CN114647885B - Method and system for construction drawing design content display and application calculation - Google Patents

Method and system for construction drawing design content display and application calculation Download PDF

Info

Publication number
CN114647885B
CN114647885B CN202210350324.2A CN202210350324A CN114647885B CN 114647885 B CN114647885 B CN 114647885B CN 202210350324 A CN202210350324 A CN 202210350324A CN 114647885 B CN114647885 B CN 114647885B
Authority
CN
China
Prior art keywords
project
calculation
component
general
content
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202210350324.2A
Other languages
Chinese (zh)
Other versions
CN114647885A (en
Inventor
杨万勇
杨耀庭
华健
黄博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Mengcheng Technology Co ltd
Original Assignee
Beijing Mengcheng Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Mengcheng Technology Co ltd filed Critical Beijing Mengcheng Technology Co ltd
Priority to CN202210350324.2A priority Critical patent/CN114647885B/en
Publication of CN114647885A publication Critical patent/CN114647885A/en
Application granted granted Critical
Publication of CN114647885B publication Critical patent/CN114647885B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2119/00Details relating to the type or aim of the analysis or the optimisation
    • G06F2119/02Reliability analysis or reliability optimisation; Failure analysis, e.g. worst case scenario performance, failure mode and effects analysis [FMEA]

Abstract

The invention provides a method and a system for displaying construction drawing design content and calculating application. The method comprises the following steps: establishing a general component; filling the calculation content, material information, calculation steps and formulas of the general component; saving and submitting the universal component to a project component library; in the project component library, parts are screened in batches according to the part characteristics of the unit project to which the universal components are applied, and the calculation amount content of the universal components is mapped to the parts of the unit project to form a universal calculation amount result of the unit project; and supplementing the calculated amount content of the non-universal part of the unit project in the project file of the unit project, completing the calculated amount of the whole unit project and forming a calculated amount result. The scheme provided by the invention can improve the efficiency of the whole calculation amount by multiple times; the consistency of fields is ensured, and the statistical difficulty is greatly reduced; the method realizes quick batch modification of errors without changing each part of each unit project, and improves the modification efficiency of the errors by tens of times.

Description

Method and system for construction drawing design content display and application calculation
Technical Field
The invention belongs to the field of engineering management and design, and particularly relates to a method and a system for displaying construction drawing design content and calculating application.
Background
The engineering project is a project using engineering construction as a carrier, and is a disposable engineering construction task as a managed object. The method takes a building or a structure as a target product, needs to pay a certain fee, is completed in a certain time according to a certain program, and meets the quality requirement.
The project management organization (organization of project management) is a project construction project department, which refers to a collection of persons and facilities that implement or participate in project management work and have clear responsibilities, permissions and interrelations. Including subcontractors, contractors, subcontractors, and other management organizations established with respect to the organization to accomplish project management goals. Here the feature value contractor type project department.
And (5) reviewing drawings: the drawing review refers to the activities of fully and carefully familiarizing and reviewing the construction drawing before design background after each construction unit (construction unit, supervision unit, construction unit and other relevant units) receives the construction drawing design file which is reviewed to be qualified by the construction drawing review organization. The related personnel of each unit should be familiar with the engineering design files and should participate in the drawing consultation conference hosted by the construction unit, the construction unit should host the drawing consultation conference in time, the related personnel such as the organization supervision unit and the construction unit carry out the drawing consultation and arrange the result into a consultation problem list, and the construction unit submits the result to the design unit in the appointed time before the design meeting is completed. The drawing consultation is carried out by arranging the meeting summary of the construction unit and signing by each party participating in the meeting.
Calculating the engineering quantity: the engineering quantity refers to the engineering quantity of each project or structural member expressed in natural measurement units or physical measurement units, such as light boxes, mirror boxes and counters, measured in number. The contents of the engineering quantity calculation are as follows: the method comprises the steps of project list, project coding, comprehensive unit price, measure project, reserved money, total contract cost, sporadic cost, consumption quota, enterprise quota, bid price base, bid price, construction project, single project, unit project, subsection project and subsection project.
Engineering quantity calculation rule: the computation of the engineering quantities has explicit computation rules, which must be reasonably well understood. In the process of checking the engineering quantity data by actual parties, disputes often occur, which is mostly caused by different understandings of the calculation rules, and in the process of understanding the calculation rules, the characteristics of drawings and construction projects and the understandings of the construction process are combined. And repeatedly knocking the rules of calculation, such as pile length, wherein the pile length is calculated by taking the elevation of the bottom of the bearing platform as the standard for the bearing platform, the pile length is calculated by taking the elevation of the top of the beam as the standard for the pile beam, and the pile length is calculated from the elevation of the bottom of the pile to the bottom surface of the bearing platform or the bottom surface of the beam for the cast-in-situ bored pile. For the column type pier integrated with the pile, if no bearing platform or tie beam exists, the original ground line at the pile position is taken as a boundary line, the lower part of the ground line is taken as the length of the cast-in-place pile, and if the drawing has marks, the drawing marks are taken as the standard.
Unit engineering: the unit project refers to a building or a structure which has independent construction conditions and can form an independent use function, and can be determined by construction, supervision and construction unit negotiations before construction, and construction technical data is collected, arranged and accepted according to the negotiation.
Construction drawing: the design is used for representing the overall layout of engineering projects, and the required patterns of buildings, the external shapes of structures, internal arrangement, structural construction, internal and external decoration, material operation, equipment, construction and the like. In the field of infrastructure, a construction drawing is generally divided into a general drawing and a work point drawing, the work point drawing describes the detailed content of the work point drawing according to unit engineering, and the general drawing extracts common design content in each work point drawing according to specific division items to form a special book, so that the repeated workload of design workers is reduced, the quantity of the construction drawing is greatly reduced, and the printing, carrying and circulation of the drawing are facilitated.
At present, when construction units in the field of infrastructure (roads, railways, municipal works and subways) conduct drawing review, the engineering quantity calculation mainly depends on that a field technician conducts task disassembly according to unit engineering in Excel or other existing computation software in the market, then the unit engineering is a computation unit decomposition subsection, a decomposition part, a column calculation formula and a filling calculation attribute to form an engineering quantity calculation result.
After the calculation of one unit project is finished, the calculation of the project of another unit project is carried out until the calculation of all the unit projects on one project is finished, the construction cost is 10 billion yuan of project, the unit project quantity is about 30-50, and the general calculation period of the project is as long as 3 months.
Disadvantages of the prior art
The existing software is adopted, when the calculation personnel calculate, a unit project is required to be selected, the unit project is divided firstly, then the part is divided, the calculation is carried out one by one according to the part until the calculation of all the parts of the unit project is finished, then the next unit project calculation is carried out, and the process is circulated in sequence until the calculation of the part projects on all the unit projects of the project is finished.
Because the calculated content of the general design drawing part in the construction drawing is consistent for each unit project, the calculated personnel need to repeat the calculated content of the general design drawing in the construction drawing or copy and paste the calculated content of other unit projects on the corresponding part in each unit project, the working machinery of the calculated personnel is repeated, the calculated period is long, and the inaccurate calculated result is easily caused by the wrong copying and pasting or the content loss.
Disclosure of Invention
In order to solve the technical problems, the invention provides a technical scheme of a method and a system for displaying construction drawing design content and calculating application, so as to solve the technical problems.
The invention discloses a method for displaying design content and applying calculation of a construction drawing in a first aspect, which comprises the following steps:
s1, establishing a general component;
s2, filling calculation content, material information, calculation steps and formulas of the general component;
s3, saving and submitting the general components to a project component library;
s4, screening parts in batch in the project component library according to the part characteristics of the unit project applicable to the universal component, and mapping the calculation content of the universal component to the parts of the unit project to form a universal calculation result of the unit project;
and S5, supplementing the calculated amount content of the non-universal part of the unit project in the project file of the unit project, completing the calculated amount of the whole unit project and forming a calculated amount result.
According to the method of the first aspect of the present invention, in the step S1, the specific method for establishing the general-purpose member includes:
according to the design content in the general design drawing of the project, under different branch projects, different components are divided according to the entity structure, and the general components are established.
According to the method of the first aspect of the present invention, in the step S1, the specific contents of the general-purpose member include: component name, component unit, corresponding construction drawing figure number and component description.
According to the method of the first aspect of the present invention, in step S2, a specific method of filling the calculation amount content, the material information, the calculation step and the formula of the general-purpose component includes:
establishing calculation content names according to component types under the components according to the design content and the engineering quantity detail table given in the general design drawing;
filling in material names, material specification models and units corresponding to the calculated amount content according to the design elements in the general design drawing;
filling calculation steps and calculation parameters of corresponding calculation amount contents according to the design elements in the general design drawing, listing a calculation formula in each calculation step, setting decimal place retention rules, and filling step descriptions and units;
and filling a drawing number and a calculation description corresponding to the calculation content according to the design elements in the general design drawing.
According to the method of the first aspect of the present invention, in the step S3, the specific method for saving and submitting the generic component to the project component library includes:
and the general components are classified and stored according to the branch items where the general components are established.
According to the method of the first aspect of the present invention, in the step S3, after saving and submitting the generic component to the project component library, the method further comprises:
in the project component library, the generic components and their names and contents are viewed.
According to the method of the first aspect of the present invention, in step S4, before the parts are batch-screened according to the part characteristics of the unit project to which the general-purpose member is applied in the project member library, the method further includes:
according to the project files of the unit project, the project is divided into sub-items and parts are decomposed.
The second aspect of the invention discloses a system for displaying construction drawing design content and applying calculation, which comprises:
a first processing module configured to establish a generic component;
a second processing module configured to fill in the calculation amount content, material information, calculation steps and formulas of the general-purpose member;
a third processing module configured to save and submit the generic component to a project component library;
a fourth processing module configured to, in the project component library, screen parts in batches according to part characteristics of a unit project to which a general component is applied, and map calculation content of the general component to the parts of the unit project to form a general calculation result of the unit project;
and the fifth processing module is configured to supplement the calculated amount content of the non-universal part of the unit project in the project file of the unit project, complete the calculated amount of the whole unit project and form a calculated amount result.
According to the system of the second aspect of the present invention, the first processing module is configured to establish the generic component specifically including:
according to the design content in the general design drawing of the project, under different branch projects, different components are divided according to the entity structure, and the general components are established.
According to the system of the second aspect of the present invention, the first processing module is configured to, in detail, the generic component includes: name of component, unit of component, number of corresponding construction drawing and description of component
According to the system of the second aspect of the present invention, the second processing module is configured to fill out the computation content, the material information, the calculation steps and the formula of the general-purpose component, and specifically includes:
establishing calculation content names according to component types under the components according to the design content and the engineering quantity detail table given in the general design drawing;
filling in the material name, the material specification model and the unit corresponding to the calculated content according to the design elements in the general design drawing;
filling calculation steps and calculation parameters of corresponding calculation amount contents according to the design elements in the general design drawing, listing a calculation formula in each calculation step, setting decimal place retention rules, and filling step descriptions and units;
and filling a drawing number and a calculation description corresponding to the calculation content according to the design elements in the general design drawing.
According to the system of the second aspect of the present invention, the third processing module is configured such that the specific method for saving and submitting the generic component to the project component library includes:
and the general components are classified and stored according to the branch items of the general components when the general components are established.
According to the system of the second aspect of the present invention, the third processing module is configured to, after saving and submitting the generic component to the project component library, further include:
in the project component library, general components and their names and contents are viewed.
According to the system of the second aspect of the present invention, before the batch screening of the parts according to the part features of the unit project to which the general-purpose member is applied in the project member library, the fourth processing module is configured to:
and according to the project file of the unit project, performing branch and item division and part decomposition on the project.
A third aspect of the invention discloses an electronic device. The electronic device comprises a memory and a processor, the memory stores a computer program, and the processor executes the computer program to realize the steps of the method for displaying the design content of the construction drawing and applying the calculation in any one of the first aspect of the disclosure.
A fourth aspect of the invention discloses a computer-readable storage medium. The computer readable storage medium has stored thereon a computer program which, when executed by a processor, implements the steps in a method of construction drawing design content presentation and application calculation of any one of the first aspects of the disclosure.
The scheme provided by the invention has the following beneficial effects:
1. the problem that in the construction process, the calculation staff repeatedly calculate the general design drawing part of the construction drawing in the engineering quantity calculation is thoroughly solved, the calculation mode is changed into a double-line mode which can be synchronously performed from a single mode, and the efficiency of the whole calculation is improved by multiple times.
2. The problem that fields such as calculation content, materials and calculation methods are not uniform due to different cognition of calculation staff on a project, so that the gathering and counting are difficult can be solved, all staff quote the same member, the consistency of the fields is guaranteed, and the counting difficulty is greatly reduced.
3. For errors discovered in the later inspection process, mapping contents on all relevant unit engineering parts can be automatically modified directly by modifying the components, so that the rapid batch modification of the errors is realized, each part of each unit engineering is not required to be modified, and the modification efficiency of the errors is improved by 10 times.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and other drawings can be obtained by those skilled in the art without creative efforts.
FIG. 1 is a flow diagram of a method for construction drawing design content presentation and application calculation in accordance with an embodiment of the present invention;
FIG. 2 is a block diagram of a system for construction drawing design content presentation and application computing in accordance with an embodiment of the present invention;
fig. 3 is a block diagram of an electronic device according to an embodiment of the present invention.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The design method needs to establish a data structure needed by calculation of various professional engineering quantities in the field of infrastructure, highway engineering, railway engineering, municipal engineering and subway engineering before designing the method.
Engineering quantity calculation data decomposition structure first level: component names, such as: pile foundation
Engineering quantity calculation data decomposition structure second level: the contents and units of the calculation amount are, for example: pile foundation concrete m 3 And pile foundation reinforcing steel bar kg
The engineering quantity calculation data decomposition structure comprises a third level: material items, for example: HRB400 steel bar diameter 16 number N1
The fourth level of the engineering quantity calculation data decomposition structure is as follows: calculation steps, calculation formulas, calculation parameters, and diagrams, for example: calculating parameters: the pile length is m, and the pile diameter is cm; calculating formula: pile foundation volume = PI (). D ^2/4 ^ pile length m
The invention discloses a method for displaying construction drawing design content and applying calculation, in particular to a method and a system for displaying and applying calculation to construction drawing design content in the field of application infrastructure, such as roads, railways, municipal administration, subways and the like. Fig. 1 is a flowchart of a method for displaying construction diagram design content and applying calculation according to an embodiment of the present invention, as shown in fig. 1, the method includes:
s1, establishing a general component;
s2, filling calculation content, material information, calculation steps and formulas of the general component;
s3, storing and submitting the general components to a project component library;
s4, screening parts in batch in the project component library according to the part characteristics of the unit project applicable to the universal component, and mapping the calculation amount content of the universal component to the parts of the unit project to form a universal calculation amount result of the unit project;
and S5, supplementing the calculated amount content of the non-universal part of the unit project in the project file of the unit project, completing the calculated amount of the whole unit project and forming a calculated amount result.
In step S1, a general-purpose member is established.
In some embodiments, in step S1, the specific method for establishing a generic component includes:
according to the design content of the general design drawing in the construction drawing of the project, the construction drawing is divided into different components according to the entity structure under different sub-projects, and the general components are established. The specific contents of the general component comprise: component name, component unit, corresponding construction drawing figure number and component description.
Taking a pile foundation member as an example: the name of the component is a bored pile with the diameter of 1.2m, and the unit of the component is as follows: root, corresponding to the construction drawing number: in step S4-5, the components are described as follows: the method is suitable for the cast-in-situ bored pile with the pile diameter of 1.2m in the project.
In step S2, the calculation amount content, material information, calculation steps, and formulas of the general-purpose member are filled in.
In some embodiments, in step S2, a specific method of filling out the computation content, the material information, the calculation step and the formula of the general-purpose component includes:
establishing calculation content names according to component types under the components according to design contents and engineering quantity lists given by the general design drawing part in the construction drawing; taking a pile foundation member as an example: pile foundation concrete (general composition type), pile foundation HRB400 steel bars (steel bar type), pile foundation HPB300 steel bars (steel bar type), and sounding pipe length (other steel materials);
according to the design elements of the general design drawing part in the construction drawing,filling in the material name, material specification model and unit corresponding to the calculated amount content; taking pile foundation concrete as an example: the material name is ordinary silicate concrete, the specification is C30, and the unit is m 3
Filling calculation steps and calculation parameters of corresponding calculation amount contents according to design elements of a general design drawing part in a construction drawing, listing a calculation formula in each calculation step, setting a decimal place retention rule, and filling step description and units; taking pile foundation concrete as an example: adding a calculation step, wherein the calculation parameters are as follows: the pile length and the pile diameter are calculated according to the following formula: PI (), pile length, pile diameter/4, 2 effective fractions are reserved in the fraction, and the steps are as follows: pile foundation concrete with unit of m 3
Filling a drawing number and a calculation description corresponding to the calculation content according to the design elements of the general design drawing part in the construction drawing; taking pile foundation concrete as an example: the drawing number is: s4-31, the calculation is as follows: the concrete amount is designed according to a drawing, the over-filling concrete amount is not included, and extra calculation is needed for the over-filling amount.
In step S3, the generic component is saved and submitted to the project component library.
In some embodiments, in step S3, the specific method for saving and submitting the generic component to the project component library includes:
and the general components are classified and stored according to the branch items where the general components are established.
After saving and submitting the generic component to a project component library, the method further comprises:
in the project component library, general components and their names and contents are viewed.
In step S4, the parts are batch-screened in the project component library based on the part features of the unit projects to which the general-purpose components are applied, and the calculation amount contents of the general-purpose components are mapped to the parts of the unit projects to form the general-purpose calculation amount results of the unit projects.
In some embodiments, in step S4, before the batch screening of the sites according to the site features of the unit project applicable to the general-purpose member in the project component library, the method further includes:
and according to the project file of the unit project, performing branch and item division and part decomposition on the project.
Specifically, according to project files of unit projects, the projects are divided into items and parts are decomposed; in the project component library, parts are screened in batches according to the part characteristics of the unit project to which the universal components are applied, and the calculated amount content of the universal components is mapped to the parts of the unit project to form a universal calculated amount result of the unit project; taking a 1.2m bored pile component as an example, the part with the pile diameter =1.2m is screened under the partial items of the pile foundations of all unit projects, and the component is mapped to all the parts in batch to complete the calculation of all the general design contents.
In conclusion, the scheme provided by the invention can thoroughly solve the problem that in the construction process, the calculation amount personnel repeatedly calculate the part of the general design drawing in the engineering amount calculation, the calculation amount mode is changed into a double-line mode which can be synchronously carried out from a single mode, and the efficiency of the whole calculation amount is improved by multiple times; the method can solve the problem that the fields such as the calculated amount content, the calculated amount materials and the calculating method are not unified due to different cognition of calculated amount personnel on the project, so that the gathering and counting are difficult, all personnel quote the same member, the consistency of the fields is ensured, and the counting difficulty is greatly reduced. For errors discovered in the later inspection process, mapping contents on all relevant unit engineering parts can be automatically modified directly by modifying the components, so that the rapid batch modification of the errors is realized, each part of each unit engineering is not required to be modified, and the modification efficiency of the errors is improved by 10 times.
The invention discloses a system for displaying construction drawing design contents and applying calculation in a second aspect. FIG. 2 is a block diagram of a system for construction drawing design content presentation and application computing, according to an embodiment of the present invention; as shown in fig. 2, the system 100 includes:
a first processing module 101 configured to establish a generic component;
a second processing module 102 configured to fill out the computation content, material information, calculation steps and formulas of the general-purpose component;
a third processing module 103 configured to save and submit the generic component to a project component library;
a fourth processing module 104 configured to, in the project component library, screen parts in batches according to part characteristics of a unit project to which a general-purpose component is applied, and map calculation content of the general-purpose component to the parts of the unit project to form a general calculation result of the unit project;
and the fifth processing module 105 is configured to supplement the calculated amount content of the non-universal part of the unit project in the project file of the unit project, complete the calculated amount of the whole unit project and form a calculated amount result.
According to the system of the second aspect of the present invention, the first processing module 101 is configured to, specifically, establish a generic component including:
according to the design content in the general design drawing of the project, under different branch projects, different components are divided according to the entity structure, and the general components are established.
According to the system of the second aspect of the present invention, the first processing module 101 is configured to, the general-purpose components specifically include: name of component, unit of component, number of corresponding construction drawing and description of component
According to the system of the second aspect of the present invention, the second processing module 102 is configured to fill out the computation content, the material information, the calculation steps and the formulas of the generic component, and specifically includes:
establishing calculation content names according to component types under the components according to the design content and the engineering quantity detail table given in the general design drawing;
filling in material names, material specification models and units corresponding to the calculated amount content according to the design elements in the general design drawing;
filling calculation steps and calculation parameters of corresponding calculation amount contents according to the design elements in the general design drawing, listing a calculation formula in each calculation step, setting decimal place retention rules, and filling step descriptions and units;
and filling a drawing number and a calculation description corresponding to the calculation content according to the design elements in the general design drawing.
According to the system of the second aspect of the present invention, the third processing module 103 is configured to, the specific method for saving and submitting the generic component to the project component library includes:
and the general components are classified and stored according to the branch items where the general components are established.
According to the system of the second aspect of the present invention, the third processing module 103 is configured to, after saving and submitting the generic component to the project component library, further include:
in the project component library, the generic components and their names and contents are viewed.
According to the system of the second aspect of the present invention, the fourth processing module 104 is configured to, before the batch screening of the parts in the project component library according to the part characteristics of the unit project to which the universal component is applied, the method further includes:
according to the project files of the unit project, the project is divided into sub-items and parts are decomposed.
A third aspect of the invention discloses an electronic device. The electronic device comprises a memory and a processor, the memory stores a computer program, and the processor executes the computer program to realize the steps of the method for displaying the design content of the construction drawing and applying the calculation in any one of the first aspect of the disclosure.
Fig. 3 is a block diagram of an electronic device according to an embodiment of the present invention, and as shown in fig. 3, the electronic device includes a processor, a memory, a communication interface, a display screen, and an input device, which are connected by a system bus. Wherein the processor of the electronic device is configured to provide computing and control capabilities. The memory of the electronic equipment comprises a nonvolatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the operation of an operating system and computer programs in the non-volatile storage medium. The communication interface of the electronic device is used for carrying out wired or wireless communication with an external terminal, and the wireless communication can be realized through WIFI, an operator network, near Field Communication (NFC) or other technologies. The display screen of the electronic equipment can be a liquid crystal display screen or an electronic ink display screen, and the input device of the electronic equipment can be a touch layer covered on the display screen, a key, a track ball or a touch pad arranged on the shell of the electronic equipment, an external keyboard, a touch pad or a mouse and the like.
It will be understood by those skilled in the art that the structure shown in fig. 3 is only a partial block diagram related to the technical solution of the present disclosure, and does not constitute a limitation of the electronic device to which the solution of the present application is applied, and a specific electronic device may include more or less components than those shown in the drawings, or combine some components, or have a different arrangement of components.
A fourth aspect of the invention discloses a computer-readable storage medium. The computer readable storage medium has stored thereon a computer program which, when executed by a processor, implements the method of the steps in a method of construction drawing design content presentation and application computing of any one of the first aspect of the disclosure.
It should be noted that the technical features of the above embodiments can be arbitrarily combined, and for the sake of brevity, all possible combinations of the technical features in the above embodiments are not described, however, as long as there is no contradiction between the combinations of the technical features, the scope of the present description should be considered. The above examples only express several embodiments of the present application, and the description thereof is more specific and detailed, but not construed as limiting the scope of the invention. It should be noted that, for a person skilled in the art, several variations and modifications can be made without departing from the concept of the present application, which falls within the scope of protection of the present application. Therefore, the protection scope of the present patent shall be subject to the appended claims.

Claims (6)

1. A method for construction drawing design content presentation and application calculation is characterized by comprising the following steps:
s1, establishing a general component;
in step S1, the specific method for establishing a general member includes:
dividing the project into different components according to the entity structure under different sub-items according to the design content in the general design drawing of the project, and establishing a general component;
in the step S1, the specific contents of the general-purpose member include: the name of the component, the unit of the component, the number of the corresponding construction drawing and the description of the component;
s2, filling calculation content, material information, calculation steps and formulas of the general component;
in step S2, a specific method for filling the calculation amount content, the material information, the calculation step, and the formula of the general-purpose component includes:
establishing calculation content names according to component types under the components according to the design content and the engineering quantity detail table given in the general design drawing;
filling in material names, material specification models and units corresponding to the calculated amount content according to the design elements in the general design drawing;
filling calculation steps and calculation parameters of corresponding calculation amount contents according to the design elements in the general design drawing, listing a calculation formula in each calculation step, setting decimal place retention rules, and filling step descriptions and units;
filling a drawing number and a calculation description corresponding to the calculated amount content according to the design elements in the general design drawing;
s3, storing and submitting the general components to a project component library;
in step S3, the specific method for saving and submitting the generic component to the project component library includes:
the general components are classified and stored according to the branch items of the general components when being established;
s4, screening parts in batch in the project component library according to the part characteristics of the unit project applicable to the universal component, and mapping the calculation content of the universal component to the parts of the unit project to form a universal calculation result of the unit project;
and S5, supplementing the calculated amount content of the non-universal part of the unit project in the project file of the unit project, completing the calculated amount of the whole unit project and forming a calculated amount result.
2. The method of claim 1, wherein after saving and submitting the generic components to the project component library in step S3, the method further comprises:
in the project component library, the generic components and their names and contents are viewed.
3. The method of claim 1, wherein in step S4, before batch screening of sites according to site features of unit projects applicable to general-purpose components in the project component library, the method further comprises:
and according to the project file of the unit project, performing branch and item division and part decomposition on the project.
4. A system for construction drawing design content presentation and application computing, the system comprising:
a first processing module configured to establish a generic component;
dividing the project into different components according to the entity structure under different sub-items according to the design content in the general design drawing of the project, and establishing a general component;
the specific contents of the general components comprise: the name of the component, the unit of the component, the number of the corresponding construction drawing and the description of the component;
a second processing module configured to fill in the calculation amount content, material information, calculation steps and formulas of the general-purpose member;
establishing calculation content names according to component types under the components according to the design content and the engineering quantity detail table given in the general design drawing;
filling in the material name, the material specification model and the unit corresponding to the calculated content according to the design elements in the general design drawing;
filling calculation steps and calculation parameters of corresponding calculation amount contents according to the design elements in the general design drawing, listing a calculation formula in each calculation step, setting decimal place retention rules, and filling step descriptions and units;
filling a drawing number and a calculation description corresponding to the calculation content according to the design elements in the general design drawing;
a third processing module configured to save and submit the generic component to a project component library;
the general components are classified and stored according to the branch items of the general components when being established;
a fourth processing module configured to, in the project component library, screen parts in batches according to part characteristics of a unit project to which a general component is applied, and map calculation content of the general component to the parts of the unit project to form a general calculation result of the unit project;
and the fifth processing module is configured to supplement the calculated amount content of the non-universal part of the unit project in the project file of the unit project, complete the calculated amount of the whole unit project and form a calculated amount result.
5. An electronic device, comprising a memory and a processor, wherein the memory stores a computer program, and the processor implements the steps of the method for displaying construction drawing design content and applying calculation according to any one of claims 1 to 3 when executing the computer program.
6. A computer-readable storage medium, having stored thereon a computer program which, when executed by a processor, implements the steps of a method of construction drawing design content presentation and application computing of any of claims 1 to 3.
CN202210350324.2A 2022-04-02 2022-04-02 Method and system for construction drawing design content display and application calculation Active CN114647885B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210350324.2A CN114647885B (en) 2022-04-02 2022-04-02 Method and system for construction drawing design content display and application calculation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210350324.2A CN114647885B (en) 2022-04-02 2022-04-02 Method and system for construction drawing design content display and application calculation

Publications (2)

Publication Number Publication Date
CN114647885A CN114647885A (en) 2022-06-21
CN114647885B true CN114647885B (en) 2023-03-24

Family

ID=81997100

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210350324.2A Active CN114647885B (en) 2022-04-02 2022-04-02 Method and system for construction drawing design content display and application calculation

Country Status (1)

Country Link
CN (1) CN114647885B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117033399A (en) * 2023-07-20 2023-11-10 北京梦诚科技有限公司 Method and system for managing engineering quantity change

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016034027A1 (en) * 2014-09-01 2016-03-10 深圳汇林达科技有限公司 Method and system for formwork matching of three-dimensional spatial software
CN108846639A (en) * 2018-06-12 2018-11-20 湖南建工集团有限公司 One kind is based on BIM technology design and construction valuation management system and method
CN112307548A (en) * 2020-11-02 2021-02-02 中国电建集团华东勘测设计研究院有限公司 BIM-based rail transit construction visualization progress management method and system
CN113722790A (en) * 2021-07-22 2021-11-30 上海市水利工程设计研究院有限公司 BIM technology-based model engineering quantity statistical method
CN113806869A (en) * 2021-09-22 2021-12-17 江南造船(集团)有限责任公司 Method, medium, and server group for managing marine component library
CN114140083A (en) * 2021-12-03 2022-03-04 上海鹦伍塔科技有限公司 General data environment application system based on building information model

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104392482B (en) * 2014-02-26 2016-04-06 国家电网公司 Substation project project three-dimensional calculation amount model generation system and method
CN110378568A (en) * 2019-06-24 2019-10-25 中铁四局集团有限公司 Construction calculation volume method, system, computer equipment and readable storage medium storing program for executing based on BIM technology
US11402820B2 (en) * 2020-03-17 2022-08-02 Consulting Engineers, Corp. Method and system for building framing and manufacturing system
CN111598730A (en) * 2020-03-27 2020-08-28 广联达科技股份有限公司 System and method for extracting engineering quantity and avoiding secondary quantity extraction
CN111898356B (en) * 2020-07-20 2021-07-16 昆明海巍科技有限公司 Engineering cost analysis method and system for reducing repeated workload

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016034027A1 (en) * 2014-09-01 2016-03-10 深圳汇林达科技有限公司 Method and system for formwork matching of three-dimensional spatial software
CN108846639A (en) * 2018-06-12 2018-11-20 湖南建工集团有限公司 One kind is based on BIM technology design and construction valuation management system and method
CN112307548A (en) * 2020-11-02 2021-02-02 中国电建集团华东勘测设计研究院有限公司 BIM-based rail transit construction visualization progress management method and system
CN113722790A (en) * 2021-07-22 2021-11-30 上海市水利工程设计研究院有限公司 BIM technology-based model engineering quantity statistical method
CN113806869A (en) * 2021-09-22 2021-12-17 江南造船(集团)有限责任公司 Method, medium, and server group for managing marine component library
CN114140083A (en) * 2021-12-03 2022-03-04 上海鹦伍塔科技有限公司 General data environment application system based on building information model

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
BIM在地铁工程算量中的应用研究;苟国銮等;《建筑经济》;第82-85页 *
基于BIM的工程量提取匹配造价库资源的方法;张谦等;《建筑经济》(第04期);第33-37页 *
基于参数化设计工程量统计方法研究;李明照等;《施工技术》;第1023-1025页 *
基于构件的工程造价信息系统分析与设计;巩宁平;《电脑开发与应用》(第01期);第64-66页 *

Also Published As

Publication number Publication date
CN114647885A (en) 2022-06-21

Similar Documents

Publication Publication Date Title
Lu et al. BIM and big data for construction cost management
Nagalingam et al. Building information modelling and future quantity surveyor's practice in Sri Lankan construction industry
CN105719070A (en) Electronic auxiliary reviewing method and system
Rice et al. Comparison of currently available european LCA software
CN114647885B (en) Method and system for construction drawing design content display and application calculation
CN114971597B (en) BIM-based calculated amount and metering payment road cost calculation system and method
CN110910092A (en) Highway construction information management platform
Han et al. Construction quality evaluation of asphalt pavement based on BIM and GIS
CN112669019A (en) Engineering data automatic filing method based on engineering quantity list and quality inspection data correlation interaction
CN106845925A (en) Engineering based on the BIM amount of calculating quickly and project high in the clouds collaborative platform soon is to amount method
CN114648246B (en) Construction site progress recording and construction standing book data statistics method and system
Ahmad et al. Malaysian public private partnership
Kazaz et al. Quantification of fresh ready-mix concrete waste: order and truck-mixer based planning coefficients
Nguyen et al. A theoretical BIM-based framework for quantity take-off to facilitate progress payments: the case of high-rise building projects in Vietnam
CN114648244A (en) Design method and system of five-volume dynamic machine account
Guo et al. Implementation of CIM-related technologies within transportation projects
Albtoush et al. Techniques to Reduce Cost Overruns During the Design Phase of Construction Projects
CN112836975A (en) Bid evaluation method, device, terminal device and computer readable storage medium
CN112396296A (en) Resource scheduling system based on BIM
CN110705853A (en) Transformer substation cost dynamic management and control system and method based on BIM model
Wang Engineering productivity and unit price assessment model
CN114819543B (en) Data decomposition structure method and system for progress engineering quantity statistics
Makwana et al. An approach for ready mixed concrete selection for construction companies through analytic hierarchy process
CN110472103B (en) Construction business form management method, system, storage medium and electronic terminal
Okereke et al. Building information modeling (BIM) and quantity surveying consultancy services in Nigeria

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant