CN113934406B - Power engineering audit system and method for developing intelligent flow based on iteration increment mode - Google Patents

Power engineering audit system and method for developing intelligent flow based on iteration increment mode Download PDF

Info

Publication number
CN113934406B
CN113934406B CN202111287243.4A CN202111287243A CN113934406B CN 113934406 B CN113934406 B CN 113934406B CN 202111287243 A CN202111287243 A CN 202111287243A CN 113934406 B CN113934406 B CN 113934406B
Authority
CN
China
Prior art keywords
audit
project
unit
information
report
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202111287243.4A
Other languages
Chinese (zh)
Other versions
CN113934406A (en
Inventor
陈平
陈晔
李谦
陈识
张宏艳
付清泉
蔡静
叶婧芸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Wuhan Electric Power Technical College
Original Assignee
State Grid Corp of China SGCC
Wuhan Electric Power Technical College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Wuhan Electric Power Technical College filed Critical State Grid Corp of China SGCC
Priority to CN202111287243.4A priority Critical patent/CN113934406B/en
Publication of CN113934406A publication Critical patent/CN113934406A/en
Application granted granted Critical
Publication of CN113934406B publication Critical patent/CN113934406B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F8/00Arrangements for software engineering
    • G06F8/20Software design
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F8/00Arrangements for software engineering
    • G06F8/10Requirements analysis; Specification techniques
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply

Abstract

The invention discloses an electric power engineering audit system and method for developing intelligent flow based on an iteration increment mode, wherein the system comprises the following steps: the plan management module is used for realizing the functions of construction project planning, audit demand management, reporting, distributing and publishing of audit projects and managing overdue projects; establishing and iterative updating of the service model are realized; the audit progress management module is used for inquiring audit progress execution conditions of all audit projects; the quality management module is used for providing operation content and approval functions for the auditing mechanism; the achievement management module is used for realizing the functions of inputting and inquiring audit problems, filing correction data and managing images in engineering; and the intermediary management module is used for realizing functions of intermediary mechanism share inquiry, intermediary information maintenance, intermediary mechanism evaluation and payment function. The invention improves the accuracy of management information acquisition through system construction, is beneficial to project problem and risk pre-judgment through remote audit and centralized analysis, and improves the supervision efficacy of audit work.

Description

Power engineering audit system and method for developing intelligent flow based on iteration increment mode
Technical Field
The invention relates to the field of intelligent control of electric power engineering audit business processes, in particular to an electric power engineering audit system and method for developing an intelligent process based on an iteration increment mode.
Background
The Genexus is an agile development platform, has a series of specific methods of description, generation, test, loop iteration and the like, greatly simplifies the development process of software programs, and can automatically generate all contents from a database to codes, front ends to back ends and server ends to client services. Support the full life cycle (Davos) of software and incremental development mode based on accumulation of 'knowledge base'. Genexus has the characteristics of high efficiency (development efficiency is improved), diversity (Web, android, IOS, weChat generation at one time), simplicity (project development can be participated in through learning in a short time), quality (automatic generation of source codes without BUG), maturity (product maturity is stable), and evolution (following technical trend).
And the electric power audit work targets and ideas take business processes as ties, user demands as guides and system functions as grippers, and the comprehensive risk management and internal control system construction results are solidified, so that informatization functions such as data dynamic management, responsibility association solidification, control operation evaluation and the like are realized. And a strong informatization support is provided for building a full-service and full-process risk management and internal control system. In order to further deepen risk management and internal control system construction, implementation work of a wind control system is carried out.
Disclosure of Invention
Aiming at the defects in the prior art, the invention provides an electric power engineering audit system and method for developing an intelligent flow based on an iteration increment mode.
The technical scheme adopted for solving the technical problems is as follows:
the invention provides an electric power engineering audit system for developing intelligent flow based on an iteration increment mode, which comprises: the system comprises a planning management module, an audit progress management module, a quality management module, a result management module and an intermediary management module; wherein:
the plan management module is used for realizing the functions of construction project planning, audit demand management, reporting, distributing and publishing of audit projects and managing overdue projects; the plan management module is used for establishing a business model by acquiring and analyzing business demand data and clearing the data relationship between a plan and an audit project in the business demand data; when a user puts forward a new demand after using, carrying out iterative increment development on a service model according to new demand data, carrying out quick adjustment on the service model, and realizing a new demand function;
the audit progress management module is used for inquiring the audit progress execution conditions of all audit projects, checking the information of time executors of each audit node in the audit projects, and timely grasping the project conditions through the execution progress;
the quality management module is used for providing operation content and approval functions for an audit mechanism, and comprises the functions of pre-audit investigation submission, pre-audit investigation and audit, audit scheme submission, audit scheme audit, solicited opinion manuscript submission, solicited opinion manuscript audit, audit report submission, audit report audit, record manuscript management, major event management and audit report adjustment;
the achievement management module is used for realizing the functions of inputting and inquiring audit problems, filing correction data and managing images in engineering;
and the intermediary management module is used for realizing functions of intermediary mechanism share inquiry, intermediary information maintenance, intermediary mechanism evaluation and payment function.
Further, the plan management module of the present invention includes: the system comprises a construction project planning unit, an audit demand management unit and an overdue project management unit; wherein:
the construction project planning unit is used for creating a project plan on line for the planned project, carrying out corresponding adjustment, supplement, modification and perfection operation, supporting batch processing of the adjustment plan every year and providing a retrieval function according to the year and project information;
the audit demand management unit is used for reporting audit items on line, distributing audit transaction confirmation to the items after reporting, and issuing the items after issuing, wherein the items enter an audit flow stage, and the execution progress condition of the items is checked through the audit demand management module;
the overdue item management unit is used for recording and managing all overdue items, and each unit is responsible for the overdue reason explanation of the item of the unit and supports the function of batch import inquiry.
Further, the quality management module of the present invention includes: the system comprises a pre-examination investigation unit, an audit scheme unit, a comment solicitation unit, an audit report unit, a record manuscript management unit and a major event management unit; wherein:
the pre-examination investigation unit is used for examining and approving the pre-examination investigation condition of the project, supporting the inquiry according to the project coding, the project type and the audit type conditions, and supporting the export of a pre-examination investigation report;
the audit scheme unit is used for submitting and approving an uploading audit scheme and inputting audit project plan starting time, plan finishing time and intermediary mechanism project personnel configuration information; the audit scheme can be inquired according to the scheme name and the scheme state; automatically generating a solicited opinion manuscript and an audit report after the audit scheme passes approval;
the solicited opinion manuscript unit is used for inputting, submitting, approving and uploading solicited opinion manuscript files;
the audit report unit is used for uploading and inputting related structural information to the official audit report of the project by each unit, supporting multi-condition inquiry and batch downloading, and supporting the export functions of the audit report and report detail;
the record manuscript management unit is used for realizing the uploading and downloading functions of the record manuscript files;
and the major event management unit is used for inputting major event information to the audit scheme and supporting the inquiry and export functions of the audit scheme.
Further, the achievement management module of the present invention includes: an audit problem unit, a correction data reporting unit and an engineering management image unit; wherein:
the audit problem unit is used for recording problem information found in the project audit process by each unit and supporting the functions of importing, exporting and inquiring audit problems;
the correction data filling unit is used for recording correction information of project audit problems of each unit, and comprises correction completion time, correction measures and correction condition content, and supports the functions of importing, exporting and inquiring correction data;
and the project management image unit is used for carrying out statistics and summarization on audit management data of a designated unit and carrying out visual display on the project audit progress of the unit, the weight distribution and development trend of different types of audit problems and the follow-up audit correction condition information.
Further, the intermediary management module of the present invention comprises: the system comprises an intermediary mechanism share inquiry unit, an intermediary information maintenance unit, an intermediary mechanism evaluation unit and a payment letter unit; wherein:
the agency share inquiring unit is used for realizing multidimensional inquiring and displaying functions of the agency shares occupied by each audit transaction according to the bid validity period and the bid section of each year;
the medium information maintenance unit is used for realizing the management and maintenance of medium mechanisms for winning a bid and the information of personnel recording the medium mechanisms, and comprises the functions of adding, modifying, deleting and exporting the medium mechanisms, and the functions of adding, modifying, deleting, exporting and importing the medium mechanisms for personnel recording the medium mechanisms;
the agency evaluation unit is used for performing multi-dimensional evaluation scoring on the agency which has already sent out a formal audit report but is not evaluated in a month, and evaluating the agency through automatic system scoring and comprehensive scoring of province companies and city companies;
and the payment function unit is used for providing an audit payment function for the audit project with the formal audit report according to the units and the project types of the ground city, and supporting the functions of inquiring and downloading the provided audit payment function.
The invention provides an electric power engineering audit method for developing an intelligent flow based on an iteration increment mode, which comprises the following steps:
step1, acquiring business requirements of electric power engineering audit;
step2, analyzing and dividing service function modules according to service requirements, and determining data relations among the service modules;
step3, analyzing the business flow and designing a system scheme;
step 4, creating a knowledge base and configuring relevant attributes of the knowledge base;
step 5, constructing a service module, constructing a service model based on a database, and constructing TRN (Transmission) through abstracting audit service, wherein the TRN comprises information required by service demand data and how to operate the information;
step 6, the Procedure is established to abstract the audit service, so that concrete audit service logic is realized, and the service of inquiring and updating the database is realized;
step 7, establishing a WebPanel to abstract the user view, namely, a user-visualized interactive interface, and realizing data processing of audit business logic by calling a Procedure service in the interaction process to persist the result to a data warehouse for storage;
step 8, building the whole service system through the steps 5-7, and completing closed loop of the system through the interconnection combination between the steps 5-7;
step 9, after the system test is completed, deploying the system to a server, configuring relevant information of a database website, initializing basic data, and performing online trial;
and step 10, quick response is carried out according to the trial feedback information, and the feedback content is solved and online is updated according to the development mode of incremental iteration.
Further, the step of establishing WebPanel in the step 7 of the present invention is as follows:
step a1, creating a WebPanel object;
step a2, dragging interface elements to MainTable according to the interactive interface view style, and carrying out layout of the interface elements according to the actual positions of the elements;
step a3, after the layout of the interface elements is completed, proportional adjustment is carried out according to the relevant proportion in the actual audit service;
step a4, setting the attribute of the interface element to beautify the display effect of the element;
and a step a5, writing interface interaction events, including submitting and auditing the operation of the function, editing the operation function according to the operation of the actual interface, and writing the function operation by calling the Procedure object in the step 6.
Further, the method of the invention also comprises the steps of grasping audit data and calculating an audit and charging to generate a payment function by developing an electric power engineering audit system of an intelligent flow based on an iterative increment mode, and comprises the following steps:
step1, inputting the information of the aesthetic charging month to be settled;
step2, determining input month to perform data capture of formal report of the month, and outputting classified audit report data by data classification;
setp3, obtaining an audit item under a report according to the audit report information, and calculating the audit charging according to the item type and a calculation formula configured by an audit type matching system;
and setp4, accumulating the audit and charging, integrating the data information to generate a payment function file and providing a downloading function.
Further, the specific implementation steps of the step2 of the present invention are as follows:
step2.1, the system grabs out the information of the officially-issued audit report according to the input month information, and performs data association grabbing by taking the audit report as main data;
step2.2, classifying the obtained audit report information according to project units, project types and audit transaction departments, calling a Procedure to check the obtained audit report information, and limiting the selection of the audit reports with the same three types to obtain a payment function.
Further, the specific implementation steps of the step3 of the present invention are as follows:
step3.1, acquiring audit items under an audit report according to audit report data classified by Step2, calling a Procedure to acquire audit item types and audit types, and matching the audit item types and the audit types with a configured audit and charging calculation formula;
step3.2, a calculation formula relates to the amount information such as the delivery amount, the trial reduction amount, the trial increment tax and the like of an audit item, coefficients of different offices are different, and GeneXus obtains the information of the item according to the item in a selected audit report by calling a Procedure, and calculates the obtained information in the formula; the specific algorithm formula is as follows:
the payment function examination and charging is formed by accumulating examination and charging of each item in an audit report of the generated payment function:
A+=B
a is payment letter examination and charging;
b is the examination and charging of each item of audit report contained under the payment function;
the project examination and charging calculation formula is different according to the project type and the report type;
the examination and charging calculation formula of the audit item with the item type of the main network or the resolution is as follows:
a*0.002*c
a is the review amount of the project with the project type of the main network and the report type of the project of the resolution;
c is the coefficient of the transaction part;
the examination and charging calculation formula of the audit item with the item type of distribution network or settlement is as follows:
(a*0.005+b*0.05)*c
a is the review amount of the project with the project type of the distribution network and the report type of the project of the resolution;
b is the review and deduction information of the project;
project trial reduction = project trial amount-project trial amount
And carrying out iterative incremental development on the configuration of the formula information by GeneXus according to the user requirement.
The invention has the beneficial effects that: the system and the method for auditing the electric power engineering based on the intelligent process developed by the iterative increment mode utilize a data interface to penetrate and reference time, text, fields and other information in typical system such as ERP system, infrastructure management and control system, process system, manufacturing cost system and the like so as to provide data source support for engineering audit and realize audit targets such as compliance, timeliness and integrity audit of the whole engineering process. The system solves the problems of complicated auditing process, overlong auditing time and high auditing cost, and standardizes and processes auditing business. Through the construction of the system, the management organization architecture is perfected; the accuracy of management information acquisition is improved. Through remote audit, centralized analysis and on-site verification, the problems in the project can be found, risks caused by the problems can be prejudged, and supervision effectiveness of audit work can be improved.
Drawings
The invention will be further described with reference to the accompanying drawings and examples, in which:
fig. 1 is a schematic diagram of a system structure according to an embodiment of the present invention.
Detailed Description
The present invention will be described in further detail with reference to the drawings and examples, in order to make the objects, technical solutions and advantages of the present invention more apparent. It should be understood that the specific embodiments described herein are for purposes of illustration only and are not intended to limit the scope of the invention.
As shown in fig. 1, an electric power engineering audit system for developing an intelligent process based on an iterative incremental manner according to an embodiment of the present invention includes: the system comprises a planning management module, an audit progress management module, a quality management module, a result management module and an intermediary management module; wherein:
the plan management module is used for realizing the functions of construction project planning, audit demand management, reporting, distributing and publishing of audit projects and managing overdue projects; the plan management module is used for establishing a business model by acquiring and analyzing business demand data and clearing the data relationship between a plan and an audit project in the business demand data; when a user puts forward a new demand after using, carrying out iterative increment development on a service model according to new demand data, carrying out quick adjustment on the service model, and realizing a new demand function;
the audit progress management module is used for inquiring the audit progress execution conditions of all audit projects, checking the information of time executors of each audit node in the audit projects, and timely grasping the project conditions through the execution progress;
the quality management module is used for providing operation content and approval functions for an audit mechanism, and comprises the functions of pre-audit investigation submission, pre-audit investigation and audit, audit scheme submission, audit scheme audit, solicited opinion manuscript submission, solicited opinion manuscript audit, audit report submission, audit report audit, record manuscript management, major event management and audit report adjustment;
the achievement management module is used for realizing the functions of inputting and inquiring audit problems, filing correction data and managing images in engineering;
and the intermediary management module is used for realizing functions of intermediary mechanism share inquiry, intermediary information maintenance, intermediary mechanism evaluation and payment function.
The plan management module includes: the system comprises a construction project planning unit, an audit demand management unit and an overdue project management unit; wherein:
the construction project planning unit is used for creating a project plan on line for the planned project, carrying out corresponding adjustment, supplement, modification and perfection operation, supporting batch processing of the adjustment plan every year and providing a retrieval function according to the year and project information;
the audit demand management unit is used for reporting audit items on line, distributing audit transaction confirmation to the items after reporting, and issuing the items after issuing, wherein the items enter an audit flow stage, and the execution progress condition of the items is checked through the audit demand management module;
the overdue item management unit is used for recording and managing all overdue items, and each unit is responsible for the overdue reason explanation of the item of the unit and supports the function of batch import inquiry.
The quality management module comprises: the system comprises a pre-examination investigation unit, an audit scheme unit, a comment solicitation unit, an audit report unit, a record manuscript management unit and a major event management unit; wherein:
the pre-examination investigation unit is used for examining and approving the pre-examination investigation condition of the project, supporting the inquiry according to the project coding, the project type and the audit type conditions, and supporting the export of a pre-examination investigation report;
the audit scheme unit is used for submitting and approving an uploading audit scheme and inputting audit project plan starting time, plan finishing time and intermediary mechanism project personnel configuration information; the audit scheme can be inquired according to the scheme name and the scheme state; automatically generating a solicited opinion manuscript and an audit report after the audit scheme passes approval;
the solicited opinion manuscript unit is used for inputting, submitting, approving and uploading solicited opinion manuscript files;
the audit report unit is used for uploading and inputting related structural information to the official audit report of the project by each unit, supporting multi-condition inquiry and batch downloading, and supporting the export functions of the audit report and report detail;
the record manuscript management unit is used for realizing the uploading and downloading functions of the record manuscript files;
and the major event management unit is used for inputting major event information to the audit scheme and supporting the inquiry and export functions of the audit scheme.
The achievement management module comprises: an audit problem unit, a correction data reporting unit and an engineering management image unit; wherein:
the audit problem unit is used for recording problem information found in the project audit process by each unit and supporting the functions of importing, exporting and inquiring audit problems;
the correction data filling unit is used for recording correction information of project audit problems of each unit, and comprises correction completion time, correction measures and correction condition content, and supports the functions of importing, exporting and inquiring correction data;
and the project management image unit is used for carrying out statistics and summarization on audit management data of a designated unit and carrying out visual display on the project audit progress of the unit, the weight distribution and development trend of different types of audit problems and the follow-up audit correction condition information.
The intermediary management module comprises: the system comprises an intermediary mechanism share inquiry unit, an intermediary information maintenance unit, an intermediary mechanism evaluation unit and a payment letter unit; wherein:
the agency share inquiring unit is used for realizing multidimensional inquiring and displaying functions of the agency shares occupied by each audit transaction according to the bid validity period and the bid section of each year;
the medium information maintenance unit is used for realizing the management and maintenance of medium mechanisms for winning a bid and the information of personnel recording the medium mechanisms, and comprises the functions of adding, modifying, deleting and exporting the medium mechanisms, and the functions of adding, modifying, deleting, exporting and importing the medium mechanisms for personnel recording the medium mechanisms;
the agency evaluation unit is used for performing multi-dimensional evaluation scoring on the agency which has already sent out a formal audit report but is not evaluated in a month, and evaluating the agency through automatic system scoring and comprehensive scoring of province companies and city companies;
and the payment function unit is used for providing an audit payment function for the audit project with the formal audit report according to the units and the project types of the ground city, and supporting the functions of inquiring and downloading the provided audit payment function.
The electric power engineering audit method for developing the intelligent flow based on the iterative increment mode of the embodiment of the invention adopts the electric power engineering audit system for developing the intelligent flow based on the iterative increment mode of the embodiment of the invention, and the method comprises the following steps:
step1, acquiring business requirements of electric power engineering audit;
step2, analyzing and dividing service function modules according to service requirements, and determining data relations among the service modules;
step3, analyzing the business flow and designing a system scheme;
step 4, creating a knowledge base and configuring relevant attributes of the knowledge base;
step 5, constructing a service module, constructing a service model based on a database, and constructing TRN (Transmission) through abstracting audit service, wherein the TRN comprises information required by service demand data and how to operate the information;
step 6, the Procedure is established to abstract the audit service, so that concrete audit service logic is realized, and the service of inquiring and updating the database is realized;
step 7, establishing a WebPanel to abstract the user view, namely, a user-visualized interactive interface, and realizing data processing of audit business logic by calling a Procedure service in the interaction process to persist the result to a data warehouse for storage;
step 8, building the whole service system through the steps 5-7, and completing closed loop of the system through the interconnection combination between the steps 5-7;
step 9, after the system test is completed, deploying the system to a server, configuring relevant information of a database website, initializing basic data, and performing online trial;
and step 10, quick response is carried out according to the trial feedback information, and the feedback content is solved and online is updated according to the development mode of incremental iteration.
The construction step of establishing the WebPanel in the step 7 is as follows:
step a1, creating a WebPanel object;
step a2, dragging interface elements to MainTable according to the interactive interface view style, and carrying out layout of the interface elements according to the actual positions of the elements;
step a3, after the layout of the interface elements is completed, proportional adjustment is carried out according to the relevant proportion in the actual audit service;
step a4, setting the attribute of the interface element to beautify the display effect of the element;
and a step a5, writing interface interaction events, including submitting and auditing the operation of the function, editing the operation function according to the operation of the actual interface, and writing the function operation by calling the Procedure object in the step 6.
The method also comprises the steps of grasping audit data and calculating an examination and billing generated payment function by developing an electric power engineering audit system of an intelligent flow based on an iterative increment mode, and comprises the following steps:
step1, inputting the information of the aesthetic charging month to be settled;
step2, determining input month to perform data capture of formal report of the month, and outputting classified audit report data by data classification;
setp3, obtaining an audit item under a report according to the audit report information, and calculating the audit charging according to the item type and a calculation formula configured by an audit type matching system;
and setp4, accumulating the audit and charging, integrating the data information to generate a payment function file and providing a downloading function.
The specific implementation steps of step2 are as follows:
step2.1, the system grabs out the information of the officially-issued audit report according to the input month information, and performs data association grabbing by taking the audit report as main data;
step2.2, classifying the obtained audit report information according to project units, project types and audit transaction departments, calling a Procedure to check the obtained audit report information, and limiting the selection of the audit reports with the same three types to obtain a payment function.
The specific implementation steps of step3 are as follows:
step3.1, acquiring audit items under an audit report according to audit report data classified by Step2, calling a Procedure to acquire audit item types and audit types, and matching the audit item types and the audit types with a configured audit and charging calculation formula;
step3.2, a calculation formula relates to the amount information such as the delivery amount, the trial reduction amount, the trial increment tax and the like of an audit item, coefficients of different offices are different, and GeneXus obtains the information of the item according to the item in a selected audit report by calling a Procedure, and calculates the obtained information in the formula; the specific algorithm formula is as follows:
the payment function examination and charging is formed by accumulating examination and charging of each item in an audit report of the generated payment function:
A+=B
a is payment function examination and charging
B is the examination and charging of each item of audit report contained under payment function
The project trial billing calculation formula is different according to the project type and the report type. For example:
the examination and charging calculation formula of the audit item with the item type of the main network (resolution) is as follows:
a*0.002*c
a is the amount of the project with the project type as the main network and the report type as the resolution
c is the coefficient of the transaction part
The examination and charging calculation formula of the audit item with the item type of distribution network (settlement) is as follows:
(a*0.005+b*0.05)*c
a is the amount of the project with the project type of distribution network and the report type of resolution
b is the review derate information for the item.
(project trial reduction = project trial amount-project trial amount)
c is the coefficient of the transaction part
GeneXus can perform iterative incremental development on the configuration of formula information according to user requirements, and the effect on various systems which are generated and the evolution of the effects are automatic. Database reorganization and regeneration of programs, services and user interfaces can be performed without recoding.
The incremental nature of rules, structures and procedures is the nature of GeneXus. Thus, the implementation of iterative and evolutionary development without requiring manual reconstruction is a powerful element used in any sprint or similar stage of agile methods. Iterations that are often considered in any development are made easier because GeneXus will automatically maintain changes made since the last generation of software, allowing impact analysis on the last generation and the currently generated content. The development of scenes or user stories in agile development (one of the most widespread practices to some extent) is just the process of GeneXus saving information: a user's views (UIs) are acquired and existing modes are applied to these views or new modes are allowed to be created to conform to the proposed scene.
It will be understood that modifications and variations will be apparent to those skilled in the art from the foregoing description, and it is intended that all such modifications and variations be included within the scope of the following claims.

Claims (10)

1. An electric power engineering audit system for developing intelligent processes based on an iterative incremental mode, which is characterized by comprising: the system comprises a planning management module, an audit progress management module, a quality management module, a result management module and an intermediary management module; wherein:
the plan management module is used for realizing the functions of construction project planning, audit demand management, reporting, distributing and publishing of audit projects and managing overdue projects; the plan management module is used for establishing a business model by acquiring and analyzing business demand data and clearing the data relationship between a plan and an audit project in the business demand data; when a user puts forward a new demand after using, carrying out iterative increment development on a service model according to new demand data, carrying out quick adjustment on the service model, and realizing a new demand function;
the audit progress management module is used for inquiring the audit progress execution conditions of all audit projects, checking the information of time executors of each audit node in the audit projects, and timely grasping the project conditions through the execution progress;
the quality management module is used for providing operation content and approval functions for an audit mechanism, and comprises the functions of pre-audit investigation submission, pre-audit investigation and audit, audit scheme submission, audit scheme audit, solicited opinion manuscript submission, solicited opinion manuscript audit, audit report submission, audit report audit, record manuscript management, major event management and audit report adjustment;
the achievement management module is used for realizing the functions of inputting and inquiring audit problems, filing correction data and managing images in engineering;
and the intermediary management module is used for realizing functions of intermediary mechanism share inquiry, intermediary information maintenance, intermediary mechanism evaluation and payment function.
2. The power engineering audit system for developing intelligent processes based on iterative incremental mode according to claim 1 wherein the plan management module includes: the system comprises a construction project planning unit, an audit demand management unit and an overdue project management unit; wherein:
the construction project planning unit is used for creating a project plan on line for the planned project, carrying out corresponding adjustment, supplement, modification and perfection operation, supporting batch processing of the adjustment plan every year and providing a retrieval function according to the year and project information;
the audit demand management unit is used for reporting audit items on line, distributing audit transaction confirmation to the items after reporting, and issuing the items after issuing, wherein the items enter an audit flow stage, and the execution progress condition of the items is checked through the audit demand management module;
the overdue item management unit is used for recording and managing all overdue items, and each unit is responsible for the overdue reason explanation of the item of the unit and supports the function of batch import inquiry.
3. The power engineering audit system for developing intelligent processes based on iterative incremental mode according to claim 1 wherein the quality management module includes: the system comprises a pre-examination investigation unit, an audit scheme unit, a comment solicitation unit, an audit report unit, a record manuscript management unit and a major event management unit; wherein:
the pre-examination investigation unit is used for examining and approving the pre-examination investigation condition of the project, supporting the inquiry according to the project coding, the project type and the audit type conditions, and supporting the export of a pre-examination investigation report;
the audit scheme unit is used for submitting and approving an uploading audit scheme and inputting audit project plan starting time, plan finishing time and intermediary mechanism project personnel configuration information; the audit scheme can be inquired according to the scheme name and the scheme state; automatically generating a solicited opinion manuscript and an audit report after the audit scheme passes approval;
the solicited opinion manuscript unit is used for inputting, submitting, approving and uploading solicited opinion manuscript files;
the audit report unit is used for uploading and inputting related structural information to the official audit report of the project by each unit, supporting multi-condition inquiry and batch downloading, and supporting the export functions of the audit report and report detail;
the record manuscript management unit is used for realizing the uploading and downloading functions of the record manuscript files;
and the major event management unit is used for inputting major event information to the audit scheme and supporting the inquiry and export functions of the audit scheme.
4. The power engineering audit system for developing intelligent processes based on iterative incremental mode according to claim 1 wherein the outcome management module includes: an audit problem unit, a correction data reporting unit and an engineering management image unit; wherein:
the audit problem unit is used for recording problem information found in the project audit process by each unit and supporting the functions of importing, exporting and inquiring audit problems;
the correction data filling unit is used for recording correction information of project audit problems of each unit, and comprises correction completion time, correction measures and correction condition content, and supports the functions of importing, exporting and inquiring correction data;
and the project management image unit is used for carrying out statistics and summarization on audit management data of a designated unit and carrying out visual display on the project audit progress of the unit, the weight distribution and development trend of different types of audit problems and the follow-up audit correction condition information.
5. The power engineering audit system for developing intelligent processes based on iterative incremental mode according to claim 1 wherein the intermediary management module comprises: the system comprises an intermediary mechanism share inquiry unit, an intermediary information maintenance unit, an intermediary mechanism evaluation unit and a payment letter unit; wherein:
the agency share inquiring unit is used for realizing multidimensional inquiring and displaying functions of the agency shares occupied by each audit transaction according to the bid validity period and the bid section of each year;
the medium information maintenance unit is used for realizing the management and maintenance of medium mechanisms for winning a bid and the information of personnel recording the medium mechanisms, and comprises the functions of adding, modifying, deleting and exporting the medium mechanisms, and the functions of adding, modifying, deleting, exporting and importing the medium mechanisms for personnel recording the medium mechanisms;
the agency evaluation unit is used for performing multi-dimensional evaluation scoring on the agency which has already sent out a formal audit report but is not evaluated in a month, and evaluating the agency through automatic system scoring and comprehensive scoring of province companies and city companies;
and the payment function unit is used for providing an audit payment function for the audit project with the formal audit report according to the units and the project types of the ground city, and supporting the functions of inquiring and downloading the provided audit payment function.
6. An electric power engineering auditing method for developing an intelligent flow based on an iterative increment mode, which adopts the electric power engineering auditing system for developing the intelligent flow based on the iterative increment mode as set forth in claim 1, is characterized in that the method comprises the following steps:
step1, acquiring business requirements of electric power engineering audit;
step2, analyzing and dividing service function modules according to service requirements, and determining data relations among the service modules;
step3, analyzing the business flow and designing a system scheme;
step 4, creating a knowledge base and configuring relevant attributes of the knowledge base;
step 5, constructing a service module, constructing a service model based on a database, and constructing TRN (Transmission) through abstracting audit service, wherein the TRN comprises information required by service demand data and how to operate the information;
step 6, the Procedure is established to abstract the audit service, so that concrete audit service logic is realized, and the service of inquiring and updating the database is realized;
step 7, establishing a WebPanel to abstract the user view, namely, a user-visualized interactive interface, and realizing data processing of audit business logic by calling a Procedure service in the interaction process to persist the result to a data warehouse for storage;
step 8, building the whole service system through the steps 5-7, and completing closed loop of the system through the interconnection combination between the steps 5-7;
step 9, after the system test is completed, deploying the system to a server, configuring relevant information of a database website, initializing basic data, and performing online trial;
and step 10, quick response is carried out according to the trial feedback information, and the feedback content is solved and online is updated according to the development mode of incremental iteration.
7. The method for auditing electric power engineering based on intelligent process development in an iterative incremental manner according to claim 6, wherein the step 7 of establishing WebPanel comprises the following steps:
step a1, creating a WebPanel object;
step a2, dragging interface elements to MainTable according to the interactive interface view style, and carrying out layout of the interface elements according to the actual positions of the elements;
step a3, after the layout of the interface elements is completed, proportional adjustment is carried out according to the relevant proportion in the actual audit service;
step a4, setting the attribute of the interface element to beautify the display effect of the element;
and a step a5, writing interface interaction events, including submitting and auditing the operation of the function, editing the operation function according to the operation of the actual interface, and writing the function operation by calling the Procedure object in the step 6.
8. The method for auditing electric power engineering based on developing intelligent processes in an iterative incremental manner according to claim 6, further comprising the steps of calculating an audit fee to generate a payment function by grasping audit data by an electric power engineering audit system based on developing intelligent processes in an iterative incremental manner, comprising the steps of:
step1, inputting the information of the aesthetic charging month to be settled;
step2, determining input month to perform data capture of formal report of the month, and outputting classified audit report data by data classification;
setp3, obtaining an audit item under a report according to the audit report information, and calculating the audit charging according to the item type and a calculation formula configured by an audit type matching system;
and setp4, accumulating the audit and charging, integrating the data information to generate a payment function file and providing a downloading function.
9. The method for auditing electric power engineering based on intelligent process development in an iterative incremental manner according to claim 8, wherein the specific implementation steps of step2 are as follows:
step2.1, the system grabs out the information of the officially-issued audit report according to the input month information, and performs data association grabbing by taking the audit report as main data;
step2.2, classifying the obtained audit report information according to project units, project types and audit transaction departments, calling a Procedure to check the obtained audit report information, and limiting the selection of the audit reports with the same three types to obtain a payment function.
10. The method for auditing electric power engineering based on intelligent process development in an iterative incremental manner according to claim 8, wherein the specific implementation steps of step3 are as follows:
step3.1, acquiring audit items under an audit report according to audit report data classified by Step2, calling a Procedure to acquire audit item types and audit types, and matching the audit item types and the audit types with a configured audit and charging calculation formula;
step3.2, a calculation formula relates to the amount information such as the delivery amount, the trial reduction amount, the trial increment tax and the like of an audit item, coefficients of different offices are different, and GeneXus obtains the information of the item according to the item in a selected audit report by calling a Procedure, and calculates the obtained information in the formula; the specific algorithm formula is as follows:
the payment function examination and charging is formed by accumulating examination and charging of each item in an audit report of the generated payment function:
A+=B
a is payment letter examination and charging;
b is the examination and charging of each item of audit report contained under the payment function;
the project examination and charging calculation formula is different according to the project type and the report type;
the examination and charging calculation formula of the audit item with the item type of the main network or the resolution is as follows:
a*0.002*c
a is the review amount of the project with the project type of the main network and the report type of the project of the resolution;
c is the coefficient of the transaction part;
the examination and charging calculation formula of the audit item with the item type of distribution network or settlement is as follows:
(a*0.005+b*0.05)*c
a is the review amount of the project with the project type of the distribution network and the report type of the project of the resolution;
b is the review and deduction information of the project;
project trial reduction = project trial amount-project trial amount
And carrying out iterative incremental development on the configuration of the formula information by GeneXus according to the user requirement.
CN202111287243.4A 2021-11-02 2021-11-02 Power engineering audit system and method for developing intelligent flow based on iteration increment mode Active CN113934406B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111287243.4A CN113934406B (en) 2021-11-02 2021-11-02 Power engineering audit system and method for developing intelligent flow based on iteration increment mode

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111287243.4A CN113934406B (en) 2021-11-02 2021-11-02 Power engineering audit system and method for developing intelligent flow based on iteration increment mode

Publications (2)

Publication Number Publication Date
CN113934406A CN113934406A (en) 2022-01-14
CN113934406B true CN113934406B (en) 2024-02-27

Family

ID=79285396

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111287243.4A Active CN113934406B (en) 2021-11-02 2021-11-02 Power engineering audit system and method for developing intelligent flow based on iteration increment mode

Country Status (1)

Country Link
CN (1) CN113934406B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117333141B (en) * 2023-11-27 2024-02-06 国网浙江省电力有限公司 Automatic auditing method, system, equipment and medium for engineering quantity of electric power engineering

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107920276A (en) * 2016-10-09 2018-04-17 中国电信股份有限公司 A kind of O&M operation On line inspection method, apparatus and auditing system
CN108335080A (en) * 2018-01-25 2018-07-27 广州建衡工程咨询有限公司 A kind of Construction Audit system and implementation method
CN109858876A (en) * 2019-01-22 2019-06-07 安徽天勤盛创信息科技股份有限公司 A kind of auditing system for agent-construction organization
CN111461668A (en) * 2020-04-08 2020-07-28 国网天津市电力公司 Digital auditing system and method based on process automation technology
CN111552700A (en) * 2020-04-23 2020-08-18 国网河北省电力有限公司 Intelligent audit platform for dynamically auditing project construction process of power system
CN112070338A (en) * 2020-07-22 2020-12-11 国网天津市电力公司 Enterprise internal auxiliary auditing method
KR102204444B1 (en) * 2020-07-15 2021-01-18 국민건강보험공단 System and method for performing audit task in non-facing

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060069685A1 (en) * 2004-09-14 2006-03-30 Dickens Tom A Method and a process, provided through internet based software, for the development, management, and reporting of information regarding contingent liabilities
US11468237B2 (en) * 2018-05-11 2022-10-11 Kpmg Llp Audit investigation tool

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107920276A (en) * 2016-10-09 2018-04-17 中国电信股份有限公司 A kind of O&M operation On line inspection method, apparatus and auditing system
CN108335080A (en) * 2018-01-25 2018-07-27 广州建衡工程咨询有限公司 A kind of Construction Audit system and implementation method
CN109858876A (en) * 2019-01-22 2019-06-07 安徽天勤盛创信息科技股份有限公司 A kind of auditing system for agent-construction organization
CN111461668A (en) * 2020-04-08 2020-07-28 国网天津市电力公司 Digital auditing system and method based on process automation technology
CN111552700A (en) * 2020-04-23 2020-08-18 国网河北省电力有限公司 Intelligent audit platform for dynamically auditing project construction process of power system
KR102204444B1 (en) * 2020-07-15 2021-01-18 국민건강보험공단 System and method for performing audit task in non-facing
CN112070338A (en) * 2020-07-22 2020-12-11 国网天津市电力公司 Enterprise internal auxiliary auditing method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
工程项目跟踪审计的尝试及成果;刘素杰;;河北能源职业技术学院学报;20180615(02);65-67 *
省级电网企业数字化审计平台建设的路径;黄妙红;王珏;肖嘉丽;;管理观察;20200730(21);27-28 *

Also Published As

Publication number Publication date
CN113934406A (en) 2022-01-14

Similar Documents

Publication Publication Date Title
CN112950162B (en) Information system engineering supervision work distribution management information system
CN111815283B (en) Information system engineering supervision enterprise business management system
CN111815424B (en) Information system engineering supervision project cost accounting management system
CN111815281B (en) Information system project supervision project bid management system
US6873972B1 (en) Systems and methods for credit line monitoring
CN103136626A (en) On-line management method for engineering project
CN110728422A (en) Building information model, method, device and settlement system for construction project
CN111178680B (en) Wind power plant engineering quality overall process management system, method and equipment
CN111191965A (en) Overall process engineering consultation service evaluation system
JP6049799B2 (en) Management support program
CN108765071A (en) Automobile leasing management method and device
CN113934406B (en) Power engineering audit system and method for developing intelligent flow based on iteration increment mode
Solomon Ensuring A Successful Data Warehouse Initiative.
CN112435023A (en) Distributed automatic electricity charge settlement method based on robot client
US6032131A (en) System and method for accurately modeling spending
CN108876577A (en) The system that multilingual mobile visualization collects processing information
JP2003288476A (en) Line capacity integrated evaluation/management operation system for production line and line capacity integrated evaluation/management operation method for the production line
CN114969127B (en) Reconciliation method, reconciliation system and storage medium for automatically combining reconciliation transactions
US7752109B2 (en) Method of determining parameters of a long-term lease
KR20020008644A (en) The construction management system and the service method using the system
Lee et al. Quantified benefit of implementing enterprise resource planning through process simulation
CN114066382B (en) Settlement management system based on mobile internet technology
CN114066383B (en) Bid management system based on mobile internet technology
CN114281924A (en) Digital management system
Pan et al. Construction Project Management System Based on Improved Artificial Bee Colony Algorithm

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant