CN114016924A - Wingspan system of drill jumbo - Google Patents

Wingspan system of drill jumbo Download PDF

Info

Publication number
CN114016924A
CN114016924A CN202111275562.3A CN202111275562A CN114016924A CN 114016924 A CN114016924 A CN 114016924A CN 202111275562 A CN202111275562 A CN 202111275562A CN 114016924 A CN114016924 A CN 114016924A
Authority
CN
China
Prior art keywords
wingspan
arm
hinged
section
arm section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111275562.3A
Other languages
Chinese (zh)
Inventor
印治南
张莉枚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Heyuan Machinery Technology Co ltd
Original Assignee
Henan Heyuan Machinery Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Heyuan Machinery Technology Co ltd filed Critical Henan Heyuan Machinery Technology Co ltd
Priority to CN202111275562.3A priority Critical patent/CN114016924A/en
Publication of CN114016924A publication Critical patent/CN114016924A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B15/00Supports for the drilling machine, e.g. derricks or masts

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses a rock drilling jumbo wingspan system, which comprises a wingspan frame, a wingspan small arm, a wingspan big arm, a wingspan main arm and a wingspan oil cylinder, wherein the wingspan small arm is arranged on the wingspan frame; the wing exhibition frame is vertically fixed on the chassis of the rock drilling jumbo; the two sides of the bottom of the wingspan frame are symmetrically hinged with a base of a wingspan oil cylinder, and the end part of a piston rod of the wingspan oil cylinder is hinged with the middle section of the main wingspan arm; the top of the main wingspan arm is hinged with the middle part of the wingspan frame, and the bottom of the main wingspan arm is hinged with the bottom of the large wingspan arm; the top of the small wingspan arm is hinged with the top of the wingspan frame, the bottom of the small wingspan arm is hinged with the middle section of the large wingspan arm, and a rock drilling arm is installed at the top of the large wingspan arm. The wingspan system of the drill jumbo can improve the positioning precision of the drill boom of the drill jumbo, improve the position precision of a drill hole, effectively avoid overbreak and guarantee the safety of construction personnel.

Description

Wingspan system of drill jumbo
Technical Field
The invention relates to the technical field of rock drilling equipment, in particular to a wingspan system of a drill jumbo.
Background
In actual tunnel engineering operation, in order to improve the mechanical operation degree of tunnel construction and accelerate the construction progress, a double-arm rock drilling jumbo is often adopted for tunnel blasting and drilling operation. The double-arm rock drilling trolley is suitable for the tunneling and drilling operation engineering of roadways, tunnels and culverts in the departments of metal mines, non-metal mines, hydropower, railways, highways, war industry, metallurgy, building materials, chemical engineering and the like, has wide application range, and is an advanced rock drilling device in the current engineering construction of China.
The quality of tunnel excavation molding depends on the quality of drilling hole forming quality, the quality of the drilling hole forming quality depends on the positioning precision of a rock drilling arm of a drill jumbo, the position deviation of the rock drilling arm can cause over-excavation and under-excavation of serious tunnel excavation, and the safety of constructors can be threatened.
Disclosure of Invention
In view of the above, the invention aims to provide a rock drilling jumbo wingspan system aiming at the defects of the prior art, so that the positioning precision of a rock drilling arm of the rock drilling jumbo is improved, the position precision of a drill hole is improved, the phenomenon of over-short excavation is effectively avoided, and the safety of constructors is guaranteed.
In order to achieve the purpose, the invention adopts the following technical scheme: a rock drilling jumbo wingspan system comprises a wingspan frame, a wingspan small arm, a wingspan big arm, a wingspan main arm and a wingspan oil cylinder; the wing exhibition frame is vertically fixed on the chassis of the rock drilling jumbo; the two sides of the bottom of the wingspan frame are symmetrically hinged with a base of a wingspan oil cylinder, and the end part of a piston rod of the wingspan oil cylinder is hinged with the middle section of the main wingspan arm; the top of the main wingspan arm is hinged with the middle part of the wingspan frame, and the bottom of the main wingspan arm is hinged with the bottom of the large wingspan arm; the top of the small wingspan arm is hinged with the top of the wingspan frame, the bottom of the small wingspan arm is hinged with the middle section of the large wingspan arm, and a rock drilling arm is installed at the top of the large wingspan arm;
the main wingspan arm comprises a first arm section, a second arm section and a bolt; the bottom of the first arm section and the top of the second arm section are fixedly connected through bolts.
Further, the top of the first arm section is hinged with the middle of the wingspan frame, and the bottom of the second arm section is hinged with the bottom of the wingspan large arm; the ratio of the length of the first arm section to the length of the second arm section is 2-3:1, and the end part of a piston rod of the wingspan oil cylinder is hinged with the middle section of the first arm section; the included angle between the first arm section and the second arm section towards the main arm side of the wingspan is 120 degrees and 160 degrees.
Furthermore, the included angle between the first arm section and the second arm section is realized by a turnbuckle bolt; the method for adjusting the included angle comprises the following steps: according to the unfolding span interval of the wingspan system or the position of the single-side rock drilling boom, the included angle between the first arm section and the second arm section is determined by combining the containing space required by the wingspan oil cylinder, the bolt is unscrewed, the second arm section is rotated to the preset included angle by taking the bolt as a base point, and then the bolt is screwed down to complete angle fixing.
The invention has the beneficial effects that:
the wingspan system of the drill jumbo can finely adjust the span distance between the drill drilling arms or the position of the single-side drill drilling arm, improve the positioning precision of the drill drilling arms of the drill jumbo, improve the position precision of drill holes, effectively avoid over-underexcavation and ensure the safety of construction personnel.
The included angle between the first arm section and the second arm section of the rock drilling jumbo wingspan system is realized through the tension bolts, and the span distance between the two rock drilling arms or the position of the single-side rock drilling arm can be finely adjusted by adjusting the included angle between the first arm section and the second arm section, so that the position precision of a drill hole is improved.
The ratio of the length of the first arm section to the length of the second arm section of the rock drilling jumbo wingspan system is 2-3:1, and the included angle between the first arm section and the second arm section towards the main wingspan arm side is 120-160 degrees, so that sufficient accommodating space can be reserved for the wingspan oil cylinder after the wingspan system is folded, the problem that the main wingspan arm is blocked or collides with the wingspan oil cylinder when the wingspan system is folded is avoided, and the reasonability and the stability of the wingspan system structure are improved.
Drawings
FIG. 1 is a schematic structural view of a rock drilling jumbo wingspan system in a furled state;
FIG. 2 is a schematic view of the extended state structure of the rock drilling jumbo wingspan system of the present invention.
Description of reference numerals: the wingspan structure comprises a wingspan frame 1, a wingspan small arm 2, a wingspan big arm 3, a wingspan main arm 4, a first arm section 41, a second arm section 42, a bolt 43 and a wingspan oil cylinder 5.
Detailed Description
The following are specific examples of the present invention and further describe the technical solutions of the present invention, but the present invention is not limited to these examples.
Example 1
A rock drilling jumbo wingspan system comprises a wingspan frame 1, a wingspan small arm 2, a wingspan big arm 3, a wingspan main arm 4 and a wingspan oil cylinder 5. The wing exhibition frame 1 is vertically fixed on the chassis of the rock drilling jumbo.
The two sides of the bottom of the wingspan frame 1 are symmetrically hinged with bases of wingspan oil cylinders 5, and the end parts of piston rods of the wingspan oil cylinders 5 are hinged with the middle sections of the wingspan main arms 4. The top of the main wingspan arm 4 is hinged with the middle part of the wingspan frame 1, and the bottom of the main wingspan arm 4 is hinged with the bottom of the large wingspan arm 3. The top of the small wingspan arm 2 is hinged with the top of the wingspan frame 1, the bottom of the small wingspan arm 2 is hinged with the middle section of the large wingspan arm 3, and the top of the large wingspan arm 3 is provided with a rock drilling arm.
The span main arm 4 comprises a first arm segment 41, a second arm segment 42 and a bolt 43. The bottom of the first arm segment 41 and the top of the second arm segment 42 are fixed by bolts 43.
Example 2
The present embodiment is different from embodiment 1 in that: the top of the first arm section 41 is hinged with the middle of the wingspan frame 1, and the bottom of the second arm section 42 is hinged with the bottom of the wingspan large arm 3. The ratio of the length of the first arm section 41 to the length of the second arm section 42 is 2-3:1, and the end part of a piston rod of the wingspan oil cylinder 5 is hinged with the middle section of the first arm section 41. The included angle between the first arm section 41 and the second arm section 42 towards the main wingspan arm 4 side is 120-160 degrees, so that a sufficient accommodating space can be reserved for the wingspan oil cylinder 5 after the wingspan system is folded, the main wingspan arm is prevented from being blocked or colliding with the wingspan oil cylinder when the wingspan system is folded, and the reasonability and the stability of the structure of the wingspan system are improved.
Example 3
The present embodiment is different from embodiment 2 in that: the included angle of first arm section 41 and second arm section 42 is realized through lag bolt 43, and the accessible adjusts the included angle of first arm section 41 and second arm section 42, finely tunes the span interval between two rock drilling booms or the position of unilateral rock drilling boom, improves the position accuracy of drilling.
The method for adjusting the included angle comprises the following steps: according to the span distance of the span system or the position of the single-side rock drilling boom, the containing space required by the span oil cylinder 5 is combined, the included angle between the first arm section 41 and the second arm section 42 is determined, the bolt 43 is loosened, the second arm section 42 is rotated to the preset included angle by taking the bolt 43 as a base point, and then the bolt 43 is tightened to complete the angle fixation.
Finally, the above embodiments are only used for illustrating the technical solutions of the present invention and not for limiting, and other modifications or equivalent substitutions made by the technical solutions of the present invention by those of ordinary skill in the art should be covered within the scope of the claims of the present invention as long as they do not depart from the spirit and scope of the technical solutions of the present invention.

Claims (3)

1. A drill jumbo wingspan system which characterized in that: the wingspan structure comprises a wingspan frame, a wingspan small arm, a wingspan big arm, a wingspan main arm and a wingspan oil cylinder; the wing exhibition frame is vertically fixed on the chassis of the rock drilling jumbo; the two sides of the bottom of the wingspan frame are symmetrically hinged with a base of a wingspan oil cylinder, and the end part of a piston rod of the wingspan oil cylinder is hinged with the middle section of the main wingspan arm; the top of the main wingspan arm is hinged with the middle part of the wingspan frame, and the bottom of the main wingspan arm is hinged with the bottom of the large wingspan arm; the top of the small wingspan arm is hinged with the top of the wingspan frame, the bottom of the small wingspan arm is hinged with the middle section of the large wingspan arm, and a rock drilling arm is installed at the top of the large wingspan arm;
the main wingspan arm comprises a first arm section, a second arm section and a bolt; the bottom of the first arm section and the top of the second arm section are fixedly connected through bolts.
2. A rock drill jumbo wingspan system as claimed in claim 1, wherein: the top of the first arm section is hinged with the middle of the wingspan frame, and the bottom of the second arm section is hinged with the bottom of the wingspan large arm; the ratio of the length of the first arm section to the length of the second arm section is 2-3:1, and the end part of a piston rod of the wingspan oil cylinder is hinged with the middle section of the first arm section; the included angle between the first arm section and the second arm section towards the main arm side of the wingspan is 120 degrees and 160 degrees.
3. A rock-drilling rig wingspan system according to claim 2 wherein: the included angle between the first arm section and the second arm section is realized through an elastic bolt; the method for adjusting the included angle comprises the following steps: according to the unfolding span interval of the wingspan system or the position of the single-side rock drilling boom, the included angle between the first arm section and the second arm section is determined by combining the containing space required by the wingspan oil cylinder, the bolt is unscrewed, the second arm section is rotated to the preset included angle by taking the bolt as a base point, and then the bolt is screwed down to complete angle fixing.
CN202111275562.3A 2021-10-29 2021-10-29 Wingspan system of drill jumbo Pending CN114016924A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111275562.3A CN114016924A (en) 2021-10-29 2021-10-29 Wingspan system of drill jumbo

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111275562.3A CN114016924A (en) 2021-10-29 2021-10-29 Wingspan system of drill jumbo

Publications (1)

Publication Number Publication Date
CN114016924A true CN114016924A (en) 2022-02-08

Family

ID=80058835

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111275562.3A Pending CN114016924A (en) 2021-10-29 2021-10-29 Wingspan system of drill jumbo

Country Status (1)

Country Link
CN (1) CN114016924A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11229749A (en) * 1998-02-18 1999-08-24 Furukawa Co Ltd Boom lifting device for drill jumbo
CN203066861U (en) * 2012-12-29 2013-07-17 徐州徐工铁路装备有限公司 Three-arm drill jumbo drill arm combined support
CN109707309A (en) * 2019-01-16 2019-05-03 中国铁建重工集团有限公司 A kind of four-arm rock drilling jumbo
CN110295917A (en) * 2019-05-29 2019-10-01 中国铁建重工集团股份有限公司 Wingspan device of drill jumbo
CN210013707U (en) * 2019-05-29 2020-02-04 江西鑫通机械制造有限公司 Side arm for clamping arch frame
CN212376695U (en) * 2020-07-22 2021-01-19 河南安诺尼建筑科技有限公司 Large-angle adjusting bracket

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11229749A (en) * 1998-02-18 1999-08-24 Furukawa Co Ltd Boom lifting device for drill jumbo
CN203066861U (en) * 2012-12-29 2013-07-17 徐州徐工铁路装备有限公司 Three-arm drill jumbo drill arm combined support
CN109707309A (en) * 2019-01-16 2019-05-03 中国铁建重工集团有限公司 A kind of four-arm rock drilling jumbo
CN110295917A (en) * 2019-05-29 2019-10-01 中国铁建重工集团股份有限公司 Wingspan device of drill jumbo
CN210013707U (en) * 2019-05-29 2020-02-04 江西鑫通机械制造有限公司 Side arm for clamping arch frame
CN212376695U (en) * 2020-07-22 2021-01-19 河南安诺尼建筑科技有限公司 Large-angle adjusting bracket

Similar Documents

Publication Publication Date Title
CN207905847U (en) Fill anchor, slip casting integration drill boom and the rock drilling vehicle with the drill boom
CN201771421U (en) Frame pillar type hydraulic drilling machine
CN207905842U (en) Combined type drill boom for punchinging, locking anchor pole and the rock drilling vehicle with the drill boom
CN201915826U (en) Drilling system and drilling equipment
CN207905721U (en) Multi-functional drill boom and rock drilling vehicle with the drill boom
CN206458492U (en) Support group for coal mining
CN108086905A (en) For punchinging, installing the combined type drill boom of anchor pole and there is the rock drilling vehicle of the drill boom
CN207905846U (en) The drill boom of automatic installation locking anchor pole and the rock drilling vehicle with the drill boom
CN108119174A (en) For punchinging, locking the combined type drill boom of anchor pole and there is the rock drilling vehicle of the drill boom
CN106761494A (en) A kind of guider and method for tunnel pre-grouting armature boring
CN114016924A (en) Wingspan system of drill jumbo
CN206513384U (en) The exempting from of a kind of tunnel steelframe welds scalable one-above-the-other layout
CN108049901A (en) The drill boom of automatic installation locking anchor pole and the rock drilling vehicle with the drill boom
CN104499949B (en) A kind of removable drill boom for coal mine support
CN206539323U (en) A kind of guider for tunnel pre-grouting armature boring
CN205805540U (en) Longwell protrusive working face of coal seam mechanization exploits complete set of equipments without lane
CN115095357A (en) Built-in pipe shed supporting device and direct construction method of pipe shed in tunnel
CN204754778U (en) Assistance -localization real -time and mobile device of construction of adaptation transmission line rock stock
CN211623339U (en) Advanced small catheter support
CN208950507U (en) A kind of novel drill boom of polar coordinates positioning
CN207905707U (en) Brace type drill boom propulsive mechanism
CN206487486U (en) A kind of mining TBM safe temporary support device
CN104989274A (en) Positioning and moving device for rock jumbolter of power transmission line
CN212656840U (en) Mine roof-bolter adjusting device
CN215408463U (en) Single track release rig structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Country or region after: China

Address after: 471000 North side of Heluo Road, Houying Community, Luoyang Area (High tech) Xindian Street Office, China (Henan) Pilot Free Trade Zone, Luoyang City, Henan Province (No. 2 East of the intersection of Heluo Road and Houshi Road)

Applicant after: Henan Heyuan Machinery Technology Co.,Ltd.

Address before: 471000 room 1115, Ruize building, 215 Heluo Road, high tech Zone, Luoyang City, Henan Province

Applicant before: Henan Heyuan Machinery Technology Co.,Ltd.

Country or region before: China