防沉降和抗滑移的桥梁锥坡施工方法 Download PDFInfo
- Publication number
- CN114032778A CN114032778A CN202111412676.8A CN202111412676A CN114032778A CN 114032778 A CN114032778 A CN 114032778A CN 202111412676 A CN202111412676 A CN 202111412676A CN 114032778 A CN114032778 A CN 114032778A
- Authority
- CN
- China
- Prior art keywords
- slope
- layer
- bridge
- construction method
- settling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/20—Securing of slopes or inclines
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/18—Placing by vibrating
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Architecture (AREA)
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
本发明公开了一种防沉降和抗滑移的桥梁锥坡施工方法,包括步骤,S1、浇筑桥台时沿垂直和水平方向分布预埋拉杆,对拉杆外露端做防锈蚀处理;S2、铺设一层一定厚度的回填土并碾压密实,靠近桥台区域采用人工或小型设备夯实,靠近路堤边坡区域采用挖台阶处理,将整板土体全面压实合格;S3、在当层回填土的顶面铺设柔性的连接筋、外侧面安装当层的坡面板,将连接筋的一端与拉杆连接、另一端与坡面板连接,使连接筋处于紧绷状态;S4、重复步骤S2和步骤S3,逐层往上施工,直至锥坡填筑完成,然后在坡面板外侧面上分布安装肋柱,单根肋柱同时卡在所有层坡面板的外侧面上。能防止锥坡沉降和滑移,抗震好,节约成本。
Description
技术领域
本发明属于土木工程施工领域,具体涉及一种防沉降和抗滑移的桥梁锥坡施工方法。
背景技术
在桥梁锥坡施工中,通常在桥台强度达到设计强度75%时,方可先填筑台背,待桥梁主体结构施工完成后,再填筑锥坡,锥坡采用分层填筑,分层碾压;在上述桥梁锥坡施工中,一般存在以下问题:1)桥台与锥坡接触面碾压处理不到位;2)土体锥坡体量较小,与桥台和路基的有效接触面较小,整体性较差,加长时间受流水冲刷,会使锥坡产生沉降变形和整体滑移,严重影响路堤边坡,直至路堤整体。
发明内容
本发明的目的是提供一种防沉降和抗滑移的桥梁锥坡施工方法,能防止锥坡沉降和滑移,抗震好,节约成本。
本发明所采用的技术方案是:
一种防沉降和抗滑移的桥梁锥坡施工方法,包括步骤:
S1、浇筑桥台时沿垂直和水平方向分布预埋拉杆,对拉杆外露端做防锈蚀处理;
S2、铺设一层一定厚度的回填土并碾压密实,靠近桥台区域采用人工或小型设备夯实,靠近路堤边坡区域采用挖台阶处理,将整板土体全面压实合格;
S3、在当层回填土的顶面铺设柔性的连接筋、外侧面安装当层的坡面板,将连接筋的一端与拉杆连接、另一端与坡面板连接,使连接筋处于紧绷状态;
S4、重复步骤S2和步骤S3,逐层往上施工,直至锥坡填筑完成,然后在坡面板外侧面上分布安装肋柱,单根肋柱同时卡在所有层坡面板的外侧面上。
优选地,连接筋为钢索或钢链。
优选地,连接筋和拉杆外露端在连接拉紧后,再套上一层防水保护材料。
优选地,拉杆预埋时与桥台钢筋错开不接触。
优选地,浇筑桥台时拉杆按照垂直方向15cm间距、水平方向50cm间距分布预埋。
优选地,每层回填土厚15cm。
优选地,肋柱以1m间距分布。
本发明的有益效果是:
分布的拉杆可以有效抵抗锥坡面与桥台面由于材料不同和自然沉降所形成的剪力面,防止锥坡的沉降;拉杆和连接筋将桥台与坡面板连接,从而将土体锥坡形成一个完整的整体,可以有效的解决桥台与土体锥坡的不均匀沉降问题,增加了锥坡使用年限,可以有效的抵抗流水对锥坡冲刷造成的滑移破坏,保护了路堤边坡不受冲刷,避免雨水冲刷造成的护坡下空洞,土体流失,保证锥坡土体质量;连接筋采用柔性件,填土引起的地基变形对其影响比其他结构物小,是很好的抗震结构;肋柱提高了坡面板的整体性,确保坡面板的牢固与锥坡的整体稳定性,使锥坡整体具有了抗滑移的能力,同时使锥坡更加安全可靠,抗冲刷耐久性好,可以省去护坡的施工,节约成本。
附图说明
图1是本发明实施例中桥梁锥坡施工后的正剖图。
图2是本发明实施例中桥梁锥坡施工后的俯剖图。
图中:1-拉杆;2-连接筋;3-桥台;4-坡面板;5-肋柱;6-路堤边坡;7-回填土。
具体实施方式
下面结合附图和实施例对本发明作进一步的说明。
一种防沉降和抗滑移的桥梁锥坡施工方法,如图1和图2所述,包括步骤:S1、浇筑桥台3时沿垂直和水平方向分布预埋拉杆1,对拉杆1外露端做防锈蚀处理;S2、铺设一层一定厚度的回填土7并碾压密实,靠近桥台3区域采用人工或小型设备夯实,靠近路堤边坡6区域采用挖台阶处理,将整板土体全面压实合格;S3、在当层回填土7的顶面铺设柔性的连接筋2、外侧面安装当层的坡面板4,将连接筋2的一端与拉杆1连接、另一端与坡面板4连接,使连接筋2处于紧绷状态;S4、重复步骤S2和步骤S3,逐层往上施工,直至锥坡填筑完成,然后在坡面板4外侧面上分布安装肋柱5,单根肋柱5同时卡在所有层坡面板4的外侧面上。
在本实施例中,连接筋2为钢索或钢链。
在本实施例中,连接筋2和拉杆1外露端在连接拉紧后,再套上一层防水保护材料。
在本实施例中,拉杆1预埋时与桥台3钢筋错开不接触。
在本实施例中,浇筑桥台3时拉杆1按照垂直方向15cm间距、水平方向50cm间距分布预埋,每层回填土7厚15cm,肋柱5以1m间距分布。
在本发明中,分布的拉杆1可以有效抵抗锥坡面与桥台面由于材料不同和自然沉降所形成的剪力面,防止锥坡的沉降;拉杆1和连接筋2将桥台3与坡面板4连接,从而将土体锥坡形成一个完整的整体,可以有效的解决桥台3与土体锥坡的不均匀沉降问题,增加了锥坡使用年限,可以有效的抵抗流水对锥坡冲刷造成的滑移破坏,保护了路堤边坡6不受冲刷,避免雨水冲刷造成的护坡下空洞,土体流失,保证锥坡土体质量;连接筋2采用柔性件,填土引起的地基变形对其影响比其他结构物小,是很好的抗震结构;肋柱5提高了坡面板4的整体性,确保坡面板4的牢固与锥坡的整体稳定性,使锥坡整体具有了抗滑移的能力,同时使锥坡更加安全可靠,抗冲刷耐久性好,可以省去护坡的施工,节约成本。
应当理解的是,对本领域普通技术人员来说,可以根据上述说明加以改进或变换,而所有这些改进和变换都应属于本发明所附权利要求的保护范围。
Claims (7)
1.一种防沉降和抗滑移的桥梁锥坡施工方法,其特征在于:包括步骤,
S1、浇筑桥台时沿垂直和水平方向分布预埋拉杆,对拉杆外露端做防锈蚀处理;
S2、铺设一层一定厚度的回填土并碾压密实,靠近桥台区域采用人工或小型设备夯实,靠近路堤边坡区域采用挖台阶处理,将整板土体全面压实合格;
S3、在当层回填土的顶面铺设柔性的连接筋、外侧面安装当层的坡面板,将连接筋的一端与拉杆连接、另一端与坡面板连接,使连接筋处于紧绷状态;
S4、重复步骤S2和步骤S3,逐层往上施工,直至锥坡填筑完成,然后在坡面板外侧面上分布安装肋柱,单根肋柱同时卡在所有层坡面板的外侧面上。
2.如权利要求1所述的防沉降和抗滑移的桥梁锥坡施工方法,其特征在于:连接筋为钢索或钢链。
3.如权利要求1所述的防沉降和抗滑移的桥梁锥坡施工方法,其特征在于:连接筋和拉杆外露端在连接拉紧后,再套上一层防水保护材料。
4.如权利要求1所述的防沉降和抗滑移的桥梁锥坡施工方法,其特征在于:拉杆预埋时与桥台钢筋错开不接触。
5.如权利要求1所述的防沉降和抗滑移的桥梁锥坡施工方法,其特征在于:浇筑桥台时拉杆按照垂直方向15cm间距、水平方向50cm间距分布预埋。
6.如权利要求1所述的防沉降和抗滑移的桥梁锥坡施工方法,其特征在于:每层回填土厚15cm。
7.如权利要求1所述的防沉降和抗滑移的桥梁锥坡施工方法,其特征在于:肋柱以1m间距分布。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111412676.8A CN114032778A (zh) | 2021-11-25 | 2021-11-25 | 防沉降和抗滑移的桥梁锥坡施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111412676.8A CN114032778A (zh) | 2021-11-25 | 2021-11-25 | 防沉降和抗滑移的桥梁锥坡施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN114032778A true CN114032778A (zh) | 2022-02-11 |
Family
ID=80145467
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202111412676.8A Pending CN114032778A (zh) | 2021-11-25 | 2021-11-25 | 防沉降和抗滑移的桥梁锥坡施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114032778A (zh) |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05140942A (ja) * | 1991-11-20 | 1993-06-08 | Maeda Kousen Kk | 盛土形成方法 |
KR20000006620A (ko) * | 1999-07-02 | 2000-02-07 | 이은수 | 분리형 보강토 옹벽 및 그 시공방법 |
KR20040076713A (ko) * | 2003-02-26 | 2004-09-03 | (주) 코리아에스이 | 영구앵커와 프리캐스트 콘크리트 패널을 이용한 옹벽 구조및 옹벽의 시공방법 |
CN201850505U (zh) * | 2010-11-18 | 2011-06-01 | 中交第一公路勘察设计研究院有限公司 | 一种防止桥头跳车的刚柔过渡结构 |
CN103046547A (zh) * | 2012-12-31 | 2013-04-17 | 中国建筑西南勘察设计研究院有限公司 | 锚碇锚杆组合型支挡结构 |
CN105002916A (zh) * | 2015-07-15 | 2015-10-28 | 杭州江润科技有限公司 | 一种浸水路堤高边坡联锁式生态砖柔性防护结构及施工方法 |
CN106087628A (zh) * | 2016-07-27 | 2016-11-09 | 浙江大学城市学院 | 无桥头锥坡现浇挡板泡沫混凝土轻质路堤结构及施工方法 |
CN210049193U (zh) * | 2019-05-15 | 2020-02-11 | 中国电建集团中南勘测设计研究院有限公司 | 一种桥梁锥坡生态防护系统 |
CN111218870A (zh) * | 2019-11-22 | 2020-06-02 | 中国一冶集团有限公司 | 一种用于道路拓宽的新老路基拼接结构及其施工方法 |
CN111305152A (zh) * | 2020-03-25 | 2020-06-19 | 杭州昂创科技有限公司 | 台阶式三维立体加筋桥台锥坡生态防护的施工方法 |
CN213203989U (zh) * | 2020-08-07 | 2021-05-14 | 中国水利水电第八工程局有限公司 | 一种桥梁工程锥形护坡结构 |
-
2021
- 2021-11-25 CN CN202111412676.8A patent/CN114032778A/zh active Pending
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05140942A (ja) * | 1991-11-20 | 1993-06-08 | Maeda Kousen Kk | 盛土形成方法 |
KR20000006620A (ko) * | 1999-07-02 | 2000-02-07 | 이은수 | 분리형 보강토 옹벽 및 그 시공방법 |
KR20040076713A (ko) * | 2003-02-26 | 2004-09-03 | (주) 코리아에스이 | 영구앵커와 프리캐스트 콘크리트 패널을 이용한 옹벽 구조및 옹벽의 시공방법 |
CN201850505U (zh) * | 2010-11-18 | 2011-06-01 | 中交第一公路勘察设计研究院有限公司 | 一种防止桥头跳车的刚柔过渡结构 |
CN103046547A (zh) * | 2012-12-31 | 2013-04-17 | 中国建筑西南勘察设计研究院有限公司 | 锚碇锚杆组合型支挡结构 |
CN105002916A (zh) * | 2015-07-15 | 2015-10-28 | 杭州江润科技有限公司 | 一种浸水路堤高边坡联锁式生态砖柔性防护结构及施工方法 |
CN106087628A (zh) * | 2016-07-27 | 2016-11-09 | 浙江大学城市学院 | 无桥头锥坡现浇挡板泡沫混凝土轻质路堤结构及施工方法 |
CN210049193U (zh) * | 2019-05-15 | 2020-02-11 | 中国电建集团中南勘测设计研究院有限公司 | 一种桥梁锥坡生态防护系统 |
CN111218870A (zh) * | 2019-11-22 | 2020-06-02 | 中国一冶集团有限公司 | 一种用于道路拓宽的新老路基拼接结构及其施工方法 |
CN111305152A (zh) * | 2020-03-25 | 2020-06-19 | 杭州昂创科技有限公司 | 台阶式三维立体加筋桥台锥坡生态防护的施工方法 |
CN213203989U (zh) * | 2020-08-07 | 2021-05-14 | 中国水利水电第八工程局有限公司 | 一种桥梁工程锥形护坡结构 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101083947B1 (ko) | 축대 또는 옹벽용 블록 시스템과 그 축조방법 | |
CN205776273U (zh) | 高填方边坡衡重式挡土墙与预应力锚索组合支护结构 | |
BR112012033713A2 (pt) | reforço de âncora para estai | |
CN110700291A (zh) | 一种联合支挡结构及其施工方法 | |
CN210395412U (zh) | 一种适用于山区架空输电线路的预应力锚桩抗拔基础 | |
CN115455528A (zh) | 一种护坡椅式锚索桩组合结构及其计算方法 | |
CN114032778A (zh) | 防沉降和抗滑移的桥梁锥坡施工方法 | |
DE2062477A1 (de) | Verfahren und Einrichtung zum Schützen und/oder Stabilisieren von geneigten Fla chen | |
CN209873819U (zh) | 一种超高陡岩质边坡系统防治结构 | |
CN111236278A (zh) | 一种斜坡软土地基桩-索加固结构、加固系统及构造方法 | |
CN216920296U (zh) | 一种后张法有粘结预应力围护桩 | |
Ohta et al. | Retrofit technique for asphalt concrete pavements after seismic damage | |
CN112411466B (zh) | 基于旧桩基改造的施工平台及其施工方法 | |
CN209798563U (zh) | 一种装配式涵洞抗浮结构 | |
CN211872688U (zh) | 一种陡坡桥墩防落石结构 | |
JP6333597B2 (ja) | 耐洗掘性を有する水床構造 | |
CN212001171U (zh) | 一种陡坡邻近填方工程的危岩防护结构 | |
KR100711602B1 (ko) | 십자형 연결말뚝을 이용한 해상 물막이 | |
KR102138839B1 (ko) | 대형마대를 이용한 현장 타설형 콘크리트블록을 활용한 호안공사 방법 | |
CN211006716U (zh) | 一种联合支挡结构 | |
JP2013249660A (ja) | 土留め壁の補強工法および補強構造 | |
JP6532512B2 (ja) | 岸壁または護岸構造及びその構築方法 | |
CN217231452U (zh) | 一种锥坡防沉降和抗滑移结构 | |
CN212612255U (zh) | 一种码头升级改造结构 | |
KR20130061054A (ko) | 강관을 이용한 급경사면 호안블록 일체화 구조 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |