CN107816223A - A kind of safety and stability type platform canopy station and its installation method - Google Patents

A kind of safety and stability type platform canopy station and its installation method Download PDF

Info

Publication number
CN107816223A
CN107816223A CN201711249767.8A CN201711249767A CN107816223A CN 107816223 A CN107816223 A CN 107816223A CN 201711249767 A CN201711249767 A CN 201711249767A CN 107816223 A CN107816223 A CN 107816223A
Authority
CN
China
Prior art keywords
platform
mobile jib
awning
support
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711249767.8A
Other languages
Chinese (zh)
Other versions
CN107816223B (en
Inventor
邵宝健
甘国军
朱克进
巫明杰
张伟
张广敏
肖攀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Huning Steel Mechanism Co Ltd
Original Assignee
Jiangsu Huning Steel Mechanism Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Huning Steel Mechanism Co Ltd filed Critical Jiangsu Huning Steel Mechanism Co Ltd
Priority to CN201711249767.8A priority Critical patent/CN107816223B/en
Publication of CN107816223A publication Critical patent/CN107816223A/en
Application granted granted Critical
Publication of CN107816223B publication Critical patent/CN107816223B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/12Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
    • E04H1/1205Small buildings erected in the open air
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B7/00Roofs; Roof construction with regard to insulation
    • E04B7/08Vaulted roofs
    • E04B7/10Shell structures, e.g. of hyperbolic-parabolic shape; Grid-like formations acting as shell structures; Folded structures
    • E04B7/105Grid-like structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/15Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/15Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
    • E04G1/152Platforms made of metal or with metal-supporting frame
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/36Scaffolds for particular parts of buildings or buildings of particular shape, e.g. for stairs, cupolas, domes
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/12Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
    • E04H1/1205Small buildings erected in the open air
    • E04H1/1211Waiting shelters for bus stops
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/10Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
    • Y02A40/25Greenhouse technology, e.g. cooling systems therefor

Abstract

The invention discloses a kind of safety and stability type platform canopy station, including:Platform post awning and roof truss without columns, described platform post awning is located between roof truss without columns, one group of supporting construction is provided with described platform post awning, steel column, awning truss Cantilever Beams and rail members, keel and connection beam are provided with described supporting construction, movement joint is provided between the supporting construction;Support system and reticulated shell system are provided with the roof truss without columns, the reticulated shell system is in support system, main rod and net canopy are provided with wherein described reticulated shell system, surrounding mobile jib and oblique mobile jib are provided with the main rod, a kind of heretofore described safety and stability type platform canopy station, designed by the collocation formula of platform post awning and roof truss without columns, realize the integration of resource, while its demand and quality is ensured, also it is effectively reduced construction workload, reduce difficulty of construction, make its design more reasonable, it more disclosure satisfy that the demand of people.

Description

A kind of safety and stability type platform canopy station and its installation method
Technical field
The invention belongs to build manufacturing field, more particularly to a kind of safety and stability type platform canopy station.
Background technology
With the fast development of social economy, the quality of life and living standard of people are all constantly improving, and no matter It is that the production of enterprise or the rhythm of life of people are all constantly being accelerated.For building trade and in this way, with motor-car, height The generation of iron, subway, each website are required for platform, and current most building is built using armored concrete, but It requires more serious due to the particularity of construction, to weather and external condition, thus the growth-promoting production of steel building It is raw.
But existing steel building is also merely resting on some large-scale venues, does not popularize, in particular for Some platforms, existing station, most of is all that it not only increases construction volume, while also result in money all with platform The waste in source, also there is certain potential safety hazard in it in design and the use in later stage.
The content of the invention
Goal of the invention:In order to overcome the above insufficient, it is an object of the invention to provide a kind of safety and stability type platform canopy station Room, its is simple in construction, reasonable in design, is readily produced, and automaticity is high, reduces manual labor amount, improves operating efficiency, stores up Doses is big and application is flexible.
Technical scheme:To achieve these goals, the invention provides a kind of safety and stability type platform canopy station, bag Include:Platform post awning and roof truss without columns, described platform post awning are located between roof truss without columns, described platform post One group of supporting construction is provided with awning, steel column, awning truss Cantilever Beams and rail members, keel are provided with described supporting construction And connection beam, on steel column, the rail members are longitudinally located between steel column the awning truss Cantilever Beams, and are through at awning On truss Cantilever Beams, the keel are located at the both ends of awning truss Cantilever Beams, are provided with girder steel between two keel, the girder steel is located at It is through in rail members, its both ends is connected with keel, and described connection beam is laterally located at awning truss Cantilever Beams and rail members On, and movement joint is provided between the supporting construction;
Support system and reticulated shell system are provided with the roof truss without columns, the reticulated shell system is located in support system, wherein Main rod and net canopy are provided with the reticulated shell system, surrounding mobile jib and oblique mobile jib, the surrounding master are provided with the main rod Bar is located at the edge of reticulated shell system, and its end is connected with the connecting node of support system and reticulated shell system, and the net canopy is located at four The inner side of all mobile jibs, the oblique mobile jib is on net canopy.
A kind of heretofore described safety and stability type platform canopy station, passes through platform post awning and roof truss without columns The design of collocation formula, realize the integration of resource, ensureing its demand and while quality, be also effectively reduced construction working Measure, reduce difficulty of construction, make its design more reasonable, more disclosure satisfy that the demand of people.
Heretofore described awning truss Cantilever Beams are provided with wind up beam and lower-cord beam, one end of the beam that winds up and lower edge One end connection of beam, and, between the two provided with strut.
Heretofore described surrounding mobile jib is provided with along route direction mobile jib and longitudinal mobile jib, the suitable route direction mobile jib On along the support system in route direction, longitudinal mobile jib is in the support system of longitudinal direction.
Vertical direction mobile jib is provided between heretofore described oblique mobile jib.
Packway is provided between heretofore described net canopy.
Heretofore described packway is in the shape of the letter V, and two ends on its two sides are connected with two reticulated shell systems respectively.
Heretofore described net canopy is made up of at least one set of oblique secondary bar, and it is engaged with oblique mobile jib.
The installation method of heretofore described safety and stability type platform canopy station, specific installation method are as follows:
Operating platform is built in ground specified location according to construction drawing first, after the completion of platform building to be operated, then in platform On build platform post awning and roof truss without columns;
Platform post awning to build mode as follows:
1):Built-in fitting is fixed on specified location first, then steel column is fixed on built-in fitting;
2):Then in the longitudinally positioned awning truss Cantilever Beams of steel column, i.e., it is symmetrical arranged and will winds up in the both sides of steel column respectively Beam and lower-cord beam, and strut is set between beam and lower-cord beam winding up;
3):Rail members are laterally set at the top of steel column again;
4):After the completion of rail members and steel column assembly, then distribution sets girder steel on the longitudinal direction of rail members;
5):After girder steel is set, the both ends of awning truss Cantilever Beams and girder steel are attached and reinforced by keel;
6):Ready connection beam is laterally located on awning truss Cantilever Beams and rail members again, so far, the one of platform roofing Group supporting construction is completed;
7):Then repeat step 1)To 6)Carry out next group of supporting construction and carry out assembly, in assembled next group of supporting construction, two Movement joint is provided between 2 groups of adjacent supporting constructions;
8):After the completion of drawing structure assembly to be supported, ceiling is finally installed to supporting construction;
The installation method of roof truss without columns is as follows:
1):The bottom steel column bottom embedded concrete structure in support system is fixed to it first, and set at the top of it Put cast steel node;
2):After system to be supported fixes, main rod and support system are carried out by cast steel node assembled, i.e. according to drawing, Surrounding mobile jib is fixedly connected with support system by cast steel node, then vertical direction mobile jib passes through cast steel node and support again System connects, then sets oblique mobile jib between two vertical direction mobile jibs;
3):Oblique mobile jib uses cross-over design, and its both ends is connected with cast steel node;
4):Then round steel pipe cross-over design networking is passed through in the supporting construction that two vertical direction mobile jibs and the oblique mobile jib of setting are formed Canopy, and in reticulated shell 2)Top is set wingceltis bar, wingceltis holder structure;
5):Then by setting V-shaped packway between two;
Assembled good platform post awning and roof truss without columns finally carried out into linking connects again can.
Support member, support top platform, track girder and girder are provided with heretofore described operating platform, it is described Supporting top platform, described track girder is located at ground, track is formed between two track girders above support member, wherein, Support frame column and center temporary support columns are provided with described support member, conversion beam is provided between support frame as described above column, Connected between the top of described support frame as described above column by horizon bar, described center temporary support columns are located at operating platform Middle part, and the top of the center temporary support columns is connected by platform beams;
Connected between the top of described support frame column and the top of center temporary support columns by girder, described girder Longitudinal direction sets longitudinal secondary beam by position of joints, and described support top platform is connected by connector with girder.
A kind of installation method of heretofore described safety and stability type platform canopy station, the operating platform are specific Assembling method is as follows:
1):Operating platform is divided into by two parts according to drawing first, and support frame column is set in specified location according to drawing With center temporary support columns, and connected by conversion beam and truss in the bottom of each operating platform integral;;
2):Then corresponding bearing diagonal and diagonal brace reinforcing bar is set up in the end of conversion beam;
3):It is connected longitudinally at the top of support frame column and middle part horizon bar;
4):Support frame column is connected with center temporary support columns by conversion beam between two operating platforms, and conversion beam passes through Support column or roller and rail contact;
5):Then assembly is carried out to support platform, girder one end is connected with Two bors d's oeuveres H steel, the other end and center temporary support columns Connection, girder spacing is 4-8 rice, girder and square tube, according to reticulated shell line style putting up platform stepped during assembly;
6):Then longitudinal secondary beam is set by position of joints in the longitudinal direction of girder, the top laying plank of secondary beam, faces side and safety is set Rope, is connected between each step with safety net;
7):When operating platform need to shift installation position location, weld and lead on the bright H profile steel platform that shone in the support frame column bottom village Draw otic placode, by elevator machine travel, operating platform is slid onto into position location.
Above-mentioned technical proposal can be seen that the present invention and have the advantages that:
1st, heretofore described a kind of safety and stability type platform canopy station, platform post awning and roof truss without columns are passed through Collocation formula designs, and realizes the integration of resource, while its demand and quality is ensured, is also effectively reduced construction working Measure, reduce difficulty of construction, make its design more reasonable, more disclosure satisfy that the demand of people.
2nd, platform post awning by being provided with supporting construction in the lower section of ceiling, passes through the support knot of high intensity in the present invention The setting of structure, whole platform post awning installation and the stability and security that use are greatly improved, meanwhile, it uses steel knot The design built is built, greatly improves the efficiency of its construction, total design is relatively reasonable, easy for installation, is applied to building It is many convenient that work is brought, and at the same time, the setting of movement joint, can effectively prevent it from becoming in the use in later stage Shape, further improve its security used.
2nd, heretofore described awning truss Cantilever Beams are provided with and winded up beam and lower-cord beam, one end of the beam that winds up with One end connection of lower-cord beam, and, between the two provided with strut, the setting of described wind up beam and lower-cord beam and strut, significantly The support performance for improving awning truss Cantilever Beams, improve its connection stability.
3rd, heretofore described to wind up beam and lower-cord beam is in arc line shaped, both cooperate, and the design of arc line shaped, enter one The security that step improves its supportive and the later stage uses;The strut outwards shortens successively from steel column, itself and beam and the lower edge of winding up Beam cooperates, the design of the length formula of strut, allows it further to improve its connection with winding up beam and lower-cord beam coordinates more preferable Stability and fastness.
5th, straining beam and longitudinal girder steel are provided with heretofore described connection beam, described straining beam and longitudinal girder steel are handed over Fork is set, and described straining beam sequentially passes through longitudinal girder steel and awning truss Cantilever Beams, improves the stability of beam body.
6th, the lower section of heretofore described steel column is provided with embedded section, and the embedded section is provided with pedestal, on the pedestal Provided with built-in fitting, the built-in fitting is provided with fixed seat, and the fixed seat is provided with the hanger for installing, and improves steel column and sets Stability and fastness, increase its security used.
7th, heretofore described roof truss without columns, cooperated by support system and reticulated shell system, greatly carried The high reasonability of roof truss without columns designs, meanwhile, the setting of main rod and net canopy, greatly improve the support performance of awning With the security used;Bottom steel column is provided with described support system, described bottom steel column uses concrete filled steel tube, The bottom embedded concrete structure of bottom steel column, bottom steel column upper end are provided with cast steel node, greatly improve the steady of its fixation It is qualitative, the setting of cast steel node, it is easy to the connection of steel column and other connection members.
8th, packway is provided between heretofore described net canopy, the compactness and stability connected between two net canopies is improved, carries High overall anti-wound property;The packway is in the shape of the letter V, and two ends on its two sides are connected with two reticulated shell systems respectively, using more The stability of side shape, further improve stability and security that its installation uses with the later stage.
9th, heretofore described net canopy is made up of at least one set of oblique secondary bar, and it is engaged with oblique mobile jib, further carries The stability of its high connection;The surrounding mobile jib is in arc-shaped, and it is engaged with net canopy, improves its wind resistance.
10th, the present invention in operating platform, it is reasonable in design, be more bonded with platform, cooperation it is more close, greatly Improve the stability built of platform, meanwhile, for operating platform in itself for, its whole design of itself is also more stable, logical Cross support frame column and center temporary support columns structure plays the powerful support main force, and both are attached by girder, significantly Improve the stability and security of its own.
11st, heretofore described conversion beam uses H type conversion beams, and described conversion beam is connected by drawing otic placode with embedded part Connect, draw the setting of ear, be easy to move to setting for this platform, it can be moved according to the time situation of construction, gives Construction provides many convenience;Support beam column, raker beam and cross-brace beam, the support beam column are provided with described girder Lower section be fixed on ground through conversion beam, described raker beam located at the top of support beam column, its both ends respectively with support frame Column is connected with center temporary support columns, and described cross-brace beam is through between conversion beam;Heretofore described girder and Bearing diagonal is provided between conversion beam, further improves the stability that girder connects with conversion beam.
12nd, the top of heretofore described support frame column is provided with the awning Column border node for connecting, described awning post Node is provided with the connecting tube for connecting, and is easy to support frame column to be connected with miscellaneous part, when its height or needs multilayer During construction, it can take the circumstances into consideration to increase and reduce, greatly improve its applicability;The girder uses square tube, and according to reticulated shell line style Putting up platform stepped, allow it to coordinate more close with platform, improve the stability of its construction, also effectively raise it The quality of construction.
Brief description of the drawings
Fig. 1 is the structural representation of safety and stability type platform canopy station of the present invention;
Fig. 2 is the structural representation of safety and stability type platform post awning of the present invention;
Fig. 3 is the enlarged drawing of ceiling in the present invention;
Fig. 4 is the structural representation of roof truss without columns of the present invention;
Fig. 5 is the structural representation of reticulated shell system in roof truss without columns in the present invention;
Fig. 6 is the partial enlarged drawing of reticulated shell system in the present invention;
Fig. 7 is the structural representation set for this platform in the present invention.
Embodiment
Below in conjunction with the accompanying drawings and specific embodiment, the present invention is furture elucidated.
Embodiment
A kind of safety and stability type platform canopy station as depicted, including:Platform post awning 1 and roof truss without columns 2, Described platform post awning 1 is located between roof truss without columns 2, and one group of supporting construction 11 is provided with described platform post awning 1, Steel column 112, awning truss Cantilever Beams 113 and rail members 114, keel 115 and connection beam are provided with described supporting construction 111 116, on steel column 112, the longitudinal direction of rail members 114 is located between steel column 112 the awning truss Cantilever Beams 113, and It is through on awning truss Cantilever Beams 113, the keel 115 are between the both ends of awning truss Cantilever Beams 113, two keel 115 Provided with girder steel 25, the girder steel 25 is located at being through in rail members 114, and its both ends is connected with keel 115, described connection beam 116 laterally on awning truss Cantilever Beams 113 and rail members 114, and movement joint 12 is provided between the supporting construction 11;
Support system 21 and reticulated shell system 22 are provided with the roof truss without columns 2, the reticulated shell system 22 is located at support system On 21, wherein being provided with main rod 221 and net canopy 222 in the reticulated shell system 22, surrounding mobile jib is provided with the main rod 221 223 and oblique mobile jib 224, the surrounding mobile jib 223 is located at the edge of reticulated shell system 22, its end and support system 21 and reticulated shell The connecting node connection of system 22, the net canopy 222 are located at the inner side of surrounding mobile jib 223, and the oblique mobile jib 224 is located at net canopy On 222.
The Cantilever Beams of awning truss described in the present embodiment 113 are provided with wind up beam 1131 and lower-cord beam 1132, described to wind up One end of beam 1131 is connected with one end of lower-cord beam 1132, and, between the two provided with strut 1133.
Surrounding mobile jib described in the present embodiment 223 is provided with along route direction mobile jib and longitudinal mobile jib, the direct route line side It is located to mobile jib along in the support system 21 in route direction, longitudinal mobile jib is in the support system 21 of longitudinal direction.
Vertical direction mobile jib 225 is provided with described in the present embodiment between oblique mobile jib 224.
Packway 226 is provided between net canopy described in the present embodiment 222.
Packway 226 described in the present embodiment is in the shape of the letter V, and two ends on its two sides connect with two reticulated shell systems 22 respectively Connect.
Net canopy described in the present embodiment 222 is made up of at least one set of oblique secondary bar, and it is engaged with oblique mobile jib 224.
Embodiment 2
A kind of safety and stability type platform canopy station as depicted, including:Platform post awning 1 and roof truss without columns 2, it is described Platform post awning 1 be located at roof truss without columns 2 between, one group of supporting construction 11 is provided with described platform post awning 1, it is described Supporting construction 111 in be provided with steel column 112, awning truss Cantilever Beams 113 and rail members 114, keel 115 and connection beam 116, On steel column 112, the longitudinal direction of rail members 114 is located between steel column 112 the awning truss Cantilever Beams 113, and is through at On awning truss Cantilever Beams 113, the keel 115 are located at the both ends of awning truss Cantilever Beams 113, are provided between two keel 115 Girder steel 25, located at being through in rail members 114, its both ends is connected the girder steel 25 with keel 115, and described connection beam 116 is horizontal To on awning truss Cantilever Beams 113 and rail members 114, and movement joint 12 is provided between the supporting construction 11;
Support system 21 and reticulated shell system 22 are provided with the roof truss without columns 2, the reticulated shell system 22 is located at support system On 21, wherein being provided with main rod 221 and net canopy 222 in the reticulated shell system 22, surrounding mobile jib is provided with the main rod 221 223 and oblique mobile jib 224, the surrounding mobile jib 223 is located at the edge of reticulated shell system 22, its end and support system 21 and reticulated shell The connecting node connection of system 22, the net canopy 222 are located at the inner side of surrounding mobile jib 223, and the oblique mobile jib 224 is located at net canopy On 222.
The Cantilever Beams of awning truss described in the present embodiment 113 are provided with wind up beam 1131 and lower-cord beam 1132, described to wind up One end of beam 1131 is connected with one end of lower-cord beam 1132, and, between the two provided with strut 1133.
Surrounding mobile jib described in the present embodiment 223 is provided with along route direction mobile jib and longitudinal mobile jib, the direct route line side It is located to mobile jib along in the support system 21 in route direction, longitudinal mobile jib is in the support system 21 of longitudinal direction.
Vertical direction mobile jib 225 is provided with described in the present embodiment between oblique mobile jib 224.
Packway 226 is provided between net canopy described in the present embodiment 222.
Packway 226 described in the present embodiment is in the shape of the letter V, and two ends on its two sides connect with two reticulated shell systems 22 respectively Connect.
Net canopy described in the present embodiment 222 is made up of at least one set of oblique secondary bar, and it is engaged with oblique mobile jib 224.
The installation method of safety and stability type platform canopy station described in the present embodiment, specific installation method are as follows:
Operating platform 3 is built in ground specified location according to construction drawing first, after the completion of platform 3 to be operated is built, then flat Platform post awning 1 and roof truss without columns 2 are built on platform;
Platform post awning 1 to build mode as follows:
1):Built-in fitting is fixed on specified location first, then steel column 112 is fixed on built-in fitting;
2):Then in the longitudinally positioned awning truss Cantilever Beams 113 of steel column 112, i.e., symmetrically set in the both sides of steel column 112 respectively To wind up beam 1131 and lower-cord beam 1132 are put, and strut 1133 is set between beam 1131 and lower-cord beam 1132 winding up;
3):Rail members 114 are laterally set at the top of steel column 112 again;
4):After the completion of rail members 114 and the assembly of steel column 112, then distribution sets girder steel on the longitudinal direction of rail members 114 25;
5):After girder steel 25 is set, the both ends of awning truss Cantilever Beams 113 and girder steel 25 are attached by keel 24 And reinforce;
6):Ready connection beam 26 is laterally located on awning truss Cantilever Beams 113 and rail members 114 again, so far, platform One group of supporting construction 11 of ceiling is completed;
7):Then repeat step 1 to 6 carries out next group of supporting construction 11 and carries out assembly, in assembled next group of supporting construction 11, Movement joint 12 is provided between two 2 groups of adjacent supporting constructions 11;
8):After the completion of the drawing assembly of structure 11 to be supported, ceiling is finally installed to supporting construction 11;
The installation method of roof truss without columns 2 is as follows:
1):It is fixed the bottom steel column bottom embedded concrete structure in support system 21 first, and at the top of it Cast steel node is set;
2):After system 21 to be supported fixes, assembly is carried out to main rod 221 and support system 21 by cast steel node, i.e. root According to drawing, surrounding mobile jib 223 is fixedly connected with support system 21 by cast steel node, then vertical direction mobile jib 225 is logical again Cross cast steel node to be connected with support system 21, then oblique mobile jib 224 is set between two vertical direction mobile jibs 225;
3):Oblique mobile jib 224 uses cross-over design, and its both ends is connected with cast steel node;
4):Then intersected in the supporting construction that two vertical direction mobile jibs 225 and the oblique mobile jib 224 of setting are formed by round steel pipe and set Networking canopy 222 is counted, and is set above the net canopy 2222 of reticulated shell 2 by wingceltis bar, wingceltis holder structure;
5):Then by setting V-shaped packway 226 between two;
Assembled good platform post awning 1 and roof truss without columns 2 finally carried out into linking connects again can.
Support member 31, support top platform 32, track girder 33 and master are provided with operating platform 3 described in the present embodiment Beam 34, described support top platform 32 are located at ground, two track girders 33 located at the top of support member 31, described track girder 33 Between form track, wherein, support frame column 311 and center temporary support columns 312 are provided with described support member 31, it is described Conversion beam 313 is provided between support frame column 311, passes through horizon bar 314 between the top of described support frame as described above column 311 Connection, described center temporary support columns 312 are located at the middle part of operating platform, and the top of the center temporary support columns 312 Connected by platform beams 15;
Connected between the top of described support frame column 311 and the top of center temporary support columns 312 by girder 34, it is described The longitudinal direction of girder 34 by position of joints, longitudinal secondary beam 5 is set, described support top platform 32 passes through connector and girder 34 Connection.
The specific assembling method of operating platform 3 described in the present embodiment is as follows:
1):Operating platform is divided into by two parts according to drawing first, and support frame column is set in specified location according to drawing 311 and center temporary support columns 312, and connected by conversion beam 313 and truss in the bottom of each operating platform integral;;
2):Then corresponding bearing diagonal 37 and diagonal brace reinforcing bar are set up in the end of conversion beam 313;
3):It is connected longitudinally at the top of support frame column 311 and middle part horizon bar 314;
4):Support frame column 311 and center temporary support columns 312 are connected by conversion beam 313 between two operating platforms, and turned Change beam 313 and pass through support column or roller and rail contact;
5):Then assembly is carried out to support platform 2, the one end of girder 34 is connected with Two bors d's oeuveres H steel, the other end and center temporary support Post 312 connects, and girder spacing is 4-8 rice, girder and square tube, according to reticulated shell line style putting up platform into step during assembly Shape;
6):Then longitudinal secondary beam 35 is set by position of joints in the longitudinal direction of girder 34, the top laying plank of secondary beam 35, faces side and set Safety rope is put, is connected between each step with safety net;
7):When operating platform need to shift installation position location, welded on the bright H profile steel platform that shone in the bottom village of support frame column 311 Traction otic placode 36 is connect, by elevator machine travel, operating platform is slid onto into position location.
Embodiment 3
A kind of safety and stability type platform canopy station as depicted, including:Platform post awning 1 and roof truss without columns 2, it is described Platform post awning 1 be located at roof truss without columns 2 between, one group of supporting construction 11 is provided with described platform post awning 1, it is described Supporting construction 111 in be provided with steel column 112, awning truss Cantilever Beams 113 and rail members 114, keel 115 and connection beam 116, On steel column 112, the longitudinal direction of rail members 114 is located between steel column 112 the awning truss Cantilever Beams 113, and is through at On awning truss Cantilever Beams 113, the keel 115 are located at the both ends of awning truss Cantilever Beams 113, are provided between two keel 115 Girder steel 25, located at being through in rail members 114, its both ends is connected the girder steel 25 with keel 115, and described connection beam 116 is horizontal To on awning truss Cantilever Beams 113 and rail members 114, and movement joint 12 is provided between the supporting construction 11;
Support system 21 and reticulated shell system 22 are provided with the roof truss without columns 2, the reticulated shell system 22 is located at support system On 21, wherein being provided with main rod 221 and net canopy 222 in the reticulated shell system 22, surrounding mobile jib is provided with the main rod 221 223 and oblique mobile jib 224, the surrounding mobile jib 223 is located at the edge of reticulated shell system 22, its end and support system 21 and reticulated shell The connecting node connection of system 22, the net canopy 222 are located at the inner side of surrounding mobile jib 223, and the oblique mobile jib 224 is located at net canopy On 222.
The Cantilever Beams of awning truss described in the present embodiment 113 are provided with wind up beam 1131 and lower-cord beam 1132, described to wind up One end of beam 1131 is connected with one end of lower-cord beam 1132, and, between the two provided with strut 1133.
Surrounding mobile jib described in the present embodiment 223 is provided with along route direction mobile jib and longitudinal mobile jib, the direct route line side It is located to mobile jib along in the support system 21 in route direction, longitudinal mobile jib is in the support system 21 of longitudinal direction.
Vertical direction mobile jib 225 is provided with described in the present embodiment between oblique mobile jib 224.
Packway 226 is provided between net canopy described in the present embodiment 222.
Packway 226 described in the present embodiment is in the shape of the letter V, and two ends on its two sides connect with two reticulated shell systems 22 respectively Connect.
Net canopy described in the present embodiment 222 is made up of at least one set of oblique secondary bar, and it is engaged with oblique mobile jib 224.
Wind up beam 221 described in the present embodiment and lower-cord beam 222 is in arc line shaped, both cooperate.
Strut 223 described in the present embodiment outwards shortens successively from steel column 21, itself and beam 221 and the phase of lower-cord beam 222 of winding up Mutually coordinate.
Straining beam and longitudinal girder steel, described straining beam and longitudinal steel are provided with connection beam 116 described in the present embodiment Beam is arranged in a crossed manner, and described straining beam sequentially passes through longitudinal girder steel and awning truss Cantilever Beams 113.
The lower section of steel column 112 described in the present embodiment is provided with embedded section, and the embedded section is provided with pedestal, the pedestal Built-in fitting is provided with, the built-in fitting is provided with fixed seat, and the fixed seat is provided with the hanger for installing.
Steel column 112 described in the present embodiment uses circular steel tube concrete post, and its inner side is provided with supporting plate, the support Plate is engaged provided with perforate, described perforate with the fixed seat on built-in fitting among it in cylinder.
Bottom steel column is provided with support system 21 described in the present embodiment, described bottom steel column uses concrete filled steel tube Structure, the bottom embedded concrete structure of bottom steel column, bottom steel column upper end are provided with cast steel node.
Surrounding mobile jib described in the present embodiment 223 is in arc-shaped, and it is engaged with net canopy 222.
Net canopy described in the present embodiment 222 uses groin monolayer net booth structure, and the top of net canopy 222 is purlin purlin support Structure, purlin are square steel tubular construction.
Embodiment 4
A kind of safety and stability type platform canopy station as depicted, including:Platform post awning 1 and roof truss without columns 2, it is described Platform post awning 1 be located at roof truss without columns 2 between, one group of supporting construction 11 is provided with described platform post awning 1, it is described Supporting construction 111 in be provided with steel column 112, awning truss Cantilever Beams 113 and rail members 114, keel 115 and connection beam 116, On steel column 112, the longitudinal direction of rail members 114 is located between steel column 112 the awning truss Cantilever Beams 113, and is through at On awning truss Cantilever Beams 113, the keel 115 are located at the both ends of awning truss Cantilever Beams 113, are provided between two keel 115 Girder steel 25, located at being through in rail members 114, its both ends is connected the girder steel 25 with keel 115, and described connection beam 116 is horizontal To on awning truss Cantilever Beams 113 and rail members 114, and movement joint 12 is provided between the supporting construction 11;
Support system 21 and reticulated shell system 22 are provided with the roof truss without columns 2, the reticulated shell system 22 is located at support system On 21, wherein being provided with main rod 221 and net canopy 222 in the reticulated shell system 22, surrounding mobile jib is provided with the main rod 221 223 and oblique mobile jib 224, the surrounding mobile jib 223 is located at the edge of reticulated shell system 22, its end and support system 21 and reticulated shell The connecting node connection of system 22, the net canopy 222 are located at the inner side of surrounding mobile jib 223, and the oblique mobile jib 224 is located at net canopy On 222.
The Cantilever Beams of awning truss described in the present embodiment 113 are provided with wind up beam 1131 and lower-cord beam 1132, described to wind up One end of beam 1131 is connected with one end of lower-cord beam 1132, and, between the two provided with strut 1133.
Surrounding mobile jib described in the present embodiment 223 is provided with along route direction mobile jib and longitudinal mobile jib, the direct route line side It is located to mobile jib along in the support system 21 in route direction, longitudinal mobile jib is in the support system 21 of longitudinal direction.
Vertical direction mobile jib 225 is provided with described in the present embodiment between oblique mobile jib 224.
Packway 226 is provided between net canopy described in the present embodiment 222.
Packway 226 described in the present embodiment is in the shape of the letter V, and two ends on its two sides connect with two reticulated shell systems 22 respectively Connect.
Net canopy described in the present embodiment 222 is made up of at least one set of oblique secondary bar, and it is engaged with oblique mobile jib 224.
Wind up beam 221 described in the present embodiment and lower-cord beam 222 is in arc line shaped, both cooperate.
Strut 223 described in the present embodiment outwards shortens successively from steel column 21, itself and beam 221 and the phase of lower-cord beam 222 of winding up Mutually coordinate.
Straining beam and longitudinal girder steel, described straining beam and longitudinal steel are provided with connection beam 116 described in the present embodiment Beam is arranged in a crossed manner, and described straining beam sequentially passes through longitudinal girder steel and awning truss Cantilever Beams 113.
The lower section of steel column 112 described in the present embodiment is provided with embedded section, and the embedded section is provided with pedestal, the pedestal Built-in fitting is provided with, the built-in fitting is provided with fixed seat, and the fixed seat is provided with the hanger for installing.
Steel column 112 described in the present embodiment uses circular steel tube concrete post, and its inner side is provided with supporting plate, the support Plate is engaged provided with perforate, described perforate with the fixed seat on built-in fitting among it in cylinder.
Bottom steel column is provided with support system 21 described in the present embodiment, described bottom steel column uses concrete filled steel tube Structure, the bottom embedded concrete structure of bottom steel column, bottom steel column upper end are provided with cast steel node.
Surrounding mobile jib described in the present embodiment 223 is in arc-shaped, and it is engaged with net canopy 222.
Net canopy described in the present embodiment 222 uses groin monolayer net booth structure, and the top of net canopy 222 is purlin purlin support Structure, purlin are square steel tubular construction.
The installation method of safety and stability type platform canopy station described in the present embodiment, specific installation method are as follows:
Operating platform 3 is built in ground specified location according to construction drawing first, after the completion of platform 3 to be operated is built, then flat Platform post awning 1 and roof truss without columns 2 are built on platform;
Platform post awning 1 to build mode as follows:
1):Built-in fitting is fixed on specified location first, then steel column 112 is fixed on built-in fitting;
2):Then in the longitudinally positioned awning truss Cantilever Beams 113 of steel column 112, i.e., symmetrically set in the both sides of steel column 112 respectively To wind up beam 1131 and lower-cord beam 1132 are put, and strut 1133 is set between beam 1131 and lower-cord beam 1132 winding up;
3):Rail members 114 are laterally set at the top of steel column 112 again;
4):After the completion of rail members 114 and the assembly of steel column 112, then distribution sets girder steel on the longitudinal direction of rail members 114 25;
5):After girder steel 25 is set, the both ends of awning truss Cantilever Beams 113 and girder steel 25 are attached by keel 24 And reinforce;
6):Ready connection beam 26 is laterally located on awning truss Cantilever Beams 113 and rail members 114 again, so far, platform One group of supporting construction 11 of ceiling is completed;
7):Then repeat step 1 to 6 carries out next group of supporting construction 11 and carries out assembly, in assembled next group of supporting construction 11, Movement joint 12 is provided between two 2 groups of adjacent supporting constructions 11;
8):After the completion of the drawing assembly of structure 11 to be supported, ceiling is finally installed to supporting construction 11;
The installation method of roof truss without columns 2 is as follows:
1):It is fixed the bottom steel column bottom embedded concrete structure in support system 21 first, and at the top of it Cast steel node is set;
2):After system 21 to be supported fixes, assembly is carried out to main rod 221 and support system 21 by cast steel node, i.e. root According to drawing, surrounding mobile jib 223 is fixedly connected with support system 21 by cast steel node, then vertical direction mobile jib 225 is logical again Cross cast steel node to be connected with support system 21, then oblique mobile jib 224 is set between two vertical direction mobile jibs 225;
3):Oblique mobile jib 224 uses cross-over design, and its both ends is connected with cast steel node;
4):Then intersected in the supporting construction that two vertical direction mobile jibs 225 and the oblique mobile jib 224 of setting are formed by round steel pipe and set Networking canopy 222 is counted, and is set above the net canopy 2222 of reticulated shell 2 by wingceltis bar, wingceltis holder structure;
5):Then by setting V-shaped packway 226 between two;
Assembled good platform post awning 1 and roof truss without columns 2 finally carried out into linking connects again can.
Support member 31, support top platform 32, track girder 33 and master are provided with operating platform 3 described in the present embodiment Beam 34, described support top platform 32 are located at ground, two track girders 33 located at the top of support member 31, described track girder 33 Between form track, wherein, support frame column 311 and center temporary support columns 312 are provided with described support member 31, it is described Conversion beam 313 is provided between support frame column 311, passes through horizon bar 314 between the top of described support frame as described above column 311 Connection, described center temporary support columns 312 are located at the middle part of operating platform, and the top of the center temporary support columns 312 Connected by platform beams 15;
Connected between the top of described support frame column 311 and the top of center temporary support columns 312 by girder 34, it is described The longitudinal direction of girder 34 by position of joints, longitudinal secondary beam 35 is set, described support top platform 32 passes through connector and girder 34 Connection.
Conversion beam 313 described in the present embodiment use H type conversion beams, described conversion beam 313 by draw otic placode 36 with Embedded part connects.
Support beam column 341, raker beam 342 and cross-brace beam 343 are provided with girder 34 described in the present embodiment, it is described The lower section of beam column 341 is supported to be fixed on ground through conversion beam 313, described raker beam 342 is located at the top of support beam column 341 Portion, its both ends are connected with support frame column 311 and center temporary support columns 312 respectively, and described cross-brace beam 343, which is through at, to be turned Change between beam 313.
Bearing diagonal 37 is provided between girder 34 and conversion beam 313 described in the present embodiment.
The top of support frame column described in the present embodiment 311 is provided with the awning Column border node 316 for connecting, described rain Canopy Column border node 316 is provided with the connecting tube for connecting.
The inner side of awning Column border node 316 described in the present embodiment is provided with dividing plate, and perforation is provided among described dividing plate, And the described phase side of awning Column border node 316 is provided with engaging lug relatively.
Conversion beam 313 described in the present embodiment passes through support column or roller and rail contact.
Girder 34 described in the present embodiment uses square tube, and according to reticulated shell line style putting up platform stepped.
Longitudinal secondary beam 35 described in the present embodiment uses channel-section steel, and the channel-section steel is provided with matched sheet material, and Face side and be provided with safety rope.
The specific assembling method of operating platform 3 described in the present embodiment is as follows:
1):Operating platform is divided into by two parts according to drawing first, and support frame column is set in specified location according to drawing 311 and center temporary support columns 312, and connected by conversion beam 313 and truss in the bottom of each operating platform integral;;
2):Then corresponding bearing diagonal 37 and diagonal brace reinforcing bar are set up in the end of conversion beam 313;
3):It is connected longitudinally at the top of support frame column 311 and middle part horizon bar 314;
4):Support frame column 311 and center temporary support columns 312 are connected by conversion beam 313 between two operating platforms, and turned Change beam 313 and pass through support column or roller and rail contact;
5):Then assembly is carried out to support platform 2, the one end of girder 34 is connected with Two bors d's oeuveres H steel, the other end and center temporary support Post 312 connects, and girder spacing is 4-8 rice, girder and square tube, according to reticulated shell line style putting up platform into step during assembly Shape;
6):Then longitudinal secondary beam 35 is set by position of joints in the longitudinal direction of girder 34, the top laying plank of secondary beam 35, faces side and set Safety rope is put, is connected between each step with safety net;
7):When operating platform need to shift installation position location, welded on the bright H profile steel platform that shone in the bottom village of support frame column 311 Traction otic placode 36 is connect, by elevator machine travel, operating platform is slid onto into position location.
Described above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, under the premise without departing from the principles of the invention, some improvement can also be made, these improvement also should be regarded as the present invention's Protection domain.

Claims (10)

  1. A kind of 1. safety and stability type platform canopy station, it is characterised in that:Including:Platform post awning(1)And roof truss without columns (2), described platform post awning(1)Located at roof truss without columns(2)Between, described platform post awning(1)In be provided with one group Supporting construction(11), described supporting construction(111)In be provided with steel column(112), awning truss Cantilever Beams(113)And rail members (114), keel(115)And connection beam(116), the awning truss Cantilever Beams(113)Located at steel column(112)On, the longeron Component(114)Longitudinal direction is located at steel column(112)Between, and it is through at awning truss Cantilever Beams(113)On, the keel(115)It is located at Awning truss Cantilever Beams(113)Both ends, two keel(115)Between be provided with girder steel(25), the girder steel(25)It is vertical located at being through at Beam(114)In, its both ends and keel(115)Connection, described connection beam(116)Laterally it is located at awning truss Cantilever Beams (113)And rail members(114)On, and the supporting construction(11)Between be provided with movement joint(12);
    The roof truss without columns(2)In be provided with support system(21)With reticulated shell system(22), the reticulated shell system(22)It is located at Support system(21)On, wherein the reticulated shell system(22)In be provided with main rod(221)With net canopy(222), the main rod (221)In be provided with surrounding mobile jib(223)With oblique mobile jib(224), the surrounding mobile jib(223)Located at reticulated shell system(22)Side Edge, its end and support system(21)With reticulated shell system(22)Connecting node connection, the net canopy(222)Located at surrounding mobile jib (223)Inner side, the oblique mobile jib(224)Located at net canopy(222)On.
  2. 2. safety and stability type platform canopy station according to claim 1, it is characterised in that:The awning truss Cantilever Beams (113)It is provided with the beam that winds up(1131)And lower-cord beam(1132), the beam that winds up(1131)One end and lower-cord beam(1132)'s One end connects, and, between the two provided with strut(1133).
  3. 3. safety and stability type platform canopy station according to claim 1, it is characterised in that:The surrounding mobile jib(223) It is provided with and is located at along route direction mobile jib and longitudinal mobile jib, the suitable route direction mobile jib along the support system in route direction (21)On, support system of the longitudinal mobile jib located at longitudinal direction(21)On.
  4. 4. safety and stability type platform canopy station according to claim 1, it is characterised in that:The oblique mobile jib(224) Between be provided with vertical direction mobile jib(225), the vertical direction mobile jib(225)It is provided with.
  5. 5. safety and stability type platform canopy station according to claim 1, it is characterised in that:The net canopy(222)Between Provided with packway(226).
  6. 6. safety and stability type platform canopy station according to claim 5, it is characterised in that:The packway(226)In V words Shape, two ends on its two sides respectively with two reticulated shell systems(22)Connection.
  7. 7. safety and stability type platform canopy station according to claim 1, it is characterised in that:The net canopy(222)By extremely Few one group of oblique secondary bar is formed, itself and oblique mobile jib(224)It is engaged.
  8. 8. the installation method of the safety and stability type platform canopy station according to any one of claim 1 to 7, its feature exist In:Specific installation method is as follows:
    Operating platform is built in ground specified location according to construction drawing first(3), platform to be operated(3)After the completion of building, then Platform post awning is built on platform(1)And roof truss without columns(2);
    Platform post awning(1)To build mode as follows:
    1):Built-in fitting is fixed on specified location first, then by steel column(112)It is fixed on built-in fitting;
    2):Then in steel column(112)Longitudinally positioned awning truss Cantilever Beams(113), i.e., respectively in steel column(112)Both sides It is symmetrical arranged the beam that will wind up(1131)And lower-cord beam(1132), and in the beam that winds up(1131)And lower-cord beam(1132)Between set support Bar(1133);
    3):Again in steel column(112)Top laterally set rail members(114);
    4):Work as rail members(114)With steel column(112)After the completion of assembly, then in rail members(114)Longitudinal direction on be distributed set Girder steel(25);
    5):Treat girder steel(25)After setting, pass through keel(24)To awning truss Cantilever Beams(113)And girder steel(25)Both ends It is attached and reinforces;
    6):Again by ready connection beam(26)Laterally it is located at awning truss Cantilever Beams(113)And rail members(114)On, extremely This, one group of supporting construction of platform roofing(11)It is completed;
    7):Then repeat step 1)To 6)Carry out next group of supporting construction(11)Assembly is carried out, in assembled next group of supporting construction (11)When, two 2 groups of adjacent supporting constructions(11)Between be provided with movement joint(12);
    8):According to drawing structure to be supported(11)After the completion of assembly, ceiling is finally installed to supporting construction(11);
    Roof truss without columns(2)Installation method it is as follows:
    1):First support system(21)In bottom steel column bottom embedded concrete structure it is fixed, and in Qi Ding Portion sets cast steel node;
    2):System to be supported(21)After fixing, by cast steel node to main rod(221)With support system(21)Spelled Dress, i.e. according to drawing, by cast steel node by surrounding mobile jib(223)And support system(21)It is fixedly connected, then Vertical Square again To mobile jib(225)Pass through cast steel node and support system(21)Connection, then in two vertical direction mobile jibs(225)Between set it is oblique Mobile jib(224);
    3):Oblique mobile jib(224)Using cross-over design, and its both ends is connected with cast steel node;
    4):Then two vertical direction mobile jib(225)With the oblique mobile jib of setting(224)Handed in the supporting construction of formation by round steel pipe Fork design networking canopy(222), and in reticulated shell(2 net canopies(222)2)Top is set wingceltis bar, wingceltis holder structure;
    5):Then by setting V-shaped packway between two(226);
    Finally again by assembled good platform post awning(1)And roof truss without columns(2)Carrying out that linking connects can.
  9. 9. the installation method of safety and stability type platform canopy station according to claim 8, it is characterised in that:Described behaviour Make platform(3)In be provided with support member(31), support top platform(32), track girder(33)And girder(34), described support Top platform(32)Located at support member(31)Top, described track girder(33)Located at ground, two track girders(33)Between shape Into track, wherein, described support member(31)In be provided with support frame column(311)With center temporary support columns(312), it is described Support frame column(311)Between be provided with conversion beam(313), described support frame as described above column(311)Top between pass through water Flat bar(314)Connection, described center temporary support columns(312)Located at the middle part of operating platform, and the center temporary support Post(312)Top pass through platform beams(15)Connection;
    Described support frame column(311)Top and center temporary support columns(312)Top between pass through girder(34)Even Connect, described girder(34)Longitudinal direction by position of joints, longitudinal secondary beam is set(5), described support top platform(32)Pass through company Fitting and girder(34)Connection.
  10. A kind of 10. installation method of safety and stability type platform canopy station according to claim 9, it is characterised in that:Institute State operating platform(3)Specific assembling method is as follows:
    1):Operating platform is divided into by two parts according to drawing first, and support frame column is set in specified location according to drawing (311)With center temporary support columns(312), and pass through conversion beam in the bottom of each operating platform(313)And truss connects into It is overall;;
    2):Then in conversion beam(313)End set up corresponding bearing diagonal(37)And diagonal brace reinforcing bar;
    3):In support frame column(311)Top and middle part horizon bar(314)It is connected longitudinally;
    4):Pass through conversion beam between two operating platforms(313)By support frame column(311)With center temporary support columns(312)Even Connect, and conversion beam(313)Pass through support column or roller and rail contact;
    5):Then to support platform(2)Carry out assembled, girder(34)One end is connected with Two bors d's oeuveres H steel, and the other end is interim with center Support column(312)Connection, girder spacing is 4-8 rice, girder and square tube, according to reticulated shell line style putting up platform during assembly Stepped;
    6):Then in girder(34)Longitudinal direction by position of joints, longitudinal secondary beam is set(35), secondary beam(35)Top laying plank, Face side and safety rope is set, connected between each step with safety net;
    7):When operating platform need to shift installation position location, in support frame column(311)Shine on bright H profile steel platform in the bottom village Welding traction otic placode(36), by elevator machine travel, operating platform is slid onto into position location.
CN201711249767.8A 2017-12-01 2017-12-01 Safe and stable type station canopy station house and installation method thereof Active CN107816223B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711249767.8A CN107816223B (en) 2017-12-01 2017-12-01 Safe and stable type station canopy station house and installation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711249767.8A CN107816223B (en) 2017-12-01 2017-12-01 Safe and stable type station canopy station house and installation method thereof

Publications (2)

Publication Number Publication Date
CN107816223A true CN107816223A (en) 2018-03-20
CN107816223B CN107816223B (en) 2023-07-28

Family

ID=61605632

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711249767.8A Active CN107816223B (en) 2017-12-01 2017-12-01 Safe and stable type station canopy station house and installation method thereof

Country Status (1)

Country Link
CN (1) CN107816223B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110952786A (en) * 2019-12-25 2020-04-03 中建国厦集团股份有限公司 Truss structure and installation method thereof
CN113152807A (en) * 2021-04-08 2021-07-23 中建铁路投资建设集团有限公司 Construction method of circular arch-shaped hyperbolic canopy structure
CN113833292A (en) * 2021-05-28 2021-12-24 中铁五局集团建筑工程有限责任公司 Reconstruction method of station canopy
CN114232915A (en) * 2021-12-31 2022-03-25 中铁五局集团有限公司 Method for assembling canopy hanging sheet units of roof of station at traffic hub site
CN114232901A (en) * 2021-12-31 2022-03-25 中铁五局集团有限公司 Construction method of steel structure canopy roof curtain wall of traffic hub station platform
CN114250997A (en) * 2021-12-31 2022-03-29 中铁五局集团有限公司 Construction method of platform steel structure main body of traffic junction
CN117365135A (en) * 2023-12-05 2024-01-09 北京建工集团有限责任公司 Temporary support frame for steel truss installation and steel truss construction method

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101440667A (en) * 2008-07-25 2009-05-27 中铁四局集团有限公司 Mounting method for wide span single layer rain shed reticulated shell structure
CN201460279U (en) * 2009-04-30 2010-05-12 鲁海波 Canopy
EP2317022A2 (en) * 2009-10-08 2011-05-04 MSB-Management GmbH Platform covering and method of erection
CN204199657U (en) * 2014-09-15 2015-03-11 中国建筑第八工程局有限公司 The construction operation platform of irregular ceiling
CN104790644A (en) * 2015-04-30 2015-07-22 天津二建建筑工程有限公司 Extending and contracting sliding support frame for roof decorative bottom boards
CN105604349A (en) * 2015-11-24 2016-05-25 江苏华海钢结构有限公司 Movable steel structure bus station
CN205296905U (en) * 2015-12-28 2016-06-08 青岛金盾石化集团有限公司 Frame construction rainshelter
CN205314242U (en) * 2016-01-11 2016-06-15 四川省第十五建筑有限公司 Job site ground many function combination formula protection canopy
CN105735477A (en) * 2016-03-23 2016-07-06 广州五羊钢结构有限公司 Latticed shell unit block and manufacturing method thereof
CN106223595A (en) * 2016-08-10 2016-12-14 中国中元国际工程有限公司 A kind of rack high altitude bulk sliding platform and high altitude bulk construction method
CN206128600U (en) * 2016-08-31 2017-04-26 广西建工集团第五建筑工程有限责任公司 Mobilizable steel construction high altitude operation platform
CN206290016U (en) * 2016-12-07 2017-06-30 中铁上海设计院集团有限公司 A kind of railway station building and its platform canopy structure
CN207538522U (en) * 2017-12-01 2018-06-26 江苏沪宁钢机股份有限公司 A kind of safety-type platform canopy station

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101440667A (en) * 2008-07-25 2009-05-27 中铁四局集团有限公司 Mounting method for wide span single layer rain shed reticulated shell structure
CN201460279U (en) * 2009-04-30 2010-05-12 鲁海波 Canopy
EP2317022A2 (en) * 2009-10-08 2011-05-04 MSB-Management GmbH Platform covering and method of erection
CN204199657U (en) * 2014-09-15 2015-03-11 中国建筑第八工程局有限公司 The construction operation platform of irregular ceiling
CN104790644A (en) * 2015-04-30 2015-07-22 天津二建建筑工程有限公司 Extending and contracting sliding support frame for roof decorative bottom boards
CN105604349A (en) * 2015-11-24 2016-05-25 江苏华海钢结构有限公司 Movable steel structure bus station
CN205296905U (en) * 2015-12-28 2016-06-08 青岛金盾石化集团有限公司 Frame construction rainshelter
CN205314242U (en) * 2016-01-11 2016-06-15 四川省第十五建筑有限公司 Job site ground many function combination formula protection canopy
CN105735477A (en) * 2016-03-23 2016-07-06 广州五羊钢结构有限公司 Latticed shell unit block and manufacturing method thereof
CN106223595A (en) * 2016-08-10 2016-12-14 中国中元国际工程有限公司 A kind of rack high altitude bulk sliding platform and high altitude bulk construction method
CN206128600U (en) * 2016-08-31 2017-04-26 广西建工集团第五建筑工程有限责任公司 Mobilizable steel construction high altitude operation platform
CN206290016U (en) * 2016-12-07 2017-06-30 中铁上海设计院集团有限公司 A kind of railway station building and its platform canopy structure
CN207538522U (en) * 2017-12-01 2018-06-26 江苏沪宁钢机股份有限公司 A kind of safety-type platform canopy station

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110952786A (en) * 2019-12-25 2020-04-03 中建国厦集团股份有限公司 Truss structure and installation method thereof
CN110952786B (en) * 2019-12-25 2022-07-15 中建国厦集团股份有限公司 Truss structure and installation method thereof
CN113152807A (en) * 2021-04-08 2021-07-23 中建铁路投资建设集团有限公司 Construction method of circular arch-shaped hyperbolic canopy structure
CN113152807B (en) * 2021-04-08 2022-08-26 中建铁路投资建设集团有限公司 Construction method of circular arch-shaped hyperbolic canopy structure
CN113833292A (en) * 2021-05-28 2021-12-24 中铁五局集团建筑工程有限责任公司 Reconstruction method of station canopy
CN114232915A (en) * 2021-12-31 2022-03-25 中铁五局集团有限公司 Method for assembling canopy hanging sheet units of roof of station at traffic hub site
CN114232901A (en) * 2021-12-31 2022-03-25 中铁五局集团有限公司 Construction method of steel structure canopy roof curtain wall of traffic hub station platform
CN114250997A (en) * 2021-12-31 2022-03-29 中铁五局集团有限公司 Construction method of platform steel structure main body of traffic junction
CN117365135A (en) * 2023-12-05 2024-01-09 北京建工集团有限责任公司 Temporary support frame for steel truss installation and steel truss construction method
CN117365135B (en) * 2023-12-05 2024-03-19 北京建工集团有限责任公司 Temporary support frame for steel truss installation and steel truss construction method

Also Published As

Publication number Publication date
CN107816223B (en) 2023-07-28

Similar Documents

Publication Publication Date Title
CN107816223A (en) A kind of safety and stability type platform canopy station and its installation method
CN102352604B (en) Truss sheet unit of steel truss girder, steel truss girder structure and mounting method thereof
CN106760529B (en) Roof steel truss sliding assembly construction platform and installation method
CN208430687U (en) Self-anchored type suspended-cable structure support construction and system
CN207538522U (en) A kind of safety-type platform canopy station
CN205935200U (en) Steel structural framework XI type supports structure
CN107939075A (en) A kind of safety and stability type platform column awning and its installation method
CN212535710U (en) A no post structure that is used for single hunch to stride secretly dig station greatly
CN205775852U (en) A kind of active force conversion support for steel structure support moulding bed top
CN114809699A (en) Construction method of assembly type outer facade enclosure system for reconstruction of upper part of super high-rise building
CN105507427A (en) Mounting method for extending single-layer latticed shell structure
CN106436550B (en) A kind of spacial special-shaped arch combined bridge structure of two Span Continuous
CN107419806A (en) A kind of grid solid beam-string structure system across X-type greatly and its construction method
CN207538439U (en) A kind of stable type operating platform
CN109505225B (en) Safe and stable suspension bridge and construction process thereof
CN104818867B (en) A kind of mobile assembling public lavatory
CN202913338U (en) Steel truss full-welded truss piece
CN205557290U (en) Monolithic purlin formula annular passenger footbridge
CN205574216U (en) Many portable wind and rain canopies of point type
CN211848997U (en) Semi-span pier beam-lifting machine for bridge on high pier column prefabricated T beam in limited space
CN107916804A (en) A kind of safety and stability type roof truss without columns and its installation method
CN206428815U (en) The firm sunlight shed of fixed structure
CN205558305U (en) Steel gallery promotes reinforcing apparatus
CN107939034A (en) A kind of safety and stability type operating platform and assembling method
CN206319622U (en) A kind of roof system steel truss sliding rail

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 214200 Baijia village, Zhangzhu Town, Yixing City, Wuxi City, Jiangsu Province

Applicant after: JiangSu HuNing Steel Structure & Machinery Co.,Ltd.

Address before: 214200 Zhang Zhu Zhen Bai Jia Cun, Yixing City, Wuxi City, Jiangsu Province

Applicant before: JiangSu HuNing Steel Structure & Machinery Co.,Ltd.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant