CN114232901A - Construction method of steel structure canopy roof curtain wall of traffic hub station platform - Google Patents

Construction method of steel structure canopy roof curtain wall of traffic hub station platform Download PDF

Info

Publication number
CN114232901A
CN114232901A CN202111671188.9A CN202111671188A CN114232901A CN 114232901 A CN114232901 A CN 114232901A CN 202111671188 A CN202111671188 A CN 202111671188A CN 114232901 A CN114232901 A CN 114232901A
Authority
CN
China
Prior art keywords
installation
steel
curtain wall
horizontal
lines
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111671188.9A
Other languages
Chinese (zh)
Inventor
曹振兴
李术才
周浩
邵伟
李洋
龙根望
夏真荣
颜桢炜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 5 Engineering Group Co Ltd
Original Assignee
China Railway No 5 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 5 Engineering Group Co Ltd filed Critical China Railway No 5 Engineering Group Co Ltd
Priority to CN202111671188.9A priority Critical patent/CN114232901A/en
Publication of CN114232901A publication Critical patent/CN114232901A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D3/00Roof covering by making use of flat or curved slabs or stiff sheets
    • E04D3/02Roof covering by making use of flat or curved slabs or stiff sheets of plane slabs, slates, or sheets, or in which the cross-section is unimportant
    • E04D3/16Roof covering by making use of flat or curved slabs or stiff sheets of plane slabs, slates, or sheets, or in which the cross-section is unimportant of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B7/00Roofs; Roof construction with regard to insulation
    • E04B7/08Vaulted roofs
    • E04B7/10Shell structures, e.g. of hyperbolic-parabolic shape; Grid-like formations acting as shell structures; Folded structures
    • E04B7/102Shell structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F10/00Sunshades, e.g. Florentine blinds or jalousies; Outside screens; Awnings or baldachins
    • E04F10/08Sunshades, e.g. Florentine blinds or jalousies; Outside screens; Awnings or baldachins of a plurality of similar rigid parts, e.g. slabs, lamellae
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates
    • E04G21/1841Means for positioning building parts or elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

The invention discloses a construction method of a steel structure canopy roof curtain wall of a transportation junction station platform, which comprises the following steps: s1: measuring and paying off; s2: checking whether the structure and the embedded part meet the installation precision requirement of the curtain wall according to the measurement paying-off result and correcting; s3: the dividing lines and the marking lines of the connecting pieces are all shot on the structure to be used as datum lines for installing the connecting pieces, and the steel connecting pieces are installed according to the shot central lines and the dividing lines of the pay-off groups; s4: carrying out grid installation on the vertical keels, and carrying out installation on the horizontal keels according to horizontal transverse lines; s5: mounting an aluminum plate on the keel frame by using a pressing plate; s6: after the aluminum plate is installed, the plate seams are cleaned, foam strips are filled in the plate seams, and then glue is applied. The rain-proof curtain wall has the advantages of high installation precision and efficiency and capability of improving the overall appearance effect and the rain-proof effect.

Description

Construction method of steel structure canopy roof curtain wall of traffic hub station platform
Technical Field
The invention mainly relates to a construction technology of a comprehensive transportation hub in a large transportation city, in particular to a construction method of a steel structure canopy roof curtain wall of a platform at a transportation hub.
Background
The large transport city comprehensive traffic hub is positioned at the intersection of a cross sentry street office and a dragon city street office, the intersection of the dragon sentry road and the dragon flying road is 5 kilometers away from the dragon sentry center city, and the central area of the Futian is 25 kilometers. Under the current situation, a large transportation station of No. 3 line is planned to transfer No. 14 line (fourth stage), No. 16 line (fourth stage) and No. 33 line (medium deep) at the station, so as to form a terminal station for transferring 4 track lines. The large transportation hub is shaped like the dance of a bay area, the whole shape is elegant and light, the canopy is of a space truss steel structure, the roof is in a double-slope double-curved-sector curved intersecting state, the canopy panel mainly adopts a fluorocarbon spraying aluminum plate and a daylighting plate, the structure and decoration are novel in shape, the processing and installation precision is high, and the design and construction implementation challenges are large. The steel construction canopy roofing surface course adopts aluminum plate + glass, and whole form is slice wave shape, and the whole engineering construction degree of difficulty lies in the panel distortion, fixes a position the difficulty, and cross operation is many from top to bottom, all provides higher requirement to construction quality and construction safety.
Disclosure of Invention
The invention aims to solve the technical problem of overcoming the defects of the prior art and provides a construction method of a steel structure canopy roof curtain wall of a platform at a transportation junction station, which has high installation precision and efficiency and can improve the overall appearance effect and the rainproof effect.
In order to solve the technical problems, the invention adopts the following technical scheme:
a construction method of a steel structure canopy roof curtain wall of a platform at a transportation junction site comprises the following steps:
s1: measuring and paying off;
s2: checking whether the structure and the embedded part meet the installation precision requirement of the curtain wall according to the measurement paying-off result and correcting;
s3: the dividing lines and the marking lines of the connecting pieces are all shot on the structure to be used as datum lines for installing the connecting pieces, and the steel connecting pieces are installed according to the shot central lines and the dividing lines of the pay-off groups;
s4: carrying out grid installation on the vertical keels, and carrying out installation on the horizontal keels according to horizontal transverse lines;
s5: mounting an aluminum plate on the keel frame by using a pressing plate;
s6: after the aluminum plate is installed, the plate seams are cleaned, foam strips are filled in the plate seams, and then glue is applied.
As a further improvement of the above technical solution:
in step S1, the reference axis and the level point are determined, the control line and the corner control line are released by the vian instrument, the steel wire is released without error, the installation reference line of the roof or the curtain wall is determined, and after releasing the steel wire, the steel wire is detected and adjusted by the level instrument.
In step S3, the height and the left and right of the steel connecting piece are controlled within 2-3 mm, the steel wire is installed according to the steel wire arranged in the pay-off set in combination with a construction drawing, the angle connector is connected to the embedded piece through the bolt, the bolt is adjusted to the installation position, and then the bolt is screwed down.
In step S4, the steel keel is tested before being installed, the steel keel is checked for straightness, the method of checking adopts a pull-through method, if the steel keel is not qualified, the steel keel is corrected and then put on the wall, the installation sequence of the steel keel is from bottom to top, the framework is comprehensively checked during installation, the adjustment is carried out at any time, errors are reduced, the bolts are all in a bolting mode, all the bolts are provided with leveling pads and elastic pads to prevent looseness, the error number cannot extend outwards, and each vertical keel is installed according to the steel wire line controlled near the axis to be used as a reference, and grid installation is carried out.
In step S4, the installation of steel joist, the vertical must stay the expansion joint, one between every floor, the vertical expansion joint stays 20mm clearance, adopt the lock pin to connect, connection length is not less than 250mm, check the box condition, if carry out the installation of horizontal fossil fragments after meeting the standard requirement, the installation of horizontal fossil fragments, install according to horizontal line, screw up 5 minutes after all horizontal materials and adjust according to horizontal fish silk thread, directly meet the requirements, after finishing the installation, fill in the hidden list after the self-checking is qualified, report and manage the acceptance, the welding seam is brushed with two antirust paints after the acceptance is qualified, then carry out next process construction.
In step S5, the difference in the horizontal height of two adjacent horizontal aluminum plates should not be greater than 2mm, the allowable deviation of the straightness of the vertical plate is 2.5mm, the allowable deviation of the levelness of the horizontal plate is controlled to be 2-3 mm, and the machine-made screws are tightened after adjustment.
Compared with the prior art, the invention has the advantages that:
the invention relates to a construction method of a steel structure canopy roof curtain wall of a platform of a transportation junction site. The integral installation precision and efficiency of the connecting piece, the vertical keel and the transverse keel are ensured; and the installation of aluminum plate and board seam carry out the foam strip and fill, beat again and glue then improved whole outward appearance effect and rain-proof effect.
Drawings
FIG. 1 is a flow chart of a construction method of a steel structure canopy roof curtain wall of a platform of a transportation junction station.
Detailed Description
The invention will be described in further detail below with reference to the drawings and specific examples.
As shown in fig. 1, an embodiment of the construction method of the curtain wall of the roof of the steel structure canopy of the transportation junction station of the invention comprises the following steps:
s1: measuring and paying off;
s2: checking whether the structure and the embedded part meet the installation precision requirement of the curtain wall according to the measurement paying-off result and correcting;
s3: the dividing lines and the marking lines of the connecting pieces are all shot on the structure to be used as datum lines for installing the connecting pieces, and the steel connecting pieces are installed according to the shot central lines and the dividing lines of the pay-off groups;
s4: carrying out grid installation on the vertical keels, and carrying out installation on the horizontal keels according to horizontal transverse lines;
s5: mounting an aluminum plate on the keel frame by using a pressing plate;
s6: after the aluminum plate is installed, the plate seams are cleaned, foam strips are filled in the plate seams, and then glue is applied.
By adopting the method, whether the structure and the embedded part meet the installation precision requirement of the curtain wall or not is checked and corrected by measuring and paying off according to the measuring and paying off result. The integral installation precision and efficiency of the connecting piece, the vertical keel and the transverse keel are ensured; and the installation of aluminum plate and board seam carry out the foam strip and fill, beat again and glue then improved whole outward appearance effect and rain-proof effect.
In this embodiment, in step S1, the reference axis and the level point are determined, the control line and the corner control line are released by the vian instrument, the steel wire is released without any error, the roof or curtain wall installation reference line is determined, and after releasing the wire, the steel wire is detected and aligned by the level instrument.
In this embodiment, in step S3, the height and the left and right of the steel connecting member are controlled within 2-3 mm, the steel wire arranged in the paying-off set is installed in combination with the construction drawing, the corner connector is connected to the embedded member by the bolt, the bolt is adjusted to the installation position, and then the bolt is tightened.
In this embodiment, in step S4, the steel joists are subjected to material inspection before installation, the steel joists are subjected to straightness inspection firstly, the inspection method adopts a pull-through method, if the steel joists do not meet the requirements, the steel joists are corrected and then put on the wall, the installation sequence of the steel joists is from bottom to top, the framework is comprehensively inspected during installation, adjustment is performed at any time, errors are reduced, due to the fact that all the steel joists adopt a bolting mode, all the bolts are provided with leveling pads and elastic pads to prevent looseness, the errors cannot extend outwards, and each vertical joists are installed according to the control steel wire line close to the axis to be used as a reference, and grid installation is performed.
In this embodiment, in step S4, the installation of steel joist, the expansion joint must be stayed to the vertical, one department between every floor, 20mm clearance is stayed at vertical expansion joint, adopt the lock pin to connect, connection length is not less than 250mm, the check box condition, if carry out the installation of horizontal fossil fragments after meeting the standard requirement, the installation of horizontal fossil fragments, install according to horizontal line, screw up 5 minutes after all with horizontal material and adjust according to horizontal fish silk thread, directly meet the requirements, after the completion of installation, fill in the hidden list after the self-checking is qualified, report the supervision acceptance, the welding seam is applied with twice anti-rust paint after the acceptance is qualified, then carry out next process construction.
In this embodiment, in step S5, the difference in the horizontal height of two adjacent horizontal aluminum plates should not be greater than 2mm, the allowable deviation of the straightness of the vertical plate is 2.5mm, the allowable deviation of the levelness of the horizontal plate is controlled to be 2-3 mm, the machine-made screws are tightened after adjustment, during the installation of the aluminum plates, the installation is performed according to the number of screws specified by design, the phenomenon of short installation is avoided, during the installation, not only the flatness is considered, but also the size and various indexes of the dividing joints are considered, the error range is controlled, and the installation is performed according to the direction of an arrow on the aluminum plate protective film, so as to prevent the error caused by the refraction of the aluminum plates.
Although the present invention has been described with reference to the preferred embodiments, it is not intended to be limited thereto. Those skilled in the art can make numerous possible variations and modifications to the present invention, or modify equivalent embodiments to equivalent variations, without departing from the scope of the invention, using the teachings disclosed above. Therefore, any simple modification, equivalent change and modification made to the above embodiments according to the technical spirit of the present invention should fall within the protection scope of the technical scheme of the present invention, unless the technical spirit of the present invention departs from the content of the technical scheme of the present invention.

Claims (6)

1. A construction method of a steel structure canopy roof curtain wall of a platform at a transportation junction site is characterized by comprising the following steps:
s1: measuring and paying off;
s2: checking whether the structure and the embedded part meet the installation precision requirement of the curtain wall according to the measurement paying-off result and correcting;
s3: the dividing lines and the marking lines of the connecting pieces are all shot on the structure to be used as datum lines for installing the connecting pieces, and the steel connecting pieces are installed according to the shot central lines and the dividing lines of the pay-off groups;
s4: carrying out grid installation on the vertical keels, and carrying out installation on the horizontal keels according to horizontal transverse lines;
s5: mounting an aluminum plate on the keel frame by using a pressing plate;
s6: after the aluminum plate is installed, the plate seams are cleaned, foam strips are filled in the plate seams, and then glue is applied.
2. The construction method of the steel structure canopy roofing curtain wall of the transportation junction station according to claim 1, characterized in that: in step S1, the datum axis and the datum point are determined, the control line and the corner control line are released through the vian instrument, the datum central line and the horizontal line provided by the civil engineering are retested, the steel wire is released after no fault occurs, the roof or curtain wall installation datum line is determined, and after the line is released, the datum line is detected and adjusted through the level instrument.
3. The construction method of the steel structure canopy roofing curtain wall of the transportation junction station according to claim 2, characterized in that: in step S3, the height and the left and right of the steel connecting piece are controlled within 2-3 mm, the steel wire is installed according to the steel wire arranged in the pay-off set in combination with a construction drawing, the angle connector is connected to the embedded piece through the bolt, the bolt is adjusted to the installation position, and then the bolt is screwed down.
4. The construction method of the steel structure canopy roofing curtain wall of the transportation junction station according to claim 3, characterized in that: in step S4, the steel joists are tested before being installed, the steel joists are first inspected for straightness by a pull-through method, and if the steel joists do not meet the requirements, the steel joists are corrected and then put on the wall, the installation sequence of the steel joists is from bottom to top, the framework is comprehensively inspected during installation, the adjustment is performed at any time, and errors are reduced.
5. The construction method of the steel structure canopy roofing curtain wall of the transportation junction station according to claim 4, characterized in that: in step S4, the installation of steel joist, the vertical must stay the expansion joint, one between every floor, the vertical expansion joint stays 20mm clearance, adopt the lock pin to connect, connection length is not less than 250mm, the installation of vertical joist finishes, check the box condition, if accord with the installation of horizontal fossil fragments after the standard requirement, the installation of horizontal fossil fragments, install according to horizontal line, screw up all horizontal material to 5 minutes after tight again according to horizontal fish silk thread and adjust, directly accord with the requirement, after the installation is accomplished, fill in the hidden list after the self-checking is qualified, report the supervision acceptance, the welding seam is brushed two times of anti-rust paint after the acceptance is qualified, then carry out next process construction.
6. The construction method of the steel structure canopy roofing curtain wall of the transportation junction station according to claim 5, characterized in that:
in step S5, the difference in the horizontal height of two adjacent horizontal aluminum plates should not be greater than 2mm, the allowable deviation of the straightness of the vertical plate is 2.5mm, the allowable deviation of the levelness of the horizontal plate is controlled to be 2-3 mm, and the machine-made screws are tightened after adjustment.
CN202111671188.9A 2021-12-31 2021-12-31 Construction method of steel structure canopy roof curtain wall of traffic hub station platform Pending CN114232901A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111671188.9A CN114232901A (en) 2021-12-31 2021-12-31 Construction method of steel structure canopy roof curtain wall of traffic hub station platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111671188.9A CN114232901A (en) 2021-12-31 2021-12-31 Construction method of steel structure canopy roof curtain wall of traffic hub station platform

Publications (1)

Publication Number Publication Date
CN114232901A true CN114232901A (en) 2022-03-25

Family

ID=80745342

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111671188.9A Pending CN114232901A (en) 2021-12-31 2021-12-31 Construction method of steel structure canopy roof curtain wall of traffic hub station platform

Country Status (1)

Country Link
CN (1) CN114232901A (en)

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100237028A1 (en) * 2009-03-20 2010-09-23 Northen States Metals Company Support system for solar panels
CN103711321A (en) * 2014-01-08 2014-04-09 成军 Construction method for wide support type fluorocarbon aluminum cover plate on coping of stone curtain wall
CN105298143A (en) * 2015-05-12 2016-02-03 江苏南通六建建设集团有限公司 Construction method of multi-lateral double-curved-face open-type titanium composite board curtain wall
CN105672656A (en) * 2014-11-20 2016-06-15 五冶集团上海有限公司 Construction method of exterior hidden frame supported glass curtain wall
CN106760560A (en) * 2017-03-30 2017-05-31 青岛新华友建工集团股份有限公司 Complicated arc list construction of Pyramid engineering method
CN107489215A (en) * 2017-07-27 2017-12-19 温州建设集团有限公司 A kind of construction technology of new network type glass curtain wall
CN107816223A (en) * 2017-12-01 2018-03-20 江苏沪宁钢机股份有限公司 A kind of safety and stability type platform canopy station and its installation method
CN108035553A (en) * 2017-11-09 2018-05-15 中国化学工程第六建设有限公司 Large-span steel workshop contour plate in-situ precast construction technique
AU2014101648A4 (en) * 2014-02-12 2019-05-02 Arkistruct Ltd. A prefabricated panel building system
CN110331802A (en) * 2019-06-20 2019-10-15 成张佳宁 A kind of construction method of polymorphic structure aluminium veneer curtain wall
CN111576747A (en) * 2020-04-20 2020-08-25 中铁建工集团有限公司 Double-layer metal roof construction process
CN112431420A (en) * 2020-07-30 2021-03-02 中建八局第二建设有限公司 Construction method of large-span double-sided arc aluminum plate curtain wall
CN113293896A (en) * 2021-05-17 2021-08-24 中国建筑第七工程局有限公司 GH parametric picture interference simulation imaging perforated aluminum plate curtain wall construction method
CN113833276A (en) * 2021-07-27 2021-12-24 中建一局华江建设有限公司 Construction method of mountain building decorative gabion curtain wall
CN114233010A (en) * 2021-12-31 2022-03-25 中铁五局集团有限公司 Method for assembling inverted triangular truss on site of roof canopy of station at traffic hub

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100237028A1 (en) * 2009-03-20 2010-09-23 Northen States Metals Company Support system for solar panels
CN103711321A (en) * 2014-01-08 2014-04-09 成军 Construction method for wide support type fluorocarbon aluminum cover plate on coping of stone curtain wall
AU2014101648A4 (en) * 2014-02-12 2019-05-02 Arkistruct Ltd. A prefabricated panel building system
CN105672656A (en) * 2014-11-20 2016-06-15 五冶集团上海有限公司 Construction method of exterior hidden frame supported glass curtain wall
CN105298143A (en) * 2015-05-12 2016-02-03 江苏南通六建建设集团有限公司 Construction method of multi-lateral double-curved-face open-type titanium composite board curtain wall
CN106760560A (en) * 2017-03-30 2017-05-31 青岛新华友建工集团股份有限公司 Complicated arc list construction of Pyramid engineering method
CN107489215A (en) * 2017-07-27 2017-12-19 温州建设集团有限公司 A kind of construction technology of new network type glass curtain wall
CN108035553A (en) * 2017-11-09 2018-05-15 中国化学工程第六建设有限公司 Large-span steel workshop contour plate in-situ precast construction technique
CN107816223A (en) * 2017-12-01 2018-03-20 江苏沪宁钢机股份有限公司 A kind of safety and stability type platform canopy station and its installation method
CN110331802A (en) * 2019-06-20 2019-10-15 成张佳宁 A kind of construction method of polymorphic structure aluminium veneer curtain wall
CN111576747A (en) * 2020-04-20 2020-08-25 中铁建工集团有限公司 Double-layer metal roof construction process
CN112431420A (en) * 2020-07-30 2021-03-02 中建八局第二建设有限公司 Construction method of large-span double-sided arc aluminum plate curtain wall
CN113293896A (en) * 2021-05-17 2021-08-24 中国建筑第七工程局有限公司 GH parametric picture interference simulation imaging perforated aluminum plate curtain wall construction method
CN113833276A (en) * 2021-07-27 2021-12-24 中建一局华江建设有限公司 Construction method of mountain building decorative gabion curtain wall
CN114233010A (en) * 2021-12-31 2022-03-25 中铁五局集团有限公司 Method for assembling inverted triangular truss on site of roof canopy of station at traffic hub

Similar Documents

Publication Publication Date Title
CN105019665A (en) Method for mounting long-span structure beam based on total station
CN104060523A (en) Ultra-large type bridge box girder component, dedicated jig frame and assembling method thereof
CN101725255A (en) Segmental slipping and assembling process of overhead large-span steel structure
CN110158826B (en) Construction method of large-span special-shaped steel keel glass curtain wall
CN105401732A (en) Assembling method of large steel structure module of nuclear power plant
CN112554345A (en) Ground splicing and integral lifting construction method for large-span welding ball net rack
CN103821372A (en) Method for installing trusses with different heights
CN101440667A (en) Mounting method for wide span single layer rain shed reticulated shell structure
CN110306704B (en) Hollow aluminum plate and glass composite curtain wall structure and mounting method thereof
CN106436549A (en) Long-service-life high-strength bridge deck steel box girder and assembling method thereof
US11601086B2 (en) Solar canopy system with roll-formed structural components
CN106223623A (en) Steel construction box arched roof truss installation method
CN205443895U (en) Modular shelter bridge
CN114232901A (en) Construction method of steel structure canopy roof curtain wall of traffic hub station platform
CN113833276A (en) Construction method of mountain building decorative gabion curtain wall
Mason Piece by piece
CN113914517B (en) Stone curtain wall system and construction method thereof
CN110965489A (en) Subway insertion type totally-enclosed sound barrier and construction method
CN114457943B (en) Large-span curved surface pull rod curtain wall-sunshade truss pull rod structure and construction method
CN114934673A (en) Construction method of glass curtain wall of wood structure system
CN106320186A (en) Positioning system for pre-embedded anchor bar of arch support and construction method
CN114059721A (en) Construction method for continuously welding stainless steel metal roof of tennis court
CN113605581A (en) Unit plate glass curtain wall roof and construction method thereof
CN113107101A (en) Construction method for oblique crossing connection of broken line steel pipe column and arc box girder based on BIM
CN111593661A (en) Installation and construction method for solar energy system on circular arch tower

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20220325