CN114246149A - Tool and method for preparing ground pile for mussel hanging culture - Google Patents

Tool and method for preparing ground pile for mussel hanging culture Download PDF

Info

Publication number
CN114246149A
CN114246149A CN202111682024.6A CN202111682024A CN114246149A CN 114246149 A CN114246149 A CN 114246149A CN 202111682024 A CN202111682024 A CN 202111682024A CN 114246149 A CN114246149 A CN 114246149A
Authority
CN
China
Prior art keywords
sleeve
ground
rod
ground pile
tool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111682024.6A
Other languages
Chinese (zh)
Inventor
闻海波
吕国华
马学艳
金武
徐跑
东新旭
王林
郑冰清
张呈祥
丁图强
顾若波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangyin Shengang Sanxian Cultivation Co ltd
Freshwater Fisheries Research Center of Chinese Academy of Fishery Sciences
Original Assignee
Jiangyin Shengang Sanxian Cultivation Co ltd
Freshwater Fisheries Research Center of Chinese Academy of Fishery Sciences
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangyin Shengang Sanxian Cultivation Co ltd, Freshwater Fisheries Research Center of Chinese Academy of Fishery Sciences filed Critical Jiangyin Shengang Sanxian Cultivation Co ltd
Priority to CN202111682024.6A priority Critical patent/CN114246149A/en
Publication of CN114246149A publication Critical patent/CN114246149A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01KANIMAL HUSBANDRY; CARE OF BIRDS, FISHES, INSECTS; FISHING; REARING OR BREEDING ANIMALS, NOT OTHERWISE PROVIDED FOR; NEW BREEDS OF ANIMALS
    • A01K61/00Culture of aquatic animals
    • A01K61/50Culture of aquatic animals of shellfish
    • A01K61/54Culture of aquatic animals of shellfish of bivalves, e.g. oysters or mussels
    • A01K61/56Culture of aquatic animals of shellfish of bivalves, e.g. oysters or mussels for pearl production
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/28Prefabricated piles made of steel or other metals
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/80Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in fisheries management
    • Y02A40/81Aquaculture, e.g. of fish

Abstract

The invention provides a ground pile preparation tool for hanging cultivation of mussels. The tool for preparing the ground pile for hanging culture of the mussels is made of the steel pipe, is firm and durable, can be used for a long time by one-time piling, can be repeatedly used, cannot influence daily pond inspection and ship passing by hiding the ground pile underground, reduces the influence of typhoon weather, is simple to operate, and meets the piling requirements of different water depths.

Description

Tool and method for preparing ground pile for mussel hanging culture
Technical Field
The invention relates to the technical field of freshwater shellfish culture, in particular to a tool and a method for preparing ground piles for hanging and culturing large aquatic shellfish in ponds or lakes and the like.
Background
China is a big aquaculture country, the aquaculture yield increases year by year, and a large amount of aquaculture tail water containing residual baits and excrement is directly discharged into the environment, so that the environment pollution of a water area is caused, the healthy production of fishery is seriously influenced, and the concept of green and healthy aquaculture is violated; pond tail water treatment also receives more and more attention, and impurities in water can be removed through physical, chemical and biological methods according to the properties of tail water; the biological method utilizes animals, plants, microorganisms and the like in water to absorb and decompose organic matters in water, and has the advantages of safety, environmental protection, low cost and the like. For inland provinces, water area resources such as lakes, reservoirs and the like are main places for fishery production, the large-water-area fishery relieves the contradiction of more people and less land in inland areas, increases the income of farmers, and optimizes the industrial structure; the traditional economic, quantity-benefit type is changed into the environment-friendly and quality-benefit type in the large-water-surface fishery, and the functions of water purification, water retention, ecological restoration and the like of the fishery are fully exerted; the mussels have high-efficiency filtering capacity, can effectively remove organic debris and algae in water, and are widely applied to pond tail water treatment and large-water-surface water purification fishery; the traditional method is used for piling, so that the wooden sticks are easy to rot, the daily pond inspection and ship passing are hindered, typhoon weather cannot be resisted, the attractiveness is affected, and the like.
The freshwater pearl culture industry in China always faces the problems of high yield, low quality and the like, and the culture benefit is continuously reduced; in order to avoid the risk of culturing single pearl mussel, more and more farmers select a fish and mussel mixed culture mode, and the culture mode has the advantages of three-dimensionally utilizing the culture space of a water body, reasonably utilizing baits, saving the culture cost, avoiding environmental pollution, greatly improving the culture benefit of the water body and the like, and generates good ecological benefit, economic benefit and social benefit; however, problems also exist in the mixed culture process of the fishes and the mussels, the pearl mussels generally need to be cultured for 2-3 years after the pearl nuclei are inserted, and the fishes can be basically harvested at least once every year, so that the mussels in a pond need to be cleaned away when the fishes are harvested, therefore, ground piles for culturing the mussels also need to be dismantled, the ground piles need to be dug again after the fishes are harvested, and much workload is increased in large-area culture of the pond or the lake.
Disclosure of Invention
Aiming at the defects in the prior art, the invention provides a ground pile preparation tool for mussel hanging culture, which solves the problems that the conventional ground piles in the existing pond tail water treatment, large-water-surface water purification fishery and pond, lake and fish-mussel mixed culture hinder daily inspection of ponds and large water surfaces, sailing and frequent loading and unloading, have large workload and the like. The technical scheme adopted by the invention is as follows:
a ground stake preparation instrument that mussels were raised in midair, wherein: ground stake preparation instrument includes sleeve and telescopic link, sleeve pot head is established on the ground stake, the telescopic link is connected to the sleeve other end, squeezes the ground stake into underground through strikeing telescopic link top.
Preferably, the tool for preparing the ground pile for mussel hanging culture is characterized in that: the sleeve includes cover section, changeover portion and linkage segment, cover section is connected to the one end of interlude, the other end connection linkage segment of interlude, the length of cover section is 39 ~ 40cm, the internal diameter of cover section is 2.6 ~ 2.8cm, the length of linkage segment is 30 ~ 32cm, the internal diameter of linkage segment is 1.9 ~ 2.1cm, the one end that the changeover portion was kept away from to the linkage segment sets up the external screw thread.
Preferably, the tool for preparing the ground pile for mussel hanging culture is characterized in that: the sleeve rod is a sleeve short rod or a sleeve long rod.
Preferably, the tool for preparing the ground pile for mussel hanging culture is characterized in that: the sleeve short rod or the sleeve long rod is connected with the connecting section through a first nut.
Preferably, the tool for preparing the ground pile for mussel hanging culture is characterized in that: ground stake preparation instrument still includes extension bar, the extension bar both ends all set up the external screw thread, extension bar one end is passed through the second nut and is connected with the linkage segment, the extension bar other end is connected through first nut and sleeve quarter butt or telescopic long rod.
Preferably, the tool for preparing the ground pile for mussel hanging culture is characterized in that: the length of sleeve quarter butt is 8 ~ 10cm, the length of sleeve quarter butt is 100 ~ 120cm, the sleeve quarter butt and the one end that the sleeve quarter butt is close to the linkage segment all set up the external screw thread, the length of external screw thread is 1.5 ~ 1.8cm, the one end that the linkage segment was kept away from to sleeve quarter butt and sleeve quarter butt is solid construction.
Preferably, the tool for preparing the ground pile for mussel hanging culture is characterized in that: the ground stake is close to the one end on ground and sets up pointed end portion, ground stake length is 40 ~ 50cm, and the external diameter is 1 ~ 3 cm.
Preferably, the tool for preparing the ground pile for mussel hanging culture is characterized in that: the length of the external thread of the extension rod is 1.5-1.8 cm, and the length of the extension rod is 100-120 cm.
The sleeve, the sleeve rod, the extension rod and the ground pile are all of hollow structures, and the sleeve, the sleeve rod, the extension rod and the ground pile are made of steel.
A method for preparing a ground pile for hanging cultivation of mussels is disclosed, wherein: the method comprises the following steps:
s1, tying a rope on a ground pile, putting the ground pile into one end of a sleeve, and connecting the other end of the sleeve with a sleeve rod through a first nut;
s2, vertically putting the connected device into water, knocking the top end of the sleeve rod by a hammer, driving the sleeve rod into the ground for about 35-45 cm, pulling out the sleeve rod and the sleeve together, leaving the ground pile at the bottom, and tying 1 floater at the place where the rope is exposed out of the water surface.
A method for preparing a ground pile for hanging cultivation of mussels is disclosed, wherein: the method comprises the following steps:
s1, tying a rope on a ground pile, putting the ground pile into one end of a sleeve, connecting the other end of the sleeve with one end of an extension bar through a second nut, and connecting the other end of the extension bar with the sleeve bar through a first nut;
s2, vertically putting the connected device into water, knocking the top end of the sleeve rod by a hammer, driving the sleeve rod into the ground for about 35-45 cm, pulling out the sleeve rod and the sleeve together, leaving the ground pile at the bottom, and tying 1 floater at the place where the rope is exposed out of the water surface.
The invention has the advantages that:
the tool for preparing the ground pile for hanging culture of the mussels is made of the steel pipe, is firm and durable, can be used for a long time by one-time piling, can be repeatedly used, cannot influence daily pond inspection and ship passing by hiding the ground pile underground, reduces the influence of typhoon weather, is simple to operate, and meets the piling requirements of different water depths.
Drawings
Fig. 1 is a schematic structural diagram of embodiment 1 of the present invention.
Fig. 2 is a schematic structural diagram of embodiment 2 of the present invention.
Fig. 3 is a schematic structural diagram of embodiment 3 of the present invention.
Detailed Description
The invention is further illustrated by the following specific figures and examples.
Example 1
As shown in fig. 1, the present embodiment provides a ground pile preparation tool for mussels, wherein: ground stake preparation instrument includes sleeve 2 and sleeve pole, 2 pot heads of sleeve are established on ground stake 1, sleeve short-bar 3 is connected to the 2 other ends of sleeve, and 3 tops of sleeve short-bar are beaten ground stake 1 into the underground through knocking.
The sleeve 2 comprises a sleeve section 21, a transition section 22 and a connecting section 23, one end of the middle section 21 is connected with the sleeve section 21, the other end of the middle section 22 is connected with the connecting section 23, the length of the sleeve section 21 is 39-40 cm, the inner diameter of the sleeve section 21 is 2.6-2.8 cm, the length of the connecting section 23 is 30-32 cm, the inner diameter of the connecting section 23 is 1.9-2.1 cm, and one end, far away from the transition section 22, of the connecting section 23 is provided with an external thread; the short sleeve rod 3 is connected to the connecting section 23 by means of a first nut 5.
The length of the sleeve short rod 3 is 8-10 cm, external threads are arranged at one end, close to the connecting section 23, of the sleeve short rod 3, the length of each external thread is 1.5-1.8 cm, and one end, far away from the connecting section 23, of the sleeve short rod 3 is of a solid structure; the one end that ground stake 1 is close to ground sets up pointed end 11, the length of ground stake 1 is 40 ~ 50cm, and the external diameter is 1 ~ 3 cm.
Two holes are drilled in the middle of the ground pile 1 to facilitate tying of a rope, and two holes are drilled in the lower end of the sleeve section 21 and the upper end of the connecting section 23 of the sleeve 2 respectively to facilitate disassembly; the sleeve short rod 3 is convenient to disassemble by drilling two holes at the position close to the lower threads.
Example 2
As shown in fig. 2, the present embodiment provides a ground pile preparation tool for mussels, wherein: ground pile preparation instrument includes sleeve 2 and sleeve stock 4, 2 pot heads of sleeve are established on ground pile 1, 2 other ends of sleeve connect sleeve stock 4, squeeze into the underground with ground pile 1 through strikeing the sleeve stock top.
The sleeve 2 comprises a sleeve section 21, a transition section 22 and a connecting section 23, one end of the middle section 22 is connected with the sleeve section 21, the other end of the middle section 22 is connected with the connecting section 23, the length of the sleeve section 21 is 39-40 cm, the inner diameter of the sleeve section 21 is 2.6-2.8 cm, the length of the connecting section 23 is 30-32 cm, the inner diameter of the connecting section 23 is 1.9-2.1 cm, and one end, far away from the transition section 22, of the connecting section 23 is provided with an external thread; the sleeve long rod 4 is connected with the connecting section 23 through a first nut 5; the length of the long sleeve rod 4 is 100-120 cm, external threads are arranged at one end, close to the connecting section 23, of the long sleeve rod 4, the length of the external threads is 1.5-1.8 cm, and the end, far away from the connecting section 23, of the long sleeve rod 4 is of a solid structure; the one end that ground stake 1 is close to ground sets up pointed end 11, the length of ground stake 1 is 40 ~ 50cm, and the external diameter is 1 ~ 3 cm.
Two holes are drilled in the middle of the ground pile 1 to facilitate tying of a rope, and two holes are drilled in the lower end of the sleeve section 21 and the upper end of the connecting section 23 of the sleeve 2 respectively to facilitate disassembly; two holes are drilled at the position of the sleeve long rod 4 close to the lower thread, so that the sleeve long rod is convenient to disassemble.
Example 3
As shown in fig. 3, a ground pile preparation tool for mussels hanging culture, wherein: ground pile preparation instrument includes sleeve 2 and sleeve stock 4, 2 pot heads of sleeve are established on ground pile 1, 2 other ends of sleeve connect sleeve stock 4, squeeze into the underground with ground pile 1 through strikeing the sleeve stock top.
Sleeve 2 includes sleeve section 21, changeover portion 22 and linkage segment 23, sleeve section 21 is connected to the one end of changeover portion 22, linkage segment 23 is connected to the other end of changeover portion 22, sleeve section 21's length is 39 ~ 40cm, sleeve section 21's internal diameter is 2.6 ~ 2.8cm, linkage segment 23's length is 30 ~ 32cm, linkage segment 23's internal diameter is 1.9 ~ 2.1cm, the one end that changeover portion 22 was kept away from to linkage segment 23 sets up the external screw thread.
The ground pile manufacturing tool further comprises an extension bar 6, wherein external threads are arranged at two ends of the extension bar 6, one end of the extension bar 6 is connected with the connecting section 23 through a second nut 7, and the other end of the extension bar 6 is connected with the sleeve short rod 3 or the sleeve long rod 4 through a first nut 5; the length of the sleeve short rod 3 is 8-10 cm, the length of the sleeve long rod 4 is 100-120 cm, external threads are arranged at one ends, close to the connecting section 23, of the sleeve short rod 3 and one end, close to the connecting section 23, of the sleeve long rod 4, the length of the external threads is 1.5-1.8 cm, and the ends, far away from the connecting section 23, of the sleeve short rod 3 and the sleeve long rod 4 are both of solid structures; a tip part 11 is arranged at one end, close to the ground, of the ground pile 1, the length of the ground pile 1 is 40-50 cm, and the outer diameter of the ground pile 1 is 1-3 cm; the length of the external thread of the extension bar 6 is 1.5-1.8 cm, and the length of the extension bar 6 is 100-120 cm.
Two holes are drilled in the middle of the ground pile 1 to facilitate tying of a rope, and two holes are drilled in the lower end of the sleeve section 21 and the upper end of the connecting section 23 of the sleeve 2 respectively to facilitate disassembly; two holes are drilled at the position of the sleeve long rod 4 close to the lower thread, so that the sleeve long rod is convenient to disassemble; two holes are respectively drilled at the two ends of the extension bar 6, so that the extension bar is convenient to disassemble.
Example 4
In 30 days 7 months in 2020, 20 thousands of young hyriopsis cumingii are cultivated in a 300 mu fish-mussel polyculture pond in a certain farm in the urban area of Suzhou city in a hanging mode, and the depth of water at the piling position is about 1 m.
As shown in fig. 2, the method for preparing the ground pile for mussel hanging culture comprises the following steps:
s1, firstly tying one end of a rope on a ground pile 1, putting the ground pile 1 into a sleeve section 21 of a sleeve 2, and connecting a connecting section 23 of the sleeve 2 with a sleeve long rod 4 through a nut 5;
s2, vertically putting the connected device into water, knocking the top end of the long sleeve rod 4 by a hammer, driving the long sleeve rod 4 into the ground for about 40cm, pulling out the long sleeve rod 4 together with the sleeve 2, leaving the ground pile 1 at the bottom, and tying 1 floater at a place where the rope is exposed out of the water surface;
s3, the sleeve 2 and the sleeve long rod 4 are not required to be disassembled, and the ground pile 1 tied with the rope can be directly placed into the sleeve to continue piling; 20 ground piles are respectively driven on the south and north bank sides at intervals of 1m, and the corresponding ground piles on the south and north are connected by ropes, so that 20 ropes are formed;
s4, each net cage is provided with 4 floats, 100 young hyriopsis cumingii are placed in the net cages, 2 pieces of spade soil are added, and 50 net cages are hung on each rope.
In 10/15/2020, the net cage and the rope for hanging the net cage are detached, the net cage is removed by a ship, the ground pile and the rope and the floater tied on the ground pile are left, the net is pulled to sell fish, the rope is tied after the net is pulled, and the net cage is hung.
Example 5
8000 young solen crassipes are hung in river channels of Yangzhong base of freshwater fishery research center of Chinese aquatic science research institute in 12.8.8.2020.
As shown in fig. 3, the method for preparing the ground pile for mussel hanging culture comprises the following steps:
s1, measuring the depth of water at a piling position to be about 1.5m, tying one end of a rope 9 to a ground pile 1, putting the ground pile 1 into a sleeve section 21 of a sleeve 2, connecting a connecting section 23 of the sleeve 2 with an extension rod 6 through a second nut 7, and connecting the extension rod 6 with a sleeve long rod 4 through a first nut 5;
s2, vertically putting the connected device into water, knocking the top end of a long sleeve rod 4 by a hammer, driving the long sleeve rod 4 into the ground for about 40cm, pulling out the long sleeve rod 4 together with an extension rod 6 and a sleeve 2, leaving a ground pile 1 at the bottom, and tying 1 floater at a place where a rope is exposed out of the water surface;
s3, the sleeve long rod 4, the extension rod 6 and the sleeve 2 do not need to be disassembled, the tied ground piles 1 can be directly placed into the sleeve, pile driving is continued, 4 ground piles are driven in a river channel, and 2 ground piles on two banks are connected by ropes along the river direction;
s4, each net cage is provided with 4 floats, 100 young hyriopsis cumingii are placed in the net cages, 2 spade earth is added, 40 net cages are placed on each rope, when a ship passes through, the net cages lean against the two sides under the action of the ship body, and the ship can smoothly pass through a river channel.
Example 6
In 8-month-5-day 2020, 75 million hyriopsis cumingii are hung on 3000 mu of large water surface of a certain farm in Weishan county of Jining to purify water, and water samples are taken before piling to measure phytoplankton and phytoplankton in water.
As shown in fig. 2-3, the method for preparing the ground pile for mussel hanging culture comprises the following steps:
s1, tying one end of a rope 9 to a ground pile 1 when the water depth of a shoreside shallow water is about 1m, putting the ground pile 1 into a sleeve section 21 of a sleeve 2, and connecting a connecting section 23 of the sleeve 2 with a sleeve long rod 4 through a first screw cap 5;
s2, vertically putting the connected device into water, knocking the top end of a long sleeve rod 4 by a hammer, driving the long sleeve rod into the ground for about 40cm, pulling out the long sleeve rod 4 together with a sleeve 2, leaving a ground pile 1 at the bottom, tying 1 floater at a place where a rope is exposed out of the water surface, directly putting the long sleeve rods 4 tied with the rope 9 into the sleeve 2 without disassembling, and continuously driving 150 ground piles at an interval of about 1 m;
s3, the deep water position is about 2m in depth, one end of a rope is tied to the ground pile 1, the ground pile 1 is placed in a sleeve section 21, a connecting section 23 of a sleeve 22 is connected with an extension bar 6 through a second nut 7, and the extension bar 6 is connected with a sleeve long bar 4 through a first nut 5;
s4, vertically putting the connected device into water, knocking the top end of the long sleeve rod 4 by a hammer, driving the long sleeve rod 4 into the ground for about 40cm, pulling out the long sleeve rod 4 together with the extension rod 6 and the sleeve 2, leaving the ground pile 1 at the bottom, and tying 1 floater 10 at a place where the rope is exposed out of the water surface;
s5, sleeve stock 4, extension bar 6 and sleeve 2 need not to dismantle, can directly put into the ground stake 1 of tether, and interval 1m continues to beat 150 ground stakes, couples together the corresponding ground stake in shallow water district and deep water district with the rope, and 9 every interval 1m of rope are 1 floats, hang the pocket on the rope, place 2 three angle hyriopsis cumingii in every pocket.
Water samples are taken at 20 days in 8 months and 8 months in 2020 to measure the phytoplankton in the water, and the species and the number of the planktonic algae in the water are found to be obviously reduced, and the number of the planktonic animals is relatively reduced.
The tool for preparing the ground pile for hanging culture of the mussels is made of the steel pipe, is firm and durable, can be used for a long time by one-time piling, can be repeatedly used, cannot influence daily pond inspection and ship passing by hiding the ground pile underground, reduces the influence of typhoon weather, is simple to operate, and meets the piling requirements of different water depths.
Finally, it should be noted that the above embodiments are only for illustrating the technical solutions of the present invention and not for limiting, and although the present invention has been described in detail with reference to examples, it should be understood by those skilled in the art that modifications or equivalent substitutions may be made on the technical solutions of the present invention without departing from the spirit and scope of the technical solutions of the present invention, which should be covered by the claims of the present invention.

Claims (10)

1. The utility model provides a ground stake preparation instrument that mussels were raised by crane which characterized in that: ground stake preparation instrument includes sleeve (2) and cover barrel rod, sleeve (2) pot head is established on ground stake (1), sleeve (2) other end connection cover barrel rod is through strikeing cover barrel rod top and squeeze into ground stake (1) underground.
2. The tool for preparing ground pile for mussel hanging culture according to claim 1, wherein: sleeve (2) are including cover section (21), changeover portion (22) and linkage segment (23), cover section (21) is connected to the one end of interlude (22), linkage segment (23) is connected to the other end of interlude (22), the length of cover section (21) is 39 ~ 40cm, the internal diameter of cover section (21) is 2.6 ~ 2.8cm, the length of linkage segment (23) is 30 ~ 32cm, the internal diameter of linkage segment (23) is 1.9 ~ 2.1cm, the one end that changeover portion (22) was kept away from in linkage segment (23) sets up the external screw thread.
3. The tool for preparing ground pile for mussel hanging culture according to claim 2, wherein: the sleeve rod is a sleeve short rod (3) or a sleeve long rod (4).
4. The tool for preparing ground pile for mussel hanging culture according to claim 3, wherein: the sleeve short rod (3) or the sleeve long rod (4) is connected with the connecting section (23) through a first screw cap (5).
5. The tool for preparing ground pile for mussel hanging culture according to claim 3, wherein: ground stake preparation instrument still includes extension bar (6), extension bar (6) both ends all set up the external screw thread, extension bar (6) one end is passed through second nut (7) and is connected with linkage segment (23), extension bar (6) other end is passed through first nut (5) and sleeve quarter butt (3) or sleeve stock (4) connection.
6. The tool for preparing ground pile for mussel hanging culture according to claim 3, wherein: the length of sleeve quarter butt (3) is 8 ~ 10cm, the length of sleeve stock (4) is 100 ~ 120cm, the one end that sleeve quarter butt (3) and sleeve stock (4) are close to linkage segment (23) all sets up the external screw thread, the length of external screw thread is 1.5 ~ 1.8cm, the one end that linkage segment (23) were kept away from to sleeve quarter butt (3) and sleeve stock (4) is solid construction.
7. The tool for preparing ground pile for mussel hanging culture according to claim 1, wherein: ground stake (1) is close to the one end on ground and sets up pointed end (11), the length of ground stake (1) is 40 ~ 50cm, and the external diameter is 1 ~ 3 cm.
8. The tool for preparing ground pile for mussel hanging culture according to claim 5, wherein: the length of the external thread of the extension bar (6) is 1.5-1.8 cm, and the length of the extension bar (6) is 100-120 cm.
9. A method for preparing a ground pile for mussel hanging culture is characterized by comprising the following steps: the method comprises the following steps:
s1, tying a rope (9) on a ground pile (1), placing the ground pile (1) into one end of a sleeve (2), and connecting the other end of the sleeve (2) with a sleeve rod through a first nut (5);
s2, vertically placing the connected device into water, knocking the top end of the sleeve rod by a hammer, driving the sleeve rod into the ground by about 35-45 cm, pulling out the sleeve rod and the sleeve (2) together, leaving the ground pile (1) at the bottom, and tying 1 floater (10) at the position where the rope is exposed out of the water surface.
10. A method for preparing a ground pile for mussel hanging culture is characterized by comprising the following steps: the method comprises the following steps:
s1, tying a rope (9) on a ground pile (1), placing the ground pile (1) into one end of a sleeve (2), connecting the other end of the sleeve (2) with one end of an extension bar (6) through a second nut (5), and connecting the other end of the extension bar (6) with a sleeve bar through a first nut (5);
s2, vertically placing the connected device into water, knocking the top end of the sleeve rod by a hammer, driving the sleeve rod into the ground by about 35-45 cm, pulling out the sleeve rod and the sleeve (2) together, leaving the ground pile (1) at the bottom, and tying 1 floater (10) at the position where the rope is exposed out of the water surface.
CN202111682024.6A 2021-12-28 2021-12-28 Tool and method for preparing ground pile for mussel hanging culture Pending CN114246149A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111682024.6A CN114246149A (en) 2021-12-28 2021-12-28 Tool and method for preparing ground pile for mussel hanging culture

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111682024.6A CN114246149A (en) 2021-12-28 2021-12-28 Tool and method for preparing ground pile for mussel hanging culture

Publications (1)

Publication Number Publication Date
CN114246149A true CN114246149A (en) 2022-03-29

Family

ID=80799252

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111682024.6A Pending CN114246149A (en) 2021-12-28 2021-12-28 Tool and method for preparing ground pile for mussel hanging culture

Country Status (1)

Country Link
CN (1) CN114246149A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20130003187U (en) * 2011-11-21 2013-05-29 현태섭 put directly into the ground to Detachable fish tank stake holder
CN105386444A (en) * 2015-11-23 2016-03-09 江创葵 Foundation pile hole forming device and method
CN205884383U (en) * 2016-08-15 2017-01-18 郭伟锋 Pile pole
CN207235665U (en) * 2017-08-07 2018-04-17 大元建业集团股份有限公司 Quickly fix the device of tall and big trees timber earth anchor
CN209856690U (en) * 2018-12-25 2019-12-27 深圳市大疆创新科技有限公司 Fixing frame extension bar and cradle head
CN211368702U (en) * 2019-11-15 2020-08-28 无锡万物生态科技有限公司 Be used for aquatic pile driver

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20130003187U (en) * 2011-11-21 2013-05-29 현태섭 put directly into the ground to Detachable fish tank stake holder
CN105386444A (en) * 2015-11-23 2016-03-09 江创葵 Foundation pile hole forming device and method
CN205884383U (en) * 2016-08-15 2017-01-18 郭伟锋 Pile pole
CN207235665U (en) * 2017-08-07 2018-04-17 大元建业集团股份有限公司 Quickly fix the device of tall and big trees timber earth anchor
CN209856690U (en) * 2018-12-25 2019-12-27 深圳市大疆创新科技有限公司 Fixing frame extension bar and cradle head
CN211368702U (en) * 2019-11-15 2020-08-28 无锡万物生态科技有限公司 Be used for aquatic pile driver

Similar Documents

Publication Publication Date Title
CN103340165B (en) Mandarin fish pond ecological high and stable yield method
JP5936005B2 (en) Floating-type rotary farming ginger
CN106719220A (en) A kind of building method of the aquafarm with the unrestrained function that disappears
CN107996386A (en) A kind of offshore spot laver thallus cultural method
CN206978430U (en) A kind of combined type ocean culture system (OCS)
CN103478084B (en) A kind of method of running water cage culture eurysome golden thread leech
CN107265646A (en) A kind of method for controlling the outburst of city appearance water body blue-green alga bloom
CN114246149A (en) Tool and method for preparing ground pile for mussel hanging culture
CN109122437B (en) Method for relay cultivation of oysters in low-tide areas of surface water and intertidal zones of pond
LU505257B1 (en) Tool and method for preparing ground piles for hanging mussels
CN203884434U (en) Wind wave-resistant shell reef capable of attaching alga
CN103053454A (en) Precious marine product proliferation reef applicable to diversified mixed culture and use method of precious marine product proliferation reef
CN105191845A (en) Three-dimensional ecological mixed culture method for sea cucumbers and sea horses
CN113287550B (en) Small-size ginseng seedling bottom sowing ecological breeding device and use method
CN101755694A (en) Method for culturing soft-shell green crabs indoors by using cage
CN101331862B (en) Bait breeding method of sediment pool bechedemer
CN103734094A (en) Method of using mesh bags for leech aquaculture in lakes
CN112471025A (en) Net cage for pond culture of fish fry and culture method
CN201612081U (en) Layered cultivation pond
Johnson et al. Good Management Practices in Seaweed Farming
CN2686317Y (en) Shore-based Gracilaria verrucosa hanging bamboo raft
CN204994395U (en) Special vaulting pole is bred at laver deep sea
CN202385614U (en) Plastic film pond bag breeding
CN110250067B (en) Rice grass carp reef and preparation method thereof
CN211268160U (en) Straw fish reef

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20220329

RJ01 Rejection of invention patent application after publication