficial effects of the invention are as follows:
according to the long water-jacket room provided by the invention, the first floating platform can be used as a conversion platform of the first inclined ladder and the second inclined ladder and also can be used as a rest platform of personnel, so that the personnel can safely and conveniently reach the bottom deck of the long water-jacket room through the first inclined ladder, the first floating platform and the second inclined ladder. Meanwhile, the first floating platform is connected with the second floating platform, so that personnel can safely and conveniently arrive at the manhole through the first floating platform and the second floating platform in sequence and then enter the anchor chain cabin. In addition, deposit shelf and hawser etc. in the first platform that wafts, increased the first storage function that wafts the platform, improved the first utilization ratio that wafts the platform, the first platform that wafts separates the long room of sailor into double entry cabin, has optimized the inside overall arrangement of the long room of sailor, has improved the inside space utilization ratio of the long room of sailor.
The ship provided by the invention comprises the long water-jacket room, the first floating platform can be used as a conversion platform of the first inclined ladder and the second inclined ladder and also can be used as a rest platform of personnel, so that the personnel can safely and conveniently reach the bottom deck of the long water-jacket room through the first inclined ladder, the first floating platform and the second inclined ladder. Meanwhile, the first floating platform is connected with the second floating platform, so that personnel can safely and conveniently arrive at the manhole through the first floating platform and the second floating platform in sequence and then enter the anchor chain cabin. In addition, deposit shelf and hawser etc. in the first platform that wafts, increased the first storage function that wafts the platform, improved the first utilization ratio that wafts the platform, the first platform that wafts separates the long room of sailor into double entry cabin, has optimized the inside overall arrangement of the long room of sailor, has improved the inside space utilization ratio of the long room of sailor.
Drawings
Fig. 1 is a longitudinal sectional view of a conventional vessel's sailor chamber;
FIG. 2 is a longitudinal cross-sectional view of a sailor chamber of a marine vessel according to an embodiment of the present invention;
fig. 3 is a cross-sectional view of a sailor chamber of a marine vessel according to an embodiment of the present invention.
The component names and designations in the drawings are as follows:
10', a sailor chamber; 20', a main deck; 1', a manhole; 2', an inclined ladder channel; 3', a hydraulic pump station; 4', a straight ladder;
10. a sailor chamber; 20. a main deck;
1. a first floating platform; 11. hoisting the eye plate; 2. a first inclined ladder; 3. a second inclined ladder; 4. a second floating platform; 5. a manhole; 6. an outfitting platform; 7. a shelf; 8. a hydraulic pump station; 9. chain locker.
Detailed Description
In order to make the technical problems solved, the technical solutions adopted and the technical effects achieved by the present invention clearer, the technical solutions of the present invention are further described below by way of specific embodiments with reference to the accompanying drawings. It is to be understood that the specific embodiments described herein are merely illustrative of the invention and are not limiting of the invention. It should be further noted that, for the convenience of description, only some but not all of the features relevant to the present invention are shown in the drawings.
In the description of the present invention, unless expressly stated or limited otherwise, the terms "connected," "connected," and "fixed" are to be construed broadly, e.g., as meaning permanently connected, removably connected, or integral to one another; can be mechanically or electrically connected; either directly or indirectly through intervening media, either internally or in any other relationship. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.
In the present invention, unless otherwise expressly stated or limited, "above" or "below" a first feature means that the first and second features are in direct contact, or that the first and second features are not in direct contact but are in contact with each other via another feature therebetween. Also, the first feature being "on," "above" and "over" the second feature includes the first feature being directly on and obliquely above the second feature, or merely indicating that the first feature is at a higher level than the second feature. A first feature being "under," "below," and "beneath" a second feature includes the first feature being directly under and obliquely below the second feature, or simply meaning that the first feature is at a lesser elevation than the second feature.
In the description of the present embodiment, the terms "upper", "lower", "right", etc. are used in an orientation or positional relationship based on that shown in the drawings only for convenience of description and simplicity of operation, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used only for descriptive purposes and are not intended to have a special meaning.
The technical scheme of the invention is further explained by the specific implementation mode in combination with the attached drawings.
As shown in fig. 2 and 3, the present embodiment discloses a longwall 10, which 10 is disposed at the bow of a ship. The top of the longshowter 10 has an inlet communicating with the main deck 20, and the inner wall of the longshowter 10 has a manhole 5 communicating with the chain locker 9. The hydraulic pump station 8 is arranged on a deck at the bottom of the long water hand chamber 10, the inner wall of the long water hand chamber 10 is also provided with a hanging opening, and the hydraulic pump station 8 moves in or out of the long water hand chamber 10 through the hanging opening. The hydraulic power unit 8 is used to power the anchor chain for recovery or release of the anchor chain. Personnel (or sailors) on the ship can enter the sailor chamber 10 from the main deck 20 through the entrance of the sailor chamber 10 so as to install and maintain the hydraulic pump station 8, and can enter the chain locker 9 through the manhole 5 in the sailor chamber 10 to complete the auxiliary recovery of the chain and other operations.
