CN114704064A - Flow combination construction method for disk-buckle type self-overhanging operation frame and rope net operation frame - Google Patents

Flow combination construction method for disk-buckle type self-overhanging operation frame and rope net operation frame Download PDF

Info

Publication number
CN114704064A
CN114704064A CN202210311994.3A CN202210311994A CN114704064A CN 114704064 A CN114704064 A CN 114704064A CN 202210311994 A CN202210311994 A CN 202210311994A CN 114704064 A CN114704064 A CN 114704064A
Authority
CN
China
Prior art keywords
frame
work frame
overhanging
steel pipe
rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210311994.3A
Other languages
Chinese (zh)
Inventor
江林
江升
徐广舒
徐笛
顾轶
朱志钢
冒凤明
陈丁瑶
江婷婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongru Construction Group Co ltd
Nantong Vocational College
Original Assignee
Zhongru Construction Group Co ltd
Nantong Vocational College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongru Construction Group Co ltd, Nantong Vocational College filed Critical Zhongru Construction Group Co ltd
Priority to CN202210311994.3A priority Critical patent/CN114704064A/en
Publication of CN114704064A publication Critical patent/CN114704064A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/18Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by cantilevers or other provisions mounted in openings in the building, e.g. window openings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/001Safety or protective measures against falling down relating to scaffoldings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/08Scaffold boards or planks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings
    • E04G5/147Railings specially adapted for mounting prior to the mounting of the platform
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings
    • E04G2005/148Railings latticed or netted

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a mobile combination construction method of a coil buckle type self-overhanging operation frame and a rope net operation frame, and relates to the technical field of building construction. The construction steps are as follows: prefabricating an outward projecting rope net operating frame; the outer overhanging rope net operating frame is installed and fixed with the outer overhanging double steel pipes; the self-cantilever operation frame is installed, a disc buckle type triangular truss is erected on a disc buckle type support frame on the outer side of the building beam, and a hook type steel pedal is fully paved between two disc buckle type triangular trusses; installing a shaping protection grid; and disassembling the disk buckle type self-overhanging operation frame. The invention has the advantages that: the floor outer beam lower disc buckle type support frame, the overhanging disc buckle triangular truss, the protective railing, the shaping protective grating and the outer overhanging rope net operation frame are used for flow combination construction, so that the turnover material is saved, and the frame body is safe and stable; from encorbelmenting the operation frame and demolising back and do construction work platform concurrently, but integral hoisting aversion ann tears open, replaces later stage hanging flower basket for decoration, and safety and stability is high, improves the efficiency of construction.

Description

盘扣式自悬挑作业架与绳网作业架的流动组合施工方法The flow combination construction method of the buckle type self-suspension work frame and the rope net work frame

技术领域technical field

本发明涉及建筑施工技术领域,具体涉及盘扣式自悬挑作业架与绳网作业架的流动组合施工方法。The invention relates to the technical field of building construction, in particular to a flow combined construction method of a buckle-type self-suspension work frame and a rope-net work frame.

背景技术Background technique

对于高层建筑外墙外侧的施工防护架体,目前常规做法有:一是采用落地式钢管脚手架,为保证外防护架体的稳定性需设置大量的连墙杆,给日后玻璃幕墙等装饰施工带来很大的困难;二是采用悬挑梁式钢管脚手架,预埋型钢挑梁的锚叠合板中现浇部分太薄,锚固长度不够,且采用型钢悬挑防护架会在楼面安装大量的型钢挑梁,为二次结构ALC板的运输和玻璃幕墙的安装带来很大的困难;三是采用上拉式或下撑式悬挑式钢管脚手架,外梁需留洞口锚固工字钢或上部拉杆、钢丝绳或下撑杆,增大因修补洞口引起外墙渗漏的隐患,拆除麻烦,安全隐患大。For the construction protection frame body on the outer wall of high-rise buildings, the current conventional practices are as follows: First, use floor-standing steel pipe scaffolding. The second is the use of cantilever beam-type steel pipe scaffolding, the cast-in-place part of the anchor composite plate of the embedded steel cantilever beam is too thin, and the anchorage length is not enough, and the use of the steel cantilever protection frame will install a large number of The steel cantilever beam brings great difficulties to the transportation of the secondary structure ALC board and the installation of the glass curtain wall; the third is to use the upper-pull or lower-support type cantilevered steel pipe scaffolding, and the outer beam needs to be anchored with I-beam or The upper tie rod, steel wire rope or lower support rod increase the hidden danger of leakage of the outer wall caused by repairing the hole, which is troublesome to dismantle and has a great potential safety hazard.

以上几种外防护体系都比较笨重,材料用量大,成本高;另外高层建筑高空作业吊篮,机具简陋,频繁移机使用不便,安全保障低,施工效率低。The above external protection systems are relatively cumbersome, require a large amount of materials, and have high costs; in addition, high-rise buildings have high-altitude working gondolas, simple equipment, inconvenient use of frequent moving machines, low safety assurance, and low construction efficiency.

发明内容SUMMARY OF THE INVENTION

本发明要解决的技术问题是提供盘扣式自悬挑作业架与绳网作业架的流动组合施工方法,能够解决现有技术中高层建筑外墙外侧的施工防护体系安装材料用量大、结构较笨重、成本高、后续装饰施工不便、安全隐患大、施工效率低的问题。The technical problem to be solved by the present invention is to provide a flow combined construction method of a coil-type self-suspension work frame and a rope net work frame, which can solve the problem that the installation material consumption of the construction protection system on the outer side of the outer wall of the high-rise building in the prior art is large and the structure is relatively high. The problems of bulky, high cost, inconvenient subsequent decoration and construction, great safety hazard and low construction efficiency.

为解决上述技术问题,本发明的技术方案为:包括以下步骤:In order to solve the above-mentioned technical problems, the technical scheme of the present invention is: comprising the following steps:

S1、预制外挑绳网作业架:外挑绳网作业架由钢管杆件、钢丝绳、安全网、移动脚手板组合形成矩形架体,外挑绳网作业架水平设置,外挑绳网作业架的外挑长度为3m,钢丝绳交错连接于钢管杆件上并通过钢丝锁固定,钢丝绳与长度方向的钢管杆件的拉结点间距为50~60cm,钢丝绳下方挂设安全网,安全网和钢丝绳上铺设移动脚手板,施工作业时在移动脚手板上放置人字梯、门型架,人字梯、门型架与建筑的上部结构通过缆风绳可靠联接,外挑绳网作业架定型化预制;S1. Prefabricated external rope net work frame: The external rope net work frame is composed of steel pipe rods, steel wire ropes, safety nets, and mobile scaffolding boards to form a rectangular frame body. The overhang length is 3m, the steel wire rope is staggeredly connected to the steel pipe rod and fixed by wire locks, the distance between the steel wire rope and the steel pipe rod in the length direction is 50-60cm, and a safety net, safety net and steel wire rope are hung under the steel wire rope A mobile scaffold is laid on the top, and a herringbone ladder and a portal frame are placed on the mobile scaffold during construction operations. The herringbone ladder, portal frame and the upper structure of the building are reliably connected by cable wind ropes, and the outer lifting rope net work frame is shaped. prefabricated;

S2、外挑绳网作业架安装:在建筑主体结构中预埋U型锚固螺栓,在距离纵向外挑双钢管根部200mm位置预留第一个锚环,外挑双钢管上还设置第二个锚环和第三个锚环,距离第一个锚环250mm处预埋第二个锚环,第三个锚环预埋在外挑双钢管悬挑处的临边结构梁中,外挑绳网作业架与外挑双钢管安装提前预制成型,吊装就位后,将外挑双钢管插入预埋U型锚环中,采用压板固定;S2. Installation of the outrigger rope mesh work frame: Pre-embed U-shaped anchor bolts in the main structure of the building, reserve the first anchor ring at a distance of 200mm from the root of the longitudinal outrigger double steel pipe, and set the second outrigger on the outrigger double pipe. Anchor ring and the third anchor ring, the second anchor ring is pre-buried at a distance of 250mm from the first anchor ring, the third anchor ring is pre-buried in the edge structural beam at the overhanging double steel pipe cantilever, and the rope net is overhanging. The installation of the work frame and the overhanging double steel pipe is prefabricated in advance. After the hoisting is in place, the outer overhanging double steel pipe is inserted into the embedded U-shaped anchor ring and fixed with a pressure plate;

S3、自悬挑作业架安装:在楼层外梁下搭设盘扣式支撑架,盘扣式梁板支撑架体搭设时,建筑首层顶部设置6m挑网,建筑二层及以上采用3米宽的定型化预制的外挑绳网作业架流动交叉施工;S3. Installation of self-suspension work frame: set up a buckle type support frame under the outer beam of the floor. When the disc buckle type beam plate support frame is erected, a 6m pick net is set on the top of the first floor of the building, and a 3m wide net is used on the second floor and above of the building. The stereotyped prefabricated external overhanging rope net work frame is used for flow cross construction;

在建筑梁外侧的盘扣式支撑架上架设盘扣三角桁架,盘扣三角桁架具有水平杆、斜杆、外立杆,在悬挑的盘扣式支撑架的支撑架立杆上插接水平杆,水平杆与支撑架立杆通过连接盘连接再通过插销销紧,斜杆与下方的水平杆连接,上方的水平杆与斜杆之间通过外立杆连接,盘扣三角桁架对称设置,两片盘扣三角桁架之间满铺挂钩式钢踏板;A disc buckle triangular truss is erected on the disc buckle support frame on the outside of the building beam. The disc buckle triangle truss has horizontal rods, inclined rods, and outer vertical rods, and is inserted horizontally on the support frame poles of the cantilevered disc buckle support frame. The rod, the horizontal rod and the supporting frame vertical rod are connected by the connecting plate and then tightened by the bolt, the inclined rod is connected with the horizontal rod below, the horizontal rod above is connected with the inclined rod by the external vertical rod, and the triangular truss of the disk buckle is symmetrically arranged. There are hook-type steel pedals between the two disc buckle triangular trusses;

S4、定型防护格栅安装:在盘扣三角桁架的外立杆顶部加插防护栏杆立杆设置防护栏杆,在防护栏杆立杆端部直接安装90°弯头及横向钢管,横向钢管、弯头与防护栏杆立杆连成整体,将定型防护格栅固定于外立杆内侧,定型防护格栅定型化预制,安装后复查盘扣式自悬挑作业架是否按设计搭设,再在外立杆、定型防护格栅的外侧满张密目安全网;S4, stereotyped protective grille installation: add protective railings to the top of the outer poles of the disc buckle triangular truss to set up protective railings, and directly install 90° elbows and horizontal steel pipes, horizontal steel pipes, elbows at the ends of the protective railing poles It is integrated with the guardrail vertical pole, and the shaped protective grille is fixed on the inner side of the outer vertical pole. The outer side of the shaped protective grille is full of dense mesh safety nets;

S5、盘扣式自悬挑作业架拆除:作业架拆除时按顺序进行:分段拆除楼层中部跨模板支撑、清理拆下模板、钢管、拆除自悬挑作业架上的密目安全网、拆除自悬挑作业架防护栏杆立杆、拆除挂钩式钢踏板、拆除盘扣三角桁架、拆除边跨盘扣式支撑架的支撑架立杆,拆除时支撑架立杆向内侧倾倒,分类整理杆件及三角架,打包后通过卸料平台及塔吊运出构件。S5. Dismantling of the self-suspension work frame with the buckle type: When the work frame is removed, proceed in sequence: remove the support of the formwork in the middle of the floor in sections, clean and remove the formwork, steel pipes, remove the dense mesh safety net on the self-suspension work frame, remove the Self-suspension work frame protective railing poles, removal of hook-type steel pedals, removal of disc buckle triangle trusses, removal of support frame poles of side span disc buckle type support frames, when dismantling, the support frame poles are dumped inward, and the poles are sorted and sorted. And tripod, after packing, the components are transported out through the unloading platform and tower crane.

进一步地,所述步骤S2中,外挑双钢管下方与建筑梁之间沿水平方向每隔3~4米设置两道斜支撑钢管,斜支撑钢管与外挑双钢管的夹角不小于45°,斜支撑钢管与外挑双钢管之间采用双面焊连接固定,外挑双钢管上方与建筑梁之间沿水平方向每隔3~4m挂一道钢丝绳,采用预埋钢卡环与建筑梁可靠连接,检查外挑双钢管的强度和稳定性。Further, in the step S2, two oblique support steel pipes are arranged between the bottom of the overhanging double steel pipe and the building beam along the horizontal direction every 3 to 4 meters, and the angle between the inclined support steel pipe and the overhanging double steel pipe is not less than 45°. , Double-sided welding is used to fix the oblique support steel pipe and the outer overhanging double steel pipe, and a steel wire rope is hung between the top of the outer overhanging double steel pipe and the building beam along the horizontal direction every 3-4m. Connect, check the strength and stability of the outer pick double steel pipe.

进一步地,所述步骤S3中,三角桁架悬挑长度为30~90cm,三角桁架的外立杆与水平杆通过连接盘连接,外立杆顶部露出连接盘10~20cm;悬挑三角桁架安装步骤:悬挑三角桁架两根水平杆固定在盘扣式支撑架的支撑架立杆的连接盘上,用插销把支撑架立杆的连接处的锚固孔锁紧,防护栏杆立杆与三角桁架的外立杆套筒对接连接;防护栏杆立杆之间增设水平杆,相邻水平杆纵横交错连接牢固,三角桁架与盘扣式支撑架连续搭设。Further, in the step S3, the cantilever length of the triangular truss is 30-90 cm, the outer vertical rod of the triangular truss is connected with the horizontal rod through the connecting plate, and the top of the outer vertical rod exposes the connecting plate 10-20 cm; the installation step of the cantilevered triangular truss : The two horizontal rods of the cantilevered triangular truss are fixed on the connecting plate of the support frame pole of the disc buckle type support frame, and the anchoring hole at the connection of the support frame pole is locked with a bolt. The outer pole sleeves are connected by butt joints; horizontal poles are added between the protective railing poles, and the adjacent horizontal poles are crisscrossed and connected firmly, and the triangular truss and the buckle-type support frame are continuously erected.

进一步地,所述步骤S4中,防护栏杆立杆高度1.5m;所述外挑绳网作业架的安全网和钢丝绳上铺设的移动脚手板配备3~4层周转使用,三角桁架配1~2层周转使用。Further, in the step S4, the height of the protective railings is 1.5m; the safety nets and the mobile scaffolding boards laid on the steel wire ropes are equipped with 3-4 layers of turnover, and the triangular trusses are equipped with 1-2 layers. Layer turnover is used.

进一步地,所述步骤S5中,盘扣式自悬挑作业架拆除时,清理拆除区域内的杂物,设置拆除区域警戒线,拆除时,由上而下进行,拆除的杆件人工递接,分类堆放。Further, in the step S5, when the buckle-type self-suspension work frame is removed, the debris in the removal area is cleaned up, and a warning line of the removal area is set. , classified and stacked.

本发明的优点在于:利用楼层外梁下盘扣式支撑架、悬挑盘扣三角桁架、防护栏杆、定型防护格栅及外挑绳网作业架的流动组合施工,简化施工工艺,承载力高,拆卸方便,节省周转材料,架体安全稳定;采用盘扣式防护栏杆,配置弯头、横向钢管和定制钢格栅防护,取代传统的钢管护栏栏杆,施工便捷,省工省料,低碳安全施工;辅以定型化预制外挑绳网作业架流动交叉作业,自悬挑作业架拆除后兼做施工作业平台,可整体吊装移位安拆,取代后期装饰用吊篮,安全稳定性高,提高施工效率。The advantages of the present invention lie in: the use of the flow combination construction of the lower disk buckle support frame of the outer beam of the floor, the cantilevered disk buckle triangle truss, the protective railing, the shaped protective grille and the outer hanging rope net work frame, the construction process is simplified, and the bearing capacity is high. , Easy to disassemble, save turnover materials, safe and stable frame body; use disc buckle type protective railings, equipped with elbows, transverse steel pipes and customized steel grille protection, replace the traditional steel pipe guardrails, convenient construction, save labor and materials, low carbon Safe construction; supplemented by the stereotyped prefabricated external overhanging rope net work frame for flowing cross operation, which can also be used as a construction work platform after dismantling the cantilever work frame. , improve construction efficiency.

附图说明Description of drawings

图1为本发明的盘扣式自悬挑作业架临边防护的外挑双钢管安装结构示意图;1 is a schematic diagram of the installation structure of the outer overhanging double steel pipe for the edge protection of the disk buckle type self-suspension work frame of the present invention;

图2为本发明的单片预制的外挑绳网作业架俯视图;Fig. 2 is the top view of the single-piece prefabricated outer pick-up rope net work frame of the present invention;

图3为本发明的盘扣三角桁架示意图;Fig. 3 is the schematic diagram of the buckled triangular truss of the present invention;

图4为本发明的防护栏杆与防护格栅的结构示意图。FIG. 4 is a schematic structural diagram of the protective railing and the protective grille of the present invention.

具体实施方式Detailed ways

为了使本发明的目的、技术方案及优点更加清楚明白,以下结合附图及具体实施方式,对本发明进行进一步详细说明。下面的实施例可以使本专业的技术人员更全面地理解本发明,但并不因此将本发明限制在所述的实施例范围之中。In order to make the objectives, technical solutions and advantages of the present invention clearer, the present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments. The following embodiments can make those skilled in the art understand the present invention more comprehensively, but do not limit the present invention to the scope of the described embodiments.

本实施案例的建筑外墙采用盘扣式自悬挑作业架与绳网作业架的流动组合架施工,应用于承建的研发楼项目,由1幢28层研究楼、地下车库和3层裙楼组成,建筑高度99.60m,总建筑面积48281.2平方米,其中裙楼3层,建筑高度14.60m,地下6419.3平方米,地上41861.9平方米。建筑结构形式:主楼-框剪结构,裙楼-框架结构。针对该建筑物的结构及外形特点,采用楼层外梁下盘扣支撑架+悬挑盘扣三角桁架+盘扣式防护栏杆及定型格栅+下层外挑绳网作业架的形式作为外防护,确保施工顺利进行。The external wall of the building in this implementation case is constructed by the flow combination frame of the buckle-type self-suspension work frame and the rope mesh work frame, which is applied to the research and development building project under construction. It consists of a building height of 99.60m and a total construction area of 48281.2 square meters, of which the podium is 3 floors, the building height is 14.60m, the underground is 6419.3 square meters, and the ground is 41861.9 square meters. Architectural structure: main building-frame-shear structure, podium-frame structure. According to the structure and appearance characteristics of the building, the form of the lower disk buckle support frame of the outer beam of the floor + the cantilevered disk buckle triangle truss + the disk buckle type protective railing and the shaped grille + the lower outer hanging rope net working frame is used as the external protection. Make sure the construction goes smoothly.

具体实施方案包括以下步骤:Specific embodiments include the following steps:

S1、预制外挑绳网作业架:如图2所示,外挑绳网作业架由φ48的钢管杆件301、钢丝绳302、安全网303、移动脚手板304组合形成矩形架体,外挑绳网作业架水平设置,外挑绳网作业架的外挑长度为3m,钢丝绳302交错连接于钢管杆件301上并通过钢丝锁固定,钢丝绳302与长度方向的钢管杆件301的拉结点间距为50~60cm,钢丝绳302下方挂设安全网303,安全网303和钢丝绳302上铺设移动脚手板304,施工作业时在移动脚手板304上放置人字梯(层高3m以内)、门型架(层高大于3m),人字梯、门型架与建筑的上部结构通过缆风绳可靠联接,外挑绳网作业架定型化预制。S1. Prefabricated external pick-up rope net work frame: As shown in Figure 2, the external pick-up rope net work stand is composed of a steel pipe rod 301 of φ48, a steel wire rope 302, a safety net 303, and a mobile scaffolding plate 304 to form a rectangular frame body, and the external pick-up rope The net work frame is set horizontally, and the overhang length of the outer pick-up rope net work frame is 3m. The steel wire rope 302 is staggered and connected to the steel pipe rod 301 and fixed by wire locks. The distance between the steel wire rope 302 and the steel pipe rod 301 in the length direction is A safety net 303 is hung under the steel wire rope 302, and a mobile scaffolding board 304 is laid on the safety net 303 and the steel wire rope 302. During construction, a herringbone ladder (within a floor height of 3m) and a portal frame are placed on the mobile scaffolding board 304. (The floor height is greater than 3m), the herringbone ladder, the portal frame and the upper structure of the building are reliably connected by the cable wind rope, and the outer hanging rope net work frame is shaped and prefabricated.

S2、外挑绳网作业架安装:如图1所示,在建筑主体结构中预埋M8*51U型锚固螺栓,在距离外挑双钢管201根部200mm位置预留第一个锚环,外挑双钢管上还设置第二个锚环和第三个锚环,距离第一个锚环250mm处设置第二个锚环,在外挑双钢管201悬挑处的临边结构梁中距离外端100mm预埋第三个锚环,外挑绳网作业架与外挑双钢管201安装提前预制成型,吊装就位后,施工时将3m外挑双钢管201插入预埋U型锚环中,采用10mm厚压板固定,安拆便捷。S2. Installation of the rope net work frame for overhanging: As shown in Figure 1, M8*51U type anchor bolts are pre-buried in the main structure of the building, and the first anchor ring is reserved at a distance of 200mm from the root of the double steel pipe 201. A second anchor ring and a third anchor ring are also set on the double steel pipe, the second anchor ring is set at a distance of 250mm from the first anchor ring, and the distance from the outer end of the edge structural beam at the cantilevered double steel pipe 201 is 100mm. The third anchor ring is pre-buried, and the outer overhanging rope net work frame and the outer overhanging double steel pipe 201 are installed and prefabricated in advance. After hoisting in place, insert the 3m outer overhanging double steel pipe 201 into the pre-buried U-shaped anchor ring during construction, using 10mm The thick platen is fixed for easy installation and disassembly.

外挑双钢管201下方与建筑梁之间沿水平方向每隔3~4米设置两道斜支撑φ48钢管202,斜支撑钢管与外挑双钢管201的夹角不小于45°,斜支撑钢管与外挑双钢管201之间采用双面焊连接固定,外挑双钢管201上方与建筑梁之间沿水平方向每隔3~4m挂一道钢丝绳,采用预埋φ22钢卡环与建筑梁可靠连接,检查外挑双钢管201的强度和稳定性。Two diagonal support φ48 steel pipes 202 are arranged between the bottom of the overhanging double steel pipe 201 and the building beam along the horizontal direction every 3 to 4 meters. The angle between the inclined support steel pipe and the overhanging double steel pipe 201 is not less than 45°. Double-sided welding is used to fix the double-sided outer steel pipes 201. A steel wire rope is hung between the top of the outer double steel pipes 201 and the building beams along the horizontal direction every 3-4m, and the embedded φ22 steel snap rings are used for reliable connection with the building beams. Check the strength and stability of the outrigger double steel pipe 201.

S3、自悬挑作业架安装:在楼层外梁下搭设盘扣式支撑架,盘扣式梁板支撑架体搭设时,建筑首层顶部设置6m挑网,建筑二层及以上采用3m宽的定型化预制的外挑绳网作业架流动交叉施工,自悬挑作业架拆除后兼做施工作业平台,可整体吊装移位安拆,取代后期装饰用吊篮。S3. Installation of self-suspension work frame: set up a buckle type support frame under the outer beam of the floor. When the disc buckle type beam plate support frame is erected, a 6m pick net is set on the top of the first floor of the building, and a 3m wide net is used on the second floor and above of the building. The stereotyped prefabricated external overhanging rope net work frame is used for cross-construction. After the cantilever work frame is removed, it can also be used as a construction work platform. It can be hoisted and moved as a whole to replace the hanging basket for later decoration.

在建筑梁外侧的盘扣式支撑架上架设盘扣三角桁架,如图3所示,盘扣三角桁架具有水平杆403、斜杆、外立杆404,悬挑三角桁架安装步骤:悬挑三角桁架两根水平杆403固定在盘扣式支撑架的支撑架立杆402的连接盘401上,用插销把支撑架立杆402的连接处的锚固孔锁紧,取代斜杆U型托焊接,保证架体稳定性,斜杆与下方的水平杆403连接,上方的水平杆403与斜杆之间通过外立杆404连接,盘扣三角桁架对称设置,两片盘扣三角桁架之间满铺挂钩式钢踏板,防护栏杆立杆404之间增设水平杆,相邻水平杆纵横交错连接牢固,三角桁架与盘扣式支撑架连续搭设,不得滞后安装和任意拆除。A buckled triangular truss is erected on the disc buckled support frame on the outside of the building beam. As shown in Figure 3, the disc buckled triangular truss has horizontal rods 403, inclined rods, and outer vertical rods 404. The installation steps of the cantilevered triangular truss: the cantilevered triangular truss The two horizontal rods 403 of the truss are fixed on the connecting plate 401 of the supporting frame vertical rod 402 of the disk buckle type supporting frame, and the anchoring hole at the connection of the supporting frame vertical rod 402 is locked with a bolt, instead of the inclined rod U-shaped bracket welding, To ensure the stability of the frame, the oblique rod is connected to the horizontal rod 403 below, the horizontal rod 403 above and the oblique rod are connected by the outer vertical rod 404, the buckled triangular trusses are symmetrically arranged, and the two disc buckled triangular trusses are fully paved Hook-type steel pedals, horizontal rods are added between the protective railing poles 404, the adjacent horizontal rods are crisscrossed and connected firmly, the triangular truss and the buckle-type support frame are continuously erected, and no lag installation or arbitrary dismantling is allowed.

根据架体受力情况,进行自悬挑盘扣三角桁架深化设计,设计三角桁架悬挑长度为30~90cm,三角桁架的外立杆404与水平杆403通过连接盘401连接,外立杆404顶部露出连接盘401为10~20cm。According to the force of the frame body, carry out the in-depth design of the triangular truss with self-suspension and buckle, and design the cantilever length of the triangular truss to be 30-90cm. The top exposed connection pad 401 is 10-20 cm.

S4、定型防护格栅安装:在盘扣三角桁架的外立杆404顶部加插防护栏杆立杆405设置防护栏杆,防护栏杆立杆405高度1.5m,防护栏杆立杆405与三角桁架的外立杆404套筒对接连接,简化施工工艺,便捷施工,如图4所示,在防护栏杆立杆405端部直接安装90°弯头及φ48横向钢管406,横向钢管406、弯头与防护栏杆405立杆连成整体,将定型防护格栅407固定于外立杆404内侧,定型防护格栅407定型化预制,安装定型钢格栅防护,取代传统扣件式钢管外脚手架,节约材料,不需另设盘扣水平杆,作为防护栏板与操作平台使用,整体稳定性好,在盘扣式自悬挑作业架拆除后,定型钢格栅可移作恢复临边防护。S4. The installation of the shaped protective grille: add a protective railing pole 405 on the top of the outer pole 404 of the buckled triangular truss to set up a protective railing. The height of the protective railing pole 405 is 1.5m. The pole 404 is connected by the sleeve, which simplifies the construction process and facilitates the construction. As shown in Figure 4, directly install a 90° elbow and a φ48 transverse steel pipe 406 at the end of the protective railing pole 405, the transverse steel pipe 406, the elbow and the protective railing 405 The vertical poles are connected as a whole, and the shaped protective grille 407 is fixed on the inner side of the outer vertical pole 404. The shaped protective grille 407 is shaped and prefabricated, and the shaped steel grille protection is installed to replace the traditional fastener-type steel tube outer scaffolding, saving materials and eliminating the need for There is also a horizontal rod with disc buckle, which is used as a protective fence and an operating platform, with good overall stability. After the disc buckle type self-suspension work frame is removed, the shaped steel grille can be moved to restore the edge protection.

安装后复查盘扣式自悬挑作业架是否按设计搭设,再在外立杆404、定型防护格栅407的外侧满张密目安全网。After installation, check whether the disc-type self-suspension work frame is set up according to the design, and then put a dense mesh safety net on the outer side of the outer pole 404 and the shaped protective grille 407.

外挑绳网作业架的安全网303和钢丝绳302上铺设的移动脚手板304配备3~4层周转使用,三角桁架配1~2层周转使用,提高施工周转效率。The safety net 303 of the outer lifting rope net work frame and the mobile scaffolding board 304 laid on the wire rope 302 are equipped with 3-4 layers of turnover, and the triangular truss is equipped with 1-2 layers of turnover to improve the construction turnover efficiency.

S5、盘扣式自悬挑作业架拆除:作业架拆除时按顺序进行:分段拆除楼层中部跨模板支撑、清理拆下模板、钢管、拆除自悬挑作业架上的密目安全网、拆除自悬挑作业架防护栏杆立杆、拆除挂钩式钢踏板、拆除盘扣三角桁架、拆除边跨盘扣式支撑架的支撑架立杆,拆除时支撑架立杆向内侧倾倒,分类整理杆件及三角架,打包后通过卸料平台及塔吊运出构件。S5. Dismantling of the self-suspension work frame with the buckle type: When the work frame is removed, proceed in sequence: remove the support of the formwork in the middle of the floor in sections, clean and remove the formwork, steel pipes, remove the dense mesh safety net on the self-suspension work frame, remove the Self-suspension work frame protective railing poles, removal of hook-type steel pedals, removal of disc buckle triangle trusses, removal of support frame poles of side span disc buckle type support frames, when dismantling, the support frame poles are dumped inward, and the poles are sorted and sorted. And tripod, after packing, the components are transported out through the unloading platform and tower crane.

拆除时混凝土结构强度必须达到设计及规范要求,盘扣式自悬挑作业架拆除时,清理拆除区域内的杂物,设置拆除区域警戒线,拆除时,由上而下进行,拆除的杆件人工递接,分类堆放。The strength of the concrete structure must meet the design and specification requirements during demolition. When the disc-type self-suspension work frame is demolished, the debris in the demolition area should be cleaned up, and the demolition area cordon should be set. Manual delivery, sorting and stacking.

拆除时,人员分组拆除,2-3人一组,分工作业,一人负责拆除自悬挑脚手架,一人负责移动安全带的固定绳,确保拆除人员始终受安全带的保护;拆除时,必须系好安全带,必须高挂低用,拆除时必须确保边跨支架没有拆除,安全带系在边跨的支架上,确保安全。When dismantling, the personnel shall be dismantled in groups, 2-3 persons shall be divided into groups, one person shall be responsible for dismantling the self-suspension scaffold, and the other shall be responsible for moving the fixed rope of the safety belt, so as to ensure that the dismantling personnel are always protected by the safety belt; A good seat belt must be hung high and used low. When removing, make sure that the side span bracket is not removed, and the seat belt is fastened to the side span bracket to ensure safety.

针对建筑物外墙外脚手架一般采用落地脚手架和悬挑脚手架费工废料及升降架施工成本高的现状,本实施例利用楼层外梁下盘扣式支撑架、悬挑盘扣三角桁架、防护栏杆、定型防护格栅及外挑绳网作业架的流动组合施工,简化施工工艺,承载力高,拆卸方便,节省周转材料,架体安全稳定;采用盘扣式防护栏杆,配置弯头、横向钢管和定制钢格栅防护,取代传统的钢管护栏栏杆,施工便捷,省工省料,低碳安全施工;辅以定型化预制外挑绳网作业架流动交叉作业,自悬挑作业架拆除后兼做施工作业平台,可整体吊装移位安拆,取代后期装饰用吊篮,安全稳定性高,提高施工效率。In view of the current situation that floor scaffolding and cantilevered scaffolding are generally used for external scaffolding of buildings, and the construction cost of lifting scaffolding is high, this embodiment uses a disk buckle type support frame under the outer beam of the floor, a cantilevered disk buckle triangular truss, and a protective railing. , The flow combination construction of the shaped protective grille and the outer pick-up rope net work frame, which simplifies the construction process, has high bearing capacity, is easy to disassemble, saves turnover materials, and the frame body is safe and stable. And customized steel grille protection, replacing the traditional steel pipe guardrails, convenient construction, saving labor and materials, low-carbon and safe construction; supplemented by the stereotyped prefabricated external overhanging rope mesh work frame flow cross operation, after the self-hanging work frame is removed As a construction work platform, it can be hoisted and dismantled as a whole, replacing the hanging basket for later decoration, with high safety and stability and improving construction efficiency.

适用于钢筋混凝土框架结构高层建筑物外墙安全防护,且无突出外墙的阳台、飘窗等结构,以有平直的外立面的钢筋混凝土框架结构最为适用;也可应用于大面积钢筋砼框架结构商业办公建筑的楼面分段施工时的安全防护作业架等。It is suitable for the safety protection of the outer wall of high-rise buildings with reinforced concrete frame structure, and the balcony, bay window and other structures without protruding outer wall. Safety protection work frame during floor segment construction of concrete frame structure commercial office buildings, etc.

在本实施案例中,盘扣支撑体系搭设面积约4万平方米,约280天完成主体结构施工作业。利用本发明进行施工的项目施工具有良好的经济效益,节约成本,提高施工效率。In this implementation case, the installation area of the buckle support system is about 40,000 square meters, and the construction of the main structure is completed in about 280 days. The project construction using the present invention has good economic benefits, saves costs and improves construction efficiency.

以上显示和描述了本发明的基本原理和主要特征以及本发明的优点。本行业的技术人员应该了解,本发明不受上述实施例的限制,上述实施例和说明书中描述的只是说明本发明的原理,在不脱离本发明精神和范围的前提下,本发明还会有各种变化和改进,这些变化和改进都落入要求保护的本发明范围内。本发明要求保护范围由所附的权利要求书及其等效物界定。The foregoing has shown and described the basic principles and main features of the present invention, as well as the advantages of the present invention. Those skilled in the art should understand that the present invention is not limited by the above-mentioned embodiments. The above-mentioned embodiments and descriptions only illustrate the principle of the present invention. Without departing from the spirit and scope of the present invention, the present invention will also have Various changes and modifications fall within the scope of the claimed invention. The claimed scope of the present invention is defined by the appended claims and their equivalents.

Claims (5)

1.盘扣式自悬挑作业架与绳网作业架的流动组合施工方法,其特征在于:包括以下步骤:1. The flow combination construction method of the self-suspension work frame of the disc buckle type and the rope net work frame is characterized in that: comprise the following steps: S1、预制外挑绳网作业架:外挑绳网作业架由钢管杆件、钢丝绳、安全网、移动脚手板组合形成矩形架体,外挑绳网作业架水平设置,外挑绳网作业架的外挑长度为3m,钢丝绳交错连接于钢管杆件上并通过钢丝锁固定,钢丝绳与长度方向的钢管杆件的拉结点间距为50~60cm,钢丝绳下方挂设安全网,安全网和钢丝绳上铺设移动脚手板,施工作业时在移动脚手板上放置人字梯、门型架,人字梯、门型架与建筑的上部结构通过缆风绳可靠联接,下部设置斜撑,外挑绳网作业架定型化预制;S1. Prefabricated external rope net work frame: The external rope net work frame is composed of steel pipe rods, steel wire ropes, safety nets, and mobile scaffolding boards to form a rectangular frame body. The overhang length is 3m, the steel wire rope is staggeredly connected to the steel pipe rod and fixed by wire locks, the distance between the steel wire rope and the steel pipe rod in the length direction is 50-60cm, and a safety net, safety net and steel wire rope are hung under the steel wire rope A mobile scaffolding board is laid on the upper part, and a herringbone ladder and a portal frame are placed on the mobile scaffolding board during construction. The herringbone ladder, the portal frame and the upper structure of the building are reliably connected by cables and wind ropes, and the lower part is provided with diagonal bracing and an external pick-up rope. Prefabrication of net work frame stereotypes; S2、外挑绳网作业架安装:在建筑主体结构中预埋U型锚固螺栓,在距离纵向外挑双钢管根部200mm位置预留第一个锚环,外挑双钢管上还设置第二个锚环和第三个锚环,距离第一个锚环250mm处预埋第二个锚环,第三个锚环预埋在外挑双钢管悬挑处的临边结构梁中,外挑绳网作业架与外挑双钢管安装提前预制成型,吊装就位后,将外挑双钢管插入预埋U型锚环中,采用压板固定;S2. Installation of the outrigger rope mesh work frame: Pre-embed U-shaped anchor bolts in the main structure of the building, reserve the first anchor ring at a distance of 200mm from the root of the longitudinal outrigger double steel pipe, and set the second outrigger on the outrigger double pipe. Anchor ring and the third anchor ring, the second anchor ring is pre-buried at a distance of 250mm from the first anchor ring, the third anchor ring is pre-buried in the edge structural beam at the overhanging double steel pipe cantilever, and the rope net is overhanging. The installation of the work frame and the overhanging double steel pipe is prefabricated in advance. After the hoisting is in place, the outer overhanging double steel pipe is inserted into the embedded U-shaped anchor ring and fixed with a pressure plate; S3、自悬挑作业架安装:在楼层外梁下搭设盘扣式支撑架,盘扣式梁板支撑架体搭设时,建筑首层顶部设置6m挑网,建筑二层及以上采用3米宽的定型化预制的外挑绳网作业架流动交叉施工;S3. Installation of self-suspension work frame: set up a buckle type support frame under the outer beam of the floor. When the disc buckle type beam plate support frame is erected, a 6m pick net is set on the top of the first floor of the building, and a 3m wide net is used on the second floor and above of the building. The stereotyped prefabricated external overhanging rope net work frame is used for flow cross construction; 在建筑梁外侧的盘扣式支撑架上架设盘扣三角桁架,盘扣三角桁架具有水平杆、斜杆、外立杆,在悬挑的盘扣式支撑架的支撑架立杆上插接水平杆,水平杆与支撑架立杆通过连接盘连接再通过插销销紧,斜杆与下方的水平杆连接,上方的水平杆与斜杆之间通过外立杆连接,盘扣三角桁架对称设置,两片盘扣三角桁架之间满铺挂钩式钢踏板;A disc buckle triangular truss is erected on the disc buckle support frame on the outside of the building beam. The disc buckle triangle truss has horizontal rods, inclined rods, and outer vertical rods, and is inserted horizontally on the support frame poles of the cantilevered disc buckle support frame. The rod, the horizontal rod and the supporting frame vertical rod are connected by the connecting plate and then tightened by the bolt, the inclined rod is connected with the horizontal rod below, the horizontal rod above is connected with the inclined rod by the external vertical rod, and the triangular truss of the disk buckle is symmetrically arranged. There are hook-type steel pedals between the two disc buckle triangular trusses; S4、定型防护格栅安装:在盘扣三角桁架的外立杆顶部加插防护栏杆立杆设置防护栏杆,在防护栏杆立杆端部直接安装90°弯头及横向钢管,横向钢管、弯头与防护栏杆立杆连成整体,将定型防护格栅固定于外立杆内侧,定型防护格栅定型化预制,安装后复查盘扣式自悬挑作业架是否按设计搭设,再在外立杆、定型防护格栅的外侧满张密目安全网;S4, stereotyped protective grille installation: add protective railings to the top of the outer poles of the disc buckle triangular truss to set up protective railings, and directly install 90° elbows and horizontal steel pipes, horizontal steel pipes, elbows at the ends of the protective railing poles It is integrated with the guardrail vertical pole, and the shaped protective grille is fixed on the inner side of the outer vertical pole. The outer side of the shaped protective grille is full of dense mesh safety nets; S5、盘扣式自悬挑作业架拆除:作业架拆除时按顺序进行:分段拆除楼层中部跨模板支撑、清理拆下模板、钢管、拆除自悬挑作业架上的密目安全网、拆除自悬挑作业架防护栏杆立杆、拆除挂钩式钢踏板、拆除盘扣三角桁架、拆除边跨盘扣式支撑架的支撑架立杆,拆除时支撑架立杆向内侧倾倒,分类整理杆件及三角架,打包后通过卸料平台及塔吊运出构件。S5. Dismantling of the self-suspension work frame with the buckle type: When the work frame is removed, proceed in sequence: remove the support of the formwork in the middle of the floor in sections, clean and remove the formwork, steel pipes, remove the dense mesh safety net on the self-suspension work frame, remove the Self-suspension work frame protective railing poles, removal of hook-type steel pedals, removal of disc buckle triangle trusses, removal of support frame poles of side span disc buckle type support frames, when dismantling, the support frame poles are dumped inward, and the poles are sorted and sorted. And tripod, after packing, the components are transported out through the unloading platform and tower crane. 2.根据权利要求1所述的盘扣式自悬挑作业架与绳网作业架的流动组合施工方法,其特征在于:所述步骤S2中,外挑双钢管下方与建筑梁之间沿水平方向每隔3~4米设置两道斜支撑钢管,斜支撑钢管与外挑双钢管的夹角不小于45°,斜支撑钢管与外挑双钢管之间采用双面焊连接固定,外挑双钢管上方与建筑梁之间沿水平方向每隔3~4m挂一道钢丝绳,采用预埋钢卡环与建筑梁可靠连接,检查外挑双钢管的强度和稳定性。2. The flow-combined construction method of the self-suspension work frame of the disc buckle type and the rope net work frame according to claim 1, characterized in that: in the step S2, the horizontal direction between the underside of the outer overhanging double steel pipe and the building beam Two oblique support steel pipes are set every 3 to 4 meters in the direction. The angle between the oblique support steel pipe and the overhanging double steel pipe is not less than 45°. A steel wire rope is hung between the top of the steel pipe and the building beam along the horizontal direction at intervals of 3-4m, and the embedded steel snap ring is used to reliably connect the building beam to check the strength and stability of the double steel pipe. 3.根据权利要求1所述的盘扣式自悬挑作业架与绳网作业架的流动组合施工方法,其特征在于:所述步骤S3中,三角桁架悬挑长度为30~90cm,三角桁架的外立杆与水平杆通过连接盘连接,外立杆顶部露出连接盘10~20cm;悬挑三角桁架安装步骤:悬挑三角桁架两根水平杆固定在盘扣式支撑架的支撑架立杆的连接盘上,用插销把支撑架立杆的连接处的锚固孔锁紧,防护栏杆立杆与三角桁架的外立杆套筒对接连接;防护栏杆立杆之间增设水平杆,相邻水平杆纵横交错连接牢固,三角桁架与盘扣式支撑架连续搭设。3. The flow combined construction method of the self-suspension work frame of the disc buckle type and the rope net work frame according to claim 1, characterized in that: in the step S3, the triangular truss cantilever length is 30-90 cm, and the triangular truss The outer pole and the horizontal pole are connected through the connecting plate, and the top of the outer pole is exposed to the connecting plate for 10-20cm; the installation steps of the cantilevered triangular truss: the two horizontal poles of the cantilevered triangle truss are fixed on the support frame pole of the disc buckle type support frame On the connecting plate of the truss, the anchoring hole at the connection of the supporting frame pole is locked with a bolt, and the protective railing pole is connected with the outer pole sleeve of the triangular truss; The rods are crisscrossed and connected firmly, and the triangular truss and the buckle-type support frame are continuously erected. 4.根据权利要求1所述的盘扣式自悬挑作业架与绳网作业架的流动组合施工方法,其特征在于:所述步骤S4中,防护栏杆立杆高度1.5m;所述外挑绳网作业架的安全网和钢丝绳上铺设的移动脚手板配备3~4层周转使用,三角桁架配1~2层周转使用。4. The construction method of the flow combination of the disc buckle type self-suspension work frame and the rope net work frame according to claim 1, characterized in that: in the step S4, the height of the protective railing pole is 1.5m; The safety net of the rope net work frame and the mobile scaffolding board laid on the wire rope are equipped with 3-4 layers of turnover, and the triangular truss is equipped with 1-2 layers of turnover. 5.根据权利要求1所述的盘扣式自悬挑作业架与绳网作业架的流动组合施工方法,其特征在于:所述步骤S5中,盘扣式自悬挑作业架拆除时,清理拆除区域内的杂物,设置拆除区域警戒线,拆除时,由上而下进行,拆除的杆件人工递接,分类堆放。5 . The flow combined construction method of the buckle type self-suspension work frame and the rope net work frame according to claim 1, wherein: in the step S5, when the disc buckle type self-suspension work frame is removed, clean The debris in the demolition area shall be set up with a cordon of the demolition area. When the demolition is carried out, it shall be carried out from top to bottom.
CN202210311994.3A 2022-03-28 2022-03-28 Flow combination construction method for disk-buckle type self-overhanging operation frame and rope net operation frame Pending CN114704064A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210311994.3A CN114704064A (en) 2022-03-28 2022-03-28 Flow combination construction method for disk-buckle type self-overhanging operation frame and rope net operation frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210311994.3A CN114704064A (en) 2022-03-28 2022-03-28 Flow combination construction method for disk-buckle type self-overhanging operation frame and rope net operation frame

Publications (1)

Publication Number Publication Date
CN114704064A true CN114704064A (en) 2022-07-05

Family

ID=82169853

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210311994.3A Pending CN114704064A (en) 2022-03-28 2022-03-28 Flow combination construction method for disk-buckle type self-overhanging operation frame and rope net operation frame

Country Status (1)

Country Link
CN (1) CN114704064A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115478679A (en) * 2022-09-27 2022-12-16 云南工程建设总承包股份有限公司 A horizontal truss unit suitable for matching with the buckle frame system
CN116290705A (en) * 2023-02-17 2023-06-23 淮安市建筑设计研究院有限公司 Spliced box-type steel column construction platform and construction method thereof
CN117702899A (en) * 2023-11-14 2024-03-15 中交四航局第六工程有限公司 Installation construction method of ultra-large span heavy steel corridor

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202788017U (en) * 2012-07-30 2013-03-13 中国建筑第八工程局有限公司 Horizontally-overhung rigid hermetic section steel protective shed for high-rise buildings
CN205444872U (en) * 2016-03-24 2016-08-10 天津鼎维固模架工程股份有限公司 Novel bracket of encorbelmenting is buckled to socket joint type dish
CN206971787U (en) * 2017-05-25 2018-02-06 中国建筑第八工程局有限公司 A kind of steel mesh protection of assembled disk button system
CN208456085U (en) * 2018-07-04 2019-02-01 中建二局第三建筑工程有限公司 Build builder's jack structure
CN112252698A (en) * 2020-10-14 2021-01-22 中国建筑第四工程局有限公司 A super high-rise large cantilever steel truss construction platform

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202788017U (en) * 2012-07-30 2013-03-13 中国建筑第八工程局有限公司 Horizontally-overhung rigid hermetic section steel protective shed for high-rise buildings
CN205444872U (en) * 2016-03-24 2016-08-10 天津鼎维固模架工程股份有限公司 Novel bracket of encorbelmenting is buckled to socket joint type dish
CN206971787U (en) * 2017-05-25 2018-02-06 中国建筑第八工程局有限公司 A kind of steel mesh protection of assembled disk button system
CN208456085U (en) * 2018-07-04 2019-02-01 中建二局第三建筑工程有限公司 Build builder's jack structure
CN112252698A (en) * 2020-10-14 2021-01-22 中国建筑第四工程局有限公司 A super high-rise large cantilever steel truss construction platform

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115478679A (en) * 2022-09-27 2022-12-16 云南工程建设总承包股份有限公司 A horizontal truss unit suitable for matching with the buckle frame system
CN116290705A (en) * 2023-02-17 2023-06-23 淮安市建筑设计研究院有限公司 Spliced box-type steel column construction platform and construction method thereof
CN117702899A (en) * 2023-11-14 2024-03-15 中交四航局第六工程有限公司 Installation construction method of ultra-large span heavy steel corridor
CN117702899B (en) * 2023-11-14 2025-02-07 中交四航局第六工程有限公司 A method for installing and constructing a super-large-span heavy-duty steel corridor

Similar Documents

Publication Publication Date Title
CN104453197B (en) High Large Cantilever concrete structural steel shape supports platform
CN108643544B (en) High-altitude overhanging construction platform support system and construction method
CN103291076B (en) Multilayer steel truss fragmented reverse hoisting construction method in arc-shaped frame
CN114704064A (en) Flow combination construction method for disk-buckle type self-overhanging operation frame and rope net operation frame
CN103603504B (en) The dynamo-electric heavy caliber standpipe of super highrise building is with the method for main body progress lifting construction
CN202324571U (en) Overhanging type double-row scaffold
CN102535845A (en) Construction method of bearing frame of corridor structure
CN206174437U (en) Be applied to gallows of super high overlength cantilevered member construction
CN110805257A (en) Flower basket overhanging type section steel bearing beam structure and construction method
CN109881585A (en) A kind of assembly flow shop platform for high pier construction
CN111236621A (en) Fixing system for beam-side embedded overhanging scaffold
CN115538792B (en) Building construction method and building construction structure by using residential building machine
CN111395730A (en) Curtain wall construction system and method suitable for high-rise building with special-shaped giant columns
CN114658214A (en) High-rise building disc buckle type high-altitude large-cantilever support frame support and anchor pressing integrated construction method
CN103147582A (en) Overhead cantilever formwork construction method
CN104847102A (en) Wall attaching method and device of attached self-lifting scaffold on retraction section of building outer wall
CN107165281A (en) A kind of high-altitude long-span overhung steel platform mould bases construction
CN116950437A (en) Self-climbing contractible and leachable layer overhanging protective net and construction method
CN209653358U (en) A kind of overhanging protection canopy
CN104831928B (en) High-altitude long-span concrete conjoined structure shuttering supporting steel platform construction method
CN212336672U (en) I-steel overhanging bearing frame of basket pull rod for constructional engineering
CN100476146C (en) High altitude placing steel pole inner concrete operating platform frame
CN212406038U (en) Lower hanging construction platform module of high-altitude large-cantilever steel roof truss
CN104989092A (en) Construction method of high-altitude overhang superposition type steel truss bearing platform
CN111764623B (en) Hanging construction platform module and construction method of high altitude large cantilever steel roof frame

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination