CN114541790A - Construction method for quickly assembling and disassembling horizontal overhanging net of high-altitude overhanging outer frame - Google Patents

Construction method for quickly assembling and disassembling horizontal overhanging net of high-altitude overhanging outer frame Download PDF

Info

Publication number
CN114541790A
CN114541790A CN202210217194.5A CN202210217194A CN114541790A CN 114541790 A CN114541790 A CN 114541790A CN 202210217194 A CN202210217194 A CN 202210217194A CN 114541790 A CN114541790 A CN 114541790A
Authority
CN
China
Prior art keywords
net
horizontal
cantilever
overhanging
roof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210217194.5A
Other languages
Chinese (zh)
Inventor
窦林
景来发
李平
熊伟
郑振颉
梅江涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Original Assignee
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd filed Critical Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority to CN202210217194.5A priority Critical patent/CN114541790A/en
Publication of CN114541790A publication Critical patent/CN114541790A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • E04G21/3204Safety or protective measures for persons during the construction of buildings against falling down
    • E04G21/3219Means supported by the building wall, e.g. security consoles
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • E04G21/3261Safety-nets; Safety mattresses; Arrangements on buildings for connecting safety-lines
    • E04G21/3266Safety nets
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A50/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE in human health protection, e.g. against extreme weather

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention provides a construction method for quickly assembling and disassembling a horizontal cantilever net of an overhead cantilever outer frame. In the construction process, the operation personnel can realize quick assembly and disassembly construction, avoid risks, reduce labor input, meet safety construction requirements, effectively prevent high-altitude falling risks, have very convenient operation, can be disassembled and recycled after use, have the recycling rate of 100 percent and extremely low use cost, greatly reduce safety protection measure cost and have remarkable economic and technical benefits.

Description

一种高空悬挑外架水平挑网快速装拆施工方法A kind of high-altitude cantilevered outer frame horizontal pick net quick assembly and disassembly construction method

技术领域technical field

本发明涉及高空悬挑外架挑网技术领域,具体是一种高空悬挑外架水平挑网快速装拆施工方法。The invention relates to the technical field of high-altitude cantilevered outer frame picking nets, in particular to a construction method for rapid assembly and disassembly of high-altitude cantilevered external frame horizontal picking nets.

背景技术Background technique

防止高处坠落是施工现场安全管理的重点,尤其在高层建筑主体结构施工阶段。高层住宅屋面有挑檐设计,外挑长度1.2m,主体结构采用爬架+铝模进行全穿插施工,当爬架施工至顶层时,因屋面挑檐结构与爬架位置冲突,造成爬架无法继续爬升至屋面。外架施工面临两种方案:第一种爬架不拆,在爬架上方搭设悬挑架;第二种先拆爬架,再搭悬挑架。第一种方法显然不经济,且显现外立面的效果不理想;而第二种方法安全性较低。Preventing falls from heights is the focus of safety management on construction sites, especially in the construction phase of the main structure of high-rise buildings. The roof of the high-rise residential building is designed with overhangs, the length of the overhang is 1.2m, and the main structure is constructed with climbing frame + aluminum formwork. Continue to climb to the roof. There are two options for the construction of the outer frame: the first is not to dismantle the climbing frame, and the cantilever frame is erected above the climbing frame; the second is to dismantle the climbing frame first, and then build the cantilever frame. The first method is obviously uneconomical, and the effect of showing the facade is not ideal; while the second method is less secure.

高空悬挑式外脚手架作业时,为防止高处坠落,常采用悬挑防护兜网与悬挑式外脚手架连接,作为高层建筑结构外围水平防护,但这种传统水平防护施工复杂,施工过程较长,不利于项目高效建造的目的。When the high-altitude cantilevered external scaffolding is operated, in order to prevent falling from a high place, the cantilevered protective net is often used to connect the cantilevered external scaffolding as the peripheral horizontal protection of the high-rise building structure. However, the traditional horizontal protection construction is complicated and the construction process is relatively long, which is not conducive to the purpose of efficient construction of the project.

发明内容SUMMARY OF THE INVENTION

针对上述现有技术,本发明提出一种高空悬挑外架水平挑网快速装拆施工方法。In view of the above-mentioned prior art, the present invention proposes a construction method for rapid assembly and disassembly of a horizontally picking net of a high-altitude cantilevered outer frame.

本发明提供的一种高空悬挑外架水平挑网快速装拆施工方法,包括下述步骤:A construction method for rapid assembly and disassembly of a high-altitude cantilevered outer frame horizontally hoisted net provided by the present invention comprises the following steps:

S1、水平挑网组装:在地面进行水平挑网组装,先搭设主骨架,再张挂防护网,并在水平挑网的两侧搭设若干竖向连接件;S1. Horizontal picking net assembly: The horizontal picking net is assembled on the ground, the main frame is set up first, then the protective net is stretched, and several vertical connectors are erected on both sides of the horizontal picking net;

S2、水平挑网吊装:待屋面悬挑梁摆放固定完成,将若干组装好的水平挑网按不同部位进行吊装,将吊装好的水平挑网吊运至屋面悬挑梁的下方,紧靠屋面结构的侧边,保持水平静止状态;S2. Hoisting of horizontal pick nets: After the roof cantilever beams are placed and fixed, several assembled horizontal pick nets are hoisted according to different parts, and the hoisted horizontal pick nets are hoisted to the bottom of the roof cantilever beams, close to The side of the roof structure is kept in a horizontal static state;

S3、水平挑网固定:将若干水平固定件置于屋面悬挑梁的上端,并与水平挑网两侧的所述竖向连接件进行连接,固定于屋面悬挑梁上;S3. Fixing the horizontal pick net: place several horizontal fixtures on the upper end of the roof cantilever beam, connect with the vertical connectors on both sides of the horizontal pick net, and fix them on the roof cantilever beam;

S4、水平挑网拆除:待悬挑外架的杆件依次拆除后,悬吊水平挑网的主骨架,拆除与所述竖向连接件连接的水平固定件,将水平挑网吊运至地面,吊运屋面悬挑梁至地面,将水平挑网进行散拆回收。S4. Dismantling the horizontal lifting net: After the rods of the cantilevered outer frame are removed in sequence, suspend the main frame of the horizontal lifting net, remove the horizontal fixing piece connected with the vertical connecting piece, and hoist the horizontal lifting net to the ground. , hoist the roof cantilever beam to the ground, and dismantle the horizontal pick net for recycling.

优选地,S1中,所述防护网由白网和安全网组成。Preferably, in S1, the protective net consists of a white net and a safety net.

优选地,S2中,水平挑网采用对接方式或叠拼方式或预留间隙再补网方式进行吊装。Preferably, in S2, the horizontal picking net is hoisted by a docking method, a stacking method, or a method of reserving a gap and then replenishing the net.

优选地,S2中,所述屋面悬挑梁采用工字钢制作。Preferably, in S2, the roof cantilever beam is made of I-beam.

优选地,S3中,在所述竖向连接件的顶端和底端均安装防滑移扣件。Preferably, in S3, anti-slip fasteners are installed on both the top and bottom ends of the vertical connectors.

相对于现有技术,本发明的有益效果为:本发明在施工过程中,作业人员能够实现快速装拆施工,规避风险的同时,减少了劳动力的投入,满足安全施工要求,有效预防高空坠落风险,且操作十分方便,使用完即可拆解回收,回收利用率达到100%,使用成本极低,大大减少了安全防护措施费用,经济、技术效益显著。Compared with the prior art, the beneficial effects of the present invention are: in the construction process of the present invention, the operator can realize rapid assembly and disassembly construction, while avoiding risks, reducing labor input, meeting safety construction requirements, and effectively preventing high-altitude falling risks. , and the operation is very convenient, it can be disassembled and recycled after use, the recycling rate reaches 100%, the use cost is extremely low, the cost of safety protection measures is greatly reduced, and the economic and technical benefits are significant.

附图说明Description of drawings

图1为本发明实施例的施工示意图。FIG. 1 is a schematic construction diagram of an embodiment of the present invention.

图2为本发明实施例中水平挑网采用对接方式进行吊装的示意图。FIG. 2 is a schematic diagram of hoisting a horizontally picking net in a docking manner in an embodiment of the present invention.

图3为本发明实施例中水平挑网采用叠拼方式进行吊装的示意图。FIG. 3 is a schematic diagram of hoisting the horizontal picking net by stacking and splicing in an embodiment of the present invention.

图4为本发明实施例中水平挑网采用预留间隙再补网方式进行吊装的示意图。FIG. 4 is a schematic diagram of hoisting a horizontally picking net by using a method of reserving a gap and then replenishing the net according to an embodiment of the present invention.

图中:1、水平挑网;2、竖向连接杆;3、屋面悬挑梁;4、屋面结构;5、水平固定杆;6、悬挑外架。In the picture: 1. Horizontal pick net; 2. Vertical connecting rod; 3. Roof cantilever beam; 4. Roof structure; 5. Horizontal fixed rod; 6. Cantilevered outer frame.

具体实施方式Detailed ways

为了使本发明实现的技术手段、创作特征、达成目的与功效易于明白了解,下面结合具体图示,进一步阐述本发明。In order to make the technical means, creation features, achievement goals and effects of the present invention easy to understand and understand, the present invention will be further described below with reference to the specific drawings.

实施例Example

一种高空悬挑外架水平挑网快速装拆施工方法,参照图1-4,包括下述步骤:A construction method for rapid assembly and disassembly of a high-altitude cantilevered outer frame horizontally picking net, referring to Figures 1-4, includes the following steps:

S1、水平挑网组装:在地面进行水平挑网1组装,可采用φ48mm普通钢管,先纵向后横向搭设主骨架,长度3-6m不等,视屋面结构纵向长度而定,宽度即外挑长度可为3m,纵横向间距可为1.5m,可组装成“田”字型水平结构,再张挂安全网和白网,安全网可采用2000目/100㎡密目网,白网可采用30mm×30mm平网,可在主骨架上先铺一道平网兜底,再铺一道密目网,并采用22#扎丝绑扎固定,并在水平挑网1的两侧采用0.8m立杆搭设若干竖向连接杆2;S1. Horizontal pick net assembly: Assemble horizontal pick net 1 on the ground. Ordinary steel pipes of φ48mm can be used. The main frame is erected longitudinally and then horizontally. The length varies from 3 to 6m, depending on the longitudinal length of the roof structure. The width is the length of the outer pick. It can be 3m, and the vertical and horizontal spacing can be 1.5m. It can be assembled into a "field"-shaped horizontal structure, and then hang safety nets and white nets. 30mm flat net, you can first lay a flat net pocket bottom on the main frame, and then lay a dense mesh net, and use 22# wire to bind and fix, and use 0.8m poles on both sides of the horizontal pick net 1 to erect several vertical connecting rod 2;

S2、水平挑网吊装:屋面悬挑梁3采用工字钢制作,待屋面悬挑梁3摆放固定完成,采用塔吊将若干组装好的水平挑网1按不同部位进行吊装,将吊装好的水平挑网1吊运至屋面悬挑梁3下方,紧靠屋面结构4的侧边,保持水平静止状态;其中,水平挑网1可采用如图2所示的对接方式进行吊装,或可采用如图3所示的叠拼方式进行吊装,或可采用如图4所示的方式进行吊装,即先预留一定的间隙,待安装完成后,进行补网;S2. Hoisting of horizontal pick nets: The roof cantilever beam 3 is made of I-beam. After the roof cantilever beam 3 is placed and fixed, a tower crane is used to hoist several assembled horizontal pick nets 1 according to different parts, and the hoisted The horizontal lifting net 1 is hoisted to the bottom of the roof cantilever beam 3, close to the side of the roof structure 4, and maintains a horizontal static state; wherein, the horizontal lifting net 1 can be hoisted by the docking method shown in Figure 2, or can be hoisted by using The stacking method shown in Figure 3 is used for hoisting, or the method shown in Figure 4 can be used for hoisting, that is, a certain gap is reserved first, and after the installation is completed, the mesh is repaired;

S3、水平挑网固定:将若干水平固定杆5置于屋面悬挑梁3的上端,并与水平挑网两侧的竖向连接杆2采用扣件进行连接,固定于屋面悬挑梁3上,两者连接点距离主节点距离不大于300mm,并在竖向连接杆2的顶端和底端各安装一个防滑移扣件,以提高水平挑网主骨架的稳固性以及安全性能;S3. Fixing the horizontal pick net: place several horizontal fixing rods 5 on the upper end of the roof cantilever beam 3, and connect with the vertical connecting rods 2 on both sides of the horizontal pick net by fasteners, and fix them on the roof cantilever beam 3 , the distance between the connection point of the two is not more than 300mm from the main node, and an anti-slip fastener is installed at the top and bottom of the vertical connecting rod 2 to improve the stability and safety performance of the main frame of the horizontal lifting net;

S4、水平挑网拆除:待悬挑外架6的杆件依次拆除后,在屋面悬挑梁3上采用小型夹具清理水平挑网1的杂物,以排除安全隐患,采用塔吊钢丝绳悬吊水平挑网1的主骨架,拆除与竖向连接杆2连接的水平固定杆5,将水平挑网1吊运至地面,吊运屋面悬挑梁3至地面,将水平挑网1进行散拆回收。 S4. Dismantling the horizontal pick net: After the rods of the cantilevered outer frame 6 are removed in turn, use a small fixture on the roof cantilever beam 3 to clean up the sundries on the horizontal pick net 1 to eliminate potential safety hazards, and use tower crane wire ropes to suspend the horizontal Lift the main frame of the net 1, remove the horizontal fixing rod 5 connected with the vertical connecting rod 2, lift the horizontal lifting net 1 to the ground, lift the roof cantilever beam 3 to the ground, and disassemble the horizontal lifting net 1 for recycling .

本实施例在施工过程中,作业人员能够实现快速装拆施工,规避风险的同时,减少了劳动力的投入,满足安全施工要求,有效预防高空坠落风险,且操作十分方便,使用完即可拆解回收,回收利用率达到100%,使用成本极低,大大减少了安全防护措施费用,经济、技术效益显著。In the construction process of this embodiment, the operator can realize rapid assembly and disassembly construction, avoid risks, reduce labor input, meet safety construction requirements, effectively prevent the risk of falling from high altitude, and the operation is very convenient, and can be disassembled after use Recycling, the recycling rate reaches 100%, the use cost is extremely low, the cost of safety protection measures is greatly reduced, and the economic and technical benefits are significant.

以上仅为本发明的实施方式,并非因此限制本发明的专利范围,凡是利用本发明说明书及附图内容所作的等效结构,直接或间接运用在其他相关的技术领域,均同理在本发明的专利保护范围之内。The above are only the embodiments of the present invention, and are not intended to limit the scope of the present invention. Any equivalent structure made by using the contents of the description and the accompanying drawings of the present invention is directly or indirectly applied to other related technical fields. within the scope of patent protection.

Claims (5)

1. A construction method for quickly assembling and disassembling a horizontal overhanging net of a high-altitude overhanging outer frame is characterized by comprising the following steps:
s1, horizontal net picking and assembling: assembling a horizontal net on the ground, firstly erecting a main framework, then hanging a protective net, and erecting a plurality of vertical connecting pieces on two sides of the horizontal net;
s2, horizontally lifting the net: after the roof cantilever beam is placed and fixed, hoisting a plurality of assembled horizontal cantilever nets according to different parts, hoisting the hoisted horizontal cantilever nets to the position below the roof cantilever beam and close to the side edge of the roof structure, and keeping the horizontal static state;
s3, horizontally screening and fixing: placing a plurality of horizontal fixing pieces at the upper end of the roof cantilever beam, connecting the horizontal fixing pieces with the vertical connecting pieces at two sides of the horizontal cantilever net, and fixing the horizontal fixing pieces on the roof cantilever beam;
s4, horizontally picking up the net and removing: after the rods of the overhanging outer frame are sequentially dismantled, suspending the main framework of the horizontal overhanging net, dismantling the horizontal fixing piece connected with the vertical connecting piece, hoisting the horizontal overhanging net to the ground, hoisting the roof overhanging beam to the ground, and scattering and dismantling the horizontal overhanging net for recycling.
2. The construction method for quickly assembling and disassembling the horizontal cantilever net of the high-altitude cantilever external frame according to claim 1, wherein in S1, the protective net is composed of a white net and a safety net.
3. The construction method for quickly assembling and disassembling the horizontal cantilever net of the high-altitude cantilever external frame as claimed in claim 1, wherein in S2, the horizontal cantilever net is hoisted by adopting a butt joint mode, a splicing mode or a reserved gap net supplementing mode.
4. The rapid mounting and dismounting construction method for the horizontal cantilever net of the high-altitude cantilever external frame as claimed in claim 1, wherein in S2, the roof cantilever beam is made of I-steel.
5. The high-altitude overhanging outer frame horizontal cantilever net quick assembly and disassembly construction method according to claim 1, wherein in S3, anti-slip fasteners are installed at the top end and the bottom end of the vertical connecting piece.
CN202210217194.5A 2022-03-07 2022-03-07 Construction method for quickly assembling and disassembling horizontal overhanging net of high-altitude overhanging outer frame Pending CN114541790A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210217194.5A CN114541790A (en) 2022-03-07 2022-03-07 Construction method for quickly assembling and disassembling horizontal overhanging net of high-altitude overhanging outer frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210217194.5A CN114541790A (en) 2022-03-07 2022-03-07 Construction method for quickly assembling and disassembling horizontal overhanging net of high-altitude overhanging outer frame

Publications (1)

Publication Number Publication Date
CN114541790A true CN114541790A (en) 2022-05-27

Family

ID=81662848

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210217194.5A Pending CN114541790A (en) 2022-03-07 2022-03-07 Construction method for quickly assembling and disassembling horizontal overhanging net of high-altitude overhanging outer frame

Country Status (1)

Country Link
CN (1) CN114541790A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115596096A (en) * 2022-09-26 2023-01-13 中建二局第三建筑工程有限公司(Cn) Reverse construction method for overground nonstandard layer with cornice of full concrete outer wall structure

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06185019A (en) * 1992-12-17 1994-07-05 Kensetsu Toso Kogyo Kk Hanging scaffolding method and coupling device used therefor
KR200219589Y1 (en) * 2000-11-25 2001-04-02 쓰리엠안전개발주식회사 Safety power device
KR20020041267A (en) * 2000-12-01 2002-06-01 오성우 Safety power device
CN202031308U (en) * 2010-12-31 2011-11-09 青建集团股份公司 Inverted-hanging type scaffold
CN105298099A (en) * 2015-11-17 2016-02-03 中国建筑第八工程局有限公司 Modular suspension type steel tube fastener scaffold operating platform and erecting method thereof
CN205134919U (en) * 2015-11-17 2016-04-06 中国建筑第八工程局有限公司 Modularization suspension type steel tubes clamps scaffold operation platform
CN209670305U (en) * 2019-01-25 2019-11-22 天长市华利机械实业有限公司 A kind of overhanging scaffold component
CN210396207U (en) * 2019-07-15 2020-04-24 北京建工建筑产业化投资建设发展有限公司 The connecting parts of the outer cantilever net and the building steel structure
CN212130002U (en) * 2020-04-30 2020-12-11 中建七局第四建筑有限公司 Regularization formula of encorbelmenting safety is chosen net
CN212773582U (en) * 2020-04-09 2021-03-23 中建二局阳光智造有限公司 Construction is chosen net
CN113550550A (en) * 2021-06-30 2021-10-26 重庆建工第三建设有限责任公司 Overhanging unit type scaffold convenient to assemble and disassemble
CN215564638U (en) * 2021-05-24 2022-01-18 中建八局西南建设工程有限公司 Steel construction net mounting structure of choosing outward

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06185019A (en) * 1992-12-17 1994-07-05 Kensetsu Toso Kogyo Kk Hanging scaffolding method and coupling device used therefor
KR200219589Y1 (en) * 2000-11-25 2001-04-02 쓰리엠안전개발주식회사 Safety power device
KR20020041267A (en) * 2000-12-01 2002-06-01 오성우 Safety power device
CN202031308U (en) * 2010-12-31 2011-11-09 青建集团股份公司 Inverted-hanging type scaffold
CN105298099A (en) * 2015-11-17 2016-02-03 中国建筑第八工程局有限公司 Modular suspension type steel tube fastener scaffold operating platform and erecting method thereof
CN205134919U (en) * 2015-11-17 2016-04-06 中国建筑第八工程局有限公司 Modularization suspension type steel tubes clamps scaffold operation platform
CN209670305U (en) * 2019-01-25 2019-11-22 天长市华利机械实业有限公司 A kind of overhanging scaffold component
CN210396207U (en) * 2019-07-15 2020-04-24 北京建工建筑产业化投资建设发展有限公司 The connecting parts of the outer cantilever net and the building steel structure
CN212773582U (en) * 2020-04-09 2021-03-23 中建二局阳光智造有限公司 Construction is chosen net
CN212130002U (en) * 2020-04-30 2020-12-11 中建七局第四建筑有限公司 Regularization formula of encorbelmenting safety is chosen net
CN215564638U (en) * 2021-05-24 2022-01-18 中建八局西南建设工程有限公司 Steel construction net mounting structure of choosing outward
CN113550550A (en) * 2021-06-30 2021-10-26 重庆建工第三建设有限责任公司 Overhanging unit type scaffold convenient to assemble and disassemble

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115596096A (en) * 2022-09-26 2023-01-13 中建二局第三建筑工程有限公司(Cn) Reverse construction method for overground nonstandard layer with cornice of full concrete outer wall structure

Similar Documents

Publication Publication Date Title
CN102864936B (en) Combination lifting construction method for large-scale high hollow building roof of steel structure
CN107558723B (en) Method for manufacturing and installing hanging bracket of hanging basket for inclined roof
CN205224567U (en) Collapsible foldable elevartor shaft construction platform
CN107100358A (en) Cantilever bracket, frame body and construction method for non-unloading industrialized safety protection
CN103603504B (en) The dynamo-electric heavy caliber standpipe of super highrise building is with the method for main body progress lifting construction
CN204401997U (en) A kind of suspension type ceiling construction scaffold
CN101775896B (en) Rigid hanging scaffolding for installation of steel roof equipment piping
CN103669815A (en) Method for constructing hanging rope and pipe combined all-round scaffold construction platform and protective system
CN111677299A (en) Lifting device and method for steel bar truss floor support plate
CN114704064A (en) Flow combination construction method for disk-buckle type self-overhanging operation frame and rope net operation frame
CN109653484B (en) Roofing superelevation faces external hanging flower basket mounting structure of empty curtain engineering
CN105952129B (en) Elevator shaft combined type integral lifting operation platform and construction method thereof
CN114541790A (en) Construction method for quickly assembling and disassembling horizontal overhanging net of high-altitude overhanging outer frame
CN204753397U (en) Temporary mounting hanger for steel box bridge
CN212406038U (en) Lower hanging construction platform module of high-altitude large-cantilever steel roof truss
CN215107152U (en) High-altitude lateral angle control overhanging operation platform
CN115306137A (en) Operation platform structure for mounting suspended ceiling at bottom of overhead corridor and construction method thereof
CN105839907A (en) Suspension type steel platform scaffold foundation and method for mounting same
CN217631164U (en) Overhanging type operating platform for mounting steel structure corridor type steel beam
CN216516907U (en) High-altitude convenient cantilever frame
CN216866034U (en) Large area high-altitude grid structure aluminum grille ceiling construction device
CN205840289U (en) A kind of suspension type vertical operating platform
CN113550550A (en) Overhanging unit type scaffold convenient to assemble and disassemble
CN111608377B (en) Comprehensive construction method for building overhanging scaffold
CN113445723A (en) Construction platform for mounting overhanging structure curtain wall and mounting method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20220527