CN114541790A - Construction method for quickly assembling and disassembling horizontal overhanging net of high-altitude overhanging outer frame - Google Patents
Construction method for quickly assembling and disassembling horizontal overhanging net of high-altitude overhanging outer frame Download PDFInfo
- Publication number
- CN114541790A CN114541790A CN202210217194.5A CN202210217194A CN114541790A CN 114541790 A CN114541790 A CN 114541790A CN 202210217194 A CN202210217194 A CN 202210217194A CN 114541790 A CN114541790 A CN 114541790A
- Authority
- CN
- China
- Prior art keywords
- net
- horizontal
- cantilever
- overhanging
- roof
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 27
- 238000004064 recycling Methods 0.000 claims abstract description 7
- 230000001681 protective effect Effects 0.000 claims description 5
- 230000003068 static effect Effects 0.000 claims description 3
- 229910000831 Steel Inorganic materials 0.000 claims description 2
- 239000010959 steel Substances 0.000 claims description 2
- 210000001503 joint Anatomy 0.000 claims 1
- 238000012216 screening Methods 0.000 claims 1
- 230000001502 supplementing effect Effects 0.000 claims 1
- 238000000034 method Methods 0.000 abstract description 14
- 230000009194 climbing Effects 0.000 description 4
- 238000010586 diagram Methods 0.000 description 4
- 238000003032 molecular docking Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 1
- 229910052782 aluminium Inorganic materials 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/32—Safety or protective measures for persons during the construction of buildings
- E04G21/3204—Safety or protective measures for persons during the construction of buildings against falling down
- E04G21/3219—Means supported by the building wall, e.g. security consoles
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/32—Safety or protective measures for persons during the construction of buildings
- E04G21/3261—Safety-nets; Safety mattresses; Arrangements on buildings for connecting safety-lines
- E04G21/3266—Safety nets
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A50/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE in human health protection, e.g. against extreme weather
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
Description
技术领域technical field
本发明涉及高空悬挑外架挑网技术领域,具体是一种高空悬挑外架水平挑网快速装拆施工方法。The invention relates to the technical field of high-altitude cantilevered outer frame picking nets, in particular to a construction method for rapid assembly and disassembly of high-altitude cantilevered external frame horizontal picking nets.
背景技术Background technique
防止高处坠落是施工现场安全管理的重点,尤其在高层建筑主体结构施工阶段。高层住宅屋面有挑檐设计,外挑长度1.2m,主体结构采用爬架+铝模进行全穿插施工,当爬架施工至顶层时,因屋面挑檐结构与爬架位置冲突,造成爬架无法继续爬升至屋面。外架施工面临两种方案:第一种爬架不拆,在爬架上方搭设悬挑架;第二种先拆爬架,再搭悬挑架。第一种方法显然不经济,且显现外立面的效果不理想;而第二种方法安全性较低。Preventing falls from heights is the focus of safety management on construction sites, especially in the construction phase of the main structure of high-rise buildings. The roof of the high-rise residential building is designed with overhangs, the length of the overhang is 1.2m, and the main structure is constructed with climbing frame + aluminum formwork. Continue to climb to the roof. There are two options for the construction of the outer frame: the first is not to dismantle the climbing frame, and the cantilever frame is erected above the climbing frame; the second is to dismantle the climbing frame first, and then build the cantilever frame. The first method is obviously uneconomical, and the effect of showing the facade is not ideal; while the second method is less secure.
高空悬挑式外脚手架作业时,为防止高处坠落,常采用悬挑防护兜网与悬挑式外脚手架连接,作为高层建筑结构外围水平防护,但这种传统水平防护施工复杂,施工过程较长,不利于项目高效建造的目的。When the high-altitude cantilevered external scaffolding is operated, in order to prevent falling from a high place, the cantilevered protective net is often used to connect the cantilevered external scaffolding as the peripheral horizontal protection of the high-rise building structure. However, the traditional horizontal protection construction is complicated and the construction process is relatively long, which is not conducive to the purpose of efficient construction of the project.
发明内容SUMMARY OF THE INVENTION
针对上述现有技术,本发明提出一种高空悬挑外架水平挑网快速装拆施工方法。In view of the above-mentioned prior art, the present invention proposes a construction method for rapid assembly and disassembly of a horizontally picking net of a high-altitude cantilevered outer frame.
本发明提供的一种高空悬挑外架水平挑网快速装拆施工方法,包括下述步骤:A construction method for rapid assembly and disassembly of a high-altitude cantilevered outer frame horizontally hoisted net provided by the present invention comprises the following steps:
S1、水平挑网组装:在地面进行水平挑网组装,先搭设主骨架,再张挂防护网,并在水平挑网的两侧搭设若干竖向连接件;S1. Horizontal picking net assembly: The horizontal picking net is assembled on the ground, the main frame is set up first, then the protective net is stretched, and several vertical connectors are erected on both sides of the horizontal picking net;
S2、水平挑网吊装:待屋面悬挑梁摆放固定完成,将若干组装好的水平挑网按不同部位进行吊装,将吊装好的水平挑网吊运至屋面悬挑梁的下方,紧靠屋面结构的侧边,保持水平静止状态;S2. Hoisting of horizontal pick nets: After the roof cantilever beams are placed and fixed, several assembled horizontal pick nets are hoisted according to different parts, and the hoisted horizontal pick nets are hoisted to the bottom of the roof cantilever beams, close to The side of the roof structure is kept in a horizontal static state;
S3、水平挑网固定:将若干水平固定件置于屋面悬挑梁的上端,并与水平挑网两侧的所述竖向连接件进行连接,固定于屋面悬挑梁上;S3. Fixing the horizontal pick net: place several horizontal fixtures on the upper end of the roof cantilever beam, connect with the vertical connectors on both sides of the horizontal pick net, and fix them on the roof cantilever beam;
S4、水平挑网拆除:待悬挑外架的杆件依次拆除后,悬吊水平挑网的主骨架,拆除与所述竖向连接件连接的水平固定件,将水平挑网吊运至地面,吊运屋面悬挑梁至地面,将水平挑网进行散拆回收。S4. Dismantling the horizontal lifting net: After the rods of the cantilevered outer frame are removed in sequence, suspend the main frame of the horizontal lifting net, remove the horizontal fixing piece connected with the vertical connecting piece, and hoist the horizontal lifting net to the ground. , hoist the roof cantilever beam to the ground, and dismantle the horizontal pick net for recycling.
优选地,S1中,所述防护网由白网和安全网组成。Preferably, in S1, the protective net consists of a white net and a safety net.
优选地,S2中,水平挑网采用对接方式或叠拼方式或预留间隙再补网方式进行吊装。Preferably, in S2, the horizontal picking net is hoisted by a docking method, a stacking method, or a method of reserving a gap and then replenishing the net.
优选地,S2中,所述屋面悬挑梁采用工字钢制作。Preferably, in S2, the roof cantilever beam is made of I-beam.
优选地,S3中,在所述竖向连接件的顶端和底端均安装防滑移扣件。Preferably, in S3, anti-slip fasteners are installed on both the top and bottom ends of the vertical connectors.
相对于现有技术,本发明的有益效果为:本发明在施工过程中,作业人员能够实现快速装拆施工,规避风险的同时,减少了劳动力的投入,满足安全施工要求,有效预防高空坠落风险,且操作十分方便,使用完即可拆解回收,回收利用率达到100%,使用成本极低,大大减少了安全防护措施费用,经济、技术效益显著。Compared with the prior art, the beneficial effects of the present invention are: in the construction process of the present invention, the operator can realize rapid assembly and disassembly construction, while avoiding risks, reducing labor input, meeting safety construction requirements, and effectively preventing high-altitude falling risks. , and the operation is very convenient, it can be disassembled and recycled after use, the recycling rate reaches 100%, the use cost is extremely low, the cost of safety protection measures is greatly reduced, and the economic and technical benefits are significant.
附图说明Description of drawings
图1为本发明实施例的施工示意图。FIG. 1 is a schematic construction diagram of an embodiment of the present invention.
图2为本发明实施例中水平挑网采用对接方式进行吊装的示意图。FIG. 2 is a schematic diagram of hoisting a horizontally picking net in a docking manner in an embodiment of the present invention.
图3为本发明实施例中水平挑网采用叠拼方式进行吊装的示意图。FIG. 3 is a schematic diagram of hoisting the horizontal picking net by stacking and splicing in an embodiment of the present invention.
图4为本发明实施例中水平挑网采用预留间隙再补网方式进行吊装的示意图。FIG. 4 is a schematic diagram of hoisting a horizontally picking net by using a method of reserving a gap and then replenishing the net according to an embodiment of the present invention.
图中:1、水平挑网;2、竖向连接杆;3、屋面悬挑梁;4、屋面结构;5、水平固定杆;6、悬挑外架。In the picture: 1. Horizontal pick net; 2. Vertical connecting rod; 3. Roof cantilever beam; 4. Roof structure; 5. Horizontal fixed rod; 6. Cantilevered outer frame.
具体实施方式Detailed ways
为了使本发明实现的技术手段、创作特征、达成目的与功效易于明白了解,下面结合具体图示,进一步阐述本发明。In order to make the technical means, creation features, achievement goals and effects of the present invention easy to understand and understand, the present invention will be further described below with reference to the specific drawings.
实施例Example
一种高空悬挑外架水平挑网快速装拆施工方法,参照图1-4,包括下述步骤:A construction method for rapid assembly and disassembly of a high-altitude cantilevered outer frame horizontally picking net, referring to Figures 1-4, includes the following steps:
S1、水平挑网组装:在地面进行水平挑网1组装,可采用φ48mm普通钢管,先纵向后横向搭设主骨架,长度3-6m不等,视屋面结构纵向长度而定,宽度即外挑长度可为3m,纵横向间距可为1.5m,可组装成“田”字型水平结构,再张挂安全网和白网,安全网可采用2000目/100㎡密目网,白网可采用30mm×30mm平网,可在主骨架上先铺一道平网兜底,再铺一道密目网,并采用22#扎丝绑扎固定,并在水平挑网1的两侧采用0.8m立杆搭设若干竖向连接杆2;S1. Horizontal pick net assembly: Assemble
S2、水平挑网吊装:屋面悬挑梁3采用工字钢制作,待屋面悬挑梁3摆放固定完成,采用塔吊将若干组装好的水平挑网1按不同部位进行吊装,将吊装好的水平挑网1吊运至屋面悬挑梁3下方,紧靠屋面结构4的侧边,保持水平静止状态;其中,水平挑网1可采用如图2所示的对接方式进行吊装,或可采用如图3所示的叠拼方式进行吊装,或可采用如图4所示的方式进行吊装,即先预留一定的间隙,待安装完成后,进行补网;S2. Hoisting of horizontal pick nets: The
S3、水平挑网固定:将若干水平固定杆5置于屋面悬挑梁3的上端,并与水平挑网两侧的竖向连接杆2采用扣件进行连接,固定于屋面悬挑梁3上,两者连接点距离主节点距离不大于300mm,并在竖向连接杆2的顶端和底端各安装一个防滑移扣件,以提高水平挑网主骨架的稳固性以及安全性能;S3. Fixing the horizontal pick net: place several
S4、水平挑网拆除:待悬挑外架6的杆件依次拆除后,在屋面悬挑梁3上采用小型夹具清理水平挑网1的杂物,以排除安全隐患,采用塔吊钢丝绳悬吊水平挑网1的主骨架,拆除与竖向连接杆2连接的水平固定杆5,将水平挑网1吊运至地面,吊运屋面悬挑梁3至地面,将水平挑网1进行散拆回收。 S4. Dismantling the horizontal pick net: After the rods of the cantilevered
本实施例在施工过程中,作业人员能够实现快速装拆施工,规避风险的同时,减少了劳动力的投入,满足安全施工要求,有效预防高空坠落风险,且操作十分方便,使用完即可拆解回收,回收利用率达到100%,使用成本极低,大大减少了安全防护措施费用,经济、技术效益显著。In the construction process of this embodiment, the operator can realize rapid assembly and disassembly construction, avoid risks, reduce labor input, meet safety construction requirements, effectively prevent the risk of falling from high altitude, and the operation is very convenient, and can be disassembled after use Recycling, the recycling rate reaches 100%, the use cost is extremely low, the cost of safety protection measures is greatly reduced, and the economic and technical benefits are significant.
以上仅为本发明的实施方式,并非因此限制本发明的专利范围,凡是利用本发明说明书及附图内容所作的等效结构,直接或间接运用在其他相关的技术领域,均同理在本发明的专利保护范围之内。The above are only the embodiments of the present invention, and are not intended to limit the scope of the present invention. Any equivalent structure made by using the contents of the description and the accompanying drawings of the present invention is directly or indirectly applied to other related technical fields. within the scope of patent protection.
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210217194.5A CN114541790A (en) | 2022-03-07 | 2022-03-07 | Construction method for quickly assembling and disassembling horizontal overhanging net of high-altitude overhanging outer frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210217194.5A CN114541790A (en) | 2022-03-07 | 2022-03-07 | Construction method for quickly assembling and disassembling horizontal overhanging net of high-altitude overhanging outer frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN114541790A true CN114541790A (en) | 2022-05-27 |
Family
ID=81662848
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210217194.5A Pending CN114541790A (en) | 2022-03-07 | 2022-03-07 | Construction method for quickly assembling and disassembling horizontal overhanging net of high-altitude overhanging outer frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114541790A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115596096A (en) * | 2022-09-26 | 2023-01-13 | 中建二局第三建筑工程有限公司(Cn) | Reverse construction method for overground nonstandard layer with cornice of full concrete outer wall structure |
Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06185019A (en) * | 1992-12-17 | 1994-07-05 | Kensetsu Toso Kogyo Kk | Hanging scaffolding method and coupling device used therefor |
KR200219589Y1 (en) * | 2000-11-25 | 2001-04-02 | 쓰리엠안전개발주식회사 | Safety power device |
KR20020041267A (en) * | 2000-12-01 | 2002-06-01 | 오성우 | Safety power device |
CN202031308U (en) * | 2010-12-31 | 2011-11-09 | 青建集团股份公司 | Inverted-hanging type scaffold |
CN105298099A (en) * | 2015-11-17 | 2016-02-03 | 中国建筑第八工程局有限公司 | Modular suspension type steel tube fastener scaffold operating platform and erecting method thereof |
CN205134919U (en) * | 2015-11-17 | 2016-04-06 | 中国建筑第八工程局有限公司 | Modularization suspension type steel tubes clamps scaffold operation platform |
CN209670305U (en) * | 2019-01-25 | 2019-11-22 | 天长市华利机械实业有限公司 | A kind of overhanging scaffold component |
CN210396207U (en) * | 2019-07-15 | 2020-04-24 | 北京建工建筑产业化投资建设发展有限公司 | The connecting parts of the outer cantilever net and the building steel structure |
CN212130002U (en) * | 2020-04-30 | 2020-12-11 | 中建七局第四建筑有限公司 | Regularization formula of encorbelmenting safety is chosen net |
CN212773582U (en) * | 2020-04-09 | 2021-03-23 | 中建二局阳光智造有限公司 | Construction is chosen net |
CN113550550A (en) * | 2021-06-30 | 2021-10-26 | 重庆建工第三建设有限责任公司 | Overhanging unit type scaffold convenient to assemble and disassemble |
CN215564638U (en) * | 2021-05-24 | 2022-01-18 | 中建八局西南建设工程有限公司 | Steel construction net mounting structure of choosing outward |
-
2022
- 2022-03-07 CN CN202210217194.5A patent/CN114541790A/en active Pending
Patent Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06185019A (en) * | 1992-12-17 | 1994-07-05 | Kensetsu Toso Kogyo Kk | Hanging scaffolding method and coupling device used therefor |
KR200219589Y1 (en) * | 2000-11-25 | 2001-04-02 | 쓰리엠안전개발주식회사 | Safety power device |
KR20020041267A (en) * | 2000-12-01 | 2002-06-01 | 오성우 | Safety power device |
CN202031308U (en) * | 2010-12-31 | 2011-11-09 | 青建集团股份公司 | Inverted-hanging type scaffold |
CN105298099A (en) * | 2015-11-17 | 2016-02-03 | 中国建筑第八工程局有限公司 | Modular suspension type steel tube fastener scaffold operating platform and erecting method thereof |
CN205134919U (en) * | 2015-11-17 | 2016-04-06 | 中国建筑第八工程局有限公司 | Modularization suspension type steel tubes clamps scaffold operation platform |
CN209670305U (en) * | 2019-01-25 | 2019-11-22 | 天长市华利机械实业有限公司 | A kind of overhanging scaffold component |
CN210396207U (en) * | 2019-07-15 | 2020-04-24 | 北京建工建筑产业化投资建设发展有限公司 | The connecting parts of the outer cantilever net and the building steel structure |
CN212773582U (en) * | 2020-04-09 | 2021-03-23 | 中建二局阳光智造有限公司 | Construction is chosen net |
CN212130002U (en) * | 2020-04-30 | 2020-12-11 | 中建七局第四建筑有限公司 | Regularization formula of encorbelmenting safety is chosen net |
CN215564638U (en) * | 2021-05-24 | 2022-01-18 | 中建八局西南建设工程有限公司 | Steel construction net mounting structure of choosing outward |
CN113550550A (en) * | 2021-06-30 | 2021-10-26 | 重庆建工第三建设有限责任公司 | Overhanging unit type scaffold convenient to assemble and disassemble |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115596096A (en) * | 2022-09-26 | 2023-01-13 | 中建二局第三建筑工程有限公司(Cn) | Reverse construction method for overground nonstandard layer with cornice of full concrete outer wall structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102864936B (en) | Combination lifting construction method for large-scale high hollow building roof of steel structure | |
CN107558723B (en) | Method for manufacturing and installing hanging bracket of hanging basket for inclined roof | |
CN205224567U (en) | Collapsible foldable elevartor shaft construction platform | |
CN107100358A (en) | Cantilever bracket, frame body and construction method for non-unloading industrialized safety protection | |
CN103603504B (en) | The dynamo-electric heavy caliber standpipe of super highrise building is with the method for main body progress lifting construction | |
CN204401997U (en) | A kind of suspension type ceiling construction scaffold | |
CN101775896B (en) | Rigid hanging scaffolding for installation of steel roof equipment piping | |
CN103669815A (en) | Method for constructing hanging rope and pipe combined all-round scaffold construction platform and protective system | |
CN111677299A (en) | Lifting device and method for steel bar truss floor support plate | |
CN114704064A (en) | Flow combination construction method for disk-buckle type self-overhanging operation frame and rope net operation frame | |
CN109653484B (en) | Roofing superelevation faces external hanging flower basket mounting structure of empty curtain engineering | |
CN105952129B (en) | Elevator shaft combined type integral lifting operation platform and construction method thereof | |
CN114541790A (en) | Construction method for quickly assembling and disassembling horizontal overhanging net of high-altitude overhanging outer frame | |
CN204753397U (en) | Temporary mounting hanger for steel box bridge | |
CN212406038U (en) | Lower hanging construction platform module of high-altitude large-cantilever steel roof truss | |
CN215107152U (en) | High-altitude lateral angle control overhanging operation platform | |
CN115306137A (en) | Operation platform structure for mounting suspended ceiling at bottom of overhead corridor and construction method thereof | |
CN105839907A (en) | Suspension type steel platform scaffold foundation and method for mounting same | |
CN217631164U (en) | Overhanging type operating platform for mounting steel structure corridor type steel beam | |
CN216516907U (en) | High-altitude convenient cantilever frame | |
CN216866034U (en) | Large area high-altitude grid structure aluminum grille ceiling construction device | |
CN205840289U (en) | A kind of suspension type vertical operating platform | |
CN113550550A (en) | Overhanging unit type scaffold convenient to assemble and disassemble | |
CN111608377B (en) | Comprehensive construction method for building overhanging scaffold | |
CN113445723A (en) | Construction platform for mounting overhanging structure curtain wall and mounting method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20220527 |