CN1142562A - Assembled screw rod - Google Patents

Assembled screw rod Download PDF

Info

Publication number
CN1142562A
CN1142562A CN 95119331 CN95119331A CN1142562A CN 1142562 A CN1142562 A CN 1142562A CN 95119331 CN95119331 CN 95119331 CN 95119331 A CN95119331 A CN 95119331A CN 1142562 A CN1142562 A CN 1142562A
Authority
CN
China
Prior art keywords
screw rod
millimeters
inner screw
screw
assembled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 95119331
Other languages
Chinese (zh)
Other versions
CN1053028C (en
Inventor
缪金云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Li Fajun
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 95119331 priority Critical patent/CN1053028C/en
Publication of CN1142562A publication Critical patent/CN1142562A/en
Application granted granted Critical
Publication of CN1053028C publication Critical patent/CN1053028C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Moulds, Cores, Or Mandrels (AREA)

Abstract

A combined screw bolt used to stabilize shuttering engineerings such as concrete foundation, shear wall, beam and column is composed of internal and external screw bolts and connecting rod. It features no need of welding and cutting, easy assembly and disassembly, low cost and high engineering quality.

Description

Assembled screw rod
1, assembled screw rod is according to building operations, and is that the needs of form work engineering are developed, it is used and form work engineerings such as firm various concrete, basis, shear wall, board wall, beam, post are best product.
2, assembled screw rod calculates through interrelated data, its lowest pull is 0.9 ton, actual sampling examination is drawn, minimum is stressed is not less than 1.9 tons, every square metre of maximum side force degree of template side elevation is not more than 5.6 tons, so the proof assembled screw rod is stressed with enough templates, when firm template, 50 centimetres of horizontal spacings, perpendicular spacing are commute for 60 centimetres.
3, the purpose of assembled screw rod development, speed, the safety of guaranteeing engineering and the workmanship of construction for convenience, minimizing recruitment, quickening formwork erection engineering are pushed form work engineering to a new step.
4, assembled screw rod mainly is made up of inner screw, external screw rod, connecting rod;
(1), inner screw plays absolute effect to assembled screw rod; the silk hole is connected with connecting rod behind the inner screw, preceding silk head is used and be connected external screw rod; 8 centimetres of inner screw length; for just with installation and removal, half long for square, half long for circular, square be the dismounting effect; circle plays effect easy for installation; for preventing that inner screw from being stopped up by concrete; to adding wineglass formula plastics protected enclosure above the inner screw; inner screw is protected; inner screw can be dismantled on time, can repeatedly use, in when dismounting, use autocratic wrench dismounting.
(2), external screw rod divides in two kinds, 20 centimetres of a kind of length, another kind of long 15 centimetres, can select for use according to the size of template, external screw rod compares with existing screw rod, do not need to weld, operation such as gas cutting, straightening, hard waste, can dismantle template on time, can repeatedly use again, as adding the zinc-plated advantage that can use for many years, play the external mold overall fixed, fastening good effect.
(3), the inner screw of connecting rod and both sides plays interconnect function, a connecting rod just can replace an existing screw rod to use, it plays fixing and control template home record size.
5, the screw rod of the existing usefulness of China, as accompanying drawing 5, existing screw rod Fig. 1, Fig. 2, make complicated, operation is inconvenient again, it generally is disposable use, concrete shear force wall as 40 cm thicks, need long about 90 centimetres screw rod, a screw rod processing maturation will spend RMB more than 3 yuan, every square metre just needs about 6 screw rods, every square metre concrete shear force wall form work engineering, screw rod cost will about 20 yuan, above as the pre-buried bamboo trunk of typical floor, screw rod was scurried in bamboo trunk, 40% stopped up by concrete grout also arranged, screw rod can't pump out, the straightening again of releasing, hard waste, the concrete wall surface seepage can't be repaired, the screw rod that can't pump out is gas cutting again, form removal on time, and damaged template is very big, the concrete spillage is serious, joint rots root, wall leakage, wasted a large amount of funds, material and artificial, welding slag is fallen above the scaffold fire hazardous again during the gas cutting screw rod, the bar head of the cutting off weakness that falls and easily hurt sb.'s feelings etc.
6, the assembled screw rod moulding is simple, easy to operate, use is wide, can repeatedly use, add zinc-plated can the use for many years above the screw rod, an assembled screw rod is with once just saving about three yuans, it can guarantee engineering safety and workmanship again, form removal on time again, concrete shear force wall template as same upright 40 cm thicks, a screw rod only need spend about three maos, as long as use 32 centimeter length, 0.8 a connecting rod of cm diameter just can, do not need to weld gas cutting, straightening, the hard waste formwork erection has the advantage of running mould anything but, and casting and compacting of concrete is spillage not, and metope is non-leakage rainy season, template there is not damage, on the basis of guaranteeing workmanship and engineering safety, can save a large amount of funds, material, manually.
7, (1), " each dimension figure of accompanying drawing full-page proof is unit with the millimeter, " accompanying drawing 1, assembled screw rod figure, section divide A, B, C, D, figure, A figure at accompanying drawing 2, B, C, D, figure, assembled screw rod installation drawing.At accompanying drawing 3, installation drawing, 1 inner screw, 2 connecting rods, 3 external screw rods, 4 wooden forms, 5 wooden block sides, 6 cross bars, 7 headblock sheets, 8 iron gaskets, 9 cap nuts, 10 concrete.
(2), accompanying drawing 2, A figure, inner screw full-page proof, A1, plastics protected enclosure master drawing, A2 protective cover section size figure, A3, inner screw assembly drawing.
(3), accompanying drawing 3, B figure, inner screw drawing, C figure, external screw rod drawing, D figure, connecting rod drawing.
(4), the wrench figure that uses of accompanying drawing 4, dismounting inner screw, and inner screw dismounting figure, inner screw dismounting figure, 1 refer to that spanner figure, 2 refers to inner screw figure.
(5), accompanying drawing 5, existing screw rod Fig. 1, existing screw rod Fig. 2, and existing screw rod installation drawing, installation drawing, 1 screw rod, 2 sealing pads, 3 home records are spacing, 4 outer sealing pads, 5 templates, 6 holder sides, 7 cross bars, 8 headblock sheets, 9 iron gaskets, 10 cap nuts, 11 concrete.
(6), accompanying drawing 6, assembled screw rod Figure of abstract.
8, when mounting template, from inside to outside install, when dismantling, remove from outside to inside, please refer to when installing, accompanying drawing 1, assembled screw rod installation drawing.Please refer to during dismounting, accompanying drawing 4, inner screw dismounting figure dismounting, inner screw dismounting back hole in time mend with pea gravel concreten.

Claims (3)

1; assembled screw rod is the patented product of using with firm form work engineering; mainly be to play absolute effect by inner screw; 80 millimeters of inner screw total lengths; 8 millimeters of its back silk bore dias; thick 12 millimeters; be connected with connecting rod; 8 millimeters of preceding silk diameters; long 12 millimeters are connected with external screw rod; its half length is for circular; half is long for square; circular 8 mm dias have been convenient effects of installing; 10 millimeters * 10 millimeters squares play quick detachable effect; for concrete is not stopped up inner screw; the high-quality plastics protected enclosure will be added above the inner screw; inner screw is protected; make inner screw obtain dismounting on time; a slight connecting rod just can replace an existing screw rod to use; make assembled screw rod; do not need welding; gas cutting; just can guarantee repeatedly to use; template there is not damage again; metope is non-leakage, and each project engineering can be saved large quantities of funds, material and artificial; advantages such as the safety of absolute assurance engineering and workmanship.
2, above technical characterictic patent right, it is exclusive to belong to the patentee.
3, any entity or individual must not use for the production or business purpose manufacturing, sells its patented product.
CN 95119331 1995-11-19 1995-11-19 Assembled screw rod Expired - Fee Related CN1053028C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 95119331 CN1053028C (en) 1995-11-19 1995-11-19 Assembled screw rod

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 95119331 CN1053028C (en) 1995-11-19 1995-11-19 Assembled screw rod

Publications (2)

Publication Number Publication Date
CN1142562A true CN1142562A (en) 1997-02-12
CN1053028C CN1053028C (en) 2000-05-31

Family

ID=5081960

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 95119331 Expired - Fee Related CN1053028C (en) 1995-11-19 1995-11-19 Assembled screw rod

Country Status (1)

Country Link
CN (1) CN1053028C (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101581103B (en) * 2008-09-25 2011-06-08 缪金云 Trinodal water stopping threaded rod
CN103362304A (en) * 2013-06-27 2013-10-23 中冶天工上海十三冶建设有限公司 Self-anchoring and positioning bolt device and method for mounting a template

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101581103B (en) * 2008-09-25 2011-06-08 缪金云 Trinodal water stopping threaded rod
CN103362304A (en) * 2013-06-27 2013-10-23 中冶天工上海十三冶建设有限公司 Self-anchoring and positioning bolt device and method for mounting a template
CN103362304B (en) * 2013-06-27 2016-04-06 中冶天工上海十三冶建设有限公司 A kind of method of carrying out template anchor and position from anchor and position bolt device

Also Published As

Publication number Publication date
CN1053028C (en) 2000-05-31

Similar Documents

Publication Publication Date Title
CN104652236A (en) Combined type channel steel support template rod system and construction method thereof
CN205370110U (en) Construction enclosure
CN1142562A (en) Assembled screw rod
CN206667933U (en) A kind of assembled construction wall
CN113152893A (en) Template for building construction and using method
CN204455779U (en) Combined type channel-section steel formwork leverage
CN207314850U (en) A kind of split bolt continued access combination unit
CN216042665U (en) Template for building construction
CN217518272U (en) Frock is consolidated to cross brickwork wall junction constructional column
CN210552012U (en) PC prefabricated part mold processing subassembly
CN207436500U (en) A kind of three sections of split bolt continued accesses combination unit
CN210976581U (en) Connect high formula aluminum alloy template for building
CN207988483U (en) A kind of collapsible form for building
CN201133075Y (en) Combined large formwork for cast-in-place concrete wall
CN206753208U (en) A kind of building construction enclosing instrument
CN208072905U (en) Construction support for shuttering
CN207484961U (en) A kind of novel wall column steel form
CN207224232U (en) A kind of mould for pouring imitation wood stake
CN211645987U (en) Combined bridge guardrail
CN217897267U (en) Aluminum template system
CN2284826Y (en) Hoopless variable-section column shuttering
CN221461750U (en) Scaffold convenient to splice
CN219316422U (en) Casting template of concrete member capable of being rapidly detached
CN212802512U (en) Aluminum alloy template reinforcing combination back ridge for building
CN220133488U (en) Rear-mounted crab-bolt formula even wall spare

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: LI FAJUN

Free format text: FORMER OWNER: MIAO JINYUN

Effective date: 20040329

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20040329

Address after: 518034 AB building, building 4, sweet honey village, Guangdong, Shenzhen, China

Patentee after: Li Fajun

Address before: 518034 AB building, building 4, sweet honey village, Guangdong, Shenzhen, China

Patentee before: Jiu Jinyun

C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee