CN113931129A - Flood prevention baffle of transformer substation - Google Patents

Flood prevention baffle of transformer substation Download PDF

Info

Publication number
CN113931129A
CN113931129A CN202111240101.2A CN202111240101A CN113931129A CN 113931129 A CN113931129 A CN 113931129A CN 202111240101 A CN202111240101 A CN 202111240101A CN 113931129 A CN113931129 A CN 113931129A
Authority
CN
China
Prior art keywords
fixed
piece
water blocking
flood
elastic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111240101.2A
Other languages
Chinese (zh)
Inventor
宋健
李玉霞
张启鼎
王新东
庄国强
董志超
宁学勇
王震
王莲
解平平
柳涛
许凯强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongying Power Industry Bureau Of State Grid Shandong Electric Power Co
Dongying Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
Dongying Power Industry Bureau Of State Grid Shandong Electric Power Co
Dongying Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongying Power Industry Bureau Of State Grid Shandong Electric Power Co, Dongying Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical Dongying Power Industry Bureau Of State Grid Shandong Electric Power Co
Priority to CN202111240101.2A priority Critical patent/CN113931129A/en
Publication of CN113931129A publication Critical patent/CN113931129A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/10Dams; Dykes; Sluice ways or other structures for dykes, dams, or the like
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/11Hard structures, e.g. dams, dykes or breakwaters

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Specific Sealing Or Ventilating Devices For Doors And Windows (AREA)

Abstract

The invention is suitable for the field of flood prevention, and provides a transformer substation flood prevention baffle, which comprises a mounting part and also comprises: a chute means; fixing a water retaining member; moving the water blocking member; a limiting guide member; an anti-falling buffer piece. This device is that what realize the flood stops and prevent to turn on one's side through following mode: firstly, when flood impacts a water retaining piece on one side of a movable upright post, the water retaining piece can intercept the flood; once the impact force of flood is great, under the guide effect of guide spare, the manger plate passes through loose pulley assembly and guide rail roll complex mode and moves to fixed stand, and the in-process of removal can extrude first slider and second rotation piece, and first rotation piece and second rotation piece realize the buffering to removing the stand through the mode of extruding first slider, second slider, third slider and fourth slider, and the direct position of cushioning effect is first elastic component, second elastic component, third elastic component and fourth elastic component.

Description

Flood prevention baffle of transformer substation
Technical Field
The invention belongs to the field of flood prevention, and particularly relates to a transformer substation flood prevention baffle.
Background
With the continuous aggravation of the process of human industrialization, global climate change becomes a non-negligible problem all over the world; because of the development and proliferation of climate-related mankind, the climate-related artificial flower is well valued by governments of various countries; the rapid climate change is mainly characterized by the frequent occurrence of extreme climates. The main climatic extremes are: flood, tsunami, high temperature, snow storm, earthquake, debris flow, heavy rain, and the like.
In the field of transformer substations, how to do flood prevention work of the transformer substations is one of numerous works in the field of transformer substations, and a fixed baffle is mainly adopted to intercept flood in the prior art, so that the flood is prevented from directly impacting transformer equipment and further damaging the equipment.
However, the flood prevention baffles in the prior art are all fixed baffles, and when the impact force of flood is large, because the baffles lack corresponding moving buffering effect, the damage of side turning is very easy to occur, and then the effective interception of the flood is difficult to realize.
Disclosure of Invention
The embodiment of the invention aims to provide a transformer substation flood prevention baffle plate, and aims to solve the problems that the flood prevention baffle plates in the prior art are all fixed baffle plates, and when the impact force of flood is large, because the baffle plates lack corresponding moving buffering effect, the damage of side turning is easy to occur, and further the effective interception of the flood is difficult to realize.
The embodiment of the invention is realized in such a way that the flood prevention baffle plate for the transformer substation comprises a mounting piece and further comprises:
the sliding groove device comprises a bearing piece fixed on one side of the mounting piece, and a guide rail is fixed on one side of the bearing piece;
the fixed water blocking piece comprises a bottom plate fixed inside the mounting piece, and a fixed upright post is fixed on one side of the bottom plate;
the movable water blocking piece comprises a pulley assembly which is arranged on the guide rail in a rolling way, and a movable upright post is arranged on one side of the pulley assembly;
the limiting guide part comprises a guide part fixed on one side of the fixed upright post, and the guide part penetrates through and is slidably installed in the movable upright post;
the anti-falling buffering part comprises a first sliding groove arranged in the fixed stand column and a second sliding groove arranged in the movable stand column, a first elastic part and a fourth elastic part are arranged on two sides of the first sliding groove, a third elastic part and a second elastic part are arranged on two sides of the second sliding groove, a first sliding part is arranged on one side of the first elastic part, a fourth sliding part is arranged on one side of the fourth elastic part, a third sliding part is arranged on one side of the third elastic part, a second sliding part is arranged on one side of the second elastic part, a first rotating part is rotatably arranged between the first sliding part and the second sliding part, a second rotating part is rotatably arranged between the third sliding part and the fourth sliding part, the first rotating part and the second rotating part are hinged with each other, and water blocking parts are inserted in the movable water blocking part and the fixed water blocking part; flood drives the fender water spare and removes, and the fender water spare drives loose pulley assembly and slides on the guide rail, and loose pulley assembly drives the movable stand and removes to fixed stand, and it is spacing to remove the stand through realizing at spacing guide member gliding mode, and the movable stand drives first rotation piece and second rotation piece and rotates, and first rotation piece and second rotation piece realize the buffering through the mode of first elastic component of extrusion, second elastic component, third elastic component and fourth elastic component.
Further technical scheme, the both sides of spout device are fixed with first apron and second apron, and first apron passes through rag bolt to be fixed in the inside of installed part.
Further technical scheme, one side of fixed retaining member is fixed with the bottom plate, and the inside at the installed part is fixed through threaded connection spare in the both sides of bottom plate.
According to the technical scheme, a fixing piece is fixed on one side of the limiting guide piece, two sides of the fixing piece are fixed on the side edge of the fixed stand column through bolts, and a buffering piece is fixedly mounted at the tail end of the guide piece.
According to the further technical scheme, the fixed water retaining piece and the movable water retaining piece are provided with slot positions on the inner sides.
According to the further technical scheme, a sealing element is fixed on one side of the water retaining element.
According to the technical scheme, the pulley assembly comprises a rotating shaft which is rotatably installed inside the movable upright post, a limiting part is fixed on one side of the rotating shaft, and a rotating part is fixed inside the limiting part.
The embodiment of the invention provides a flood prevention baffle plate for a transformer substation, which realizes flood prevention and rollover prevention through the following modes: firstly, when flood impacts a water retaining piece on one side of a movable upright post, the water retaining piece can intercept the flood; once the impact force of flood is great, under the guide effect of guide spare, the manger plate passes through loose pulley assembly and guide rail roll complex mode and moves to fixed stand, and the in-process of removal can extrude first slider and second rotation piece, and first rotation piece and second rotation piece realize the buffering to removing the stand through the mode of extruding first slider, second slider, third slider and fourth slider, and the direct position of cushioning effect is first elastic component, second elastic component, third elastic component and fourth elastic component. The functions are mutually matched, and the effects of supporting and buffering the flood prevention baffle are achieved.
Drawings
FIG. 1 is a schematic structural diagram of an embodiment of the present invention;
FIG. 2 is a schematic structural view of a guide rail according to an embodiment of the present invention;
FIG. 3 is a schematic structural view of a water guard according to an embodiment of the present invention;
fig. 4 is a schematic structural view of a sheave assembly in an embodiment of the present invention.
In the drawings: 1, a mounting part, 2, a first cover plate, 3, an anchor bolt, 4, a second cover plate, 5, a chute device, 51, a bearing part, 52, a 6 fixed water retaining part, 61, a base plate, 62, a 63 fixed upright post, 7 a movable water retaining part, 71 a movable upright post, 72 a pulley assembly, 8 a limit guide part, 81 a fixed part, 82 bolts, 83 guide parts, 84 a buffer part, 9 an anti-falling buffer part, 91 a first elastic part, 92 a first sliding part, 93 a first sliding groove, 94 a second sliding groove, 95 a first rotating part, 96 a second elastic part, 97 a second sliding part, 98 a third elastic part, 99 a third sliding part, 910 a second rotating part, 911 a fourth sliding part, 912 a fourth elastic part, 10 slots, 11 water retaining parts, 12 sealing parts, 13 rotating shafts, 14 limiting parts and 15 rotating parts.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is described in further detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
Specific implementations of the present invention are described in detail below with reference to specific embodiments.
As shown in fig. 1, 2 and 4, a transformer substation flood prevention baffle provided for an embodiment of the present invention includes a mounting member 1, and further includes:
the chute device 5, the chute device 5 includes the socket 51 fixed on one side of the mounting part 1, one side of the socket 51 is fixed with the guide rail 52;
the fixed water blocking piece 6 comprises a bottom plate 61 fixed inside the mounting piece 1, and a fixed upright post 63 is fixed on one side of the bottom plate 61;
the movable water blocking member 7 comprises a pulley assembly 72 which is arranged on the guide rail 52 in a rolling way, and a movable upright post 71 is arranged on one side of the pulley assembly 72;
the limiting guide part 8, the limiting guide part 8 includes a guide part 83 fixed on one side of the fixed upright post 63, the guide part 83 is penetrated and slidably installed inside the movable upright post 7;
the anti-falling buffering member 9 comprises a first sliding groove 93 arranged inside the fixed upright post 63 and a second sliding groove 94 arranged inside the movable upright post 71, a first elastic piece 91 and a fourth elastic piece 912 are arranged on two sides of the first sliding groove 93, a third elastic piece 98 and a second elastic piece 96 are arranged on two sides of the second sliding groove 94, a first sliding piece 92 is arranged on one side of the first elastic piece 91, a fourth sliding piece 911 is arranged on one side of the fourth elastic piece 912, a third sliding piece 99 is arranged on one side of the third elastic piece 98, a second sliding piece 97 is arranged on one side of the second elastic piece 96, a first rotating piece 95 is rotatably arranged between the first sliding piece 92 and the second sliding piece 97, a second rotating piece 910 is rotatably arranged between the third sliding piece 98 and the fourth sliding piece 912, the first rotating piece 95 and the second rotating piece 910 are hinged to each other, and a water blocking piece 11 is inserted into the movable water blocking piece 7 and the fixed water blocking piece 9; flood drives water blocking member 11 and removes, water blocking member 11 drives loose pulley assembly 72 and slides on guide rail 52, loose pulley assembly 72 drives removal stand 71 and removes to fixed stand 63, it is spacing to remove stand 63 through the mode realization that slides on spacing guide 8 surface, removal stand 71 drives first rotation piece 95 and second rotation piece 910 and rotates, first rotation piece 95 and second rotation piece 910 realize the buffering through the mode of extrudeing first elastic component 91, second elastic component 96, third elastic component 98 and fourth elastic component 912.
In the embodiment of the invention, the device realizes the blocking of flood and the prevention of side turning in the following modes:
firstly, when flood impacts the water blocking piece on one side of the movable upright post, the water blocking piece 11 can intercept the flood; once the impact force of the flood is large, under the guiding action of the guiding element 83, the water blocking element 11 moves towards the fixed column 63 by way of the pulley assembly 72 and the guiding rail 52 in rolling fit, and during the moving process, the first rotating element 95 and the second rotating element 910 are pressed, and the first rotating element 95 and the second rotating element 910 rotate under the pressing action of the moving column 71, wherein: the first sliding part 92 extrudes the first elastic part 91, the third sliding part 99 extrudes the third elastic part 98, the fourth sliding part 911 extrudes the fourth elastic part 912, and the second sliding part 97 extrudes the second elastic part 96, so that the movable water blocking part 7 is buffered, and the movable upright column 71 is prevented from side turning over in the sliding process.
In the embodiment of the present invention, the mounting member 1 may be a metal plate, the receiving member 51 may be a metal block, the guiding member 83 may be a metal rod, the first elastic member 91, the second elastic member 96, the third elastic member 98 and the fourth elastic member 912 may be springs, the first sliding member 92, the second sliding member 97, the third sliding member 99 and the fourth sliding member 911 may be sliders, the first rotating member 5 and the second rotating member 910 may be metal rods, and the water blocking member 11 may be a metal plate.
As shown in fig. 1, as a preferred embodiment of the present invention, a first cover plate 2 and a second cover plate 4 are fixed to both sides of a chute device 5, and the first cover plate 2 is fixed to the inside of a mounting member 1 by anchor bolts 3.
In the exemplary embodiment of the invention, the first cover plate 2, the second cover plate 4 and the anchor bolts 3 serve to fix the chute arrangement 5.
As shown in fig. 1, as a preferred embodiment of the present invention, a bottom plate 61 is fixed to one side of the water guard 6, and both sides of the bottom plate 61 are fixed to the inside of the mounting member 1 by screw-coupling members 62.
In the embodiment of the present invention, the bottom plate 61 and the screw connector 62 function to fix the water deflector 6.
In an embodiment of the present invention, the threaded connector 62 may be a threaded rod.
As shown in fig. 1, as a preferred embodiment of the present invention, a fixing member 81 is fixed to one side of the position-limiting guide 8, both sides of the fixing member 81 are fixed to the sides of the fixing posts 63 by bolts 82, and a buffer member 84 is fixedly mounted to the end of the guide 83.
In the embodiment of the present invention, the fixing member 81 and the bolt 82 are means for fixing the guide 83, and the buffer member 84 functions to prevent the end surface of the guide 83 from damaging a person.
In the embodiment of the present invention, the fixing member 81 may be a metal plate, and the buffering member 84 may be a rubber ball.
As shown in fig. 3, as a preferred embodiment of the present invention, a groove 10 is formed at the inner sides of the fixed water deflector 6 and the movable water deflector 7.
In the embodiment of the present invention, the slot 10 is used for inserting the water blocking member 11.
As shown in fig. 3, as a preferred embodiment of the present invention, a sealing member 12 is fixed to one side of a water blocking member 11.
In an embodiment of the invention, the seal 12 may prevent flood leakage.
In the present embodiment, the sealing member 12 may be a rubber pad.
As shown in fig. 4, as a preferred embodiment of the present invention, the pulley assembly 72 includes a rotating shaft 13 rotatably mounted inside a moving column 71, a limiting member 14 is fixed to one side of the rotating shaft 13, and a rotating member 15 is fixed inside the limiting member 14.
In the embodiment of the present invention, the limiting member 14 is a device for limiting the rotating member 15 and preventing derailment, and the rotating shaft 13 is a rotating device for connecting the pulley assembly 72 and the moving column 71.
In the embodiment of the present invention, the limiting member 14 may be a metal plate, and the rotating member 15 may be a metal roller.
The embodiment of the invention provides a flood prevention baffle plate for a transformer substation, which realizes the blocking of flood and the prevention of side turning through the following modes: firstly, when flood impacts the water blocking piece on one side of the movable upright post, the water blocking piece 11 can intercept the flood; once the impact force of the flood is large, under the guiding action of the guiding element 83, the water blocking element 11 moves towards the fixed column 63 by way of the pulley assembly 72 and the guiding rail 52 in rolling fit, and during the moving process, the first rotating element 95 and the second rotating element 910 are pressed, and the first rotating element 95 and the second rotating element 910 rotate under the pressing action of the moving column 71, wherein: the first sliding part 92 extrudes the first elastic part 91, the third sliding part 99 extrudes the third elastic part 98, the fourth sliding part 911 extrudes the fourth elastic part 912, and the second sliding part 97 extrudes the second elastic part 96, so that the movable water blocking part 7 is buffered.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the invention, and any modifications, equivalents and improvements made within the spirit and principle of the present invention are intended to be included within the scope of the present invention.

Claims (7)

1. The utility model provides a flood prevention baffle of transformer substation, includes the installed part, its characterized in that still includes:
the sliding groove device comprises a bearing piece fixed on one side of the mounting piece, and a guide rail is fixed on one side of the bearing piece;
the fixed water blocking piece comprises a bottom plate fixed inside the mounting piece, and a fixed upright post is fixed on one side of the bottom plate;
the movable water blocking piece comprises a pulley assembly which is arranged on the guide rail in a rolling way, and a movable upright post is arranged on one side of the pulley assembly;
the limiting guide part comprises a guide part fixed on one side of the fixed upright post, and the guide part penetrates through and is slidably installed in the movable upright post;
the anti-falling buffering part comprises a first sliding groove arranged in the fixed stand column and a second sliding groove arranged in the movable stand column, a first elastic part and a fourth elastic part are arranged on two sides of the first sliding groove, a third elastic part and a second elastic part are arranged on two sides of the second sliding groove, a first sliding part is arranged on one side of the first elastic part, a fourth sliding part is arranged on one side of the fourth elastic part, a third sliding part is arranged on one side of the third elastic part, a second sliding part is arranged on one side of the second elastic part, a first rotating part is rotatably arranged between the first sliding part and the second sliding part, a second rotating part is rotatably arranged between the third sliding part and the fourth sliding part, the first rotating part and the second rotating part are hinged with each other, and water blocking parts are inserted in the movable water blocking part and the fixed water blocking part; flood drives the fender water spare and removes, and the fender water spare drives loose pulley assembly and slides on the guide rail, and loose pulley assembly drives the movable stand and removes to fixed stand, and it is spacing to remove the stand through realizing at spacing guide member gliding mode, and the movable stand drives first rotation piece and second rotation piece and rotates, and first rotation piece and second rotation piece realize the buffering through the mode of first elastic component of extrusion, second elastic component, third elastic component and fourth elastic component.
2. The substation flood prevention baffle plate according to claim 1, wherein a first cover plate and a second cover plate are fixed to two sides of the chute device, and the first cover plate is fixed to the inside of the mounting part through anchor bolts.
3. The substation flood prevention baffle plate according to claim 1, wherein a bottom plate is fixed to one side of the fixed water blocking member, and two sides of the bottom plate are fixed to the inside of the mounting member through threaded connecting members.
4. The substation flood prevention baffle plate according to claim 1, wherein a fixing piece is fixed to one side of the limiting guide piece, two sides of the fixing piece are fixed to the side edge of the fixing upright post through bolts, and a buffering piece is fixedly mounted at the tail end of the guide piece.
5. The transformer substation flood prevention baffle plate according to claim 1, wherein slots are formed in the inner sides of the fixed water blocking piece and the movable water blocking piece.
6. The substation flood prevention baffle plate according to claim 1, wherein a sealing member is fixed to one side of the water blocking member.
7. The substation flood prevention baffle plate according to claim 1, wherein the pulley assemblies comprise rotating shafts rotatably mounted inside the moving upright columns, limiting parts are fixed on one sides of the rotating shafts, and rotating parts are fixed inside the limiting parts.
CN202111240101.2A 2021-10-25 2021-10-25 Flood prevention baffle of transformer substation Pending CN113931129A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111240101.2A CN113931129A (en) 2021-10-25 2021-10-25 Flood prevention baffle of transformer substation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111240101.2A CN113931129A (en) 2021-10-25 2021-10-25 Flood prevention baffle of transformer substation

Publications (1)

Publication Number Publication Date
CN113931129A true CN113931129A (en) 2022-01-14

Family

ID=79283986

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111240101.2A Pending CN113931129A (en) 2021-10-25 2021-10-25 Flood prevention baffle of transformer substation

Country Status (1)

Country Link
CN (1) CN113931129A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103998691A (en) * 2012-01-16 2014-08-20 日立造船株式会社 Floating flap gate
EP2915923A1 (en) * 2014-03-06 2015-09-09 Antonios Toumazis Self operating barrier for flood, spill and other protection
CN210086158U (en) * 2019-04-28 2020-02-18 中国电建集团贵阳勘测设计研究院有限公司 Dykes and dams anticollision protection architecture
CN213173546U (en) * 2020-05-20 2021-05-11 陈元进 Baffle for reducing impact in water utilization
CN213328892U (en) * 2020-09-10 2021-06-01 曹丛 Flood prevention box for hydraulic engineering
CN213417721U (en) * 2020-10-15 2021-06-11 李庆坤 A breakwater for water conservancy construction
WO2021123290A1 (en) * 2019-12-20 2021-06-24 Aquafence As A connection system, a method for connecting two modules, and a flood barrier module system
CN213571776U (en) * 2020-10-24 2021-06-29 罗文忠 Water retaining device for hydraulic engineering
CN214363275U (en) * 2021-02-08 2021-10-08 郭焕云 Flood prevention and flood fighting device for hydraulic engineering

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103998691A (en) * 2012-01-16 2014-08-20 日立造船株式会社 Floating flap gate
EP2915923A1 (en) * 2014-03-06 2015-09-09 Antonios Toumazis Self operating barrier for flood, spill and other protection
CN210086158U (en) * 2019-04-28 2020-02-18 中国电建集团贵阳勘测设计研究院有限公司 Dykes and dams anticollision protection architecture
WO2021123290A1 (en) * 2019-12-20 2021-06-24 Aquafence As A connection system, a method for connecting two modules, and a flood barrier module system
CN213173546U (en) * 2020-05-20 2021-05-11 陈元进 Baffle for reducing impact in water utilization
CN213328892U (en) * 2020-09-10 2021-06-01 曹丛 Flood prevention box for hydraulic engineering
CN213417721U (en) * 2020-10-15 2021-06-11 李庆坤 A breakwater for water conservancy construction
CN213571776U (en) * 2020-10-24 2021-06-29 罗文忠 Water retaining device for hydraulic engineering
CN214363275U (en) * 2021-02-08 2021-10-08 郭焕云 Flood prevention and flood fighting device for hydraulic engineering

Similar Documents

Publication Publication Date Title
CN113931129A (en) Flood prevention baffle of transformer substation
CN220325554U (en) Photovoltaic power generation equipment protection structure for severe environment
CN212060139U (en) Air environment monitoring device
CN105178217A (en) Wind-resistant advertisement gateway
CN112160698A (en) Aluminum alloy door and window with hide drainage route
CN111710071A (en) Intelligent entrance guard device
CN116950207A (en) Municipal wastewater intelligent treatment equipment and treatment system based on water flow automatic adjustment
CN216893047U (en) Wind pressure deformation resistant curtain wall structure
CN215210947U (en) Portable roadbed settlement detection device
CN213634603U (en) Intelligent entrance guard device
CN213508195U (en) Road surface central authorities isolation barrier
CN209978410U (en) Rotary limiting mechanism of steel pipe for solar support
CN112815037A (en) Ocean engineering structure monitoring device capable of resisting large impact force
CN112921811A (en) Safety device is used in bridge construction
CN220503829U (en) Assembled river channel rapid shutoff sluice equipment
CN216819979U (en) Remote monitoring camera with protective cover
CN221029812U (en) Telescopic device of highway bridge guardrail
CN221194459U (en) Distributed photovoltaic parking shed
CN220705391U (en) Building engineering protection network
CN221031872U (en) Protection device for plastic course lays
CN216216696U (en) Flat roof is with light-duty photovoltaic support
CN204940163U (en) One can wind resistance advertisement banister
CN218930407U (en) Protection device for outdoor broadcasting equipment
CN221476786U (en) Portable stake of charging with safeguard function
CN216625658U (en) Photovoltaic power generation group support with safeguard function

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20220114

RJ01 Rejection of invention patent application after publication