Specifically, the sailor booth 10 includes a first flight deck 1, first and second ramps 2, 3, and a second flight deck 4. The first floating platform 1 is arranged on the front wall of the long water closet 10 and divides the long water closet 10 into a compound cabin. One end of the first inclined ladder 2 is lapped on the entrance of the sailor chamber 10, and the other end is lapped on the first floating platform 1. One end of the second inclined ladder 3 is lapped on the bottom deck of the sailor chamber 10, and the other end is lapped on the first floating platform 1. The second floating platform 4 is arranged on the rear wall of the long chamber 10 of the water man and is positioned below the manhole 5 so as to enter the manhole 5 through the second floating platform 4, and the first floating platform 1 is connected with the second floating platform 4.
In this embodiment, the first floating platform 1 can be used not only as a conversion platform for the first inclined ladder 2 and the second inclined ladder 3, but also as a rest platform for the personnel, so that the personnel can safely and conveniently reach the bottom deck of the sailor chamber 10 through the first inclined ladder 2, the first floating platform 1 and the second inclined ladder 3. Meanwhile, the first floating platform 1 is connected with the second floating platform 4, so that personnel can safely and conveniently reach the manhole 5 through the first floating platform 1 and the second floating platform 4 in sequence, and then enter the anchor chain chamber 9. In addition, can deposit hawser etc. on the first platform 1 that wafts, increased the first storage function that wafts platform 1, improved the first utilization ratio that wafts platform 1, the first platform 1 that wafts separates the long room 10 of sailor into double entry cabin, has optimized the inside overall arrangement of the long room 10 of sailor, has improved the inside space utilization of the long room 10 of sailor.
Because personnel can directly get into manhole 5 through second platform 4 that wafts, need not to climb the vertical ladder from the bottom deck of the long room 10 of sailor, greatly shortened personnel and got into the walking distance and the degree of difficulty of anchor chain cabin 9, improved personnel's security. Moreover, a vertical ladder does not need to be laid between the bottom decks of the manhole 5 and the long water basin 10, the vertical ladder is prevented from interfering with an anchor abandoning device on the bottom deck, and the internal layout of the long water basin 10 is optimized.
The long room 10 of sailor still includes shelf 7, all is provided with a plurality of shelves 7 on the bottom deck of the long room 10 of sailor and the first platform 1 that wafts to make full use of the high space of the long room 10 of sailor, increased the quantity and the distribution range of shelf 7, improved the storage space of the long room 10 of sailor. Meanwhile, common tools are placed on the shelf 7 of the first floating platform 1, so that the common tools are convenient for people to take.
As shown in fig. 2 and 3, the outer plates of the bow enclose the inner side wall of the pilot chamber 10, the two outer plates defining the pilot chamber 10 are front walls, and the side wall near the stern is a rear wall. The outer plate framework of the bow extends inwards horizontally to form a first floating platform 1, the horizontal truss of the rear wall of the sailor chamber 10 extends inwards horizontally to form a second floating platform 4, the existing structural members of the sailor chamber 10 are fully utilized and modified, no external structural member is required to be additionally arranged, the sailor chamber 10 is convenient to modify, and the cost of the sailor chamber 10 is reduced.
As shown in fig. 3, the first floating platform 1 is horizontally extended from the outer plate of the ship head section to the stern direction, the extended shape of the aggregate is approximately trapezoidal, and a plurality of shelves 7 are arranged at intervals along the edge of the aggregate close to the outer plate, so that the characteristic that the joint of the aggregate and the outer plate has high strength is fully utilized, and the storage weight of the shelves 7 is favorably improved.
The first floating platform 1 of the embodiment is located in the middle of the long water hand chamber 10 along the height direction thereof, so that the space of the upper layer and the lower layer of the long water hand chamber 10 with the duplex structure is the same, and the space of the long water hand chamber 10 in the height direction is fully utilized. And can guarantee that the length of first inclined ladder 2 and second inclined ladder 3 is equal basically, be convenient for first inclined ladder 2 and second inclined ladder 3's processing and interchange. Of course, the height of the first floating platform 1 is determined by the height of the aggregate on the outer plate, and the reasonable arrangement of the internal structures such as the hydraulic pump station 8 is only needed.
As shown in fig. 3, the second bay 4 is obtained by widening the horizontal girder on the rear wall of the sailor's chamber 10. The length of the horizontal truss of this embodiment along boats and ships length direction is 1350mm for second floating platform 4 has sufficient width, with the security that makes things convenient for personnel to pass through, has improved personnel and has passed through. Of course, the length of the horizontal girder along the length direction of the ship can be increased or decreased according to the specific design requirement of the sailor chamber 10. Further, horizontal purlin extends to two topside along boats and ships width direction, has improved the structural strength and the bearing capacity of horizontal purlin, has further improved the security that personnel passed through.
As shown in fig. 2, the bottom of the first floating platform 1 is provided with a lifting eye plate 11, and the hydraulic pump station 8 is lifted to or from a lifting port through the lifting eye plate 11. The hydraulic pump station 8 is hung on the hoisting eye plate 11 by a hoisting rope, the hydraulic pump station 8 is hoisted to the installation position of the bottom deck of the long water jacket room 10 from the object hoisting port through hoisting equipment such as an electric hoist, or the hydraulic pump station 8 is hoisted to the object hoisting port from the installation position of the bottom deck, and then the hydraulic pump station 8 is hoisted out of the long water jacket room 10 through the object hoisting port.
It should be noted that the manhole 5 is located near the top of the pitcher's long chamber 10, and the second floating platform 4 (horizontal truss) is located below the manhole 5 with a small height difference from the manhole 5, so as to facilitate the direct entry of personnel into the manhole 5 through the second floating platform 4. The height of the first stage 1 is lower than the height of the second stage 4 so that there is a height difference between the first stage 1 and the second stage 4.
As shown in fig. 2, the sailor booth 10 further includes an outfitting platform 6, two ends of the outfitting platform 6 are respectively connected with the edge of the first floating platform 1 and the edge of the second floating platform 4, the first floating platform 1 and the second floating platform 4 can be smoothly communicated through the outfitting platform 6, the first floating platform 1 and the second floating platform 4 do not need to be extended too long and butted to form a whole platform, the structural weight of the sailor booth 10 is reduced, and the sailor booth can be flexibly installed according to design requirements. The outfitting platform 6 can make first platform 1 and the second platform 4 of wafing not closed completely to improve the two-layer ventilation effect about in the long room 10 of sailor, improved the air circulation nature of the long room 10 lower floor of sailor, improved the travelling comfort of personnel in the long room 10 of sailor.
Specifically, as shown in fig. 2 and 3, the outfitting platform 6 is a walking channel butted and welded together by angle steel and square steel, so that the outfitting platform 6 is simple to process, has high structural strength, light weight and good bearing performance, and can bear the safe passage of people or a plurality of people with different weights. Meanwhile, the railing columns and the railings are welded on the two sides of the walking channel in the width direction, so that personnel can conveniently hold the railings to pass through the outfitting platform 6, the influence of ship shaking on the personnel is avoided from falling off the outfitting platform 6, and the safety of the outfitting platform 6 is improved.
In order to avoid slipping when people pass through the outfitting platform 6, the outfitting platform 6 of the embodiment is horizontally installed between the first floating platform 1 and the second floating platform 4, the upper surface of the outfitting platform 6 is flush with the second floating platform 4, and the bottom of the outfitting platform 6 is arranged on the first floating platform 1, so that a step structure is formed between the upper surface of the outfitting platform 6 and the first floating platform 1. The outfitting platform 6 can be installed between the first floating platform 1 and the second floating platform 4 through fasteners such as welding or bolts, so as to ensure the stability of the outfitting platform 6.
As shown in fig. 3, the second inclined ladder 3 can be flexibly installed at different positions of the outer edge of the first floating platform 1 according to the internal layout of the long room 10 of the sailor, and only the interference between the second inclined ladder 3 and the hydraulic pump station 8 can be avoided. Specifically, the second inclined ladder 3 and the outfitting platform 6 are arranged on the outer edge of the first floating platform 1 side by side, so that personnel can flexibly select from the first floating platform 1 to pass through the second inclined ladder 3 or the outfitting platform 6, and the compact installation of the internal structure of the sailor chamber 10 is realized.
In other embodiments, if the upper surfaces of the first and second float stages 1 and 4 are flush, the sailor chamber 10 further comprises a horizontal channel, the two ends of the horizontal channel are respectively connected to the first and second float stages 1 and 4, and the horizontal channel, the first float stage 1 and the second float stage 4 are flush. The horizontal channel can be a strip-shaped steel plate and is connected with the first floating platform 1 and the second floating platform 4 into a whole through welding.
The present embodiment also discloses a vessel comprising the aforementioned hookah's gazebo 10, enabling safe and convenient access for personnel to the bottom deck and manhole 5 of the hookah's gazebo 10. The internal layout of the sailor chamber 10 is optimized, and the space utilization rate of the sailor chamber 10 is improved. The double-type structure has smaller requirements on the length direction of the sailor chamber 10, and can increase the capacity of the cargo hold on the ship, thereby improving the economy of the ship. The platform layout of the long room 10 of the water conservancy that falls by mistake both can optimize the inside layout of the long room 10 of water conservancy, can ensure the gas permeability of the long room 10 inner space of water conservancy simultaneously, promote the operational environment of the long room 10 of water conservancy.
The foregoing embodiments are merely illustrative of the principles and features of this invention, and the invention is not limited to the embodiments described above, but rather, is susceptible to various changes and modifications without departing from the spirit and scope of the invention, as claimed. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (10)

1. A sailor chamber, the top of which has an inlet communicating with a main deck (20), the inner wall of which has a manhole (5) communicating with a chain locker (9); characterized in that, the long room of sailor includes:
the first floating platform (1) is arranged on the front wall of the long water dispenser chamber and divides the long water dispenser chamber into a duplex chamber;
the water hand long chamber comprises a first inclined ladder (2) and a second inclined ladder (3), wherein one end of the first inclined ladder (2) is lapped on an inlet of the water hand long chamber, and the other end of the first inclined ladder is lapped on the first floating platform (1); one end of the second inclined ladder (3) is lapped on the bottom deck of the sailor chamber, and the other end is lapped on the first floating platform (1); and
the second platform (4) that wafts, set up in the back wall of the longshoring room of sailor is located the below of manhole (5), in order to pass through the second platform (4) that wafts gets into manhole (5), first platform (1) that wafts with the second platform (4) that wafts links to each other.
2. A sailor gate according to claim 1, characterized in that it is located in the bow of a ship, the outer plate skeleton of which extends horizontally inwards to form the first platform (1); the horizontal truss of the rear wall of the sailor chamber extends inwards horizontally to form the second floating platform (4).
3. A sailor chamber according to claim 2, characterized in that the first float (1) is located in the middle of the sailor chamber in the direction of its height.
4. The sailor scuttle of claim 2, wherein the length of the horizontal girder in the length direction of the ship is 1350mm, and the horizontal girder extends to both sides in the width direction of the ship.
5. The sailor chamber of claim 2, further comprising:
the outfitting platform (6), the both ends of outfitting platform (6) respectively with the border of first platform (1) that wafts with the border of second platform that wafts (4) links to each other.
6. The sailor booth according to claim 5, characterized in that the height of the first float (1) is lower than the height of the second float (4), the outfitting platform (6) is horizontally mounted between the first and second floats (1, 4), the upper surface of the outfitting platform (6) is flush with the second float (4), and the bottom of the outfitting platform (6) is disposed on the first float (1).
7. The sailor booth according to claim 5, characterized in that the second ramp (3) is arranged alongside one end of the outfitting platform (6) at the outer edge of the first ramp (1).
8. The hookah length chamber of claim 1, further comprising:
the shelf (7), the long room of sailor's bottom deck with all be provided with a plurality ofly on the first platform (1) of wafing the shelf (7).
9. The long water hand chamber according to claim 1, characterized in that a hydraulic pump station (8) is arranged on a bottom deck of the long water hand chamber, the inner wall of the long water hand chamber is also provided with a hanging port, and the hydraulic pump station (8) moves into or out of the long water hand chamber through the hanging port;
the bottom of the first floating platform (1) is provided with a hoisting eye plate (11), and the hydraulic pump station (8) is hoisted to or lifted away from the object hoisting port through the hoisting eye plate (11).
10. A ship comprising the sailor chamber of any one of claims 1 to 9.
CN202210362309.XA 2022-04-07 2022-04-07 Long room of sailor and boats and ships Pending CN114750878A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210362309.XA CN114750878A (en) 2022-04-07 2022-04-07 Long room of sailor and boats and ships

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210362309.XA CN114750878A (en) 2022-04-07 2022-04-07 Long room of sailor and boats and ships

Publications (1)

Publication Number Publication Date
CN114750878A true CN114750878A (en) 2022-07-15

Family

ID=82329341

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210362309.XA Pending CN114750878A (en) 2022-04-07 2022-04-07 Long room of sailor and boats and ships

Country Status (1)

Country Link
CN (1) CN114750878A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20140072315A (en) * 2012-11-30 2014-06-13 대우조선해양 주식회사 Arrangement method for emergency exit passage of engine room in vessels
CN204916066U (en) * 2015-09-16 2015-12-30 浙江欧华造船股份有限公司 Chain locker of chemical tanker
CN208085940U (en) * 2018-04-20 2018-11-13 广船国际有限公司 Ship anchor chains cabin and ship comprising it
CN209535397U (en) * 2018-12-07 2019-10-25 大连船舶重工集团有限公司 Ship based on sunk type design
CN112249239A (en) * 2020-09-25 2021-01-22 中船澄西船舶修造有限公司 Ship centralized control room ladder way arrangement structure fully utilizing limited space
CN114056489A (en) * 2021-12-23 2022-02-18 武昌船舶重工集团有限公司 Anchoring system and ship with same

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20140072315A (en) * 2012-11-30 2014-06-13 대우조선해양 주식회사 Arrangement method for emergency exit passage of engine room in vessels
CN204916066U (en) * 2015-09-16 2015-12-30 浙江欧华造船股份有限公司 Chain locker of chemical tanker
CN208085940U (en) * 2018-04-20 2018-11-13 广船国际有限公司 Ship anchor chains cabin and ship comprising it
CN209535397U (en) * 2018-12-07 2019-10-25 大连船舶重工集团有限公司 Ship based on sunk type design
CN112249239A (en) * 2020-09-25 2021-01-22 中船澄西船舶修造有限公司 Ship centralized control room ladder way arrangement structure fully utilizing limited space
CN114056489A (en) * 2021-12-23 2022-02-18 武昌船舶重工集团有限公司 Anchoring system and ship with same

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张晓峰: "《造船实用英语》", 28 February 2017, 大连海事大学出版社 *

Similar Documents

Publication Publication Date Title
JP6545895B2 (en) Self-lifting submersible submersible platform boat and method of using the same
CN110139798B (en) Straight cylinder type floating platform and swimming life buoy type floating cylinder set with extension cylinder
US4766829A (en) Catamaran-type marine craft
CN112550626A (en) Construction method of deep oil tank area of container ship
CN111098982A (en) Lashing bridge structure of large container ship
CN107985506A (en) A kind of total arrangement suitable for 10,000 tons bulk freighter
CN208102251U (en) A kind of total arrangement suitable for 10,000 tons bulk freighter
WO2009117856A2 (en) A waterborne floating boat with superstructures
CN107521630B (en) Semi-submersible support platform
CN208500165U (en) A kind of submarine afloat repair platform
CN107856819A (en) Floating shipyard and floating type warship maintenance and method of construction
CN112046694B (en) Transformation method based on unmanned barge and bottom-seated full-rotation lifting barge
US3942458A (en) Elevating pilothouse
CN114750878A (en) Long room of sailor and boats and ships
CN205273808U (en) Floating well drilling production oil storage device pump cabin structure
CN108455460A (en) A kind of submarine afloat repair platform
CN102180236A (en) Highway bridge detection ship
CN220924435U (en) Ship
CN219927937U (en) Multifunctional electric pushing tug
CN220114781U (en) Semi-submersible travelling platform with annular buoyancy tanks
WO2002081297A2 (en) Lng storage vessel and method for constructing same
CN218839701U (en) Inland river container ship arrangement structure
KR100629225B1 (en) Double pile up style quay of area that the difference between the rise and fall of the tide is large
CN217100376U (en) Chemical tanker cargo tank channel
CN220640185U (en) Multifunctional wind power operation and maintenance mother ship

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20220715