CN114294023A - Preliminary bracing trolley with formwork - Google Patents
Preliminary bracing trolley with formwork Download PDFInfo
- Publication number
- CN114294023A CN114294023A CN202210088963.6A CN202210088963A CN114294023A CN 114294023 A CN114294023 A CN 114294023A CN 202210088963 A CN202210088963 A CN 202210088963A CN 114294023 A CN114294023 A CN 114294023A
- Authority
- CN
- China
- Prior art keywords
- trolley
- steel
- formwork
- portal frame
- main arc
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The invention discloses a primary support trolley with a mould, which belongs to the technical field of tunnel construction and comprises a support steel arch frame, wherein a trapezoidal block is arranged at the bottom of the support steel arch frame, a steel template is arranged at the bottom of the support steel arch frame, and a sprue gate top window is arranged at the tops of the support steel arch frame and the steel template; according to the invention, the trolley is a large-span arc-shaped portal frame, the arc-shaped portal frame can freely stride over the original excavation trolley without influencing the use function of the original excavation trolley, the trolley is provided with a hydraulic system and an operating system, hydraulic pressure provides power for connecting with an oil cylinder, the trolley travelling mode is that a suspension type steel rail motor drives to travel, the motor piles up the trolley forwards to travel to an excavation working face, the working face is uneven, a plurality of movable steel templates are used for clinging to a face, or a sheet head blocking die and a columnar head acting die are used for effectively blocking and preventing slurry leakage, the trolley has high automation degree, high construction efficiency, reduced labor force, construction material saving and waste avoidance.
Description
Technical Field
The invention belongs to the technical field of tunnel construction, and particularly relates to a primary supporting trolley with a formwork.
Background
In the prior tunnel primary support construction, a dry spraying method and a wet spraying method are adopted for construction, the construction process is low in efficiency, expensive dry and wet spraying machines are required to be purchased in the early stage, the cost investment is high, waste caused by concrete rebound generated by spraying method construction cannot be solved at the present stage, the concrete dust in the construction environment is large, the health of constructors is influenced, the construction time is long, and the construction progress is influenced. The density, strength and planeness of the sprayed concrete can not be ensured.
The technical scheme is that in order to solve the problems, if (publication No. CN109538250A) and (publication No. CN108194106A) are subjected to spraying operation in a sliding mode, and sliding rail tracks are additionally arranged on an original excavation trolley, substantial problems cannot be solved, for example, dust is generated in the spraying operation, a guide rail additionally arranged on the original excavation trolley can also influence the transportation and installation of a supporting steel arch frame and influence the air drill to arrange a small advanced guide pipe and installation, and when explosive blasting is used, flying stones can hit the equipment more frequently due to the fact that a hub occupying the area of a tunnel is too large, so that the equipment is damaged.
Disclosure of Invention
The invention aims to: in order to solve the above problems, a formwork-equipped preliminary bracing carriage has been proposed.
In order to achieve the purpose, the invention adopts the following technical scheme: area mould preliminary bracing platform truck, including strutting the steel bow member, the bottom of strutting the steel bow member is provided with the trapezoidal piece, the bottom of strutting the steel bow member is provided with the steel form, the top of strutting the steel bow member and steel form is provided with sprue gate top window, the bottom fixed mounting of steel form has main arc portal frame, the below of main arc portal frame is provided with sliding connection walking track and original excavation platform truck, the inboard fixed mounting in bottom of steel form has the support lead screw, the one end and the holding surface in close contact with of support lead screw extrude.
As a further description of the above technical solution:
and a guiding laser is arranged at the center of the bottom of the main arc-shaped portal frame.
As a further description of the above technical solution:
and a second hydraulic cylinder is fixedly mounted on the side wall of the main arc-shaped portal frame, and the output end of the second hydraulic cylinder is fixedly connected with the side wall of the steel template.
As a further description of the above technical solution:
and a pouring opening middle window and a pouring opening lower window are arranged on the side surfaces of the supporting steel arch frame and the steel formwork, and the pouring opening middle window and the pouring opening lower window are respectively positioned at different heights.
As a further description of the above technical solution:
a first hydraulic oil cylinder is arranged inside the main arc-shaped portal frame, and a small-sized pump truck is arranged on the inner side of the trolley.
As a further description of the above technical solution:
the bottom of main arc portal frame is provided with the walking wheel, walking wheel and walking track sliding connection.
Furthermore, four large-scale vertical supporting hydraulic oil cylinders are arranged at the supporting legs of the main arc-shaped portal frame.
The dry and wet spraying process is further changed into a cast-in-place construction process, and the cast-in-place construction process has the advantages of no dust, no pollution to a construction site, quick pouring time, and the need of adding a small amount of accelerating agent into concrete, so that the quick solidification time is ensured, the strength of the concrete is ensured, the construction progress is also ensured, no rebound concrete is wasted, and the concrete surface is smooth and smooth after the formwork is removed. The primary support trolley for the full-section construction and lengthened and heightened belt formwork can be poured for use. And (3) constructing an upper step and a lower step, pouring the upper step by using a primary supporting trolley with a mould, and pouring the lower step by using a split steel diaphragm plate after the installation is finished.
Further, the dry and wet spraying construction method of the primary support is changed into a cast-in-place construction process, and the construction process uses a mould primary support pouring trolley processed by a large-span arc gantry framework. The trolley is provided with a hydraulic system and an operating system, and the hydraulic system provides power for connecting the oil cylinder. The trolley walking mode is that the suspended steel rail motor drives to walk. The motor piles up the platform truck forward and walks to the excavation working face, and the working face unevenness uses polylith activity steel form to paste the excavation face tightly, or works as the head mould with slice fender head mould, column, and the shutoff prevents leaking thick liquid.
The steel formwork is provided with a lower grouting window, a middle grouting window and an upper grouting window, the grouting windows are manufactured and installed by adopting quick connecting pipes, the inner side of the formwork is provided with an attached vibrator, concrete is poured to a certain amount, and the vibrator is started to vibrate.
And removing the formwork, recovering the fixing screw rod, lowering the lower supporting oil cylinder, contracting the left and right oil cylinders to separate from the concrete surface, crossing the original excavation trolley by the primary supporting trolley with the formwork, retreating to a rear safe distance, and performing the next circular excavation operation.
In summary, due to the adoption of the technical scheme, the invention has the beneficial effects that:
according to the invention, the trolley is a large-span arc-shaped portal frame, the arc-shaped portal frame can freely stride over the original excavation trolley without influencing the use function of the original excavation trolley, the trolley is provided with a hydraulic system and an operating system, hydraulic pressure provides power for connecting with an oil cylinder, the trolley travels in a mode of being driven by a suspension type steel rail motor, a track and the travel are in sliding connection, the motor piles up the trolley forward to travel to an excavation working face, the working face is uneven, a plurality of movable steel templates are used for attaching a tunnel face tightly, or a sheet-shaped head blocking die and a columnar head acting die are used for effectively blocking and preventing slurry leakage, the trolley has high automation degree, high construction efficiency and reduced labor force, construction materials are saved, and waste is avoided.
Drawings
FIG. 1 is a schematic structural view of a primary supporting trolley with a formwork;
fig. 2 is a schematic view of the working process of the present invention.
Illustration of the drawings:
1. a traveling rail; 2. a traveling wheel; 3. a main arc gantry; 4. supporting a steel arch frame; 5. a sprue gate top window; 6. guiding laser; 7. a first hydraulic cylinder; 8. a trapezoidal block; 9. pouring the window-in-opening; 10. a steel form; 11. a second hydraulic cylinder; 12. pouring the lower window of the opening; 13. original excavation trolleys; 14. a small pump truck; 15. supporting the screw rod: 16. a hydraulic cylinder.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1, the present invention provides a technical solution: the primary supporting trolley with the formwork comprises a supporting steel arch frame 4, a trapezoidal block 8 is arranged at the bottom of the supporting steel arch frame 4, a steel formwork 10 is arranged at the bottom of the supporting steel arch frame 4, a sprue gate top window 5 is arranged at the tops of the supporting steel arch frame 4 and the steel formwork 10, a main arc-shaped portal frame 3 is fixedly installed at the bottom of the steel formwork 10, a walking track 1 and an original excavation trolley 13 are arranged below the main arc-shaped portal frame 3, a supporting screw rod 15 is fixedly installed on the inner side of the bottom of the steel formwork 10, and one end of the supporting screw rod 15 is in close contact with and extrudes a supporting surface;
four vertical supporting large hydraulic oil cylinders 16 are arranged at the supporting feet of the main arc portal frame.
The specific implementation mode is as follows: when the trolley is moved, the four vertical supporting large hydraulic oil cylinders at the lower part are started to suspend a steel rail, the walking motor is started to push the steel rail to move forwards or backwards, the four vertical supporting large hydraulic oil cylinders at the lower part contract after the trolley is in place, the rail supports the weight of the whole trolley, the trolley is piled forwards or backwards by the starting motor to travel to an excavation working surface, the motor drives the rail to move forwards or backwards, the first hydraulic oil cylinder 7 and the second hydraulic oil cylinder 11 contract, the rail descends to the ground, the motor drives the formwork supporting trolley to move in place, the movable steel formwork 10 close to the excavation surface adjusts and clings to the working surface, when an advanced guide pipe is blocked, a sheet-shaped or columnar blocking head formwork can be used for blocking, and after the formwork is removed, the primary supporting trolley crosses the original excavation trolley and retreats to an open area to wait for recycling;
the bottom central point department of putting of main arc portal frame 3 is provided with direction laser 6, fixed mounting has second hydraulic cylinder 11 on the lateral wall of main arc portal frame 3, the output of second hydraulic cylinder 11 and the lateral wall fixed connection of steel form 10, it is provided with in the pouring opening window 9 and pours a mouthful lower window 12 to strut the side of steel bow member 4 and steel form 10, it is located different heights respectively with pouring a mouthful lower window 9 to pour mouthful in the window 9, the inside of main arc portal frame 3 is provided with first hydraulic cylinder 7, the inboard of platform truck 13 is provided with small-size pump truck 14, the bottom of main arc portal frame 3 is provided with walking wheel 2, walking wheel 2 and walking track 1 sliding connection.
The working principle is as follows: when the trolley is moved, the four vertical support large hydraulic oil cylinders 16 at the lower part are started to enable the steel rails to be suspended, the walking motor is started to push the steel rails to move forwards or backwards, the four vertical support large hydraulic oil cylinders 16 at the lower part shrink after the steel rails are in place, the track supports the weight of the whole trolley, the trolley is piled forwards or backwards by the starting motor to walk to an excavation working surface, the motor drives the track to move forwards or backwards, the first hydraulic oil cylinder 7 and the second hydraulic oil cylinder 11 shrink, the track descends to the ground, the motor drives the primary support trolley with the formwork to move in place, the movable steel formwork 10 close to the excavation surface adjusts and clings to the working surface, sheet-shaped or columnar blocking head formwork blocking can be used when an advanced guide pipe blocks, and the primary support trolley with the formwork crosses the original excavation trolley and retreats to an open section to wait for recycling.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and the technical solutions and the inventive concepts thereof according to the present invention should be equivalent or changed within the scope of the present invention.
Claims (7)
1. Area mould preliminary bracing platform truck, including strutting steel bow member (4), its characterized in that: the bottom of strutting steel bow member (4) is provided with trapezoidal piece (8), the bottom of strutting steel bow member (4) is provided with steel form (10), the top of strutting steel bow member (4) and steel form (10) is provided with sprue gate top window (5), the bottom fixed mounting of steel form (10) has main arc portal frame (3), the below of main arc portal frame (3) is provided with walking track (1) and platform truck (13), the inboard fixed mounting in bottom of steel form (10) has support lead screw (15), the one end and the holding surface in close contact with of support lead screw (15) extrude.
2. The modular preliminary bracing trolley according to claim 1, characterized in that a guiding laser (6) is provided at the bottom center position of the main arc-shaped portal frame (3).
3. The strip formwork preliminary bracing trolley according to claim 1, wherein a second hydraulic cylinder (11) is fixedly installed on the side wall of the main arc-shaped portal frame (3), and the output end of the second hydraulic cylinder (11) is fixedly connected with the side wall of the steel formwork (10).
4. The primary support trolley with the formwork as claimed in claim 1, wherein the side faces of the support steel arch frame (4) and the steel formwork (10) are provided with a pouring opening middle window (9) and a pouring opening lower window (12), and the pouring opening middle window (9) and the pouring opening lower window (12) are respectively located at different heights.
5. The strip formwork preliminary bracing trolley according to claim 1, characterized in that a first hydraulic oil cylinder (7) is arranged inside the main arc-shaped portal frame (3), and a small pump truck (14) is arranged on the inner side of the trolley (13).
6. The strip formwork preliminary bracing trolley according to claim 1, characterized in that four vertically supporting large hydraulic oil cylinders (16) are arranged at the supporting feet of the main arc-shaped portal frame (3).
7. The strip formwork preliminary bracing trolley according to claim 1, characterized in that a walking wheel (2) is arranged at the bottom end of the main arc-shaped portal frame (3), and the walking wheel (2) is connected with a walking track (1) in a sliding manner.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210088963.6A CN114294023A (en) | 2022-01-25 | 2022-01-25 | Preliminary bracing trolley with formwork |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210088963.6A CN114294023A (en) | 2022-01-25 | 2022-01-25 | Preliminary bracing trolley with formwork |
Publications (1)
Publication Number | Publication Date |
---|---|
CN114294023A true CN114294023A (en) | 2022-04-08 |
Family
ID=80976813
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210088963.6A Pending CN114294023A (en) | 2022-01-25 | 2022-01-25 | Preliminary bracing trolley with formwork |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114294023A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114607422A (en) * | 2022-04-19 | 2022-06-10 | 四川省交通建设集团股份有限公司 | Steel arch mounting device for tunnel construction |
-
2022
- 2022-01-25 CN CN202210088963.6A patent/CN114294023A/en active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114607422A (en) * | 2022-04-19 | 2022-06-10 | 四川省交通建设集团股份有限公司 | Steel arch mounting device for tunnel construction |
CN114607422B (en) * | 2022-04-19 | 2023-01-03 | 四川省交通建设集团股份有限公司 | Steel arch mounting device for tunnel construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109505630B (en) | Full-hydraulic crawler-type self-propelled trestle and construction method | |
CN105952482B (en) | Self-propelled tunnel inverted arch lining trolley | |
CN103016028A (en) | Hydraulic self-propelled steel form carrier for tunnel secondary lining operation | |
CN103982200B (en) | Slide rail Mobile steel mould trolley in tunneling boring | |
CN101363224A (en) | Movable foundation pit support system and construction method | |
CN106593469A (en) | Trolley for construction of inverted arch | |
CN211314235U (en) | Tunnel inverted arch and filling concrete paver | |
CN114294023A (en) | Preliminary bracing trolley with formwork | |
CN110173281A (en) | A kind of sliding mode system for circular tunnel concreting | |
CN106050268A (en) | Steel mould trolley for concrete lining of rounded rectangle cross section tunnel | |
CN104018855B (en) | General formula needle beam lining trolley in a kind of | |
CN217761021U (en) | Simple tunnel lining pouring trolley suitable for narrow and small section uninterrupted traffic | |
JPH11280400A (en) | Movable type pier | |
CN210827111U (en) | Environment-friendly down self-propelled steel trestle structure | |
CN216767405U (en) | Preliminary bracing trolley with formwork | |
CN213627596U (en) | Self-propelled template trolley for culvert side wall pouring construction | |
CN215715514U (en) | Quick lining device for open cut tunnel | |
CN205591932U (en) | Full -automatic highway, railway ditch cable duct lining cutting platform truck | |
CN210105880U (en) | Alternate hydraulic lifting template ditch cable trough trolley device | |
CN212671805U (en) | Split type hydraulic trolley | |
CN107630463A (en) | A kind of construction technology of underground pipe gallery construction mobile jumbo device | |
CN212534206U (en) | Cast-in-place formula piping lane erects wall construction platform truck | |
CN205977238U (en) | Small cross section's flexible formworking jumbo is walked to tunnel section of widening platform truck | |
CN205955750U (en) | Rounded rectangle cross -section tunnel steel mould trolley for concrete lining | |
CN112575814A (en) | Quick lining device for open cut tunnel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |