CN114648246B CN202210358047.XA CN202210358047A CN114648246B CN 114648246 B CN114648246 B CN 114648246B CN 202210358047 A CN202210358047 A CN 202210358047A CN 114648246 B CN114648246 B CN 114648246B
Authority
CN
China
Prior art keywords
construction
image
project
recording
item
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202210358047.XA
Other languages
Chinese (zh)
Other versions
CN114648246A (en
Inventor
杨万勇
杨耀庭
华健
梁宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Mengcheng Technology Co ltd
Original Assignee
Beijing Mengcheng Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Mengcheng Technology Co ltd filed Critical Beijing Mengcheng Technology Co ltd
Priority to CN202210358047.XA priority Critical patent/CN114648246B/en
Publication of CN114648246A publication Critical patent/CN114648246A/en
Application granted granted Critical
Publication of CN114648246B publication Critical patent/CN114648246B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06316Sequencing of tasks or work
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Tourism & Hospitality (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Physics & Mathematics (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Educational Administration (AREA)
  • Development Economics (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a construction site progress recording and construction standing book data statistical method and system. The method comprises the following steps: establishing a project WBS dictionary; establishing a project image progress template; associating the image progress item with the item WBS dictionary; establishing a part of entity decomposition; establishing an image project quantity platform account and generating a part value; establishing a construction work point according to project engineering entity division and management dimensions, and selecting a part for entity decomposition; and selecting a work point and an operation team where construction is located during recording, selecting an image progress item to be recorded and a position of entity decomposition under the work point, selecting a construction method and a construction process set in an image progress template by the image progress item to be recorded, and generating a construction ledger template list. According to the scheme provided by the invention, for the project department, the generation of the standard construction record ledger is used for meeting the lower data requirements of subsequent lower measurement, upper measurement, internal analysis and the like, and the efficiency and the quality of data use are improved.

Description

Construction site progress recording and construction standing book data statistics method and system
Technical Field
The invention belongs to the field of infrastructure industry, and particularly relates to a construction site progress recording and construction standing book data statistical method and system.
Background
1) The engineering project is a project using engineering construction as a carrier, and is a disposable engineering construction task as a managed object. The method takes a building or a structure as a target product, needs to pay a certain fee, is completed within a certain time according to a certain program, and meets the quality requirement. (from Baidu encyclopedia, www.baike.baidu.com-engineering project)
2) The project management organization (organization of project management) is a project construction project department, which refers to a collection of persons and facilities that implement or participate in project management work and have clear responsibilities, permissions and interrelations. Including subcontractors, contractors, subcontractors, and other management organizations established with respect to the organization to accomplish project management goals. Here the feature value contractor type project department. (derived in part from Baidu encyclopedia, www.baike.baidu.com-project construction project department)
3) The project image progress is as follows: the image progress of the project is the percentage of the project quantity of characters or objects according to the main components of the project, and the image position and the total progress of the construction project achieved at a certain time point are shown in a concise and concise manner. For example, the visual progress of the frame structure factory building engineering is represented by 'poured reinforced concrete column foundation is finished', 'foundation backfill is finished by 80%' and 'precast reinforced concrete beam and column are finished by 70%', and the main components of various building engineering are the same. Therefore, under a certain construction technical condition, the construction progress of each project can be generally indicated by the completion condition of the main part of the project. (derived in part from Baidu encyclopedia)
4) The building construction process refers to the sequence of main stages from the acceptance of construction tasks to the acceptance of the work. The sequence of engineering projects which must be followed in the whole construction stage is an objective rule developed through construction practices for many years. (from Baidu encyclopedia, www.baike.baidu.com-construction working procedure)
5) And recording the progress data of the engineering construction site, wherein in the construction process, a site technician needs to record the process progress condition corresponding to the image progress item of the construction site. For example: in the construction unit project, the progress of the part image progress item process (the ongoing process, some main record fields of the process, the image quantity completion condition), the input condition of personnel and machinery of each work point operation team, and the like, whether the progress condition of the project is normal can be analyzed through the data, and the rules and results which are useful for construction and technology can be obtained.
As the recording of the field completion condition of each work point of the current project on the construction field of the current infrastructure industry mainly depends on a field technician editing a large segment of progress text information (100-400 characters) in a WeChat text frame or a note book at a mobile phone end, and then sending the information to a project production management group (WeChat/qq) for a project leader to know the progress condition of the current day, and a project scheduler/technician analyzes the progress condition of the process described by each part and the time for sending the information in excel to form a construction ledger, forms a project image quantity ledger according to the completion condition of counting the image quantity by the process recording time in the construction ledger, then calculates the production value completion condition according to the part image quantity completion condition to form a project production value ledger according to a project list or a comprehensive unit price, and compiles various statistical statements such as project production daily statements, project production weekly statements, project production monthly statements and the like according to the summarized image quantity completion condition and the production completion condition;
the project scheduling manual input completion quantity of the image quantity of the day is mainly adopted for solving the statistics of the project production progress in the information system of the capital construction industry, the completion quantity is separated from the actual record of a field technician, and the project leader cannot know the detailed progress condition of each work point process.
Disadvantages of the prior art
1) Project without information system
(1) Project technicians spend 10-30 min on WeChat text boxes or mobile phone notepads to edit the completion conditions of each work point on the same day each day, while a single project averages 10 technicians, and the time spent on editing the completion conditions of the work points each day is long;
(2) the field recording contents do not have the same standard, the project scheduling analysis field recording contents are the construction ledger, when the project scheduling analysis field recording contents cannot be confirmed, related recording persons need to be found for repeated communication, and the communication efficiency is low;
(3) when the field records are repeated or wrong, accurate checking cannot be carried out, and subsequent use of data is influenced, such as project-to-next metering and completion amount during the inquiry period during the analysis of economic activities;
(4) project scheduling needs to spend half a day to collect and analyze the work point completion condition compiled by a technician every day, and a construction machine account of excel is compiled, the machine account is visually measured and the production value machine account, so that the work efficiency is low, and the time is long;
(5) a project technician records field construction records every day, returns to an office and fills in a construction ledger again according to the recorded content, and in the process, data cannot be effectively reused, the work is repeated, and the work efficiency is low;
2) Project adopting existing information system in current market
(1) The on-site progress statistics of the engineering construction stage needs the process completion quantity state of each part, and the management requirements of the construction site cannot be met by simply recording whether the part is in the completion state or not.
(2) A part of image progress item parts in the field construction progress record cannot be split in advance, and the progress statistics requirement can be met only by recording according to actually occurring parts in the construction process.
(3) Not replacing the content recorded by the field technician, but increasing the technician/scheduling daily workload (completing the filling image quantity);
(4) the recording forms are not uniform, the data are not standard, and the use of the data is influenced.
Disclosure of Invention
In order to solve the technical problems, the invention provides a technical scheme of a construction site progress recording and construction machine account data statistical method and system, and aims to solve the technical problems.
The invention discloses a construction site progress recording and construction standing book data statistical method in the first aspect, which comprises the following steps:
step S1, establishing a project WBS dictionary: establishing the branches and the subentry division of each professional project of the project, and establishing special certificate value fields of the project on the subentry;
s2, establishing a project image progress template: establishing an image progress template of each professional project of the project, establishing an image progress item for project site statistics under the professional image progress template, setting a construction record mode on the image progress item, and adding a construction method and a construction procedure according to the construction record mode;
step S3, associating the progress item of the image with the item WBS dictionary: associating corresponding image progress items on each subentry of the project WBS dictionary;
s4, establishing entity decomposition: establishing a position of entity decomposition according to the position name in project professional engineering and drawing; when a WBS dictionary is selected to establish an entity part, automatically bringing in an associated image progress item in the WBS dictionary;
s5, generating an image project quantity ledger: in the image project quantity ledger, generating a position value according to the position established in the entity decomposition and the WBS dictionary in the association image progress item;
s6, establishing a construction work point: establishing a construction work point according to project engineering entity division and management dimensions, and selecting an entity decomposition part under the construction work point;
s7, recording site construction: selecting a work point and a work team where construction is located during recording, selecting an image progress item to be recorded and a position of entity decomposition under the work point, selecting a construction method and a construction process of the image progress item to be recorded in an image progress template, and automatically taking out a recording field of the image progress item in the image progress template;
s8, generating a construction standing book: and generating a construction standing book template list according to the construction method and the construction process set in the image progress template by the selected image progress item to be recorded.
According to the method of the first aspect of the present invention, in the step S1, the method further comprises:
selecting a WBS dictionary: and selecting the established standard WBS template in the WBS template library, and automatically bringing the associated image progress item under the WBS itemization according to the selected WBS dictionary.
According to the method of the first aspect of the present invention, in the step S2, the avatar progress item includes: the name, image unit, image quantity summary coefficient, statistical unit and statistic summary coefficient of the image progress item;
the construction recording mode comprises the following steps: entity part-recording construction process, entity part-directly recording image quantity, entity part decomposition-recording construction process, entity part decomposition-directly recording image quantity, self-defining part-recording construction process and self-defining part-directly recording image quantity.
According to the method of the first aspect of the present invention, in the step S2, the method further comprises:
adding a construction method and a construction process on the visual progress items of the entity part-recording construction process, the entity part decomposition-recording construction process and the user-defined part-recording construction process in the construction record mode, and adding a process record field under the construction process;
adding a field for directly recording the image quantity on an image progress item of the method of the construction record, namely an entity part, directly recording the image quantity, decomposing the entity part, directly recording the image quantity and a user-defined part, directly recording the image quantity;
setting a calculation mode of the image quantity under each image progress item, wherein the calculation mode comprises the following steps: and automatically generating and referencing.
According to the method of the first aspect of the present invention, in the step S3, the specific method for associating corresponding avatar progress items on each sub-item of the item WBS dictionary includes:
associating corresponding image progress items on each subentry of the project WBS dictionary, and setting a generation mode for designing image quantity on the associated image progress items, wherein the generation mode for the image quantity comprises the following steps: and inputting, counting, mileage, characteristic values and list items, and respectively associating the characteristic values or the item list items set under the WBS dictionary clauses when the generation mode of the image quantity is the characteristic values and the list items.
According to the method of the first aspect of the invention, in said step S3,
the input is as follows: directly inputting parts in an image project quantity ledger to design image quantities;
the counting is as follows: automatically generating design image quantity according to the number of the parts:
mileage: automatically generating a design image quantity according to the starting and ending mileage of the part;
characteristic value: automatically generating a design image quantity according to the characteristic attribute input on the part;
a list clearing item: and automatically generating design image quantity according to the associated list items.
According to the method of the first aspect of the present invention, in the step S8, a specific method for generating a construction ledger template list according to the construction method and the construction process set in the image progress template by the selected image progress item to be recorded includes:
if the image progress item recording mode is entity part-recording construction process, entity part-directly recording image quantity, entity part decomposition-recording construction process and entity part decomposition-directly recording image quantity, generating a construction ledger template list according to the procedures and recording fields set in the part and image progress item template established in the entity decomposition;
and if the image progress item recording mode is a self-defined part-recording construction process and a self-defined part-directly recording image quantity, generating a construction standing book template list according to the part name recorded for the first time and the construction process and recording field arranged in the image progress item template.
The second aspect of the invention discloses a data statistics system for progress recording and construction machine account of a construction site, which comprises:
a first processing module configured to establish a project WBS dictionary: establishing the branches and the subentry division of each professional project of the project, and establishing special certificate value fields of the project on the subentry;
a second processing module configured to establish a project avatar progress template: establishing an image progress template of each professional project of the project, establishing an image progress item for project site statistics under the professional image progress template, setting a construction record mode in the image progress template, and adding a construction method and a construction process according to the construction record mode;
a third processing module configured to associate the avatar progress item with the item WBS dictionary: associating corresponding image progress items on each subentry of the project WBS dictionary;
a fourth processing module configured to establish an entity decomposition: establishing a position of entity decomposition according to the position name in project professional engineering and drawing; when a WBS dictionary is selected to establish an entity part, automatically bringing in an associated image progress item in the WBS dictionary;
a fifth processing module configured to generate an image project amount ledger: in the image project quantity ledger, generating a position value according to the position established in the entity decomposition and the WBS dictionary in the association image progress item;
a sixth processing module configured to establish a construction site: establishing a construction work point according to project engineering entity division and management dimensions, and selecting an entity decomposition part under the construction work point;
a seventh processing module configured to perform on-site construction recording: selecting a work point and a work team where construction is located during recording, selecting an image progress item to be recorded and a part for entity decomposition under the work point, selecting a construction method and a construction process set in the image progress template by the image progress item to be recorded, and automatically bringing out a recording field of the image progress item in the image progress template;
an eighth processing module configured to generate a construction ledger: and generating a construction standing book template list according to the construction method and the construction process set in the image progress template by the selected image progress item to be recorded.
According to the system of the second aspect of the invention, the first processing module is configured to select a WBS dictionary: and selecting the established standard WBS template in the WBS template library, and automatically bringing the associated image progress item under the WBS subentry according to the selected WBS dictionary.
According to the system of the second aspect of the present invention, the second processing module is configured such that the avatar progress item includes: the name, image unit, image quantity summary coefficient, statistical unit and statistic summary coefficient of the image progress item;
the construction recording mode comprises the following steps: entity part-recording construction process, entity part-directly recording image quantity, entity part decomposition-recording construction process, entity part decomposition-directly recording image quantity, self-defining part-recording construction process and self-defining part-directly recording image quantity.
According to the system of the second aspect of the present invention, the second processing module is configured to add a new construction method and a new construction process to the image progress item of the physical part-recording construction process, the physical part decomposition-recording construction process, the user-defined part-recording construction process, and add a new process record field under the construction process;
adding a field for directly recording the image quantity on an image progress item of the method of the construction record, namely an entity part, directly recording the image quantity, decomposing the entity part, directly recording the image quantity and a user-defined part, directly recording the image quantity;
setting a calculation mode of the image quantity under each image progress item, wherein the calculation mode comprises the following steps: and automatically generating and referencing.
According to the system of the second aspect of the present invention, the third processing module is configured to associate corresponding avatar progress items on each sub-item of the item WBS dictionary, and set a generation manner of a design avatar amount on the associated avatar progress items, the generation manner of the avatar amount including: and inputting, counting, mileage, a characteristic value and a list item, and respectively associating the characteristic value or the item list item set under the WBS dictionary clause when the generation mode of the image quantity is the characteristic value and the list item.
The system according to the second aspect of the invention, the third processing module, is configured to,
the input is as follows: directly inputting parts in an image project quantity ledger to design image quantities;
the counting is as follows: automatically generating design image quantity according to the number of the parts:
mileage: automatically generating design image quantity according to the starting mileage and the ending mileage of the part;
characteristic value: automatically generating a design image quantity according to the characteristic attribute input on the part;
a list clearing item: and automatically generating design image quantity according to the associated list items.
According to the system of the second aspect of the present invention, the eighth processing module is configured such that a specific method of generating a construction ledger template list according to a construction method and a construction process set in the avatar progress template by the selected avatar progress item to be recorded includes:
if the image progress item recording mode is entity part-recording construction process, entity part-directly recording image quantity, entity part decomposition-recording construction process and entity part decomposition-directly recording image quantity, generating a construction ledger template list according to the procedures and recording fields set in the part and image progress item template established in the entity decomposition;
and if the image progress item recording mode is a self-defined part-recording construction process and a self-defined part-directly recording image quantity, generating a construction standing book template list according to the part name recorded for the first time and the construction process and recording field arranged in the image progress item template.
A third aspect of the invention discloses an electronic device. The electronic device comprises a memory and a processor, the memory stores a computer program, and the processor executes the computer program to realize the steps of the construction site progress recording and construction ledger data statistics method in any one of the first aspect of the disclosure.
A fourth aspect of the invention discloses a computer-readable storage medium. The computer readable storage medium has stored thereon a computer program, and when the computer program is executed by a processor, the computer program implements the steps in a data statistics method for job site progress recording and construction ledger of any one of the first aspect of the present disclosure.
The scheme provided by the invention has the following beneficial effects:
(1) The image progress item process recording field is used, the problem that in the construction process, on-site technicians record data which are not standard and cannot meet the project progress statistics requirement is thoroughly solved, the data statistics on the project are more standard by using standard data, and the statistical efficiency is higher.
(2) Use image progress item process record field, through removing the quick record of end, the automatic construction record standing book that satisfies the project and use that forms, it is poor to replace the off-line edit data quality completely, problem at the end of the establishment efficiency.
(3) For the project department, the generation of the platform account is recorded through standard construction, so that the requirements of lower data such as subsequent lower measurement, upper measurement, internal analysis and the like are met, and the efficiency and the quality of data use are improved.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and other drawings can be obtained by those skilled in the art without creative efforts.
Fig. 1 is a flowchart of a data statistics method for job site progress recording and a construction machine account according to an embodiment of the present invention;
FIG. 2 is a block diagram of a data statistics system for job site progress recording and construction ledgers according to an embodiment of the present invention;
fig. 3 is a block diagram of an electronic device according to an embodiment of the present invention.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The invention discloses a construction site progress recording and construction standing book data statistical method in a first aspect. Fig. 1 is a flowchart of a data statistics method for a job site progress record and a construction machine account according to an embodiment of the present invention, and as shown in fig. 1, the method includes:
step S1, establishing a project WBS dictionary: establishing branches and itemization division of each professional project of the project, and establishing special certificate value fields of the project on the items;
s2, establishing a project image progress template: establishing an image progress template of each professional project of the project, establishing an image progress item for project site statistics under the professional image progress template, setting a construction record mode on the image progress item, and adding a construction method and a construction process according to the construction record mode;
step S3, associating the image progress item with the project WBS dictionary: associating corresponding image progress items on each subentry of the project WBS dictionary;
s4, establishing entity decomposition: establishing a position of entity decomposition according to the position name in project professional engineering and drawing; when the WBS dictionary is selected to establish an entity part, automatically bringing the associated image progress item in the WBS dictionary;
s5, generating an image project quantity ledger: in the image project quantity ledger, generating a position value according to the position established in the entity decomposition and the WBS dictionary in the association image progress item;
s6, establishing a construction work point: establishing a construction work point according to project engineering entity division and management dimensions, and selecting an entity decomposition part under the construction work point;
s7, recording site construction: selecting a work point and a work team where construction is located during recording, selecting an image progress item to be recorded and a position of entity decomposition under the work point, selecting a construction method and a construction process of the image progress item to be recorded in an image progress template, and automatically taking out a recording field of the image progress item in the image progress template;
s8, generating a construction standing book: and generating a construction standing book template list according to the selected construction method and construction process set in the image progress template of the image progress item to be recorded.
In step S1, a project WBS dictionary is established: and establishing the sections and the itemization division of each professional project of the project, and establishing special certificate value fields of the project on the itemization.
In some embodiments, in the step S1, the method further comprises:
selecting a WBS dictionary: and selecting the established standard WBS template in the WBS template library, and automatically bringing the associated image progress item under the WBS subentry according to the selected WBS dictionary.
Specifically, a main construction process and a process record of construction site records of each image progress item under the highway engineering and the railway engineering in an engineering construction stage or a field data structure of statistical records of image quantity are formulated.
The construction record data decomposition structure comprises a first level: avatar progress items, such as: an anchor frame beam;
the second level of the construction record data decomposition structure is as follows: construction sites, for example: entity decomposition part, left side/right side, starting mileage, ending mileage and construction part description;
the third level of the construction record data decomposition structure is as follows: the construction method includes: the anchor rod frame beam is cast in situ;
the fourth level of the construction record data decomposition structure: process (item), for example: erecting a support and drilling; erecting, installing anchor rods (cables), binding frame beam steel bars, installing frame beam templates, pouring frame beam concrete, and planting grass in foreign soil;
the fifth level of the construction record data decomposition structure: process record contents such as: completion, design, cumulative amount today.
Establishing a project WBS dictionary: and establishing the branches and the branch division of each professional project of the project, and establishing special evidence value fields of the project on the branches.
In step S2, establishing a project image progress template: establishing an image progress template of each professional project of the project, establishing an image progress item for project site statistics under the professional image progress template, setting a construction record mode on the image progress item, and adding a construction method and a construction process according to the construction record mode.
In some embodiments, in the step S2, the avatar progress item includes: the name, image unit, image quantity summary coefficient, statistical unit and statistic summary coefficient of the image progress item;
the construction recording mode comprises the following steps: entity part-recording construction process, entity part-directly recording image quantity, entity part decomposition-recording construction process, entity part decomposition-directly recording image quantity, self-defined part-recording construction process and self-defined part-directly recording image quantity.
Adding a construction method and a construction process on the visual progress items of the entity part-recording construction process, the entity part decomposition-recording construction process and the user-defined part-recording construction process in the construction record mode, and adding a process record field under the construction process;
adding a field for directly recording the image quantity on an image progress item of the construction record modes of an entity part-directly recording the image quantity, an entity part decomposition-directly recording the image quantity and a user-defined part-directly recording the image quantity;
setting a calculation mode of the image quantity under each image progress item, wherein the calculation mode comprises the following steps: and automatically generating and quoting, wherein automatic generation is selected, the construction part is automatically marked to be finished after the applet/app records the construction process, and a certain recording field of the part is used as image quantity when quoting is selected.
In some embodiments, a part description requirement of the avatar progress item in the recording process is further set on the avatar progress item, which specifically includes: construction position, construction position + start-stop mileage, start-stop mileage.
In step S3, the project WBS dictionary is associated with the avatar progress item: and associating corresponding avatar progress items on each sub-item of the item WBS dictionary.
In some embodiments, in the step S3, the specific method for associating corresponding avatar progress items on each sub-item of the item WBS dictionary includes:
associating corresponding image progress items on each subentry of the project WBS dictionary, and setting a generation mode for designing image quantity on the associated image progress items, wherein the generation mode for the image quantity comprises the following steps: and inputting, counting, mileage, a characteristic value and a list item, and respectively associating the characteristic value or the item list item set under the WBS dictionary clause when the generation mode of the image quantity is the characteristic value and the list item.
In some embodiments, in said step S3, said inputting: directly inputting parts in an image project quantity ledger to design image quantities;
counting: automatically generating design image quantity according to the number of the parts:
mileage: automatically generating design image quantity according to the starting mileage and the ending mileage of the part;
characteristic value: automatically generating a design image quantity according to the characteristic attribute input on the part;
clearing the items: and automatically generating the design image quantity according to the associated list items.
In step S4, an entity decomposition is established: establishing a position of entity decomposition according to the position name in project professional engineering and drawings, and inputting a corresponding characteristic value in the position; when the WBS dictionary is selected to establish the entity part, the associated vivid progress items in the WBS dictionary are automatically brought in.
In step S7, a site construction record is performed: selecting a work point and a work team where construction is located during recording, selecting an image progress item to be recorded and a position of entity decomposition under the work point, selecting a construction method and a construction process of the image progress item to be recorded in an image progress template, and automatically taking out a recording field of the image progress item in the image progress template.
Specifically, field recording is carried out on an applet or an app, time and weather are recorded, the current time and the current weather of the system are acquiescently taken and can be modified, a work point where a construction part is located and a work team are selected during recording, and fuzzy matching of the work point and the team can be carried out through searching keywords; under the work point, selecting an image progress item to be recorded and a part of entity decomposition, selecting a construction method and a construction process set in an image progress template by the image progress item to be recorded, selecting a progress state (in progress and completed) of the process, and automatically bringing out a recording field of the image progress item in the image progress template.
In step S8, a construction ledger is generated: and generating a construction standing book template list according to the selected construction method and construction process set in the image progress template of the image progress item to be recorded.
In some embodiments, in step S8, a specific method for generating a construction ledger template list according to a construction method and a construction procedure set in the image progress template by the selected image progress item to be recorded includes:
if the image progress item recording mode is entity part-recording construction process, entity part-directly recording image quantity, entity part decomposition-recording construction process and entity part decomposition-directly recording image quantity, generating a construction ledger template list according to the procedures and recording fields set in the part and image progress item template established in the entity decomposition;
and if the image progress item recording mode is a self-defined part-recording construction process and a self-defined part-directly recording image quantity, generating a construction standing book template list according to the part name recorded for the first time and the construction process and recording field arranged in the image progress item template.
In some embodiments, in the step S8, according to the recording time of the part image progress item in the applet and app, the recording state value (in progress, completed) of the process, and the like, the process starting and ending time is automatically taken to the construction ledger;
and automatically taking a value into the construction ledger according to the latest record field of the part image progress item in the applet and the app.
In summary, the solution proposed by the present invention can
(1) The image progress item process recording field is used, the problem that in the construction process, on-site technicians record data which are not standard and cannot meet the project progress statistics requirement is thoroughly solved, the data statistics on the project are more standard by using standard data, and the statistical efficiency is higher.
(2) Use image progress item process record field, through removing the quick record of end, the automatic construction record standing book that satisfies the project and use that forms replaces the problem that the line is edited data quality is poor down, compiles the inefficiency completely.
(3) For the project department, the generation of the platform account is recorded through standard construction, so that the requirements of lower data such as subsequent lower measurement, upper measurement, internal analysis and the like are met, and the efficiency and the quality of data use are improved.
The invention discloses a construction site progress recording and construction standing book data statistical system in a second aspect. FIG. 2 is a block diagram of a data statistics system for job site progress recording and construction ledgers according to an embodiment of the present invention; as shown in fig. 2, the system 100 includes:
a first processing module 101 configured to build a project WBS dictionary: establishing the branches and the subentry division of each professional project of the project, and establishing special certificate value fields of the project on the subentry;
a second processing module 102 configured to create a project avatar progress template: establishing an image progress template of each professional project of the project, establishing an image progress item for project site statistics under the professional image progress template, setting a construction record mode in the image progress template, and adding a construction method and a construction procedure according to the construction record mode;
a third processing module 103 configured to associate the avatar progress item with the item WBS dictionary: associating corresponding image progress items on each subentry of the project WBS dictionary;
a fourth processing module 104 configured to establish an entity decomposition: establishing a position of entity decomposition according to the position name in project professional engineering and drawing; when a WBS dictionary is selected to establish an entity part, automatically bringing in an associated image progress item in the WBS dictionary;
a fifth processing module 105, configured to generate an avatar project ledger: in the image project quantity ledger, generating a position value according to the position established in the entity decomposition and the WBS dictionary in the association image progress item;
a sixth processing module 106 configured to establish a construction site: establishing a construction work point according to project engineering entity division and management dimensions, and selecting an entity decomposition part under the construction work point;
a seventh processing module 107 configured to perform on-site construction recording: selecting a work point and a work team where construction is located during recording, selecting an image progress item to be recorded and a position of entity decomposition under the work point, selecting a construction method and a construction process of the image progress item to be recorded in an image progress template, and automatically taking out a recording field of the image progress item in the image progress template;
an eighth processing module 108 configured to generate a construction ledger: and generating a construction standing book template list according to the selected construction method and construction process set in the image progress template of the image progress item to be recorded.
According to the system of the second aspect of the present invention, the first processing module 101 is specifically configured to, the method further includes:
selecting a WBS dictionary: and selecting the established standard WBS template in the WBS template library, and automatically bringing the associated image progress item under the WBS subentry according to the selected WBS dictionary.
Specifically, a main construction process and a process record of construction site records of each image progress item under the highway engineering and the railway engineering in an engineering construction stage or a field data structure of statistical records of image quantity are formulated.
The construction record data decomposition structure comprises a first level: avatar progress items, such as: an anchor frame beam;
and a second level of the construction record data decomposition structure: construction sites, for example: entity decomposition part, left side/right side, starting mileage, ending mileage and construction part description;
the third level of the construction record data decomposition structure is as follows: the method includes, for example: the anchor rod frame beam is cast in situ;
the fourth level of the construction record data decomposition structure is as follows: process (item), for example: erecting a support and drilling; erecting, installing anchor rods (cables), binding frame beam steel bars, installing frame beam templates, pouring frame beam concrete, and planting grass in foreign soil;
the fifth level of the construction record data decomposition structure: the process record contents include, for example: completion, design, cumulative amount today.
Establishing a project WBS dictionary: and establishing the sections and the itemization division of each professional project of the project, and establishing special certificate value fields of the project on the itemization.
According to the system of the second aspect of the present invention, the second processing module 102 is specifically configured to, the avatar progress item includes: the name, image unit, image quantity summary coefficient, statistical unit and statistic summary coefficient of the image progress item;
the construction recording mode comprises the following steps: entity part-recording construction process, entity part-directly recording image quantity, entity part decomposition-recording construction process, entity part decomposition-directly recording image quantity, self-defining part-recording construction process and self-defining part-directly recording image quantity.
Adding a construction method and a construction process on the visual progress items of the entity part-recording construction process, the entity part decomposition-recording construction process and the user-defined part-recording construction process in the construction record mode, and adding a process record field under the construction process;
adding a field for directly recording the image quantity on an image progress item of the method of the construction record, namely an entity part, directly recording the image quantity, decomposing the entity part, directly recording the image quantity and a user-defined part, directly recording the image quantity;
setting a calculation mode of the image quantity under each image progress item, wherein the calculation mode comprises the following steps: and self-fixing, vivid and quoting, selecting automatic generation, automatically marking the construction part as finished after the small program/app records the construction process, and selecting quoting, and taking a certain recording field of the part as image quantity.
In some embodiments, a part description requirement of the avatar progress item in the recording process is further set on the avatar progress item, which specifically includes: construction position, construction position + start-stop mileage, start-stop mileage.
According to the system of the second aspect of the present invention, the third processing module 103 is specifically configured such that the specific method for associating corresponding avatar progress items on each sub-item of the item WBS dictionary includes:
associating corresponding image progress items on each subentry of the project WBS dictionary, and setting a generation mode for designing image quantity on the associated image progress items, wherein the generation mode for the image quantity comprises the following steps: and inputting, counting, mileage, a characteristic value and a list item, and respectively associating the characteristic value or the item list item set under the WBS dictionary clause when the generation mode of the image quantity is the characteristic value and the list item.
The input is as follows: directly inputting parts in an image project quantity ledger to design image quantities;
counting: automatically generating design image quantity according to the number of the parts:
mileage: automatically generating design image quantity according to the starting mileage and the ending mileage of the part;
characteristic value: automatically generating a design image quantity according to the characteristic attribute input on the part;
a list clearing item: and automatically generating design image quantity according to the associated list items.
According to the system of the second aspect of the present invention, the seventh processing module 107 is specifically configured to perform field recording on the applet or app, record time and weather, obtain the current time and weather of the system by default, modify the current time and weather, select a work point and a work team where a construction part is located during recording, and perform fuzzy matching of the work point and the work team by searching keywords; under the work point, selecting an image progress item to be recorded and a position of entity decomposition, selecting a construction method and a construction process set in an image progress template by the image progress item to be recorded, selecting a progress state (completed in progress) of the process, and automatically taking out a recording field of the image progress item in the image progress template.
According to the system of the second aspect of the present invention, the eighth processing module 108 is specifically configured such that, according to the selected construction method and construction procedure set in the avatar progress template according to the avatar progress item to be recorded, a specific method of generating the construction ledger template list includes:
if the image progress item recording mode is entity part-recording construction process, entity part-directly recording image quantity, entity part decomposition-recording construction process and entity part decomposition-directly recording image quantity, generating a construction ledger template list according to the procedures and recording fields set in the part and image progress item template established in the entity decomposition;
and if the image progress item recording mode is a self-defined part, recording construction processes and self-defined parts, directly recording image quantity, and generating a construction standing book template list according to the part name recorded for the first time, the construction processes and the recording fields arranged in the image progress item template.
In some embodiments, according to the recording time of the part image progress item in the applet and the app, the recording state value (in progress and completed) of the process and the like, the process starting and ending time is automatically taken to the construction machine account;
and automatically taking values into a construction ledger according to the latest record fields of the part image progress items in the small program and the app.
A third aspect of the invention discloses an electronic device. The electronic equipment comprises a memory and a processor, the memory stores a computer program, and the processor executes the computer program to realize the steps of the construction site progress recording and construction standing book data statistical method in any one of the first aspect of the disclosure.
Fig. 3 is a block diagram of an electronic device according to an embodiment of the present invention, and as shown in fig. 3, the electronic device includes a processor, a memory, a communication interface, a display screen, and an input device, which are connected by a system bus. Wherein the processor of the electronic device is configured to provide computing and control capabilities. The memory of the electronic equipment comprises a nonvolatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the operation of an operating system and computer programs in the non-volatile storage medium. The communication interface of the electronic device is used for carrying out wired or wireless communication with an external terminal, and the wireless communication can be realized through WIFI, an operator network, near Field Communication (NFC) or other technologies. The display screen of the electronic equipment can be a liquid crystal display screen or an electronic ink display screen, and the input device of the electronic equipment can be a touch layer covered on the display screen, a key, a track ball or a touch pad arranged on the shell of the electronic equipment, an external keyboard, a touch pad or a mouse and the like.
It will be understood by those skilled in the art that the structure shown in fig. 3 is only a partial block diagram related to the technical solution of the present disclosure, and does not constitute a limitation to the electronic device to which the solution of the present disclosure is applied, and a specific electronic device may include more or less components than those shown in the figure, or combine some components, or have different arrangements of components.
A fourth aspect of the invention discloses a computer-readable storage medium. The computer readable storage medium stores thereon a computer program, and when the computer program is executed by a processor, the computer program implements the steps in the steps of the method for data statistics of job site progress records and construction ledgers of any one of the first aspect of the disclosure.
It should be noted that the technical features of the above embodiments can be arbitrarily combined, and for the sake of brevity, all possible combinations of the technical features in the above embodiments are not described, however, as long as there is no contradiction between the combinations of the technical features, the scope of the present description should be considered. The above examples only express several embodiments of the present application, and the description thereof is more specific and detailed, but not to be construed as limiting the scope of the invention. It should be noted that, for a person skilled in the art, several variations and modifications can be made without departing from the concept of the present application, and these are all within the scope of protection of the present application. Therefore, the protection scope of the present patent shall be subject to the appended claims.

Claims (10)

1. A data statistical method for progress records and construction ledgers of a construction site is characterized by comprising the following steps:
step S1, establishing a project WBS dictionary: establishing branches and itemization division of each professional project of the project, and establishing special certificate value fields of the project on the items;
s2, establishing a project image progress template: establishing an image progress template of each professional project of the project, establishing an image progress item for project site statistics under the image progress template of the professional project, setting a construction record mode on the image progress item, and adding a construction method and a construction process according to the construction record mode;
step S3, associating the image progress item with the project WBS dictionary: associating corresponding image progress items on each subentry of the project WBS dictionary;
s4, establishing entity decomposition: establishing a position of entity decomposition according to the position name in project professional engineering and drawing; when a WBS dictionary is selected to establish an entity part, automatically bringing in an associated image progress item in the WBS dictionary;
s5, generating an image project quantity ledger: in the image project amount ledger, when associating an image progress item, generating a position value according to a position and a WBS dictionary established in entity decomposition;
s6, establishing a construction work point: establishing a construction work point according to project engineering entity division and management dimensions, and selecting an entity decomposition part under the construction work point;
s7, recording site construction: selecting a work point and a work team where construction is located during recording, selecting an image progress item to be recorded and a position of entity decomposition under the work point, selecting a construction method and a construction process of the image progress item to be recorded in an image progress template, and automatically taking out a recording field of the image progress item in the image progress template;
s8, generating a construction standing book: and generating a construction standing book template list according to the construction method and the construction process set in the image progress template by the selected image progress item to be recorded.
2. The method for the data statistics of the job site progress record and the construction ledger of claim 1, wherein in the step S1, the method further comprises:
selecting a WBS dictionary: and selecting the established standard WBS template in the WBS template library, and automatically bringing the associated image progress item under the WBS itemization according to the selected WBS dictionary.
3. The method of claim 1, wherein in the step S2, the visual progress item comprises: the name, image unit, image quantity summary coefficient, statistical unit and statistic summary coefficient of the image progress item;
the construction recording mode comprises the following steps: entity part-recording construction process, entity part-directly recording image quantity, entity part decomposition-recording construction process, entity part decomposition-directly recording image quantity, self-defined part-recording construction process and self-defined part-directly recording image quantity.
4. The method as claimed in claim 3, wherein in the step S2, the method further comprises:
adding a construction method and a construction process on the visual progress items of the entity part-recording construction process, the entity part decomposition-recording construction process and the user-defined part-recording construction process in the construction record mode, and adding a process record field under the construction process;
adding a field for directly recording the image quantity on an image progress item of the method of the construction record, namely an entity part, directly recording the image quantity, decomposing the entity part, directly recording the image quantity and a user-defined part, directly recording the image quantity;
setting a calculation mode of the image quantity under each image progress item, wherein the calculation mode comprises the following steps: and automatically generating and referencing.
5. The method of claim 1, wherein in step S3, the step of associating the corresponding visual progress item with each sub-item of the WBS dictionary comprises:
associating corresponding image progress items on each subentry of the project WBS dictionary, and setting a generation mode for designing image quantity on the associated image progress items, wherein the generation mode for the image quantity comprises the following steps: and inputting, counting, mileage, a characteristic value and a list item, and respectively associating the characteristic value or the item list item set under the WBS dictionary clause when the generation mode of the image quantity is the characteristic value and the list item.
6. The method for construction site progress recording and construction ledger data statistics according to claim 5, wherein in said step S3,
the input is as follows: directly inputting parts in an image project quantity ledger to design image quantities;
counting: automatically generating design image quantity according to the number of the parts:
mileage: automatically generating design image quantity according to the starting mileage and the ending mileage of the part;
characteristic value: automatically generating a design image quantity according to the characteristic attribute input on the part;
a list clearing item: and automatically generating design image quantity according to the associated list items.
7. The method as claimed in claim 3, wherein the step S8 of generating the construction standing book template list according to the selected construction method and construction process set in the image progress template according to the image progress item to be recorded comprises:
if the image progress item recording mode is entity part-recording construction process, entity part-directly recording image quantity, entity part decomposition-recording construction process and entity part decomposition-directly recording image quantity, generating a construction ledger template list according to the procedures and recording fields set in the part and image progress item template established in the entity decomposition;
and if the image progress item recording mode is a self-defined part-recording construction process and a self-defined part-directly recording image quantity, generating a construction standing book template list according to the part name recorded for the first time and the construction process and recording field arranged in the image progress item template.
8. A data statistics system for job site progress record and construction machine account, the system comprising:
a first processing module configured to build a project WBS dictionary: establishing the branches and the subentry division of each professional project of the project, and establishing special certificate value fields of the project on the subentry;
a second processing module configured to establish a project avatar progress template: establishing an image progress template of each professional project of the project, establishing an image progress item for project site statistics under the image progress template of the professional project, setting a construction record mode in the image progress template, and adding a construction method and a construction process according to the construction record mode;
a third processing module configured to associate the avatar progress item with the item WBS dictionary: associating corresponding image progress items on each subentry of the project WBS dictionary;
a fourth processing module configured to establish an entity decomposition: establishing a position of entity decomposition according to the position name in project professional engineering and drawing; when the WBS dictionary is selected to establish an entity part, automatically bringing the associated image progress item in the WBS dictionary;
the fifth processing module is configured to generate an image project amount ledger: in the image project amount ledger, when associating an image progress item, generating a position value according to a position and a WBS dictionary established in entity decomposition;
a sixth processing module configured to establish a construction site: establishing a construction work point according to project engineering entity division and management dimensions, and selecting an entity decomposition part under the construction work point;
a seventh processing module configured to perform on-site construction recording: selecting a work point and a work team where construction is located during recording, selecting an image progress item to be recorded and a position of entity decomposition under the work point, selecting a construction method and a construction process of the image progress item to be recorded in an image progress template, and automatically taking out a recording field of the image progress item in the image progress template;
an eighth processing module configured to generate a construction ledger: and generating a construction standing book template list according to the construction method and the construction process set in the image progress template by the selected image progress item to be recorded.
9. An electronic device, comprising a memory and a processor, wherein the memory stores a computer program, and the processor implements the steps of the method for data statistics of job site progress record and construction ledger of any one of claims 1 to 7 when executing the computer program.
10. A computer-readable storage medium, wherein a computer program is stored on the computer-readable storage medium, and when the computer program is executed by a processor, the computer program implements the steps of the method for data statistics of job site progress records and construction ledgers of any one of claims 1 to 7.
CN202210358047.XA 2022-04-06 2022-04-06 Construction site progress recording and construction standing book data statistics method and system Active CN114648246B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210358047.XA CN114648246B (en) 2022-04-06 2022-04-06 Construction site progress recording and construction standing book data statistics method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210358047.XA CN114648246B (en) 2022-04-06 2022-04-06 Construction site progress recording and construction standing book data statistics method and system

Publications (2)

Publication Number Publication Date
CN114648246A CN114648246A (en) 2022-06-21
CN114648246B true CN114648246B (en) 2022-10-04

Family

ID=81996527

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210358047.XA Active CN114648246B (en) 2022-04-06 2022-04-06 Construction site progress recording and construction standing book data statistics method and system

Country Status (1)

Country Link
CN (1) CN114648246B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115600997B (en) * 2022-12-12 2023-05-09 厦门盈趣科技股份有限公司 Digital research and development project management system and method for normative content management
CN117172685A (en) * 2023-07-26 2023-12-05 北京梦诚科技有限公司 Method and system for linear engineering progress planning, tracking and monitoring
CN117151617B (en) * 2023-07-31 2024-06-14 北京梦诚科技有限公司 Method and system for checking work receiving party based on part attribute
CN117745217A (en) * 2023-12-19 2024-03-22 北京梦诚科技有限公司 Concrete joint super management method, system, electronic equipment and storage medium

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110084526A (en) * 2019-05-05 2019-08-02 广西路桥工程集团有限公司 A kind of visualization project management monitoring system based on BIM+WBS
CN111367939A (en) * 2020-03-04 2020-07-03 昆明海巍科技有限公司 System and method for compiling and managing highway engineering project account and computer

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11042464B2 (en) * 2018-07-16 2021-06-22 Red Hat Israel, Ltd. Log record analysis based on reverse engineering of log record formats

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110084526A (en) * 2019-05-05 2019-08-02 广西路桥工程集团有限公司 A kind of visualization project management monitoring system based on BIM+WBS
CN111367939A (en) * 2020-03-04 2020-07-03 昆明海巍科技有限公司 System and method for compiling and managing highway engineering project account and computer

Also Published As

Publication number Publication date
CN114648246A (en) 2022-06-21

Similar Documents

Publication Publication Date Title
CN114648246B (en) Construction site progress recording and construction standing book data statistics method and system
CN112132543A (en) Engineering project progress management system
McGrath Waste minimisation in practice
CN109583852B (en) Material and progress informatization management system for bridge cantilever pouring construction
CN114841594B (en) Construction project site concrete section excess management method and system
CN111582696A (en) Engineering construction scheduling management method
CN110880097A (en) Project progress simulation display method and device
CN110428176B (en) Project progress auditing method and system
CN103678585A (en) User data screening method and system
CN111160866A (en) System for adjusting investment plan of power grid infrastructure project
CN115187039A (en) Construction progress management method and system based on BIM
Marzouk et al. Applications of building information modeling in cost estimation of infrastructure bridges
CN117172685A (en) Method and system for linear engineering progress planning, tracking and monitoring
CN107423035A (en) A kind of software development process product data management system
KR20020008644A (en) The construction management system and the service method using the system
CN116796950A (en) Online review system and method for power distribution network project capable of being researched
CN116128270A (en) Power grid operation plan management method and device for multi-source data fusion
Xiao et al. Study on Construction Engineering Management Based on BIM from the perspective of big data
CN113781017A (en) Railway four-electric engineering construction organization management method and system
JP4292885B2 (en) Management index calculation system
CN112884455A (en) Task plan processing system, method and device
Hindmarch et al. A support tool for assessing the impact of design changes during built environment projects
Dahmani et al. Choosing by Advantages (CBA) Used as a Qualitative Assessment Methodology in Lean Construction
CN117851412B (en) Highway engineering list compiling method and system based on BIM
CN219872423U (en) Intelligent construction management system for reconstruction and expansion engineering

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant