CN113718663A - Railway cable tower construction method for spanning multi-track operation line - Google Patents
Railway cable tower construction method for spanning multi-track operation line Download PDFInfo
- Publication number
- CN113718663A CN113718663A CN202110564513.5A CN202110564513A CN113718663A CN 113718663 A CN113718663 A CN 113718663A CN 202110564513 A CN202110564513 A CN 202110564513A CN 113718663 A CN113718663 A CN 113718663A
- Authority
- CN
- China
- Prior art keywords
- tower
- steel
- cable
- vertical rotation
- cable tower
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
- E01D21/08—Methods or apparatus specially adapted for erecting or assembling bridges by rotational movement of the bridge or bridge sections
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/14—Towers; Anchors ; Connection of cables to bridge parts; Saddle supports
Abstract
Description
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110564513.5A CN113718663A (en) | 2021-05-24 | 2021-05-24 | Railway cable tower construction method for spanning multi-track operation line |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110564513.5A CN113718663A (en) | 2021-05-24 | 2021-05-24 | Railway cable tower construction method for spanning multi-track operation line |
Publications (1)
Publication Number | Publication Date |
---|---|
CN113718663A true CN113718663A (en) | 2021-11-30 |
Family
ID=78672772
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110564513.5A Pending CN113718663A (en) | 2021-05-24 | 2021-05-24 | Railway cable tower construction method for spanning multi-track operation line |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113718663A (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007205139A (en) * | 2006-02-06 | 2007-08-16 | Sumitomo Mitsui Construction Co Ltd | Construction method of arch bridge |
CN101200880A (en) * | 2007-12-24 | 2008-06-18 | 中铁大桥局股份有限公司 | Steel tube arch single pivot ten-thousand-tonnage horizontal rotation swivel construction method |
CN101250853A (en) * | 2007-08-30 | 2008-08-27 | 中铁大桥局集团第一工程有限公司 | Steel tower self-lifting installation method |
CN201794030U (en) * | 2010-07-22 | 2011-04-13 | 中国建筑第二工程局有限公司 | Hanging basket advancing traction device for continuous beams |
CN206189277U (en) * | 2016-10-17 | 2017-05-24 | 中建交通建设集团有限公司 | Steel case arched bridge political integrity section arch rib promotes measurement system |
CN109594483A (en) * | 2018-12-04 | 2019-04-09 | 中铁九局集团第二工程有限公司 | A kind of bridge real time on-line monitoring control rotation swivel construction method based on BIM |
CN110004829A (en) * | 2018-11-27 | 2019-07-12 | 中国核工业华兴建设有限公司 | A kind of steel arch tower method for improving |
CN111455871A (en) * | 2020-05-19 | 2020-07-28 | 中交路桥建设有限公司 | Segmental vertical rotation structure for arch rib of steel box arch bridge and construction method |
-
2021
- 2021-05-24 CN CN202110564513.5A patent/CN113718663A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007205139A (en) * | 2006-02-06 | 2007-08-16 | Sumitomo Mitsui Construction Co Ltd | Construction method of arch bridge |
CN101250853A (en) * | 2007-08-30 | 2008-08-27 | 中铁大桥局集团第一工程有限公司 | Steel tower self-lifting installation method |
CN101200880A (en) * | 2007-12-24 | 2008-06-18 | 中铁大桥局股份有限公司 | Steel tube arch single pivot ten-thousand-tonnage horizontal rotation swivel construction method |
CN201794030U (en) * | 2010-07-22 | 2011-04-13 | 中国建筑第二工程局有限公司 | Hanging basket advancing traction device for continuous beams |
CN206189277U (en) * | 2016-10-17 | 2017-05-24 | 中建交通建设集团有限公司 | Steel case arched bridge political integrity section arch rib promotes measurement system |
CN110004829A (en) * | 2018-11-27 | 2019-07-12 | 中国核工业华兴建设有限公司 | A kind of steel arch tower method for improving |
CN109594483A (en) * | 2018-12-04 | 2019-04-09 | 中铁九局集团第二工程有限公司 | A kind of bridge real time on-line monitoring control rotation swivel construction method based on BIM |
CN111455871A (en) * | 2020-05-19 | 2020-07-28 | 中交路桥建设有限公司 | Segmental vertical rotation structure for arch rib of steel box arch bridge and construction method |
Non-Patent Citations (3)
Title |
---|
喝彩四院: "这样转,世界头一回见", 《HTTPS://WWW.SOHU.COM/A/433900832_670439》 * |
张乃乐等: "常益长铁路沅江特大桥(32+90+90+32)m拱塔斜拉桥总体设计", 《铁道标准设计》 * |
胡云江: "广州丫髻沙大桥的转体施工", 《公路》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103437299A (en) | Construction method for one-time turning of large-span T-shaped single pier | |
CN112227206A (en) | Process design and construction method for ground anchor to self-anchored beam | |
CN113309012A (en) | Railway steel cable tower construction device for spanning multi-track operation line | |
CN111172892A (en) | Bilateral balance traction device and method for steel structure frame bridge | |
CN110468743B (en) | Movable hanging bracket for transformation of old bridge pier cap and construction method | |
CN110396942B (en) | Steel arch frame assembling and traversing system and method for upper bearing arch bridge construction | |
CN109371852A (en) | A kind of high-level bridge construction method across rail yard | |
CN110396943B (en) | Steel arch segmental moving and hoisting system and method for upper bearing arch bridge construction | |
CN113718663A (en) | Railway cable tower construction method for spanning multi-track operation line | |
CN111395176A (en) | Construction method for lowering and dismantling movable formwork based on convenience | |
CN218117156U (en) | Anchorage foundation pit slope construction platform | |
CN116815652A (en) | Swivel device for truss type cantilever steel beam in swivel bridge and construction method | |
CN111519545A (en) | Pier and capping beam integrated construction platform and construction method thereof | |
CN111287498A (en) | Protective shed frame for construction of overhead bridge box girder crossing railway and erection method | |
CN206928193U (en) | A kind of Frame Pier swivel bridges for taking into account traffic above-ground | |
CN212834992U (en) | Suspension bridge based on long and narrow mountain landform | |
CN115961549A (en) | Rear-feeding beam type erection construction method for large-tonnage whole-section steel beam of cable-stayed bridge | |
CN212895958U (en) | Lower hanging movable bridge floor crane | |
CN111139742B (en) | Method for mounting and dismounting highway bridge girder erection machine | |
CN206319622U (en) | A kind of roof system steel truss sliding rail | |
CN112144424A (en) | Construction method for removing arch ribs of steel pipe concrete arch bridge with dumbbell-shaped cross section | |
CN211498489U (en) | Mountain area highway bridge bent cap prestressed steel strand stretch-draw construction operation rack | |
CN220413977U (en) | Middle-small span corrugated web I-shaped steel girder bridge | |
CN212771954U (en) | Pier and bent cap integral type construction platform | |
CN215561957U (en) | Cable-stayed bridge steel tower type vertical rotation installation construction device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Liu Zhifeng Inventor after: Zhu Huijuan Inventor after: Liu Shibo Inventor after: Yi Xiankun Inventor after: Yan Jianguo Inventor after: Hong Liang Inventor after: Zhao Feng Inventor after: Zhang Wende Inventor after: Chu Xiaohui Inventor after: Liu Bin Inventor after: Wang Yong Inventor after: Guo Xingliang Inventor after: Tang Zhonglin Inventor after: Li Yilin Inventor after: Liu Guocheng Inventor after: Li Zhanfei Inventor after: Gao Xuyuan Inventor after: Geng Ye Inventor after: Tian Dan Inventor after: Ma Shiqiang Inventor after: Jia Xiaoping Inventor after: Liang Qingkai Inventor after: Liu Xiaoqing Inventor after: Shen Dianyou Inventor after: Wu Ye Inventor after: Zhang Naile Inventor after: Yuan Lijun Inventor after: Chen Feng Inventor after: Liu Wei Inventor after: Liu Zhiru Inventor after: Chang Naichao Inventor before: Liu Zhifeng Inventor before: Zhu Huijuan Inventor before: Liu Shibo Inventor before: Yi Xiankun Inventor before: Yan Jianguo Inventor before: Hong Liang Inventor before: Zhao Feng Inventor before: Zhang Wende Inventor before: Chu Xiaohui Inventor before: Liu Bin Inventor before: Wang Yong Inventor before: Guo Xingliang Inventor before: Tang Zhonglin Inventor before: Li Yilin Inventor before: Liu Guocheng Inventor before: Li Zhanfei Inventor before: Gao Xuyuan Inventor before: Geng Ye Inventor before: Tian Dan Inventor before: Ma Shiqiang Inventor before: Jia Xiaoping Inventor before: Liang Qingkai Inventor before: Liu Xiaoqing Inventor before: Shen Dianyou Inventor before: Wu Ye Inventor before: Zhang Naile Inventor before: Yuan Lijun Inventor before: Chen Feng Inventor before: Liu Wei Inventor before: Liu Zhiru Inventor before: Chang Naichao |