CN113723755A - Natural resource is built storehouse and is used field exploration management system - Google Patents

Natural resource is built storehouse and is used field exploration management system Download PDF

Info

Publication number
CN113723755A
CN113723755A CN202110859773.5A CN202110859773A CN113723755A CN 113723755 A CN113723755 A CN 113723755A CN 202110859773 A CN202110859773 A CN 202110859773A CN 113723755 A CN113723755 A CN 113723755A
Authority
CN
China
Prior art keywords
task
field
data
summarizing
display area
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110859773.5A
Other languages
Chinese (zh)
Inventor
叶红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202110859773.5A priority Critical patent/CN113723755A/en
Publication of CN113723755A publication Critical patent/CN113723755A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063114Status monitoring or status determination for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063116Schedule adjustment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Tourism & Hospitality (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Physics & Mathematics (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to a natural resource reservoir building system, in particular to a field exploration management system for natural resource reservoir building. The invention aims to provide a natural resource database-building field exploration management system which can confirm post, reduce field data error rate and automatically draft field time according to weather. The invention comprises the following steps: step 1: task summarization, step 2: operator collection, step 3: summarizing the weather conditions of various regions, and step 4: task assignment, step 5: judging whether the personnel arrive at the post, and step 6: acquiring data, and step 7: and (5) archiving the data. The invention can modify the task in time by mutually matching the steps, can draft reasonable field exploration time according to weather, reasonably distributes field workers to the task place, judges whether the field workers arrive at the post, improves the timeliness of task assignment, the rationality of personnel distribution, the effectiveness of data acquisition, simplifies the working process and improves the working efficiency of the working personnel.

Description

Natural resource is built storehouse and is used field exploration management system
Technical Field
The invention relates to the field of land investigation, in particular to a field exploration management system for natural resource reservoir building.
Background
Under the background of the third national land survey, the country needs to rearrange and adjust the difference of the natural resource data. The investigation is carried out on natural resources, the property right system reformation of the natural resources is better promoted, and a complete ecological civilization system is formed. In the process of land utilization status investigation, a large number of sporadic land objects which are not suitable for being represented on a map in proportion due to the fact that the area is too small according to a map scale need to be explored on the spot, but whether the assignment situation of field tasks is reasonable, whether field workers arrive at posts or not and whether field exploration time is reasonable or not cannot be judged in actual work, so that managers cannot accurately grasp the completion situation and the completion time of the field tasks of operators, and the working efficiency is low.
In view of the above, in order to solve the problems that it cannot be determined whether the assignment of field tasks is reasonable, whether field workers arrive at post, whether field exploration time is reasonable, and the like, it is urgently needed to develop a natural resource database construction field exploration management system capable of improving the arrival rate of field workers, reasonably assigning field tasks, and reasonably formulating field exploration time.
Disclosure of Invention
(1) Technical problem to be solved
The invention aims to overcome the defects of low post arrival rate and low working efficiency of natural resource field prospecting personnel in the third national land survey process of the national land, and the technical problem to be solved is to provide the system which is simple, convenient and easy to operate, and can reasonably assign field tasks, improve the post arrival rate of field workers and improve the working efficiency.
(2) Technical scheme
In order to solve the technical problem, the invention provides a natural resource reservoir building field exploration management system, which comprises the following steps:
step 1: task summarization
The task summary comprises the following steps: a task summarizing button and a task summarizing display area; receiving a task summarizing instruction, and displaying the field task content in a summarizing display area; wherein the tasks in the summary display area are arranged by location;
step 2: staff summary
The staff gathers including: a "people summary" button, a people summary display area; receiving a personnel summary instruction, wherein the personnel summary condition is displayed in a personnel summary display area;
and step 3: summary of weather conditions in various regions
The weather condition summaries of various regions comprise: a weather condition summarizing button and a weather condition summarizing interface;
receiving a 'weather condition summarizing' instruction, wherein the weather condition is displayed in a weather condition summarizing display area;
and 4, step 4: task assignment
The task assignment comprises the following steps: a task assignment interface, a 'task assignment' button, a task assignment display area and a 'confirmation' button; receiving a task assignment instruction, and assigning a field task according to the field task content, the condition of an operator and the weather condition, wherein the field task assignment is displayed in a task assignment display area; receiving a confirmation instruction, and sending the assignment task to an operator;
and 5: confirmation on duty
The confirmation on duty comprises the following steps: GPS positioning confirmation, solid photo confirmation, GPS positioning display area and solid photo display area; receiving a 'on duty confirmation' instruction, importing the GPS positioning data and the solid photo, and displaying the GPS positioning data in a GPS positioning display area and the solid photo in a solid photo display area; receiving an ' confirmation ' instruction, judging whether the positioning data and the solid photographing picture are different from the task assignment place in the step 2, if not, popping up ' confirmation on duty is successful! "prompt box; if there is a discrepancy, pop up "the survey location does not match the dispatch location, please reconfirm! Displaying a frame, sending a message prompt to the field personnel, and going to the post again for confirmation;
step 6: obtaining field exploration data
The acquiring field exploration data comprises the following steps: a data summarizing interface, a data acquiring button and a field exploration data summarizing display area; receiving a data acquisition command, and acquiring field exploration data, wherein the field exploration data is displayed in a field exploration data summarizing and displaying area;
and 7: data archiving
The data archive comprises the following steps: a "data archive" button; receiving a data archiving command, archiving the field exploration data to a scattered terrain database of the natural resource class of the third national land survey, and popping up the data archiving success! "display frame.
Preferably, the task assignment in step 1 further includes: a 'task modification' button and a task modification interface; after receiving a task modification instruction, popping up the task modification interface; wherein, the task modification interface comprises: a task number modification frame, a task place modification frame, a task content modification frame, a task start time modification frame, a task deadline modification frame, a remark modification frame, a line feed button and a 'confirm modification' button; and modified contents are displayed in the corresponding modification frame, a 'confirm modification' instruction is received, and the modified contents are displayed in the task summarizing display area.
Preferably, the task assignment in step 4 further includes: searching weather conditions and drawing up a field time column; after receiving a task assignment command, retrieving the weather condition of the place according to the task place, drawing up the field exploration starting time and the task ending time if the weather condition is sunny, rainy and cloudy, and sending the field task content, the drawn-up field exploration starting time and the task ending time to field personnel, wherein the drawn-up field exploration starting time and the task ending time are displayed in a task assignment display area.
Preferably, the task assignment in step 4 further includes a task assignment method, and the steps of the method are as follows:
(1) comparing the number of the operating personnel with the number of the field tasks, wherein the number of the operating personnel is more than or equal to the number of the field tasks; if the number of the operating personnel is less than the number of the field tasks, prompting the operating personnel that the reserve is insufficient;
(2) confirming that the field task numbers and the field task numbers within the working area range of the operating personnel are not repeated; hiding field task numbers which belong to the working area range of the operators and have no task requirements temporarily;
(3) respectively calculating the difference value of the reserve task amount and the actual task amount with task demand in the working area range of the operating personnel;
(4) judging whether the calculated difference is greater than or equal to zero, and if the calculated difference is greater than or equal to zero, giving priority to the operation personnel to the task a with the minimum difference; if the calculation difference is smaller than zero, prompting that the operating personnel of the task a is insufficient;
(5) and (4) comparing the difference value between the residual task quantity and the required task quantity except the task a in the priority arrangement operating personnel, arranging the operating personnel A with the maximum difference value, and returning to the step (3) to continue the arrangement until the task arrangement is finished.
Preferably, the task assignment in step 4 further includes: the system comprises a time sequencing button, a personnel sequencing button and a receiving time sequencing instruction, wherein the task assignment is sequenced according to the sequence of field planned time and is displayed in a task assignment display area; and receiving a 'personnel sorting' instruction, wherein the task assignments are arranged from small to large according to the serial number of the operators and are displayed in the task assignment display area.
Preferably, the message reminding mode in step 5 includes: short messages, e-mails, etc.; the content of the message reminder comprises: and setting a field task place, drawing up field exploration starting time and task ending time. Preferably, the acquiring field survey data in step 6 further comprises: acquiring a region selection interface; wherein, the obtaining area selection interface comprises: an "acquire" button, a provincial city (county) selection column. And receiving an acquisition command, wherein the field exploration data is displayed in a field exploration data summarizing and displaying area. Preferably, the method further comprises the following steps: the task summarizing module is used for receiving a task summarizing instruction and summarizing field tasks to be displayed in the task summarizing display area;
the operator summarizing module is used for receiving a 'personnel summarizing' instruction, and the condition of the operator is displayed in an operator summarizing display area;
the weather condition summarizing module is used for receiving a weather condition summarizing instruction, and the weather conditions are displayed in a weather condition summarizing display area;
the task dispatching module: the system comprises a task assignment display area, a task assignment display area and a task scheduling area, wherein the task assignment display area is used for receiving a task assignment instruction and assigning a field task according to the field task content, the condition of an operator and the weather condition;
the arrival confirmation module: the system is used for receiving an instruction of 'on duty confirmation', and importing the GPS positioning data and the field photographing picture; receiving an ' affirmation ' instruction, judging whether the positioning data and the field photographing picture are different from the assignment place of the task assignment module, if not, popping up ' the confirmation on duty is successful! "prompt box; if there is a discrepancy, pop up "the survey location does not match the dispatch location, please reconfirm! Displaying a frame, sending a message prompt to the field personnel, and going to the post again for confirmation; wherein, the reminding content comprises: field location, field start and end time;
the field data acquisition module: the system comprises a data acquisition command, a data acquisition command and a data display command, wherein the data acquisition command is used for receiving a data acquisition command and acquiring field exploration data according to places, and the field exploration data is displayed in a field exploration data summarizing and displaying area;
a data archiving module: the data archiving system is used for receiving a data archiving command and archiving the field exploration data to a scattered terrain database of the natural resource type of the third national land survey.
Preferably, the system further comprises: one or more processors;
a memory for storing one or more programs;
when executed by the one or more processors, cause the one or more processors to implement natural resource pooling field exploration management.
Preferably, also include: a readable medium having stored thereon a computer program, wherein the program, when executed by a processor, implements natural resource banking for field survey management.
Has the advantages that:
the invention relates to a natural resource reservoir building field exploration management system, which has simple and convenient operation method and high accuracy; 1. the invention can modify the task, and if the content or the location of the task has errors, the task can be timely modified, thereby improving the accuracy of task assignment; 2. the method can draw up reasonable field exploration starting time and ending time according to weather, and improve the timeliness and completion efficiency of task assignment; 3. the task places of the operators can be reasonably distributed by effectively matching software and algorithms and combining the working range of the operators, the planned working time and the weather condition, the time and the energy for manually distributing the tasks are reduced, and the reasonability of personnel distribution is improved; 4. can know the task assignment condition according to the managers demand to whether judge field operation personnel arrive the post, improve field operation personnel and arrive the post rate, simplify work flow, improve staff's work efficiency.
Drawings
FIG. 1 is a flow chart of the operation of the present invention;
FIG. 2 is a schematic diagram of tasks, personnel, weather conditions summary of the present invention;
FIG. 3 is a schematic diagram of the invention in task modification;
FIG. 4 is a task assignment diagram of the present invention;
FIG. 5 is a schematic illustration of the present invention in post validation;
FIG. 6 is a schematic diagram of the present invention for obtaining data region selection;
FIG. 7 is a schematic diagram of a data archive of the present invention;
fig. 8 is a schematic structural diagram of an apparatus provided by the present invention.
Detailed Description
The invention is further described below with reference to the figures and examples.
Example 1
A natural resource is built storehouse and used the field exploration management system, use the computer as the hardware, install the system on this computer, establish field task summary form, field personnel summary form, weather situation summary form in advance; the use steps are as follows, as shown in fig. 1:
step 1: task summarization
As shown in fig. 2, clicking a "task summary" button, the system receiving a "task summary" instruction, the system importing the field tasks to be assigned in a preset field task summary table into the system, and displaying the field tasks in a task summary display area; the tasks in the task summary display area are arranged according to places; as shown in fig. 3, the task assignment further includes: a 'task modification' button and a task modification interface; clicking a 'task modification' button, and popping up a task modification interface after the system receives a 'task modification' instruction; wherein, the task modification interface comprises: a task number modification frame, a task place modification frame, a task content modification frame, a task start time modification frame, a task deadline modification frame, a remark modification frame, a line feed button and a 'confirm modification' button; clicking a line feed button to find out the content to be modified, displaying the modified content in the corresponding modification frame, modifying the original data into correct data, clicking a 'modification confirmation' instruction, receiving the 'modification confirmation' instruction by the system, and displaying the modified correct data in a task summarizing display area;
step 2: staff summary
As shown in fig. 2, clicking the "operator summary" button, the system receives the "operator summary" instruction, automatically guides the personnel information in the preset field task personnel list table into the system, and displays the personnel information in the operator summary display area;
and step 3: summary of weather conditions in various regions
As shown in fig. 2, clicking a "weather condition summarization" button, receiving a "weather condition summarization" instruction by the system, automatically retrieving the weather conditions of the field task area, and automatically summarizing and displaying the weather conditions to a weather condition summarization display area;
and 4, step 4: task assignment
As shown in fig. 4, clicking the "task assignment" button, the system receives the "task assignment" instruction, and reasonably assigns the field tasks summarized by the system according to the task location, field worker information, and weather conditions of various regions; if the weather condition is sunny, rainy and cloudy, drawing up the field exploration starting time and the task ending time; if the weather is severe rain, rainstorm and the like, postponing the field exploration starting time and the task ending time; wherein, the field exploration starting time and the task ending time are displayed in the task assignment display area; sending the field task, the start and end time of the field exploration time and the weather condition to corresponding field personnel in a short message and e-mail mode; wherein, the task assignment further comprises: a time sorting button, a personnel sorting button and a time sorting button are clicked, and task assignment is sorted according to the sequence of field planned time and is displayed in a task assignment display area; clicking a 'personnel sorting' button, arranging the task assignment from small to large according to the serial number of the operating personnel and displaying the task assignment in a task assignment display area;
the method for reasonably allocating tasks to the operators comprises the following steps:
(1) comparing the number of the operating personnel with the number of the field tasks, wherein the number of the operating personnel is more than or equal to the number of the field tasks; if the number of the operating personnel is less than the number of the field tasks, prompting the operating personnel that the reserve is insufficient;
(2) confirming that the field task numbers and the field task numbers within the working area range of the operating personnel are not repeated; hiding field task numbers which belong to the working area range of the operators and have no task requirements temporarily;
(3) respectively calculating the difference value of the reserve task amount and the actual task amount with task demand in the working area range of the operating personnel;
(4) judging whether the difference value is greater than or equal to zero, and if the difference value is greater than or equal to zero, giving priority to the minimum task a to arrange the operating personnel; if the difference value is smaller than zero, prompting that the operating personnel of the task a is insufficient;
(5) comparing the difference between the residual task quantity and the required task quantity except the task a in the operation personnel with priority, arranging the operation personnel A with the maximum difference, and returning to the step (3) to continue arranging until the task arrangement is finished;
wherein, the part of codes of the task assignment are as follows:
' arr1 equals the task array for a survey
arr 1=arrsh
Extracting task place name keywords
For i=1 To UBound(arr1,1)
arr1(i,2)=Right(arr1(i,2),3)
Next i
' arr2 equals the people array
arr2=arrry
l ine 1:
The arrrwdcs array is equal to the number of times each task needs to be scheduled
Dim arrrwdcs
Dim dict1 As Object
Set dict1=CreateObject("scripting.dictionary")
For i=1 To UBound(arr1,1)
If arr1(i,2)<>″″Then
dict1(arr1(i,2))=dict1(arr1(i,2))+1
End If
Next i
arrrwdcs=Range("a1:b"&dict1.Count)
m=1
For Each iIn dict1.keys
arrrwdcs(m,1)=i
arrrwdcs(m,2)=dict1(i)
m=m+1
Next i
' arrrywrwdcs is the number of times the personnel array can schedule a task
Dim arrryrwdcs
arrryrwdcs=arrrwdcs
For i=1 To UBound(arrryrwdcs,1)
arrryrwdcs(i,2)=0
For j=1 To UBound(arr2,1)
If InStr(arr2(j,3),arrryrwdcs(i,1))>0 Then arrryrwdcs(i,2)=arrryrwdcs(i,2)+1
Next j
Next i
' arrcz personnel provide a difference between the mission and mission requirements
Dim arrcz
arrcz=arrrwdcs
For i=1 To UBound(arrcz,1)
arrcz(i,2)=arrryrwdcs(i,2)-arrrwdcs(i,2)
If arrcz (i, 2) <0 the MsgBoxarrcz (i, 1) & "staff short"
Next i
' ordering of differences
Array ordering (arrcz,2)
' locating the person required for the task location with the smallest difference
Dim arrczzx
m=0
For i=1 To UBound(arr2,1)
If InStr(arr2(i,3),arrcz(1,1))>0 Then m=m+1
Next i
arrczzx=Range(Cells(1,15),Cells(m,15+UBound(arr2,2)-1))
m=0
For i=1 To UBound(arr2,1)
If InStr(arr2(i,3),arrcz(1,1))>0 Then
m=m+1
For j=1 To UBound(arr2,2)
arrczzx(m,j)=arr2(i,j)
Next j
End If
Next i
' number of human tasks
Dim splitarry
For i=1 To UBound(arrczzx,1)
splitarry=Split(arrczzx(i,3),"、")
arrczzx(i,4)=UBound(splitarry,1)
Next i
' personnel task quantity ordering
Array ordering (arrczzx, 4)
' selection of responsible person
For i=1 To UBound(arr1,1)
If arr1(i,2)=arrcz(1,1)Then
arr1(i,7)=arrczzx(1,2)
Exit For
End If
Next i
For i=1 To UBound(arrrwfp,1)
For j=1 To UBound(arr1,1)
If arrrwfp(i,1)=arr1(j,1)Then arrrwfp(i,7)=arr1(j,7)
Next j
Next i
m=0
For i=1 To UBound(arr1,1)
If arr1(i,1)=""Then m=m+1
Next i
If UBend (arr1,1) -m ═ 1 Then GoTo line2' shows that arrangement is finished when arr1 has only one value left
' task reduction
For i=1 To UBound(arr1,1)
If arr1(i,7)=arrczzx(1,2)Then
For j=1 To UBound(arr1,2)
arr1(i,j)=""
Next j
End If
Next i
' personnel reduction
For i=1 To UBound(arr2,1)
If arr2(i,2)=arrczzx(1,2)Then
For j=1 To UBound(arr2,2)
arr2(i,j)=""
Next j
End If
Next i
GoTo line1
line2:
'[a53].Resize(UBound(arrrwfp,1),UBound(arrrwfp,2))=arrrwfp
rwfp.lbxrwfp.List=arrrwfp
rwfp.lbxrwfp.ColumnCount=8
rwfp.lbxrwfp.ColumnWidths="50;110;50;100;70;100;70;70"End Sub
And 5: confirmation on duty
As shown in fig. 5, the on Shift confirmation includes: GPS positioning confirmation and solid photo confirmation; clicking a GPS positioning button, receiving a GPS positioning instruction, uploading GPS data of field personnel during field exploration to a system, and displaying the data in a GPS display area; clicking a 'solid photo' button, receiving a 'solid photo' instruction, uploading a solid photo during field exploration of field personnel to a system, and displaying the solid photo in a solid photo picture display area; clicking a confirmation button, receiving a confirmation instruction, judging whether the positioning data and the solid photographing picture are different from the task assignment place in the step 2, and popping up a prompt box of successful confirmation after arriving at the post if the positioning data and the solid photographing picture are not different from the task assignment place in the step 2; if there is a discrepancy, pop up "the survey location does not match the dispatch location, please reconfirm! Displaying a frame, sending a message prompt to the field personnel, and going to the post again for confirmation; wherein, the reminding content comprises: setting the starting time and the ending time of the field task;
step 6: obtaining data
As shown in fig. 6, click the "acquire data" button, receive the "acquire data" command, enter the import region selection interface; wherein, obtain the area selection interface including: an "acquire" button, a provincial or urban (county) selection column; clicking an acquisition button, receiving an acquisition command, and displaying the field exploration data in a field exploration data summarizing and displaying area;
and 7: data archiving
As shown in fig. 7, the "data archive" button receives the "data archive" command, archives the field exploration data into the sporadic nature database of the nature resource class for the third national land survey, and pops up "data archive success! "display frame;
a natural resource reservoir building field exploration management system is characterized by comprising:
the task summarizing module is used for receiving a task summarizing instruction and summarizing field tasks to be displayed in the task summarizing display area;
the operator summarizing module is used for receiving a 'personnel summarizing' instruction, and the condition of the operator is displayed in an operator summarizing display area;
the weather condition summarizing module is used for receiving a weather condition summarizing instruction, and the weather conditions are displayed in a weather condition summarizing display area;
the arrival confirmation module: the system is used for receiving an instruction of 'on duty confirmation', and importing the GPS positioning data and the field photographing picture; receiving a confirmation instruction, judging whether the positioning data and the solid photographing picture are different from the task assignment place in the step 2, and if not, entering the next step; if there is a discrepancy, pop up "the survey location does not match the dispatch location, please reconfirm! Displaying a frame, sending a message prompt to the field personnel, and going to the post again for confirmation; wherein, the reminding content comprises:
field location, field time;
a data acquisition module: for receiving 'acquire data' command, acquiring field exploration data according to location
The field exploration data is displayed in a field exploration data gathering display area;
a data archiving module: the data archiving system is used for receiving a data archiving command and archiving field exploration data to a scattered terrain database of a natural resource type for national land survey for the third time;
a natural resource reservoir building field exploration management system is characterized in that the system comprises:
one or more processors;
a memory for storing one or more programs;
when executed by the one or more processors, cause the one or more processors to implement natural resource banking field survey management;
a readable medium having stored thereon a computer program, wherein the program, when executed by a processor, implements natural resource banking for field survey management.
Referring now to FIG. 8, a block diagram of an apparatus 800 suitable for use in implementing embodiments of the present disclosure is shown. Devices in embodiments of the present disclosure may include, but are not limited to, mobile terminals such as mobile phones, laptops, PADs (tablets), etc., and fixed terminals such as desktop computers, etc. The apparatus shown in fig. 8 is only an example, and should not bring any limitation to the function and scope of use of the embodiments of the present disclosure.
As shown in fig. 8, the apparatus 600 may include a processing device (e.g., central processing unit, graphics processor, etc.) 801 that may perform various appropriate actions and processes in accordance with a program stored in a Read Only Memory (ROM)802 or a program loaded from a storage device 808 into a Random Access Memory (RAM) 803. In the RAM803, various programs and data necessary for the operation of the apparatus 800 are also stored. The processing apparatus 801, the ROM802, and the RAM803 are connected to each other by a bus 804. An input/output (I/O) interface 805 is also connected to bus 804.
Generally, the following devices may be connected to the I/O interface 805: input devices 806 including, for example, a touch screen, touch pad, keyboard, mouse, etc.; output devices 807 including, for example, a Liquid Crystal Display (LCD); storage 808 including, for example, a USB flash disk, hard disk, or the like; and a communication device 809. The communication means 809 may allow the device 600 to communicate wirelessly or by wire with other devices to exchange data. While fig. 8 illustrates an apparatus 800 having various means, it is to be understood that not all illustrated means are required to be implemented or provided. Alternatively, more or fewer devices may be implemented or provided.
In particular, according to an embodiment of the present disclosure, the processes described above with reference to the flowcharts may be implemented as computer software programs. For example, embodiments of the present disclosure include a computer program product comprising a computer program embodied on a computer readable medium, the computer program comprising program code for performing the method illustrated in the flow chart. In such an embodiment, the computer program may be downloaded and installed from a network through the communication means 809, or installed from the storage means 808, or installed from the ROM 802. The computer program, when executed by the processing apparatus 801, performs the above-described functions defined in the methods of the embodiments of the present disclosure.
It should be noted that the computer readable medium in the present disclosure can be a computer readable signal medium or a computer readable storage medium or any combination of the two. A computer readable storage medium may be, for example, but not limited to, an electronic, magnetic, optical, electromagnetic, infrared, or semiconductor system, apparatus, or device, or any combination of the foregoing. More specific examples of the computer readable storage medium may include, but are not limited to: an electrical connection having one or more wires, a portable computer diskette, a hard disk, a Random Access Memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disc read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing. In the present disclosure, a computer readable storage medium may be any tangible medium that can contain, or store a program for use by or in connection with an instruction execution system, apparatus, or device. In contrast, in the present disclosure, a computer readable signal medium may comprise a propagated data signal with computer readable program code embodied therein, either in baseband or as part of a carrier wave. Such a propagated data signal may take many forms, including, but not limited to, electro-magnetic, optical, or any suitable combination thereof. A computer readable signal medium may also be any computer readable medium that is not a computer readable storage medium and that can communicate, propagate, or transport a program for use by or in connection with an instruction execution system, apparatus, or device. Program code embodied on a computer readable medium may be transmitted using any appropriate medium, including but not limited to: electrical wires, optical cables, RF (radio frequency), etc., or any suitable combination of the foregoing.
The computer readable medium may be embodied in the apparatus; or may be separate and not incorporated into the device.
The computer readable medium carries one or more programs which, when executed by the apparatus, cause the apparatus to: determining a sub-region in a region corresponding to the requester under a preset grade according to the current position of the requester in the recommendation request; and determining the user recommendation information of the sub-region which meets the preset recommendation condition according to the preset graded priority and the weight of the sub-region in the region to obtain the user recommendation information corresponding to the requester.
Computer program code for carrying out operations for aspects of the present disclosure may be written in any combination of one or more programming languages, including an object oriented programming language such as Java, Smalltalk, C + +, and conventional procedural programming languages, such as the "C" programming language or similar programming languages. The program code may execute entirely on the user's computer, partly on the user's computer, as a stand-alone software package, partly on the user's computer and partly on a remote computer or entirely on the remote computer or server. In the case of a remote computer, the remote computer may be connected to the user's computer through any type of network, including a Local Area Network (LAN) or a Wide Area Network (WAN), or the connection may be made to an external computer (for example, through the Internet using an Internet service provider).
The flowchart and block diagrams in the figures illustrate the architecture, functionality, and operation of possible implementations of systems, methods and computer program products according to various embodiments of the present disclosure. In this regard, each block in the flowchart or block diagrams may represent a module, segment, or portion of code, which comprises one or more executable instructions for implementing the specified logical function(s). It should also be noted that, in some alternative implementations, the functions noted in the block may occur out of the order noted in the figures. For example, two blocks shown in succession may, in fact, be executed substantially concurrently, or the blocks may sometimes be executed in the reverse order, depending upon the functionality involved. It will also be noted that each block of the block diagrams and/or flowchart illustration, and combinations of blocks in the block diagrams and/or flowchart illustration, can be implemented by special purpose hardware-based systems which perform the specified functions or acts, or combinations of special purpose hardware and computer instructions.
The units described in the embodiments of the present disclosure may be implemented by software or hardware. Where the name of an element does not in some cases constitute a limitation on the element itself.
The above examples are merely representative of preferred embodiments of the present invention, and the description thereof is more specific and detailed, but not to be construed as limiting the scope of the present invention. It should be noted that, for those skilled in the art, various changes, modifications and substitutions can be made without departing from the spirit of the present invention, and these are all within the scope of the present invention. Therefore, the protection scope of the present patent shall be subject to the appended claims.

Claims (10)

1. A natural resource library building and field exploration management system is characterized by comprising the following steps:
step 1: task summarization
The task summary comprises the following steps: a task summarizing button and a task summarizing display area; receiving a task summarizing instruction, and displaying the field task content in a summarizing display area; wherein the tasks in the summary display area are arranged by location;
step 2: staff summary
The staff gathers including: a "people summary" button, a people summary display area; receiving a personnel summary instruction, wherein the personnel summary condition is displayed in a personnel summary display area;
and step 3: summary of weather conditions in various regions
The weather condition summaries of various regions comprise: a weather condition summarizing button and a weather condition summarizing interface; receiving a 'weather condition summarizing' instruction, wherein the weather condition is displayed in a weather condition summarizing display area;
and 4, step 4: task assignment
The task assignment comprises the following steps: a task assignment interface, a 'task assignment' button, a task assignment display area and a 'confirmation' button; receiving a task assignment instruction, and assigning a field task according to the field task content, the condition of an operator and the weather condition, wherein the field task assignment is displayed in a task assignment display area; receiving a confirmation instruction, and sending the assignment task to an operator;
and 5: confirmation on duty
The confirmation on duty comprises the following steps: GPS positioning confirmation, solid photo confirmation, GPS positioning display area and solid photo display area; receiving a 'on duty confirmation' instruction, importing the GPS positioning data and the solid photo, and displaying the GPS positioning data in a GPS positioning display area and the solid photo in a solid photo display area; receiving an ' confirmation ' instruction, judging whether the positioning data and the solid photographing picture are different from the task assignment place in the step 2, if not, popping up ' confirmation on duty is successful! "prompt box; if there is a discrepancy, pop up "the survey location does not match the dispatch location, please reconfirm! Displaying a frame, sending a message prompt to the field personnel, and going to the post again for confirmation;
step 6: obtaining field exploration data
The acquiring field exploration data comprises the following steps: a data summarizing interface, a data acquiring button and a field exploration data summarizing display area; receiving a data acquisition command, and acquiring field exploration data, wherein the field exploration data is displayed in a field exploration data summarizing and displaying area;
and 7: data archiving
The data archive comprises the following steps: a "data archive" button; receiving a data archiving command, archiving the field exploration data to a scattered terrain database of the natural resource class of the third national land survey, and popping up the data archiving success! "display frame.
2. The system for managing natural resource warehousing field exploration according to claim 1, wherein said task assignment in step 1 further comprises: a 'task modification' button and a task modification interface; after receiving a task modification instruction, popping up the task modification interface; wherein, the task modification interface comprises: a task number modification frame, a task place modification frame, a task content modification frame, a task start time modification frame, a task deadline modification frame, a remark modification frame, a line feed button and a 'confirm modification' button; and modified contents are displayed in the corresponding modification frame, a 'confirm modification' instruction is received, and the modified contents are displayed in the task summarizing display area.
3. The system for managing natural resource warehousing field exploration according to claim 1, wherein said task assignment in step 4 further comprises: searching weather conditions and drawing up a field time column; after receiving a task assignment command, retrieving the weather condition of the place according to the task place, drawing up the field exploration starting time and the task ending time if the weather condition is sunny, rainy and cloudy, and sending the field task content, the drawn-up field exploration starting time and the task ending time to field personnel, wherein the drawn-up field exploration starting time and the task ending time are displayed in a task assignment display area.
4. The system for managing natural resource warehousing field exploration according to claim 1, wherein said task assignment in step 4 further comprises a method for task assignment, said method comprising the steps of:
(1) comparing the number of the operating personnel with the number of the field tasks, wherein the number of the operating personnel is more than or equal to the number of the field tasks; if the number of the operating personnel is less than the number of the field tasks, prompting the operating personnel that the reserve is insufficient;
(2) confirming that the field task numbers and the field task numbers within the working area range of the operating personnel are not repeated; hiding field task numbers which belong to the working area range of the operators and have no task requirements temporarily;
(3) respectively calculating the difference value of the reserve task amount and the actual task amount with task demand in the working area range of the operating personnel;
(4) judging whether the calculated difference is greater than or equal to zero, and if the calculated difference is greater than or equal to zero, giving priority to the operation personnel to the task a with the minimum difference; if the calculation difference is smaller than zero, prompting that the operating personnel of the task a is insufficient;
(5) and (4) comparing the difference value between the residual task quantity and the required task quantity except the task a in the priority arrangement operating personnel, arranging the operating personnel A with the maximum difference value, and returning to the step (3) to continue the arrangement until the task arrangement is finished.
5. The system for managing natural resource warehousing field exploration according to claim 1, wherein said task assignment in step 4 further comprises: the system comprises a time sequencing button, a personnel sequencing button and a receiving time sequencing instruction, wherein the task assignment is sequenced according to the sequence of field planned time and is displayed in a task assignment display area; and receiving a 'personnel sorting' instruction, wherein the task assignments are arranged from small to large according to the serial number of the operators and are displayed in the task assignment display area.
6. The system according to claim 1, wherein the message reminding manner in step 5 comprises: short messages, e-mails, etc.; the content of the message reminder comprises: and setting a field task place, drawing up field exploration starting time and task ending time.
7. The system for field exploration management for natural resource banking according to claim 1, wherein the step 6 of obtaining field exploration data further comprises: acquiring a region selection interface; wherein, the obtaining area selection interface comprises: an "acquire" button, a provincial or urban (county) selection column; and receiving an acquisition command, wherein the field exploration data is displayed in a field exploration data summarizing and displaying area.
8. A natural resource reservoir building field exploration management system is characterized by comprising:
the task summarizing module is used for receiving a task summarizing instruction and summarizing field tasks to be displayed in the task summarizing display area;
the operator summarizing module is used for receiving a 'personnel summarizing' instruction, and the condition of the operator is displayed in an operator summarizing display area;
the weather condition summarizing module is used for receiving a weather condition summarizing instruction, and the weather conditions are displayed in a weather condition summarizing display area;
the task dispatching module: the system comprises a task assignment display area, a task assignment display area and a task scheduling area, wherein the task assignment display area is used for receiving a task assignment instruction and assigning a field task according to the field task content, the condition of an operator and the weather condition;
the arrival confirmation module: the system is used for receiving an instruction of 'on duty confirmation', and importing the GPS positioning data and the field photographing picture; receiving an ' affirmation ' instruction, judging whether the positioning data and the field photographing picture are different from the assignment place of the task assignment module, if not, popping up ' the confirmation on duty is successful! "prompt box; if there is a discrepancy, pop up "the survey location does not match the dispatch location, please reconfirm! Displaying a frame, sending a message prompt to the field personnel, and going to the post again for confirmation; wherein, the reminding content comprises: setting up the field place and setting up the start and stop time of the field;
the field data acquisition module: the system comprises a data acquisition command, a data acquisition command and a data display command, wherein the data acquisition command is used for receiving a data acquisition command and acquiring field exploration data according to places, and the field exploration data is displayed in a field exploration data summarizing and displaying area;
a data archiving module: the data archiving system is used for receiving a data archiving command and archiving the field exploration data to a scattered terrain database of the natural resource type of the third national land survey.
9. A natural resource reservoir building field exploration management system is characterized in that the system comprises:
one or more processors;
a memory for storing one or more programs;
when executed by the one or more processors, cause the one or more processors to implement the natural resource pooling field survey management of claims 1-7.
10. A readable medium having stored thereon a computer program, which when executed by a processor implements natural resource pooling field exploration management as claimed in claims 1-7.
CN202110859773.5A 2021-07-28 2021-07-28 Natural resource is built storehouse and is used field exploration management system Pending CN113723755A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110859773.5A CN113723755A (en) 2021-07-28 2021-07-28 Natural resource is built storehouse and is used field exploration management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110859773.5A CN113723755A (en) 2021-07-28 2021-07-28 Natural resource is built storehouse and is used field exploration management system

Publications (1)

Publication Number Publication Date
CN113723755A true CN113723755A (en) 2021-11-30

Family

ID=78674256

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110859773.5A Pending CN113723755A (en) 2021-07-28 2021-07-28 Natural resource is built storehouse and is used field exploration management system

Country Status (1)

Country Link
CN (1) CN113723755A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116894569A (en) * 2023-09-11 2023-10-17 常安城市公共安全技术有限公司 Environment sampling task dispatching method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106384205A (en) * 2016-09-30 2017-02-08 百度在线网络技术(北京)有限公司 Modeling method used for collecting operation input duration and modeling device thereof
CN107508695A (en) * 2017-07-06 2017-12-22 盐城新奥燃气有限公司 Gas ductwork operation management visualization system
CN111582612A (en) * 2019-02-15 2020-08-25 拉扎斯网络科技(上海)有限公司 Order distribution method and device, electronic equipment and computer readable storage medium
CN111651249A (en) * 2020-05-15 2020-09-11 拉扎斯网络科技(上海)有限公司 Task allocation method and device, readable storage medium and electronic equipment
CN111696016A (en) * 2020-05-26 2020-09-22 杭州今奥信息科技股份有限公司 Natural resource investigation management system based on internet + online checking
CN112036695A (en) * 2020-07-28 2020-12-04 拉扎斯网络科技(上海)有限公司 Weather information prediction method and device, readable storage medium and electronic equipment
CN112241856A (en) * 2019-07-16 2021-01-19 拉扎斯网络科技(上海)有限公司 Distribution resource management method, distribution resource management device, electronic equipment and computer storage medium

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106384205A (en) * 2016-09-30 2017-02-08 百度在线网络技术(北京)有限公司 Modeling method used for collecting operation input duration and modeling device thereof
CN107508695A (en) * 2017-07-06 2017-12-22 盐城新奥燃气有限公司 Gas ductwork operation management visualization system
CN111582612A (en) * 2019-02-15 2020-08-25 拉扎斯网络科技(上海)有限公司 Order distribution method and device, electronic equipment and computer readable storage medium
CN112241856A (en) * 2019-07-16 2021-01-19 拉扎斯网络科技(上海)有限公司 Distribution resource management method, distribution resource management device, electronic equipment and computer storage medium
CN111651249A (en) * 2020-05-15 2020-09-11 拉扎斯网络科技(上海)有限公司 Task allocation method and device, readable storage medium and electronic equipment
CN111696016A (en) * 2020-05-26 2020-09-22 杭州今奥信息科技股份有限公司 Natural resource investigation management system based on internet + online checking
CN112036695A (en) * 2020-07-28 2020-12-04 拉扎斯网络科技(上海)有限公司 Weather information prediction method and device, readable storage medium and electronic equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116894569A (en) * 2023-09-11 2023-10-17 常安城市公共安全技术有限公司 Environment sampling task dispatching method

Similar Documents

Publication Publication Date Title
CN107437144A (en) A kind of order dispatch method, system, computer equipment and storage medium
CN111191920A (en) Large-scale ground resource scheduling method and device
CN112150106A (en) Method and device for processing order task and providing travel service
US20170032334A1 (en) Method and system for managing service work flow
US20130007694A1 (en) Project story board to board communication tools
CN110650170B (en) Method and device for pushing information
CN113723755A (en) Natural resource is built storehouse and is used field exploration management system
CN115017484A (en) Access control method and device
CN109902848A (en) The method and apparatus of regular bus Bus stop planning
CN113233069B (en) Intelligent warehousing ex-warehouse control method and device, electronic equipment and storage medium
CN110858332A (en) Order production method and device
US20240013115A1 (en) Creating And Managing Statements Of Work
US20230206182A1 (en) Creating and managing statements of work
CN110110153A (en) A kind of method and apparatus of node searching
EP4318346A1 (en) Warehouse order task processing method and apparatus, storage medium, and electronic device
US10403011B1 (en) Passing system with an interactive user interface
US20050055262A1 (en) System and a method for distributing assignments and receiving report data
CN112988288A (en) Information processing method, system, server and storage medium for RPA program
TWM510498U (en) Project progress control and management device
CN113393209B (en) Data accounting method, device, system, equipment and medium
US20240086803A1 (en) Platform for Cross-Enterprise Project Monitoring, Management, and Reporting
US20090171809A1 (en) Efficient purchase order creation
KR102315432B1 (en) Method and apparatus for managing project using data pointer
CN117390240A (en) Display method, display system and related equipment for scheduling data
KR102315433B1 (en) Method and apparatus for managing project using setting of cost payment time

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination