CN113969547A - U-shaped manned hanging basket type maintenance platform for large bridge tower - Google Patents

U-shaped manned hanging basket type maintenance platform for large bridge tower Download PDF

Info

Publication number
CN113969547A
CN113969547A CN202111332601.9A CN202111332601A CN113969547A CN 113969547 A CN113969547 A CN 113969547A CN 202111332601 A CN202111332601 A CN 202111332601A CN 113969547 A CN113969547 A CN 113969547A
Authority
CN
China
Prior art keywords
hanging basket
manned
manned hanging
shaped
bridge tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111332601.9A
Other languages
Chinese (zh)
Inventor
赵敏
吴玉刚
张太科
陈华青
蔡依花
周旭东
薛磊
向威
张鑫敏
朱鹏
李琼星
苏杨
刘鋆
朱子怡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Provincial Highway Construction Co ltd
Wuxi Jincheng Engineering Technology Service Co ltd
Original Assignee
Guangdong Provincial Highway Construction Co ltd
Wuxi Jincheng Engineering Technology Service Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Provincial Highway Construction Co ltd, Wuxi Jincheng Engineering Technology Service Co ltd filed Critical Guangdong Provincial Highway Construction Co ltd
Priority to CN202111332601.9A priority Critical patent/CN113969547A/en
Publication of CN113969547A publication Critical patent/CN113969547A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/14Towers; Anchors ; Connection of cables to bridge parts; Saddle supports

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention relates to a U-shaped manned hanging basket type maintenance platform for a large bridge and bridge tower, which comprises a tower top hanging point (1), wherein a left group of lifting mechanisms (2) and a right group of lifting mechanisms (2) are arranged on the tower top hanging point (1), a manned hanging basket (3) is correspondingly arranged below each group of lifting mechanisms (2), and the manned hanging basket (3) is connected with the lifting mechanisms (2). The U-shaped manned hanging basket type maintenance platform for the large bridge tower can overcome the swing generated by the influence of wind power in the super-high altitude operation, improves the stability and ensures the safety of equipment and personnel in the construction process.

Description

U-shaped manned hanging basket type maintenance platform for large bridge tower
Technical Field
The invention relates to a U-shaped manned cradle type overhaul platform for a large bridge tower, belonging to the technical field of bridge overhaul and maintenance.
Background
At present, most domestic bridges (especially large and super-large bridges) use cable systems, the bridges are provided with large bridge towers which are made of concrete, and steel structure main towers are increased day by day in recent years. The bridge tower is used as a main stress structure and a non-replaceable structure of the bridge, and the design service life needs to reach 100 years or even longer.
Important structural components such as an anchoring system on a stay cable, a suspension cable saddle and the like are arranged on the bridge tower. The bridge tower itself needs to be periodically overhauled, such as repairing of concrete cracks, maintenance of external coating, corrosion prevention of a steel structure bridge tower and the like, and the embedded pipe at the upper part of the stay cable, the built-in damper in the embedded pipe and the like also need to be periodically overhauled. The general height of the bridge tower is dozens of meters or even hundreds of meters, and the maintenance construction at the height belongs to the construction of an ultra-high altitude. Meanwhile, bridge towers have different shapes, such as an A-shaped bridge tower and an H-shaped bridge tower.
The conventional maintenance means is that spider man or maintenance hanging basket are adopted for construction, the modes have many potential safety hazards, the working efficiency is low, the limited conditions are many (poor stability if wind power is large), and the maintenance requirements of the whole bridge tower and the upper end of the stay cable cannot be well met.
Disclosure of Invention
The invention aims to solve the technical problem of providing a U-shaped manned hanging basket type maintenance platform for a large bridge tower, which can adapt to tower types with different structures, meet the requirements of construction at different parts and has high overall safety.
The technical scheme adopted by the invention for solving the problems is as follows: the U-shaped manned hanging basket type maintenance platform for the large bridge tower comprises a tower top hanging point, wherein a left group of lifting mechanisms and a right group of lifting mechanisms are arranged on the tower top hanging point, a manned hanging basket is correspondingly arranged below each group of lifting mechanisms, and the manned hanging basket is connected with the lifting mechanisms.
Optionally, the tower top hoisting point comprises four supporting beams, and the four supporting beams are arranged in a shape like a Chinese character jing.
Optionally, the four support beams are bolted to each other by bolts.
Optionally, the lifting mechanism comprises a plurality of lifting machines, the lifting machines are uniformly arranged on the lifting point at the top of the tower, and the lifting machines are connected with the manned hanging basket through traction steel wire ropes.
Optionally, a safety steel wire rope is connected and arranged between the manned hanging basket and the supporting beam.
Optionally, the hoisting machine is fixedly arranged at the end of the support beam.
Optionally, the manned hanging basket is integrally U-shaped, the opening direction of the U-shaped manned hanging basket faces the tower body, and the left and right manned hanging baskets are arranged oppositely.
Optionally, the left and right manned hanging baskets are connected into a whole through the connecting device.
Optionally, the connecting device is a rail-type sliding frame.
Optionally, a plurality of groups of flexible wheels, a plurality of first turnover net plates and a plurality of inflatable bags are arranged on one side of the manned hanging basket, which is in contact with the tower body, and a second turnover net plate is arranged on the outer side of the manned hanging basket.
Compared with the prior art, the invention has the advantages that:
1. the invention can meet the use requirements of different tower types and has strong universality;
2. the invention can overcome the swing problem caused by the influence of wind force in the super high altitude operation, and improve the operation stability;
3. the invention adopts multiple safety measures (turning over the baffle and filling the air bag), and can ensure the safety of equipment and personnel in the construction process;
4. the left manned hanging basket and the right manned hanging basket are symmetrically arranged, and are lifted simultaneously through the plurality of lifting motors, so that the balance of the manned hanging baskets is effectively ensured;
5. the left and right manned hanging baskets can be assembled into a whole, the whole platform surrounds the tower body, the whole platform cannot swing randomly under wind power and the like, and the stability is good;
6. the two manned hanging baskets are connected by adopting the rail type sliding frame, the requirements of construction at different heights and different positions of the A-shaped cable tower can be met, the anchoring intervals of different stay cables can be adapted, and the spanning of the stay cables can be realized by opening and closing.
Drawings
FIG. 1 is a schematic view of an installation structure of a U-shaped manned hanging basket type maintenance platform for a large bridge tower.
Fig. 2 is a schematic structural view of the man-carrying hanging basket in fig. 1.
Wherein:
overhead hoisting point 1
Support beam 11
Lifting mechanism 2
Hoisting machine 21
Manned hanging basket 3
Traction wire rope 4
Tower body 5
Flexible wheel 6
First folding net plate 7
Air-filled bag 8
Second folding net plate 9
And a stay cable 10.
Detailed Description
As shown in fig. 1 and 2, the U-shaped manned basket type maintenance platform for a large bridge and bridge tower in the embodiment includes a tower top suspension point 1, wherein the tower top suspension point 1 is provided with a left group of lifting mechanisms 2 and a right group of lifting mechanisms 2, a manned basket 3 is correspondingly arranged below each group of lifting mechanisms 2, and the manned basket 3 is connected with the lifting mechanisms 2;
the tower top hoisting point 1 comprises four supporting beams 11, and the four supporting beams 11 are arranged in a shape of a Chinese character jing;
the four supporting beams 11 are bolted with each other by high-strength bolts;
the supporting beam 11 is made of I-shaped steel;
the lifting mechanism 2 comprises a plurality of lifting machines 21, and the plurality of lifting machines 21 are uniformly arranged on the tower top lifting point 1;
the hoister 21 is connected with the manned hanging basket 3 through a traction steel wire rope 4;
a safety steel wire rope is connected between the manned hanging basket 3 and the supporting beam 11;
the number of the lifting machines 21 of each group of lifting mechanisms 2 is 4;
the hoisting machine 21 is fixedly arranged at the end part of the support beam 11;
the manned hanging basket 3 is integrally U-shaped, and the opening direction of the U-shaped manned hanging basket 3 faces the tower body 5;
the manned hanging basket 3 is made of an aluminum alloy material;
the left and right manned hanging baskets 3 are oppositely arranged;
the left and right manned hanging baskets 3 can be connected into a whole through a connecting device;
the connecting device is a telescopic adjusting device and can be used for connection construction at the lower part of the cableway pipe, and when the cableway pipe needs to ascend and is blocked by a stay cable, the connecting device can be disconnected, the cableway pipe is separated to ascend, and is reconnected after ascending, and the same operation is carried out when the cableway pipe descends;
the connecting device can preferably adopt a rail type sliding frame;
a plurality of groups of flexible wheels 6 are arranged on one side of the manned hanging basket 3, which is in contact with the tower body 5, so that the hanging basket and the tower body are prevented from being damaged due to direct contact of the hanging basket and the tower body, and the stability of the hanging basket during lifting can be improved;
the manned hanging basket 3 is provided with a first turnover screen plate 7 on one side of the tower body 5, when the hanging basket is in a construction area, the screen plate is turned up to shield a gap between the hanging basket and the tower body, and articles are prevented from falling from the gap;
the manned hanging basket 3 is also provided with an inflatable bag 8 on one side of the tower body 5, and after the screen plate is turned up, the inflatable bag is inflated, so that the gap between the hanging basket and the tower body is completely filled by utilizing the flexibility characteristic of the inflatable bag;
in order to increase the anti-falling area, a second turnover screen plate 9 is arranged outside the manned hanging basket 3, and during construction, the screen plate is opened to increase the protection area.
In addition to the above embodiments, the present invention also includes other embodiments, and any technical solutions formed by equivalent transformation or equivalent replacement should fall within the scope of the claims of the present invention.

Claims (10)

1. The utility model provides a large-scale bridge is U type manned hanging basket formula maintenance platform for bridge tower which characterized in that: the lifting device comprises a tower top lifting point (1), wherein the left and right lifting mechanisms (2) are arranged on the tower top lifting point (1), a manned hanging basket (3) is correspondingly arranged below each lifting mechanism (2), and the manned hanging basket (3) is connected with the lifting mechanisms (2).
2. The U-shaped manned hanging basket type overhaul platform for the large bridge tower according to claim 1, which is characterized in that: the tower top hoisting point (1) comprises four supporting beams (11), and the four supporting beams (11) are arranged in a shape like a Chinese character 'jing'.
3. The U-shaped manned hanging basket type overhaul platform for the large bridge tower according to claim 2, characterized in that: the four supporting beams (11) are bolted with each other by bolts.
4. The U-shaped manned hanging basket type overhaul platform for the large bridge tower according to claim 2, characterized in that: the lifting mechanism (2) comprises a plurality of lifting machines (21), the lifting machines (21) are uniformly arranged on the tower top lifting point (1), and the lifting machines (21) are connected with the manned hanging basket (3) through traction steel wire ropes (4).
5. The U-shaped manned hanging basket type overhaul platform for the large bridge tower according to claim 1, which is characterized in that: a safety steel wire rope is connected and arranged between the manned hanging basket (3) and the supporting beam (11).
6. The U-shaped manned hanging basket type overhaul platform for the large bridge tower according to claim 4, characterized in that: the hoisting machine (21) is fixedly arranged at the end part of the supporting beam (11).
7. The U-shaped manned hanging basket type overhaul platform for the large bridge tower according to claim 1, which is characterized in that: the manned hanging basket (3) is integrally U-shaped, the opening direction of the U-shaped manned hanging basket (3) faces the tower body (5), and the left and right manned hanging baskets (3) are oppositely arranged.
8. The U-shaped manned hanging basket type overhaul platform for the large bridge tower according to claim 1 or 7, which is characterized in that: the left and right manned hanging baskets (3) are connected into a whole through a connecting device.
9. The U-shaped manned hanging basket type overhaul platform for the large bridge tower according to claim 8, characterized in that: the connecting device is a rail type sliding frame.
10. The U-shaped manned hanging basket type overhaul platform for the large bridge tower according to claim 1, which is characterized in that: the manned cradle is characterized in that one side, in contact with the tower body (5), of the manned cradle (3) is provided with a plurality of groups of flexible wheels (6), a plurality of first turnover net plates (7) and a plurality of inflatable bags (8), and the outer side of the manned cradle (3) is provided with a second turnover net plate (9).
CN202111332601.9A 2021-11-11 2021-11-11 U-shaped manned hanging basket type maintenance platform for large bridge tower Pending CN113969547A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111332601.9A CN113969547A (en) 2021-11-11 2021-11-11 U-shaped manned hanging basket type maintenance platform for large bridge tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111332601.9A CN113969547A (en) 2021-11-11 2021-11-11 U-shaped manned hanging basket type maintenance platform for large bridge tower

Publications (1)

Publication Number Publication Date
CN113969547A true CN113969547A (en) 2022-01-25

Family

ID=79589669

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111332601.9A Pending CN113969547A (en) 2021-11-11 2021-11-11 U-shaped manned hanging basket type maintenance platform for large bridge tower

Country Status (1)

Country Link
CN (1) CN113969547A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114855644A (en) * 2022-03-25 2022-08-05 浙江恒炜建设集团有限公司 Bridge main tower structure convenient to maintain and construction method thereof

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11181725A (en) * 1997-12-22 1999-07-06 Maeda Corp Method for constructing horizontal beam of main tower made of concrete
KR20020009830A (en) * 2000-07-27 2002-02-02 전장열 A self propelled working platform for construction and maintenance of bridge
CN101845795A (en) * 2010-05-17 2010-09-29 广东省长大公路工程有限公司 Cable-stayed cradle of adjustment-free cable tension long platform in construction of cable-stayed bridge
CN102900020A (en) * 2012-10-10 2013-01-30 无锡久一重工机械有限公司 Hanging basket mechanism special for cable bent tower
CN103243658A (en) * 2013-05-16 2013-08-14 中交路桥华南工程有限公司 Guyed traveler for cable-stayed bridge and assembly method for guyed traveler
CN206052543U (en) * 2016-08-30 2017-03-29 武汉二航路桥特种工程有限责任公司 High tower apparatus for examination and repair
CN108729361A (en) * 2018-08-14 2018-11-02 湖南金海集团有限公司 A kind of inverted U-shaped hanging basket device of bridge
CN211689948U (en) * 2019-12-31 2020-10-16 中铁十一局集团第一工程有限公司 Suspension operation platform device for construction of suspension cable at tower part of cable-stayed bridge
CN212883140U (en) * 2020-06-08 2021-04-06 武汉二航路桥特种工程有限责任公司 Walking type automatic bridge coating and spraying system
CN213740602U (en) * 2020-08-26 2021-07-20 中交第二航务工程局有限公司 Adjustable stay cable construction platform of outer attaches wall of tower
CN113565021A (en) * 2021-07-09 2021-10-29 无锡金诚工程技术服务有限公司 Protection system for stay cable tower end built-in damper construction

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11181725A (en) * 1997-12-22 1999-07-06 Maeda Corp Method for constructing horizontal beam of main tower made of concrete
KR20020009830A (en) * 2000-07-27 2002-02-02 전장열 A self propelled working platform for construction and maintenance of bridge
CN101845795A (en) * 2010-05-17 2010-09-29 广东省长大公路工程有限公司 Cable-stayed cradle of adjustment-free cable tension long platform in construction of cable-stayed bridge
CN102900020A (en) * 2012-10-10 2013-01-30 无锡久一重工机械有限公司 Hanging basket mechanism special for cable bent tower
CN103243658A (en) * 2013-05-16 2013-08-14 中交路桥华南工程有限公司 Guyed traveler for cable-stayed bridge and assembly method for guyed traveler
CN206052543U (en) * 2016-08-30 2017-03-29 武汉二航路桥特种工程有限责任公司 High tower apparatus for examination and repair
CN108729361A (en) * 2018-08-14 2018-11-02 湖南金海集团有限公司 A kind of inverted U-shaped hanging basket device of bridge
CN211689948U (en) * 2019-12-31 2020-10-16 中铁十一局集团第一工程有限公司 Suspension operation platform device for construction of suspension cable at tower part of cable-stayed bridge
CN212883140U (en) * 2020-06-08 2021-04-06 武汉二航路桥特种工程有限责任公司 Walking type automatic bridge coating and spraying system
CN213740602U (en) * 2020-08-26 2021-07-20 中交第二航务工程局有限公司 Adjustable stay cable construction platform of outer attaches wall of tower
CN113565021A (en) * 2021-07-09 2021-10-29 无锡金诚工程技术服务有限公司 Protection system for stay cable tower end built-in damper construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114855644A (en) * 2022-03-25 2022-08-05 浙江恒炜建设集团有限公司 Bridge main tower structure convenient to maintain and construction method thereof

Similar Documents

Publication Publication Date Title
CN201495048U (en) Double movable-arm crane used for iron tower installation
CN201882763U (en) Special carrying pole type beam of double-machine lifting crane
CN113969547A (en) U-shaped manned hanging basket type maintenance platform for large bridge tower
CN2923635Y (en) Single-column towing type elevator
CN207829430U (en) A kind of lifting type operating platform for hanging operation
CN103967263A (en) Novel hydraulic automatic climbing discharging platform
CN203947758U (en) Novel hydraulic automatic climbing discharging platform
CN213896722U (en) Modular assembling protection pocket bottom platform for front supporting point guyed cradle
CN101649684B (en) Installing method of roof mast
CN210239080U (en) Maintenance platform for space high-position operation
CN205603125U (en) Special hoist device that horizontal water tube cooler heat exchange tube was changed
CN201786011U (en) Lifting variable-size construction operating platform
CN209873572U (en) Interim navigation lifting station of adjustable vertical lift height
CN115924707A (en) Hoisting method for large rolling mill frame
CN214329956U (en) Ring rail hoisting device for curtain wall installation
CN210856930U (en) Maintenance system of cable-stay bridge inverted Y-shaped tower column
CN212533725U (en) Planetary walking trolley for detecting and maintaining main cable and sling of suspension bridge
CN206693060U (en) A kind of hoisting device for the lifting of suspension bridge saddle bearing plate
CN112065023A (en) Hanging basket traveling crane for nuclear reactor-based high-altitude outer wall operation
CN107304030B (en) Special hoisting device for replacing heat exchange tube of transverse tube cooler and application method thereof
CN110748140A (en) Track beam hanging basket special for stepped curtain wall
CN201087080Y (en) Double-beam inner climbing base plate and sleeve rack for inner climbing tower crane
CN210884893U (en) Hanging bracket for disassembling and assembling high-pressure chamber under travelling beam
CN205346600U (en) Big plate -girder hoist and mount specialized tool
CN217627102U (en) Large-scale steel box girder hoisting sling

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination