CN114227280A - Central air conditioning inner unit shell forming line - Google Patents

Central air conditioning inner unit shell forming line Download PDF

Info

Publication number
CN114227280A
CN114227280A CN202111663681.6A CN202111663681A CN114227280A CN 114227280 A CN114227280 A CN 114227280A CN 202111663681 A CN202111663681 A CN 202111663681A CN 114227280 A CN114227280 A CN 114227280A
Authority
CN
China
Prior art keywords
central air
wall
fixedly connected
module
air conditioner
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111663681.6A
Other languages
Chinese (zh)
Inventor
袁登国
汤德斌
倪永胜
李祥
高宗贵
于伟
刘宸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Aspire Industrial Technology Co ltd
Original Assignee
Anhui Aspire Industrial Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Aspire Industrial Technology Co ltd filed Critical Anhui Aspire Industrial Technology Co ltd
Priority to CN202111663681.6A priority Critical patent/CN114227280A/en
Publication of CN114227280A publication Critical patent/CN114227280A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P23/00Machines or arrangements of machines for performing specified combinations of different metal-working operations not covered by a single other subclass
    • B23P23/06Metal-working plant comprising a number of associated machines or apparatus
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23QDETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
    • B23Q7/00Arrangements for handling work specially combined with or arranged in, or specially adapted for use in connection with, machine tools, e.g. for conveying, loading, positioning, discharging, sorting
    • B23Q7/003Cyclically moving conveyors
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23QDETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
    • B23Q7/00Arrangements for handling work specially combined with or arranged in, or specially adapted for use in connection with, machine tools, e.g. for conveying, loading, positioning, discharging, sorting
    • B23Q7/04Arrangements for handling work specially combined with or arranged in, or specially adapted for use in connection with, machine tools, e.g. for conveying, loading, positioning, discharging, sorting by means of grippers

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Optics & Photonics (AREA)
  • Duct Arrangements (AREA)

Abstract

The invention relates to the technical field of central air conditioner production lines and discloses a central air conditioner inner unit shell forming line which comprises a belt conveying line, a punching module, a bending module, a welding module and a quality inspection module, wherein the punching module, the bending module, the welding module and the quality inspection module are sequentially and respectively arranged on two sides of the belt conveying line, two supporting plates are arranged on the outer side of the feeding end of the belt conveying line, and the upper surfaces of the two supporting plates are fixedly connected with a connecting plate together. This central air conditioning inner unit shell shaping line can accomplish the automatic transportation of central air conditioning inner unit shell semi-manufactured goods through the belt transfer chain, and has the ability of central air conditioning inner unit shell raw materials iron plate automatic feeding, and labour saving and time saving not only can effectively improve central air conditioning inner unit shell shaping line degree of automation, can also effectively reduce staff's intensity of labour to can improve the travelling comfort of staff's operation, and can improve central air conditioning inner unit shell contour machining's efficiency and convenience.

Description

Central air conditioning inner unit shell forming line
Technical Field
The invention relates to the technical field of central air conditioner production lines, in particular to a forming line for an inner unit shell of a central air conditioner.
Background
The central air conditioning system is composed of one or more cold and heat source systems and a plurality of air conditioning systems, and the system is different from the traditional refrigerant type air conditioner, and the air is intensively treated (such as a single machine, VRV) to achieve the comfort requirement. The principle of liquid gasification refrigeration is adopted to provide the required cold energy for the air conditioning system so as to offset the heat load of the indoor environment; the heating system provides required heat for the air conditioning system, and is used for offsetting indoor environment cooling and heating load, the central air conditioner is produced, the shell of the central air conditioner inner and outer machine used for assembling equipment needs to be processed, the iron plate needs to be punched when the shell of the central air conditioner inner machine is formed, then the punched iron plate is bent, then the bent shell is welded and fixed, and finally whether the shell is qualified is detected through work.
Each processing module of current central air conditioning inner shell shaping line distributes comparatively dispersedly, needs the staff frequently to transport central air conditioning inner shell semi-manufactured goods, and in addition, each machine-shaping position all needs the staff to bow when getting the material and takes, wastes time and energy, not only influences central air conditioning inner shell shaping processing's efficiency and convenience, still increases staff's intensity of labour to and the travelling comfort of staff's operation on the influence central air conditioning inner shell shaping line.
Disclosure of Invention
Technical problem to be solved
Aiming at the defects of the prior art, the invention provides a forming line of a shell of an inner machine of a central air conditioner, which can finish the automatic transfer of a semi-finished product of the shell of the inner machine of the central air conditioner through a belt conveying line, and has the capability of automatically feeding the raw material iron plate of the shell of the central air conditioner indoor unit, saves time and labor, not only can effectively improve the automation degree of the shell forming line of the central air conditioner indoor unit, but also can effectively reduce the labor intensity of workers and improve the operation comfort of the workers, and can improve the efficiency and the convenience of the forming processing of the shell of the central air-conditioning inner unit, solves the problem that the processing modules of the forming line of the shell of the central air-conditioning inner unit are distributed dispersedly, and all need the staff to bow when getting material in each machine-shaping position and take, not only influence central air conditioning inner unit shell contour machining's efficiency and convenience, still increase staff intensity of labour's problem.
(II) technical scheme
In order to realize the purposes that the shell forming line of the central air conditioner inner unit can finish the automatic transfer of a semi-finished product of the shell of the central air conditioner inner unit and has the capacity of automatically feeding a raw material iron plate of the shell of the central air conditioner inner unit, the automation degree of the shell forming line of the central air conditioner inner unit can be effectively improved, the labor intensity of workers can be effectively reduced, the operation comfort of the workers can be improved, and the shell forming processing efficiency and the convenience of the central air conditioner inner unit can be improved, the invention provides the following technical scheme: a forming line for an inner machine shell of a central air conditioner comprises a belt conveying line, punching modules, bending modules, welding modules and quality inspection modules, wherein the punching modules, the bending modules, the welding modules and the quality inspection modules are sequentially and respectively arranged on two sides of the belt conveying line, two supporting plates are arranged on the outer side of the feeding end of the belt conveying line, the upper surfaces of the two supporting plates are fixedly connected with a connecting plate together, the lower surface of the connecting plate is provided with a round hole, the hole wall of the round hole is fixedly connected with a first electric push rod, the bottom end of the first electric push rod is movably connected with two U-shaped rods, the rod walls of the two U-shaped rods are fixedly connected with a hollow block together, the lower surface of the hollow block is provided with a plurality of through holes, the hole wall of each through hole is fixedly connected with a valve, the bottom end of each valve is fixedly communicated with a sucker, and the inner wall of the hollow block is movably connected with a rubber piston, the inner wall fixedly connected with fixed plate of rubber piston, the round hole has all been seted up to the upper surface four corners department of hollow piece, and the pore wall fixedly connected with antifriction bearing of round hole, the inner wall fixedly connected with screw thread section of thick bamboo of antifriction bearing, the inner wall threaded connection of screw thread section of thick bamboo has the screw rod, the bottom of screw rod with the upper surface fixed connection of fixed plate, the upper surface fixed connection of hollow piece has actuating mechanism.
Preferably, the driving mechanism comprises a motor fixedly connected with the upper surface of the hollow block, the output end of the motor is fixedly connected with a driving helical gear, a driven helical gear is fixedly sleeved on the outer wall of one of the threaded cylinders, the outer wall of the driven helical gear is vertically meshed with the outer wall of the driving helical gear, a plurality of sprockets are fixedly sleeved on the outer wall of each threaded cylinder, and a transmission chain is sleeved on the outer wall of each sprocket in a common meshed mode.
Preferably, the inner side wall of one of the supporting plates is fixedly connected with a supporting block, the outer wall of the supporting block is provided with a through hole, the hole wall of the through hole is fixedly connected with a second electric push rod, the moving end of the second electric push rod is fixedly connected with a fixed block, and the lower surface of the fixed block is fixedly connected with the upper surface of the hollow block.
Preferably, the lower surfaces of the two supporting plates are fixedly connected with a bottom plate, and the corners of the two sides of the upper surface of the bottom plate are provided with fixing through holes.
Preferably, the outer wall fixedly connected with air purification equipment that the belt conveying line is located welding module department.
Preferably, the upper surface of the hollow block is fixedly connected with a plurality of supporting bars, and the upper surfaces of the supporting bars are movably connected with the lower surface of the transmission chain.
Preferably, the outer wall of the bottom end of the first electric push rod is provided with two circular moving holes movably connected with the outer wall of the U-shaped rod.
(III) advantageous effects
Compared with the prior art, the invention provides a forming line for the shell of the inner unit of the central air conditioner, which has the following beneficial effects:
this central air conditioning inner unit shell shaping line through being provided with first electric putter, second electric putter, actuating mechanism and belt transfer chain, at first arranges punching a hole module, the module of bending, welding module and quality inspection module respectively in the shaping of central air conditioning inner unit shell in proper order the both sides of belt transfer chain are carried the casing semi-manufactured goods through the belt transfer chain, need not the staff and frequently transports labour saving and time saving.
In addition, when the raw material iron plate of the shell of the inner machine of the central air conditioner is initially processed, firstly, a corresponding valve is opened according to the position and the shape of the raw material iron plate, then, a first electric push rod is started, the first electric push rod pushes a hollow block to be close to the raw material iron plate of the shell of the inner machine of the central air conditioner, a sucker is contacted with the raw material iron plate of the shell of the inner machine of the central air conditioner, then, a driving mechanism is started, a plurality of threaded cylinders simultaneously rotate in the same direction, the threaded cylinders rotate to enable a screw to move upwards, the screw drives a rubber piston to move upwards through a fixing plate, the rubber piston moves upwards to suck air at the bottom of the hollow block, further, the sucker is in a negative pressure environment, then, the sucker tightly sucks the raw material iron plate of the shell of the inner machine of the central air conditioner by utilizing the pressure, then, the hollow block is pulled upwards through the first electric push rod, the hollow block is pushed on the first electric push rod through a U-shaped rod, and the raw material iron plate of the shell of the inner machine of the central air conditioner is positioned above a belt conveying line, at last the motor that reverses again makes central air conditioning inner unit shell raw materials iron plate drop on the belt conveyor line, accomplish automatic feeding, and need not staff's the hard taking of bowing, time saving and labor saving, this mechanism can accomplish the automatic transportation of central air conditioning inner unit shell semi-manufactured goods through the belt conveyor line, and have the ability of central air conditioning inner unit shell raw materials iron plate automatic feeding, and is time saving and labor saving, not only can effectively improve central air conditioning inner unit shell shaping line degree of automation, can also effectively reduce staff's intensity of labour, and can improve the travelling comfort of staff's operation, and can improve central air conditioning inner unit shell shaping processing's efficiency and convenience.
Drawings
FIG. 1 is a schematic structural diagram of a forming line of an inner unit casing of a central air conditioner, according to the present invention;
FIG. 2 is a schematic diagram of a partial side view of a forming line of an inner unit casing of a central air conditioner according to the present invention;
FIG. 3 is a schematic structural view of a portion A of a forming line of an inner unit casing of a central air conditioner according to the present invention;
fig. 4 is a schematic structural diagram of a part B of a forming line of an inner unit casing of a central air conditioner.
In the figure: the device comprises a belt conveying line 1, a punching module 2, a bending module 3, a welding module 4, a quality inspection module 5, a supporting plate 6, a connecting plate 7, a first electric push rod 8, a driving mechanism 9, a motor 91, a driving bevel gear 92, a driven bevel gear 93, a chain wheel 94, a 95 transmission chain, a 10U-shaped rod, a hollow block 11, a valve 12, a sucking disc 13, a rubber piston 14, a fixing plate 15, a rolling bearing 16, a threaded cylinder 17, a screw rod 18, a supporting block 19, a second electric push rod 20, a fixing block 21, a bottom plate 22, an air purification device 23, a supporting bar 24 and a circular moving hole 25.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-4, a forming line for an inner unit shell of a central air conditioner comprises a belt conveying line 1, a punching module 2, a bending module 3, a welding module 4 and a quality inspection module 5, wherein the punching module 2, the bending module 3, the welding module 4 and the quality inspection module 5 are sequentially and respectively arranged at two sides of the belt conveying line 1, two support plates 6 are arranged at the outer side of the feeding end of the belt conveying line 1, a connecting plate 7 is fixedly connected to the upper surfaces of the two support plates 6 together, a circular hole is formed in the lower surface of the connecting plate 7, a first electric push rod 8 is fixedly connected to the wall of the circular hole, two U-shaped rods 10 are movably connected to the bottom end of the first electric push rod 8, a hollow block 11 is fixedly connected to the rod walls of the two U-shaped rods 10 together, a plurality of through holes are formed in the lower surface of the hollow block 11, a valve 12 is fixedly connected to the wall of the through hole, and a suction cup 13 is fixedly connected to the bottom end of the valve 12, the inner wall swing joint of hollow block 11 has rubber piston 14, rubber piston 14's inner wall fixedly connected with fixed plate 15, and the round hole has all been seted up to the upper surface four corners department of hollow block 11, and the pore wall fixedly connected with antifriction bearing 16 of round hole, antifriction bearing 16's inner wall fixedly connected with screw thread section of thick bamboo 17, and the inner wall threaded connection of screw thread section of thick bamboo 17 has screw rod 18, and the bottom of screw rod 18 is connected with the upper surface fixed of fixed plate 15, and the last fixed surface of hollow block 11 is connected with actuating mechanism 9.
The driving mechanism 9 comprises a motor 91 fixedly connected with the upper surface of the hollow block 11, the output end of the motor 91 is fixedly connected with a driving bevel gear 92, the outer wall of one of the threaded cylinders 17 is fixedly sleeved with a driven helical gear 93, the outer wall of the driven helical gear 93 is vertically meshed with the outer wall of the driving helical gear 92, the outer walls of a plurality of threaded cylinders 17 are fixedly sleeved with chain wheels 94, the outer walls of the chain wheels 94 are jointly meshed and sleeved with a transmission chain 95, the motor 91 of the mechanism rotates the thread cylinders 17 through the driving bevel gear 92 and the driven bevel gear 93, the thread cylinders 17 simultaneously rotate in the same direction through the chain wheel 94 and the transmission chain 9, the thread cylinders 17 rotate to move the screw rods 18 upwards, the screw rods 18 drive the rubber pistons 14 to move upwards through the fixing plates 15, the rubber pistons 14 move upwards to suck air at the bottom of the hollow blocks 11, further, the sucker 13 is in a negative pressure environment, and the sucker 13 tightly sucks the raw material iron plate of the shell of the indoor unit of the central air conditioner by utilizing the pressure.
Inside wall fixedly connected with supporting shoe 19 of one of them backup pad 6, the through-hole has been seted up to supporting shoe 19's outer wall, and the pore wall fixedly connected with second electric putter 20 of through-hole, second electric putter 20's removal end fixedly connected with fixed block 21, the lower surface of fixed block 21 and the last fixed surface of hollow block 11 are connected, second electric putter 20 can promote hollow block 11 material loading automatically, time saving and labor saving have reduced staff's intensity of labour, improve central air conditioning inner unit shell shaping line automation degree simultaneously.
The equal fixedly connected with bottom plate 22 of lower surface of two backup pads 6, fixing hole has all been seted up to the upper surface both sides corner of bottom plate 22, and bottom plate 22 is fixed can improve the stability that backup pad 6 placed.
The outer wall fixedly connected with air purification equipment 23 that belt conveyor line 1 is located welding module 4 department, and air purification equipment 23 can purify the air of welding module 4 department, avoids the smog polluted environment that the welding produced.
The upper surface fixed connection of hollow block 11 has a plurality of support bars 24, and the upper surface of a plurality of support bars 24 and drive chain 95's lower surface swing joint, support bar 24 can support drive chain 95, places drive chain 95 and breaks away from sprocket 94, the reliability of guarantee sprocket 94 work.
Two circular removal holes 25 with U-shaped pole 10 outer wall swing joint are seted up to first electric putter 8's bottom outer wall, and circular removal hole 25 can make things convenient for U-shaped pole 10 to slide on first electric putter 8, and then makes things convenient for central air conditioning inner unit shell raw materials iron plate material loading.
In conclusion, in the forming line of the shell of the inner machine of the central air conditioner, firstly, a punching module 2, a bending module 3, a welding module 4 and a quality inspection module 5 in the forming of the shell of the inner machine of the central air conditioner are sequentially and respectively arranged at two sides of a belt conveying line 1, a semi-finished shell is conveyed through the belt conveying line 1, frequent transportation by workers is not needed, time and labor are saved, in addition, in the initial processing of the raw material iron plate of the shell of the inner machine of the central air conditioner, firstly, the raw material iron plate of the shell of the inner machine of the central air conditioner is conveyed between two supporting plates 6 through a forklift, then, a corresponding valve 12 is opened according to the position and the shape of the raw material iron plate, then, a first electric push rod 8 is started, the hollow block 11 is pushed by the first electric push rod 8 to be close to the raw material iron plate of the shell of the inner machine of the central air conditioner, a sucker 13 is contacted with the raw material iron plate of the shell of the central air conditioner, then, a driving mechanism 9 is started, and a motor 91 enables a thread barrel 17 to rotate through a driving bevel gear 92 and a driven bevel gear 93, the plurality of thread cylinders 17 simultaneously rotate in the same direction through the chain wheel 94 and the transmission chain 9, the thread cylinders 17 rotate to enable the screw rods 18 to move upwards, the screw rods 18 drive the rubber pistons 14 to move upwards through the fixing plates 15, the rubber pistons 14 move upwards to suck air at the bottoms of the hollow blocks 11, further the suckers 13 are in a negative pressure environment, the suckers 13 tightly suck the shell raw material iron plates of the central air-conditioning indoor units by using pressure intensity, then the hollow blocks 11 are pulled up through the first electric push rods 8, the hollow blocks 11 drive the shell raw material iron plates of the central air-conditioning indoor units to rise to the height of the belt conveying line 1, next, the second electric push rods 20 are started, the second electric push rods 20 push the hollow blocks 11 through the fixing blocks 21, the hollow blocks 11 slide in the circular moving holes 25 of the first electric push rods 8 through the U-shaped rods 10, the shell raw material iron plates of the central air-conditioning indoor units are located above the belt conveying line 1, and finally the rubber pistons 14 move downwards through the reversing motor 91, rubber piston 14 moves down and blows the air and send into belt conveyor 1 to central air conditioning inner unit shell raw materials iron plate on, accomplish automatic feeding, and need not that the staff bends to difficultly take, time saving and labor saving, this mechanism can accomplish the automatic transportation of central air conditioning inner unit shell semi-manufactured goods through the belt conveyor, and has the ability of central air conditioning inner unit shell raw materials iron plate automatic feeding, and is time saving and labor saving, not only can effectively improve central air conditioning inner unit shell shaping line automation degree, can also effectively reduce staff's intensity of labour, and can improve the travelling comfort of staff's operation, and can improve central air conditioning inner unit shell shaping processing's efficiency and convenience.
It is to be noted that the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a central air conditioning inner unit shell shaping line, includes belt conveyor line (1), the module of punching a hole (2), the module of bending (3), welding module (4) and quality inspection module (5), its characterized in that: the punching module (2), the bending module (3), the welding module (4) and the quality inspection module (5) are sequentially and respectively arranged on two sides of the belt conveying line (1), two supporting plates (6) are arranged on the outer side of the feeding end of the belt conveying line (1), the upper surfaces of the two supporting plates (6) are fixedly connected with a connecting plate (7) together, a round hole is formed in the lower surface of the connecting plate (7), a first electric push rod (8) is fixedly connected with the hole wall of the round hole, two U-shaped rods (10) are movably connected with the bottom end of the first electric push rod (8), hollow blocks (11) are fixedly connected with the rod walls of the two U-shaped rods (10) together, a plurality of through holes are formed in the lower surface of each hollow block (11), a valve (12) is fixedly connected with the hole wall of each through hole, and a sucker (13) is communicated with the bottom end of the valve (12), the inner wall swing joint of hollow block (11) has rubber piston (14), the inner wall fixedly connected with fixed plate (15) of rubber piston (14), the round hole has all been seted up to the upper surface four corners department of hollow block (11), and the pore wall fixedly connected with antifriction bearing (16) of round hole, the inner wall fixedly connected with screw thread section of thick bamboo (17) of antifriction bearing (16), the inner wall threaded connection of screw thread section of thick bamboo (17) has screw rod (18), the bottom of screw rod (18) with the last fixed surface of fixed plate (15) is connected, the last fixed surface of hollow block (11) is connected with actuating mechanism (9).
2. The forming line for the outer shell of the inner machine of the central air conditioner as claimed in claim 1, wherein: actuating mechanism (9) include with hollow block (11) upper surface fixed connection's motor (91), the output fixedly connected with of motor (91) initiative helical gear (92), one of them the outer wall of a screw thread section of thick bamboo (17) is fixed to be cup jointed driven helical gear (93), the outer wall of driven helical gear (93) meshes with the outer wall of initiative helical gear (92) is perpendicular, and is a plurality of sprocket (94) has all been fixed to be cup jointed to the outer wall of a screw thread section of thick bamboo (17), and is a plurality of drive chain (95) has been cup jointed in the outer wall joint jointly of sprocket (94).
3. The forming line for the outer shell of the inner machine of the central air conditioner as claimed in claim 1, wherein: the inner side wall of one of the supporting plates (6) is fixedly connected with a supporting block (19), a through hole is formed in the outer wall of the supporting block (19), a second electric push rod (20) is fixedly connected to the hole wall of the through hole, a fixing block (21) is fixedly connected to the moving end of the second electric push rod (20), and the lower surface of the fixing block (21) is fixedly connected with the upper surface of the hollow block (11).
4. The forming line for the outer shell of the inner machine of the central air conditioner as claimed in claim 1, wherein: two the equal fixedly connected with bottom plate (22) of lower surface of backup pad (6), fixing hole has all been seted up to the upper surface both sides corner of bottom plate (22).
5. The forming line for the outer shell of the inner machine of the central air conditioner as claimed in claim 1, wherein: the outer wall fixedly connected with air purification equipment (23) that belt conveyor line (1) is located welding module (4) department.
6. The forming line for the outer shell of the inner machine of the central air conditioner as claimed in claim 2, wherein: the upper surface fixed connection of hollow block (11) has a plurality of support bars (24), and is a plurality of the upper surface of support bar (24) and the lower surface swing joint of drive chain (95).
7. The forming line for the outer shell of the inner machine of the central air conditioner as claimed in claim 1, wherein: the outer wall of the bottom end of the first electric push rod (8) is provided with two circular moving holes (25) movably connected with the outer wall of the U-shaped rod (10).
CN202111663681.6A 2021-12-31 2021-12-31 Central air conditioning inner unit shell forming line Pending CN114227280A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111663681.6A CN114227280A (en) 2021-12-31 2021-12-31 Central air conditioning inner unit shell forming line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111663681.6A CN114227280A (en) 2021-12-31 2021-12-31 Central air conditioning inner unit shell forming line

Publications (1)

Publication Number Publication Date
CN114227280A true CN114227280A (en) 2022-03-25

Family

ID=80744988

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111663681.6A Pending CN114227280A (en) 2021-12-31 2021-12-31 Central air conditioning inner unit shell forming line

Country Status (1)

Country Link
CN (1) CN114227280A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11207683A (en) * 1998-01-29 1999-08-03 Amada Co Ltd Work origin positioning method in plate material working machine and device thereof
DE4244965C2 (en) * 1992-01-17 2003-02-13 Sillner Kamilla Preparation-selection-packaging appts. for electrical components
CN102205481A (en) * 2011-01-20 2011-10-05 安徽鲲鹏装备模具制造有限公司 Method for automatically forming encircling plate of refrigerator
CN106041376A (en) * 2016-08-04 2016-10-26 苏州易升电梯部件有限公司 Welding production line of elevator door plates
CN205763461U (en) * 2016-05-27 2016-12-07 江苏精一电气科技有限公司 Power distribution cabinet flanging automatic fetching device
CN111384201A (en) * 2018-12-28 2020-07-07 北京铂阳顶荣光伏科技有限公司 Bending apparatus and bending method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4244965C2 (en) * 1992-01-17 2003-02-13 Sillner Kamilla Preparation-selection-packaging appts. for electrical components
JPH11207683A (en) * 1998-01-29 1999-08-03 Amada Co Ltd Work origin positioning method in plate material working machine and device thereof
CN102205481A (en) * 2011-01-20 2011-10-05 安徽鲲鹏装备模具制造有限公司 Method for automatically forming encircling plate of refrigerator
CN205763461U (en) * 2016-05-27 2016-12-07 江苏精一电气科技有限公司 Power distribution cabinet flanging automatic fetching device
CN106041376A (en) * 2016-08-04 2016-10-26 苏州易升电梯部件有限公司 Welding production line of elevator door plates
CN111384201A (en) * 2018-12-28 2020-07-07 北京铂阳顶荣光伏科技有限公司 Bending apparatus and bending method

Similar Documents

Publication Publication Date Title
CN111112483B (en) Convenient feeding device for sheet metal machining
CN211394287U (en) Multistage unloader of tempering furnace for glass production and processing
CN114227280A (en) Central air conditioning inner unit shell forming line
CN212558411U (en) Automatic capping machine for electronic connectors
CN210936262U (en) Belt cleaning device is used in processing of accurate micropore copper pipe
CN206156264U (en) Flat tub of automatic feeding device
CN209717710U (en) A kind of intelligent robot carried for cargo
CN215363301U (en) Heat conduction cooling conveyer belt
CN211312009U (en) Automatic corrugated board oiling machine
CN213386674U (en) Feeding conveying equipment and plate manufacturing system using same
CN211055932U (en) Annular warehousing system
CN221270656U (en) Sheet metal part surface treatment device
CN221270106U (en) Automatic welding device for production and processing of low-voltage power distribution cabinet
CN212684708U (en) Processing device for membrane grid cloth
CN217168797U (en) Plastic product line guillootine
CN221050831U (en) Conveying mechanism for processing aluminum evaporator accessories
CN215557281U (en) Full-automatic grain storage stacking equipment
CN215260196U (en) Transmission device and air conditioner outdoor unit
CN213446074U (en) Lifting device for logistics cargo handling
CN220011211U (en) Novel stereoscopic warehouse structure
CN214054255U (en) Shaft sleeve production system
CN220347048U (en) Automatic stamping device for steel-aluminum mixed material
CN218360905U (en) Hardware cleaning device
CN212602661U (en) Automatic stripping and slicing device for hollow bricks
CN217863050U (en) Turnover device for processing packaging bags

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination