CN113886653A - Automatic matching method and system for engineering cost work order database - Google Patents

Automatic matching method and system for engineering cost work order database Download PDF

Info

Publication number
CN113886653A
CN113886653A CN202111211322.7A CN202111211322A CN113886653A CN 113886653 A CN113886653 A CN 113886653A CN 202111211322 A CN202111211322 A CN 202111211322A CN 113886653 A CN113886653 A CN 113886653A
Authority
CN
China
Prior art keywords
work order
cost
library
standard
work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111211322.7A
Other languages
Chinese (zh)
Inventor
叶秀颜
李宇彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Xiangshi Engineering Consulting Co ltd
Original Assignee
Guangzhou Xiangshi Engineering Consulting Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Xiangshi Engineering Consulting Co ltd filed Critical Guangzhou Xiangshi Engineering Consulting Co ltd
Priority to CN202111211322.7A priority Critical patent/CN113886653A/en
Publication of CN113886653A publication Critical patent/CN113886653A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/90Details of database functions independent of the retrieved data types
    • G06F16/903Querying
    • G06F16/90335Query processing
    • G06F16/90344Query processing by using string matching techniques
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/90Details of database functions independent of the retrieved data types
    • G06F16/901Indexing; Data structures therefor; Storage structures
    • G06F16/9017Indexing; Data structures therefor; Storage structures using directory or table look-up
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • G06Q30/0278Product appraisal

Abstract

The invention discloses an automatic matching method and system for a project cost work order database, wherein the method comprises the following steps: acquiring historical cost achievement data and establishing a standard working model based on the data; extracting character string information related to the type of the engineering consultation service from the engineering cost consultation information input by the user; based on the character string information, work order basic data associated with the engineering consultation service is configured from the standard work model, so that workers can conduct project making and acceptance work according to the basic data. Work order information related to the type of the engineering service is extracted from input of a user, historical information related to the work order is searched from a standard working model according to the work order information and is used as an auditing reference of the construction cost, the quality and the efficiency of the construction cost consultation service are improved, and the dependence on human experience is reduced.

Description

Automatic matching method and system for engineering cost work order database
Technical Field
The invention relates to the field of construction cost, in particular to an automatic matching method and system for a construction cost work order database.
Background
The construction cost refers to the total cost spent on a certain project construction. The construction projects have the characteristic of singleness, and the construction cost is different due to different factors such as different design files, construction methods, construction time, implementation subjects and the like of each construction project, so that a large amount of repeated work is brought to the compiling and the checking of the construction cost, and the accuracy of the construction cost is difficult to guarantee.
Disclosure of Invention
In order to improve the accuracy of the construction cost, the application provides an automatic matching method and system for a construction cost work order database.
In a first aspect, the application provides a method and a system for automatically matching a project cost work order database, which adopts the following technical scheme:
an automatic matching method for a project cost work order database comprises the following steps:
acquiring historical cost achievement data and establishing a standard working model based on the data;
extracting character string information related to the type of the engineering consultation service from the engineering cost consultation information input by the user;
and configuring work order basic data associated with the engineering consultation service from the standard work model based on the character string information.
By adopting the technical scheme, the construction cost data of the historical engineering comprises relevant information such as engineering basic information and characteristic attributes, main engineering quantity content, construction cost indexes, labor cost consumption and price, material consumption and price, mechanical consumption and price, management cost and profit indexes, work order information relevant to the engineering service type is extracted from the input of a user, historical information with higher similarity to the work order is searched from a standard working model according to the work order information and is used as a verification reference of the construction cost, and a worker compares the construction cost data to be constructed with the historical data to judge whether relevant parameters of the construction to be constructed are reasonable. By the method, the quality and the efficiency of the engineering cost consultation service are improved, and the dependence on human experience is reduced.
Optionally, the auditing method further includes:
establishing a structured database based on a preset standard; wherein the structured database comprises: a cost subject library, a standard list library, a material price library, a cost index library and a content index library;
establishing a checking relation between a structured database and the work order basic data;
and confirming the auditing scheme according to the checking relationship.
By adopting the technical scheme, the system provides corresponding intelligent operation prompts and suggestions according to the checking relation between the work order basic data and the database in the attributes of enterprise standard characteristics, engineering characteristics, regionality, timeliness, relevance and the like of each database, the database provides a convenient, quick and intelligent method and tool for engineering cost business operation, and the labor workload and the artificial working errors are reduced.
Optionally, the step of confirming the audit scheme according to the work order basic data further includes:
acquiring different professional engineering consultation service work orders from the engineering cost consultation information;
matching corresponding tool packs according to the different professional engineering consultation service work orders; wherein the kit comprises: the system comprises a work guide, a contract template library, an enterprise standard inventory library, a price set template, a material price library, a budgeting standard, a cost index library, a main index content library and training data.
By adopting the technical scheme, part of projects have differences with some conventional construction projects due to the particularity of regions, construction conditions and the like, so that the projects contained in the tool kit can be accurately checked based on the data contained in the basic data and the tool kit based on the project contained in the tool kit according to different professional project consultation service worksheets and based on the basic data, the checking quality and efficiency are improved, and the error is reduced.
Optionally, the step of obtaining, based on the work order information, basic data associated with the work order information from the standard work model includes:
establishing a checking relation between the work order information and the standard work model;
and acquiring the work order basic data according to the checking relationship.
By adopting the technical scheme, the mapping relation between the work order information and the standard work model is established, so that when the work order information is extracted, the related data information can be directly acquired according to the mapping relation between the work order information and the standard work model, and the data acquisition efficiency is improved.
In a second aspect, the present application provides an intelligent auditing system for engineering cost consultation, which adopts the following technical scheme:
an intelligent auditing system for engineering cost consultation, the system comprising:
the working model generation module is used for acquiring historical construction cost result data and establishing a standard working model based on the historical construction cost result data;
the work order information acquisition module is used for extracting work order information related to the type of the engineering consultation service from the engineering cost consultation information input by the user;
and the auditing scheme generating module is used for configuring work order basic data associated with the engineering consultation service from the standard work model based on the work order information and confirming the auditing scheme according to the work order basic data so that a worker can carry out project making and acceptance checking according to the basic data.
By adopting the technical scheme, the construction cost data of the historical engineering comprises the relevant information such as the basic information and the characteristic attribute of the engineering, the content of the main engineering quantity, the construction cost index, the consumption and the price of labor cost, the consumption and the price of materials, the consumption and the price of machinery, the management cost and the profit index, the work order information relevant to the type of engineering business is extracted from the input of a user, and the historical information relevant to the work order is searched from the standard working model according to the work order information to be used as the auditing reference of the construction cost, so that the quality and the efficiency of the engineering construction cost consultation service are improved, and the dependency on people experience is reduced.
Optionally, the system further comprises:
the structured database generation module is used for establishing a structured database based on a preset standard; wherein the structured session database comprises: a cost subject library, a standard list library, a material price library, a cost index library and a content index library; establishing a checking relation between a structured database and the work order basic data; and confirming the auditing scheme according to the checking relationship.
By adopting the technical scheme, the system provides corresponding intelligent operation prompts and suggestions for each database in the attributes of enterprise standard characteristics, engineering characteristics, regionality, timeliness, relevance and the like according to the audit relationship between the engineering project basic data and the database, and the database provides a convenient, quick and intelligent method and tool for engineering cost business operation, so that the labor workload is reduced, and the artificial working errors are reduced.
Optionally, after executing the auditing scheme generating module, a toolkit module is also executed, and the toolkit module is used for acquiring different professional engineering consultation service worksheets from the engineering cost consultation information; matching corresponding tool packs according to the different professional engineering consultation service work orders; wherein the kit comprises: the system comprises a work guide, a contract template library, an enterprise standard inventory library, a price set template, a material price library, a budgeting standard, a cost index library, a main index content library and training data.
By adopting the technical scheme, according to different professional engineering consultation service work orders, the corresponding tool bags are accurately matched, and when time is checked, accurate checking can be carried out based on the items contained in the tool bags, so that the checking quality and efficiency are improved, and the error is reduced.
Optionally, the auditing scheme generating module includes a work order obtaining sub-module, and the work order obtaining sub-module is used for establishing a checking relationship between the work order information and the standard work model; and acquiring the work order basic data according to the checking relationship.
By adopting the technical scheme, the mapping relation between the work order information and the standard work model is established, so that when the work order information is extracted, the related data information can be directly acquired according to the mapping relation between the work order information and the standard work model, and the data acquisition efficiency is improved.
In a third aspect, the present application provides a computer device, comprising a memory, a processor and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps of the method for automatically matching a project cost work order database according to any one of the first aspect when executing the computer program.
In a fourth aspect, the present application provides a computer readable storage medium storing a computer program capable of being loaded by a processor and executing the first aspect.
In summary, the present application has the following beneficial effects:
1. according to the characteristics and the construction process of a construction project, a system divides the construction cost consultation service of the whole construction project into a plurality of committable professional engineering consultation services according to a set rule (the rule refers to the characteristic of the construction project and the checking relationship between the construction process and the consultation service, and the rule formulated by the relationship is related to the project type, the project scale, the project construction schedule, the delivery package range and the enterprise management mode), and configures the basic data of each professional engineering consultation service work order in a system background according to different professional engineering consultation service types, and the system comprises the following steps: entrust precondition standard, work standard, deliverable standard, acceptance standard, construction period standard, reward standard, toolkit and the like, the system automatically pushes related standards and toolkits when assigning work order tasks, and engineering cost consultation service operators are helped to quickly and accurately finish the work of compiling and acceptance of consultation business through standard work guide and big data.
Drawings
FIG. 1 is a schematic diagram of an automated matching method for a project cost work order database according to an embodiment of the present application;
FIG. 2 is a schematic diagram illustrating the database configuration in the automatic matching method for the engineering cost work order database according to an embodiment of the present application;
FIG. 3 is a schematic diagram of a computer device according to an embodiment of the present application.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
The embodiment of the application discloses an automatic matching method for a project cost work order database, which is shown in figure 1 and comprises the following steps:
s100: historical cost result data is obtained and a standard working model is established based on the data.
In this embodiment, the historical construction cost result data refers to the data of the historical construction project which has completed construction and accounting, and the historical construction project includes construction period, acceptance list, construction materials, construction basic information and characteristic attributes, main construction volume content, construction cost index, labor cost consumption and price, material consumption and price, machine consumption and price, management cost and profit index and other related information related to construction of the construction project. The standard working model refers to a series of factors such as designing and optimizing the flow, method, management action, control requirement and the like of a certain type of work, so that the complex and subjective work is programmed, related workers are guided to work according to work, the artificial random errors are reduced, and the working efficiency and quality (namely, the manufacturing cost data serving as a reference standard) are improved to the maximum extent. The contents of the standard working model include: the system comprises a workflow, a working method, a working standard, a working precondition requirement, a project quality requirement, a construction period, a working acceptance standard, a working settlement standard, relevant data and tool software and the like.
Specifically, data related to the project before and after construction are obtained from a plurality of historical engineering projects, the data are sorted, and a standard working model is established based on the obtained data. The model types comprise a target cost working model, a budget working model, a settlement working model, a bid inviting working model and a contract management working model.
S200: and extracting work order information related to the type of the engineering consultation service from the engineering cost consultation information input by the user.
In this embodiment, the construction cost advisory information refers to the fact that a construction cost advisory enterprise accepts an order, provides professional service for determining and controlling construction cost of a construction project, and issues a construction cost result file; the work order information refers to a specific item, such as: and (5) project construction period.
Specifically, the construction cost consultation information input by the user is identified to obtain a plurality of work order information contained in the construction cost consultation information. The identification information is mainly established by presetting classification rules to establish a database, and multidimensional accurate matching is performed step by selecting types in actual work, for example: by selecting the item type: residential, grade: high-end, number of layers: 20-25 floors, building area: 2 ten thousand square, the computer automatically searches the cost data of the similar type project.
Referring to fig. 2, the database includes an enterprise rating library, a standard inventory library, a typical engineering case library, a design index content library, and a material price library.
The enterprise quota base is used for making a reference price suitable for enterprise distribution according to the management level, standard drawings, standard construction schemes, a distribution mode and the like of an enterprise. The standard list clearing library is divided according to enterprise standard drawings, standard construction schemes and sub-project projects, and unified codes, unified project names, unified project characteristics and list prices of unified metering units are formulated. The typical project case library is a cost data database of a large number of repeatedly used project projects of an enterprise, and comprises design drawings, cost indexes, budget cost, man-machine content, price and the like. The design index content library is an index content benchmark which is summarized according to a large amount of case data and relevant standard specifications and is suitable for common engineering project design, for example: steel bar content index, concrete content index, masonry content index and the like. The material price library refers to various types of material prices needed for planning the construction cost, and is collected according to different regions and periods.
The five databases are independent of each other, but the association can be realized through specific engineering cases, such as: the construction budget cost is worked out, according to different business types, an enterprise quota base or a standard list base is firstly quoted for making, then the material price is quoted for replacing, the cost index and the content index are calculated by a computer, the data of a typical engineering case base and a design index content base are respectively compared and analyzed to judge whether the obtained data is accurate or not, the final engineering cost data is confirmed, and the finally formed cost data can be classified into the typical engineering case base and the design index content base through screening and adjusting.
The method mainly comprises the steps of extracting key information of a database through a computer and establishing an incidence relation with individual case engineering so as to read information of a related database, wherein the key information comprises but is not limited to information such as item types, purposes, building areas, product grades, layer heights, layer numbers, list codes, list names, list item characteristics, time attributes, region attributes and the like.
S300: based on the work order information, work order basic data associated with the engineering consultation service is configured from the standard work model, and an auditing scheme is confirmed according to the work order basic data, so that workers can conveniently conduct project making and acceptance checking according to the basic data.
In this embodiment, the work order basic data refers to each examination standard associated with the work order, and includes: commission preconditions criteria, work criteria, deliverable criteria, acceptance criteria, construction period criteria, reward criteria, kits, and the like. The auditing scheme refers to the combination of reference standards related to each work order of the engineering consultation service.
Specifically, each work order is associated with each standard in the standard work model in advance, after the work order information is extracted, the work order information is input into the standard work model, and the system brings out the standard associated with the work order name according to the name of the specific work order to form an auditing scheme.
For example, the extracted work order information includes: inputting the three work orders into a standard work model to obtain corresponding preconditions standard, deliverables standard and acceptance standard which are related to the work orders, wherein the preconditions standard comprises contract documents, construction organization design or construction scheme, corresponding acceptance tables and the like, deliverables standard budget acceptance tables, budget book software boards, node budget tables and the like.
After S300, further comprising S400: establishing a structured database based on a preset standard; wherein the structured database comprises: a cost subject library, a standard list library, a material price library, a cost index library and a content index library; establishing a checking relation between a structured database and work order basic data; and confirming the auditing scheme according to the checking relationship.
In this embodiment, the checking relationship refers to a mapping relationship between two data; the preset standard is formulated according to enterprises in different regions and is formulated by referring to a building material hall, a labor hall and a machinery hall at the same time.
Specifically, related parameters are obtained from historical engineering, wherein the parameters comprise engineering cost, material price and the like, and various parameters in various projects are classified according to different classifications to form corresponding databases; and then establishing a mapping relation between each database and each work order basic data to establish the correlation between the data, so that when the work order confirms the verification scheme, the specific parameters in the database correlated with the work order are taken out from the model through the work order.
After S300, further comprising S500: acquiring different professional engineering consultation service work orders from the engineering cost consultation information; matching corresponding tool packs according to different professional engineering consultation service work orders; wherein, the saddlebag includes: the system comprises a work guide, a contract template library, an enterprise standard inventory library, a price set template, a material price library, a budgeting standard, a cost index library, a main index content library and training data.
In this embodiment, the different professional engineering consulting services refer to different kinds of engineering projects, such as bridge construction projects, road construction projects, and the like.
Specifically, the type of the project is identified according to the construction content from the consulted information, and the corresponding toolkit is matched according to the construction content according to different construction types. For example, the project is bridge construction, and a tool kit for bridge construction comprises: the bridge acceptance training work guide, the material price library for bridge construction and the like.
Furthermore, after all data related to the project are matched, the data of the construction cost of the project to be constructed are input into the system, and the data obtained by matching and the construction cost data of the project to be constructed are subjected to data verification through a data verification method so as to verify whether the obtained data are matched with the construction cost data of the project to be constructed.
The embodiment of the application also discloses an automatic matching system of the engineering cost work order database, and the system comprises:
the working model generation module is used for acquiring historical construction cost result data and establishing a standard working model based on the historical construction cost result data;
the work order information acquisition module is used for extracting work order information related to the type of the engineering consultation service from the engineering cost consultation information input by the user;
and the auditing scheme generating module is used for configuring work order basic data associated with the engineering consultation service from the standard work model based on the work order information and confirming the auditing scheme according to the work order basic data so that a worker can conveniently perform project making and acceptance checking according to the basic data.
Furthermore, the auditing scheme generating module comprises a work order obtaining submodule, and the work order obtaining submodule is used for establishing a checking relation between the work order information and the standard work model; and acquiring the work order basic data according to the checking relationship.
Further, the system also comprises a structured database generation module, which is used for establishing a structured database based on a preset standard; wherein the structured session database includes: a cost subject library, a standard list library, a material price library, a cost index library and a content index library; establishing a checking relation between a structured database and work order basic data; and confirming the auditing scheme according to the checking relationship.
Furthermore, the system also comprises an execution toolkit module, wherein the toolkit module is used for acquiring different professional engineering consultation service worksheets from the engineering cost consultation information; matching corresponding tool packs according to different professional engineering consultation service work orders; wherein, the saddlebag includes: the system comprises a work guide, a contract template library, an enterprise standard inventory library, a price set template, a material price library, a budgeting standard, a cost index library, a main index content library and training data.
The embodiment of the application also discloses a computer device, which can be a server, with reference to fig. 3. The computer device includes a processor, a memory, a network interface, and a database connected by a system bus. Wherein the processor of the computer device is configured to provide computing and control capabilities. The memory of the computer device comprises a nonvolatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program, and a database. The internal memory provides an environment for the operation of an operating system and computer programs in the non-volatile storage medium. The database of the computer device is used to store historical suspicious behavior data. The network interface of the computer device is used for communicating with an external terminal through a network connection. The computer program is executed by a processor to realize an automatic matching method of the project cost work order database, and the method comprises the following steps:
s100: acquiring historical cost achievement data and establishing a standard working model based on the data;
s200: extracting work order information related to the type of the engineering consultation service from the engineering cost consultation information input by the user;
s300: based on the work order information, work order basic data associated with the engineering consultation service is configured from the standard work model, and an auditing scheme is confirmed according to the work order basic data, so that workers can conveniently conduct project making and acceptance checking according to the basic data.
The embodiment of the application also discloses a computer readable storage medium. In one embodiment, a computer-readable storage medium is provided, having a computer program stored thereon, which when executed by a processor, performs the steps of:
s100: acquiring historical cost achievement data and establishing a standard working model based on the data;
s200: extracting work order information related to the type of the engineering consultation service from the engineering cost consultation information input by the user;
s300: based on the work order information, work order basic data associated with the engineering consultation service is configured from the standard work model, and an auditing scheme is confirmed according to the work order basic data, so that workers can conveniently conduct project making and acceptance checking according to the basic data.
It will be understood by those skilled in the art that all or part of the processes of the methods of the embodiments described above can be implemented by hardware related to instructions of a computer program, which can be stored in a non-volatile computer-readable storage medium, and when executed, can include the processes of the embodiments of the methods described above. Any reference to memory, storage, database, or other medium used in the embodiments provided herein may include non-volatile and/or volatile memory, among others. Non-volatile memory can include read-only memory (ROM), Programmable ROM (PROM), Electrically Programmable ROM (EPROM), Electrically Erasable Programmable ROM (EEPROM), or flash memory. Volatile memory can include Random Access Memory (RAM) or external cache memory. By way of illustration and not limitation, RAM is available in a variety of forms such as Static RAM (SRAM), Dynamic RAM (DRAM), Synchronous DRAM (SDRAM), Double Data Rate SDRAM (DDRSDRAM), Enhanced SDRAM (ESDRAM), Synchronous Link DRAM (SLDRAM), Rambus Direct RAM (RDRAM), direct bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM).
It will be apparent to those skilled in the art that, for convenience and brevity of description, only the above-mentioned division of the functional units and modules is illustrated, and in practical applications, the above-mentioned function distribution may be performed by different functional units and modules according to needs, that is, the internal structure of the apparatus is divided into different functional units or modules, so as to perform all or part of the functions described above.
The above examples are only intended to illustrate the technical solution of the present invention, but not to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; such modifications and substitutions do not substantially depart from the spirit and scope of the embodiments of the present invention, and are intended to be included within the scope of the present invention.

Claims (10)

1. An automatic matching method for a project cost work order database is characterized by comprising the following steps:
acquiring historical cost achievement data and establishing a standard working model based on the data;
extracting work order information related to the type of the engineering consultation service from the engineering cost consultation information input by the user;
and configuring work order basic data associated with the engineering consultation service from the standard work model based on the work order information.
2. The method of claim 1, wherein the auditing method further comprises:
establishing a structured database based on a preset standard; wherein the structured database comprises: a cost subject library, a standard list library, a material price library, a cost index library and a content index library;
establishing a checking relation between a structured database and the work order basic data;
and confirming the auditing scheme according to the checking relationship.
3. The method of claim 1, wherein the step of validating the audit scheme based on the work order base data further comprises:
acquiring different professional engineering consultation service work orders from the engineering cost consultation information;
matching corresponding tool packs according to the different professional engineering consultation service work orders; wherein the kit comprises: the system comprises a work guide, a contract template library, an enterprise standard inventory library, a price set template, a material price library, a budgeting standard, a cost index library, a main index content library and training data.
4. The method of claim 1, wherein the step of obtaining basic data associated with the work order information from the standard work model based on the work order information comprises:
establishing a checking relation between the work order information and the standard work model;
and acquiring the work order basic data according to the checking relationship.
5. An automatic matching system for a project cost work order database, the system comprising:
the working model generation module is used for acquiring historical construction cost result data and establishing a standard working model based on the historical construction cost result data;
the work order information acquisition module is used for extracting work order information related to the type of the engineering consultation service from the engineering cost consultation information input by the user;
and the auditing scheme generating module is used for configuring work order basic data associated with the engineering consultation service from the standard work model based on the work order information and confirming the auditing scheme according to the work order basic data so that a worker can carry out project making and acceptance checking according to the basic data.
6. The automated matching system for a construction cost work order database according to claim 5, further comprising:
the structured database generation module is used for establishing a structured database based on a preset standard; wherein the structured database comprises: a cost subject library, a standard list library, a material price library, a cost index library and a content index library; establishing a checking relation between a structured database and the work order basic data; and confirming the auditing scheme according to the checking relationship.
7. The automatic matching system for project cost work order database according to claim 5, wherein after executing the auditing scheme generating module, a toolkit module is further executed, wherein the toolkit module is used for obtaining different professional project consulting business work orders from the project cost consulting information; matching corresponding tool packs according to the different professional engineering consultation service work orders; wherein the kit comprises: the system comprises a work guide, a contract template library, an enterprise standard inventory library, a price set template, a material price library, a budgeting standard, a cost index library, a main index content library and training data.
8. The automatic matching system for the project cost work order database according to claim 5, wherein the auditing scheme generation module comprises a work order acquisition sub-module, and the work order acquisition sub-module is used for establishing the checking relationship between the work order information and the standard work model; and acquiring the work order basic data according to the checking relationship.
9. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: the steps of a method for automated matching of a construction cost work order database according to any of claims 1-5 are implemented when the computer program is executed by the processor.
10. A computer-readable storage medium, in which a computer program is stored which can be loaded by a processor and which executes the method according to any of claims 1-5.
CN202111211322.7A 2021-10-18 2021-10-18 Automatic matching method and system for engineering cost work order database Pending CN113886653A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111211322.7A CN113886653A (en) 2021-10-18 2021-10-18 Automatic matching method and system for engineering cost work order database

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111211322.7A CN113886653A (en) 2021-10-18 2021-10-18 Automatic matching method and system for engineering cost work order database

Publications (1)

Publication Number Publication Date
CN113886653A true CN113886653A (en) 2022-01-04

Family

ID=79003519

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111211322.7A Pending CN113886653A (en) 2021-10-18 2021-10-18 Automatic matching method and system for engineering cost work order database

Country Status (1)

Country Link
CN (1) CN113886653A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114493266A (en) * 2022-01-26 2022-05-13 海天工程咨询有限公司 Intelligent quality control method and system for engineering cost achievement
CN116188091A (en) * 2023-05-04 2023-05-30 品茗科技股份有限公司 Method, device, equipment and medium for automatic matching unit price reference of cost list
CN116384939A (en) * 2023-04-13 2023-07-04 华腾建信科技有限公司 Engineering project safety management method, device, equipment and storage medium
CN117010925A (en) * 2023-06-21 2023-11-07 广东中洲国信建设管理咨询有限公司 Automatic pricing method, system, equipment and storage medium for engineering materials

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110084633A (en) * 2019-03-14 2019-08-02 深圳市丰浩达工程项目管理有限公司 Project cost, bid, consulting total management system
CN110727774A (en) * 2019-10-11 2020-01-24 北京中鹏诚工程造价咨询有限公司 Engineering cost consultation management system
CN111369216A (en) * 2020-03-04 2020-07-03 昆明海巍科技有限公司 Highway engineering cost information processing system and method
CN112347236A (en) * 2020-11-16 2021-02-09 友谊国际工程咨询股份有限公司 Intelligent engineering consultation method and system based on AI (Artificial Intelligence) calculated quantity and computer equipment thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110084633A (en) * 2019-03-14 2019-08-02 深圳市丰浩达工程项目管理有限公司 Project cost, bid, consulting total management system
CN110727774A (en) * 2019-10-11 2020-01-24 北京中鹏诚工程造价咨询有限公司 Engineering cost consultation management system
CN111369216A (en) * 2020-03-04 2020-07-03 昆明海巍科技有限公司 Highway engineering cost information processing system and method
CN112347236A (en) * 2020-11-16 2021-02-09 友谊国际工程咨询股份有限公司 Intelligent engineering consultation method and system based on AI (Artificial Intelligence) calculated quantity and computer equipment thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114493266A (en) * 2022-01-26 2022-05-13 海天工程咨询有限公司 Intelligent quality control method and system for engineering cost achievement
CN116384939A (en) * 2023-04-13 2023-07-04 华腾建信科技有限公司 Engineering project safety management method, device, equipment and storage medium
CN116384939B (en) * 2023-04-13 2023-12-01 华腾建信科技有限公司 Engineering project safety management method, device, equipment and storage medium
CN116188091A (en) * 2023-05-04 2023-05-30 品茗科技股份有限公司 Method, device, equipment and medium for automatic matching unit price reference of cost list
CN117010925A (en) * 2023-06-21 2023-11-07 广东中洲国信建设管理咨询有限公司 Automatic pricing method, system, equipment and storage medium for engineering materials
CN117010925B (en) * 2023-06-21 2024-03-22 广东中洲国信建设管理咨询有限公司 Automatic pricing method, system, equipment and storage medium for engineering materials

Similar Documents

Publication Publication Date Title
CN113886653A (en) Automatic matching method and system for engineering cost work order database
US8418123B2 (en) Software development production management system, computer program, and recording medium
EP2413242B1 (en) System and method for test strategy optimization
US20110307281A1 (en) Model inventory manager
KR100927953B1 (en) Project-wide integrated project management system using integrated process cost management
US20070027919A1 (en) Dispute resolution processing method and system
US20150066592A1 (en) Methods of semiconductor manufacturing and supply chain management systems
CN111523854A (en) BIM and database based automatic pricing system relating to automatic pre-settlement
KR102238926B1 (en) Cost managent system and cost managent method using the same
CN115860508A (en) Nuclear power storage engineering quantity measuring method and device, computer equipment and medium
CN116630082A (en) Method and device for allocating production resources, electronic equipment and storage medium
US20200005400A1 (en) Selection system of comparable companies
CN111738538A (en) Engineering project management system, management method, APP and storage medium
US7844486B2 (en) System and method for determining and increasing an accuracy of costing
Akinsola et al. Construction planning process improvement using information technology tools
Parhizkar et al. An AHP-Based analysis of the Cost of ERP Modification
JP2022090812A (en) Activity management system and its method
US20050097065A1 (en) System and method for analyzing relationships between sourcing variables
JP3695152B2 (en) Cost index calculation device
Wicaksono et al. An Automated Information System for Medium to Short-Term Manpower Capacity Planning in Make-To-Order Manufacturing
Lin et al. The mythical advanced planning systems in complex manufacturing environment
KR102303692B1 (en) System and method for selecting proposal data and making proposal based on debriefing system
Bagci et al. Measuring a software production line with IFPUG-based function points
Rossi et al. Life Cycle Assessment tool for environmental characterization of manufacturing companies: a methodological guidance
Bundschuh et al. The IFPUG Function Point Counting Method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20220104