CN113673941B - Steel structure processing management method and system thereof - Google Patents
Steel structure processing management method and system thereof Download PDFInfo
- Publication number
- CN113673941B CN113673941B CN202110404288.9A CN202110404288A CN113673941B CN 113673941 B CN113673941 B CN 113673941B CN 202110404288 A CN202110404288 A CN 202110404288A CN 113673941 B CN113673941 B CN 113673941B
- Authority
- CN
- China
- Prior art keywords
- steel structure
- user
- management system
- project
- flow
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 153
- 239000010959 steel Substances 0.000 title claims abstract description 153
- 238000007726 management method Methods 0.000 title claims abstract description 75
- 238000000034 method Methods 0.000 claims abstract description 46
- 238000002360 preparation method Methods 0.000 claims abstract description 41
- 238000012544 monitoring process Methods 0.000 claims description 10
- 238000005096 rolling process Methods 0.000 claims description 3
- 238000004458 analytical method Methods 0.000 abstract description 10
- 238000004519 manufacturing process Methods 0.000 abstract description 6
- 238000003466 welding Methods 0.000 description 11
- 238000009434 installation Methods 0.000 description 5
- 239000011248 coating agent Substances 0.000 description 4
- 238000000576 coating method Methods 0.000 description 4
- 238000010276 construction Methods 0.000 description 4
- 230000009286 beneficial effect Effects 0.000 description 3
- 238000007689 inspection Methods 0.000 description 3
- 238000003754 machining Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 239000004566 building material Substances 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000006855 networking Effects 0.000 description 1
- 238000007619 statistical method Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0633—Workflow analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F21/00—Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
- G06F21/30—Authentication, i.e. establishing the identity or authorisation of security principals
- G06F21/31—User authentication
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06K—GRAPHICAL DATA READING; PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
- G06K17/00—Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations
- G06K17/0022—Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisions for transferring data to distant stations, e.g. from a sensing device
- G06K17/0025—Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisions for transferring data to distant stations, e.g. from a sensing device the arrangement consisting of a wireless interrogation device in combination with a device for optically marking the record carrier
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06K—GRAPHICAL DATA READING; PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
- G06K19/00—Record carriers for use with machines and with at least a part designed to carry digital markings
- G06K19/06—Record carriers for use with machines and with at least a part designed to carry digital markings characterised by the kind of the digital marking, e.g. shape, nature, code
- G06K19/06009—Record carriers for use with machines and with at least a part designed to carry digital markings characterised by the kind of the digital marking, e.g. shape, nature, code with optically detectable marking
- G06K19/06037—Record carriers for use with machines and with at least a part designed to carry digital markings characterised by the kind of the digital marking, e.g. shape, nature, code with optically detectable marking multi-dimensional coding
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
- G06Q10/063114—Status monitoring or status determination for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
- G06Q10/087—Inventory or stock management, e.g. order filling, procurement or balancing against orders
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Theoretical Computer Science (AREA)
- Economics (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Marketing (AREA)
- Quality & Reliability (AREA)
- General Business, Economics & Management (AREA)
- Operations Research (AREA)
- Tourism & Hospitality (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Educational Administration (AREA)
- Data Mining & Analysis (AREA)
- General Engineering & Computer Science (AREA)
- Computer Security & Cryptography (AREA)
- Accounting & Taxation (AREA)
- Finance (AREA)
- Computer Networks & Wireless Communication (AREA)
- Software Systems (AREA)
- Computer Hardware Design (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- General Factory Administration (AREA)
- Control Of Heat Treatment Processes (AREA)
Abstract
A steel structure processing management method and system mainly utilizes a label plate which is respectively attached to each steel structure in a steel structure preparation process, wherein the label plate is provided with a QR code, the QR code comprises a component number and a chain which can be connected to a steel structure management system, a user can scan the QR code on the label plate by using a handheld device, and when the user is connected to the steel structure management system, the steel structure management system can record the user, the process items which the user is responsible for in the steel structure preparation process and the execution time in the steel structure management system according to the identity of the user. By performing real-time scanning and recording in each processing flow item of the steel structure preparation flow and collecting and analyzing the statistical data, the productivity and the reject ratio of the responsible personnel of each flow item can be clearly known, and the production management and analysis can be effectively and truly performed on each processing flow of the steel structure preparation flow.
Description
Technical Field
The invention relates to a processing management method, in particular to a steel structure processing management method and a system thereof.
Background
Steel structures are often used as building materials in buildings, but the steel structures for the buildings are various, so that according to actual construction requirements, a plurality of different flow projects need to be passed through in the steel structure preparation flow, for example: the whole steel structure preparation process is quite tedious, and the workers are numerous, so that the production management and the construction efficiency of the steel structure cannot be effectively and truly mastered.
For example, in the patent application of "BIM and two-dimension code based steel structure production and distribution system" and "BIM+RFID technology based assembled steel structure construction method" of China No. 106296014 and 108647894, two-dimension codes and RFID tags are respectively attached to steel structure products, and the two-dimension codes and RFID remote ends are connected to a database to obtain basic specifications of steel structure numbers, weights, lengths and the like of the steel structure products, so that subsequent processing or installation personnel can confirm whether the obtained steel structure products are correct according to the basic specifications, thereby improving the processing efficiency. However, although the method can be used for conveniently and rapidly identifying the steel structure by a processing or installation personnel, the progress and constructor of the processing flow items such as Western work, electric welding, surface coating and the like in the steel structure preparation flow cannot be recorded, the reasons and efficiency analysis of the bad workpieces are searched, and the material condition of the steel structure cannot be clearly known, so that effective and reliable production management and analysis cannot be performed on each processing flow of the steel structure preparation flow.
Disclosure of Invention
The invention mainly aims to provide a steel structure processing management method which has the effect of effectively managing and analyzing each processing flow of a steel structure preparation flow.
In order to achieve the above-mentioned object, the present invention provides a method for processing and managing steel structures, comprising the following steps:
a. each steel structure is respectively added with a signboard in a steel structure preparation process, the signboard is provided with a QR code, and the QR code at least comprises a component number and a chain which can be connected to a steel structure management system;
b. when a user scans the QR code on the nameplate by using a handheld device and connects the nameplate to the steel structure management system, the steel structure management system can record the user, the flow item responsible for the user in the steel structure preparation flow and the execution time in the steel structure management system according to the identity of the user.
Preferably, the steel structure management system is installed in a computer device through a program software, the steel structure management system is provided with a project establishing area, the project establishing area can respectively establish a project for the steel structure preparation flow of each project, each project is respectively provided with a form, the form is provided with corresponding steel structure basic data and each flow item in the steel structure preparation flow according to the steel structure preparation flow of the project, so that the user can remotely connect the steel structure management system according to the authority predefined by the steel structure management system, and the user and the execution time are recorded in the corresponding flow items.
Preferably, the project creation area is used for inputting a user account list for identifying whether the remote login user is a legal user, and the project creation area is further provided with a permission editing menu, wherein the permission editing menu can be used for setting the flow items responsible for the user in the user account list, and after the permission is set, only the selected user in each flow item can carry out subsequent recording action on the flow items.
Preferably, the handheld device is provided with application software which can be correspondingly connected to enter the steel structure management system, the application software is used for displaying a login interface and an operation interface, the login interface can be used for inputting login information of a user so as to identify the identity of the user, the operation interface is provided with a rolling menu, a project name and a process project can be selected, the operation interface is provided with a scanning area which can be used for scanning the QR code, when the handheld device scans the QR code on the label plate to log in the steel structure management system in a connecting way, the steel structure management system can establish a user account list in advance to determine whether to allow the user to log in the connecting way according to the authority setting predefined in the steel structure management system, and the user and the execution time of the user are recorded in the process project of the form of the corresponding project.
Preferably, the operation interface is further provided with a test result option, and the test result option can be used for marking the test result of the product management and recording the test result and the execution time thereof in a form of the corresponding project in real time.
Preferably, the operation interface of the handheld device can be further switched to a real-time monitoring interface, and the real-time monitoring interface can be used for displaying the statistical data collected by the steel structure management system on the real-time monitoring interface in a graphical mode when the handheld device is connected to the steel structure management system, so that the real-time progress of each processing flow item in the steel structure preparation flow can be effectively mastered.
Preferably, the operation interface of the handheld device can be further switched to a component PDF interface, and the component PDF interface can be used for connecting the handheld device to the steel structure management system so as to download the drawing processing information of the corresponding steel structure.
The invention also provides a steel structure management system which is installed in a computer device through program software, wherein the steel structure management system is provided with a project establishing area, the project establishing area can respectively establish a project for the steel structure preparation flow of each project, each project is respectively provided with a form, the form is provided with corresponding steel structure basic data and each flow item in the steel structure preparation flow according to the steel structure preparation flow of the project, each flow item is respectively provided with at least one user, and the user can be connected into the steel structure management system through a far-end connection according to the authority predefined by the steel structure management system so as to record the user, the flow item responsible for the user in the steel structure preparation flow and the execution time in the steel structure management system.
Preferably, the project creation area is used for inputting a user account list for identifying whether the remote login user is a legal user, and the project creation area is further provided with a permission editing menu, wherein the permission editing menu can be used for setting the flow items responsible for the user in the user account list, and after the permission is set, only the selected user in each flow item can carry out subsequent recording action on the flow items.
The invention has the advantages that: the invention can clearly know the productivity and the reject ratio of the responsible personnel of each process flow item by carrying out real-time scanning record in each process flow item of the steel structure preparation flow and collecting and analyzing the statistical data thereof, can effectively and truly carry out production management and analysis on each process flow of the steel structure preparation flow, and further has the effect of further clearly grasping the stock quantity of the steel products by comparing the collected in-and-out goods information in a crossing way. In addition, the invention can effectively grasp the instant progress of each processing flow item in the steel structure preparation flow by carrying out instant scanning record in each processing flow item in the steel structure preparation flow, thereby being beneficial to the management work of steel structure processing.
Drawings
FIG. 1 is a schematic flow chart of the method of the present invention.
Fig. 2 to 4 are application program interface diagrams of the steel structure management system of the present invention.
Fig. 5 is a schematic view of a login interface of the handheld device of the present invention.
FIG. 6 is a schematic diagram of an operation interface of the handheld device of the present invention.
Fig. 7 to 10 are schematic views showing the usage states of the handheld device according to the present invention in each process item.
Fig. 11 to 13 are schematic views showing the use states of analysis charts displayed by the steel structure management system of the present invention.
Fig. 14 is a schematic view of a real-time monitoring interface of the handheld device according to the present invention.
Detailed Description
Firstly, referring to fig. 1 to 5, the method for processing and managing steel structures provided by the invention mainly comprises the following steps:
a. each steel structure is respectively added with a sign board in a steel structure preparation process, the sign board is provided with a QR code, and the QR code at least comprises a component number and a chain which can be connected to a steel structure management system.
b. When a user scans the QR code on the nameplate by using a handheld device and connects the nameplate to the steel structure management system, the steel structure management system can record the user, the flow items responsible for the user in the steel structure preparation flow and the execution time in the steel structure management system according to the identity of the user.
The steel structure management system is installed in a computer device through a program software, and the computer device is built on a network (internet), as shown in fig. 2, the steel structure management system provides an application program interface 10 to display a project building area 11, the project building area 11 can respectively build a project 12 and a permission editing menu 13 for each project steel structure preparation process, the project building area 11 can be used for inputting a user account list 111, the user account list 111 contains login information of a user, the login information comprises names, accounts and passwords for identifying whether a remote login user is a legal user, and as shown in fig. 3, each project 12 can further respectively generate a form 121 for a period of recording, in the embodiment, the form 121 is in an EXCEL format, so as to be beneficial to subsequent statistical analysis, and the form 121 can be built with corresponding steel structure basic components (such as names, numbers, accounts and passwords) in the steel structure preparation processes, electric welding processes, e.g. the number, the number of the steel structures, the number of the electric welding processes, the number of the electric welding processes, etc. the steel structures, the current names, the electric welding processes, etc. As shown in fig. 4, the authority edit menu 13 is used for setting the process items responsible for the user in the user account list 111, and after the authority is set, only the selected user in each process item can perform the subsequent recording operation on the process item, and each process item is not limited to only being responsible for one person, but can be simultaneously set to be responsible for multiple persons in the same process item.
The handheld device has a function of scanning the QR code on the label plate to log in the steel structure management system by a connection, preferably, the handheld device can be composed of a smart phone, a tablet and other devices with networking function and capturing QR code images, and is provided with application software (APP) which can be used for entering the steel structure management system by a corresponding connection, the application software can be used for sequentially displaying a log-in interface 21 and an operation interface 22, as shown in fig. 5, the log-in interface 21 can be used for inputting log-in information of a user for identifying the identity of the user, the operation interface 22 (namely ERP scanning) is provided with a double-row circulating type rolling menu 221, and can be used for respectively selecting a project name and a process item (such as machining, western work, electric welding, product pipe, steel product stock, finished product stock, site taking, surface coating, installation and the like), and a scanning area 222 which can be used for scanning the QR code is arranged on the operation interface 22, so that the handheld device can scan the log-in information of the user for identifying the identity of the user, and the operation interface 22 (namely ERP scanning) can be used for respectively selecting a project name and a process item (such as machining, western work, electric welding, product taking out, surface coating, and installation, etc.), and the steel product name can be set up a corresponding to the project name and a corresponding to the user can be set up a list in the steel structure management system according to the user.
In actual operation, the method and system for processing steel structure provided by the invention is characterized in that the label plate with QR code is attached to the steel structure, so that when the steel structure enters the steel structure preparation flow, a user (i.e. responsible person) of each flow item can record the flow item and execution time of the user responsible for the steel structure preparation flow in the form 121 of the steel structure management system in real time only by scanning the QR code on the steel structure with the handheld device, and the method and system are exemplified as follows:
as shown in fig. 7: when the steel structure enters a processing flow project of the Western worker, a responsible person of the Western worker can log in the steel structure management system in a connecting way by scanning the QR code on the steel structure through a handheld device of the responsible person of the Western worker, and the responsible person of the Western worker and the execution time of the responsible person of the Western worker are recorded in a form of a corresponding project in real time; as shown in fig. 8, when the steel structure completes the process flow project of the western work and then enters the process flow project of the electric welding, the electric welding responsible person can log in the steel structure management system by scanning the QR code on the steel structure with the handheld device, and record the electric welding responsible person and the execution time thereof in the form of the corresponding project in real time, and further, as shown in fig. 9, the responsible person can log in the steel structure management system by scanning the QR code on the steel structure with the handheld device, and mark the product inspection result by clicking an inspection result option 223 on the operation interface 22, and record the product inspection result and the execution time thereof in the form of the corresponding project in real time.
By scanning the steel structure with the QR code in each process flow item, the process flow items (including machining, western work, electric welding, product pipe, steel product input, product output, site delivery, surface coating, installation, etc., but not limited thereto) can be scanned and recorded in real time, so that a statistic data (i.e. big data) can be formed in the form 121 of the corresponding project 12, and the productivity and reject ratio of the responsible personnel of each process flow item can be clearly known by analyzing the statistic data. The timing of scanning QR code can be defined by the user, for example, the person in charge of each process flow needs to scan before processing each process flow, or the person in charge of each process flow needs to scan after processing each process flow, or the person in charge of each process flow needs to scan before and after processing.
In addition, as shown in fig. 10, in the process of product shipment (logistics), logistics personnel can scan QR codes on the steel structure through the handheld device to log in the steel structure management system in a connecting way, and can additionally input logistics related information through a vehicle license plate column 224 on the operation interface 22, and simultaneously record the logistics information and the execution time thereof in a form of a corresponding project in real time, and the collected goods entering and exiting information is crossed and compared under analysis through the steel structure management system, so that the stock quantity of the steel can be further clearly known.
The steel structure management system of the present invention can graphically display the statistical result by utilizing the statistical data collected in the form 121 of each project 12 through the program setting and the computing capability of the computer device, as shown in fig. 11, and a total analysis pattern is displayed on the application program interface 10 by collecting the statistical data in the form 121 of each project 12; or as shown in fig. 12 and 13, by collecting the statistics in the form 121 of each project 12, a project analysis pattern and a comparison pattern can be presented on the application program interface 10 for the responsible person of each process project, and thus the productivity and the reject ratio of the responsible person of each process project can be clearly known.
In addition, when the operation interface 22 of the handheld device can be further switched to a real-time monitoring interface 23 and a component PDF interface 24, as shown in fig. 14, the real-time monitoring interface 23 can be used for connecting the handheld device to the steel structure management system, and the statistics collected by the steel structure management system are graphically presented on the real-time monitoring interface 23, so as to effectively grasp the real-time progress of each processing flow item in the steel structure preparation flow. The component PDF interface 24 is used for connecting the handheld device to the steel structure management system to download processing information such as part drawings, assembly drawings, construction drawings and the like of the corresponding steel structure, thereby facilitating the operation of constructors.
From the above description, it is apparent that the present invention has the advantages that the capacity and the reject ratio of the responsible personnel of each process item can be clearly known by performing real-time scanning and recording in each process item of the steel structure preparation process and collecting and analyzing the statistical data thereof, so that the present invention can effectively and truly perform production management and analysis on each process item of the steel structure preparation process, and further has the efficacy of further clearly grasping the stock quantity of the steel products by cross comparison and analysis of the collected in-and-out information. In addition, the invention can effectively grasp the instant progress of each processing flow item in the steel structure preparation flow by carrying out instant scanning record in each processing flow item in the steel structure preparation flow, thereby being beneficial to the management work of steel structure processing.
Claims (4)
1. The steel structure processing management method is characterized by comprising the following steps of:
a. each steel structure is respectively added with a signboard in a steel structure preparation process, the signboard is provided with a QR code, and the QR code at least comprises a component number and a chain which can be connected to a steel structure management system;
b. when a user scans the QR code on the nameplate by using a handheld device and connects the nameplate to the steel structure management system, the steel structure management system can record the user, the flow items responsible for the user in the steel structure preparation flow and the execution time in the steel structure management system according to the identity of the user;
the steel structure management system is installed in a computer device through program software, the steel structure management system is provided with a project establishing area, the project establishing area can respectively establish a project aiming at the steel structure preparation flow of each project, each project is respectively provided with a form, the forms are respectively provided with corresponding steel structure basic data and each flow item in the steel structure preparation flow according to the steel structure preparation flow of the project, so that a user can remotely connect the steel structure basic data and each flow item in the steel structure preparation flow to the steel structure management system according to the authority predefined by the steel structure management system, and the user and the execution time are recorded in the corresponding flow item;
the project establishing area can be used for inputting a user account list to identify whether a remote login user is a legal user, and is further provided with a permission editing menu, wherein the permission editing menu can be used for setting flow items which are responsible for the user in the user account list, and after the permission is set, only the selected user in each flow item can carry out subsequent recording action on the flow items;
the hand-held device is provided with application software which can be correspondingly connected to enter the steel structure management system, the application software is used for displaying a login interface and an operation interface, the login interface can be used for inputting login information of a user so as to identify the identity of the user, the operation interface is provided with a rolling menu, a project name and a process project can be selected, the operation interface is provided with a scanning area which can be used for scanning the QR code, when the hand-held device scans the QR code on a nameplate to log in the steel structure management system in a connecting way, the steel structure management system can establish a user account list in advance to determine whether to allow the user to log in the connecting way according to authority setting which is predefined in the steel structure management system, and the user and the execution time of the user are recorded in the process project of the form of the corresponding project.
2. The method of claim 1, wherein the operation interface further comprises a test result option for marking the test result of the product pipe and recording the test result and the execution time thereof in the form of the corresponding project.
3. The method of claim 1, wherein the operation interface of the handheld device is further switched to a real-time monitoring interface, and the real-time monitoring interface is used for graphically displaying the statistics collected by the steel structure management system on the real-time monitoring interface when the handheld device is connected to the steel structure management system, so as to effectively grasp the real-time progress of each process item in the steel structure preparation process.
4. The method of claim 1, wherein the operation interface of the handheld device is further switched to a component PDF interface for connecting the handheld device to the steel structure management system for downloading the drawing processing information of the corresponding steel structure.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
TW109115827A TWI804727B (en) | 2020-05-13 | 2020-05-13 | Steel structure processing management method and system |
TW109115827 | 2020-05-13 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN113673941A CN113673941A (en) | 2021-11-19 |
CN113673941B true CN113673941B (en) | 2024-02-02 |
Family
ID=78538061
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110404288.9A Active CN113673941B (en) | 2020-05-13 | 2021-04-15 | Steel structure processing management method and system thereof |
Country Status (3)
Country | Link |
---|---|
KR (1) | KR20210141342A (en) |
CN (1) | CN113673941B (en) |
TW (1) | TWI804727B (en) |
Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103337006A (en) * | 2013-05-31 | 2013-10-02 | 中建钢构有限公司 | Management method of steel structured project management system |
CN104361522A (en) * | 2014-10-24 | 2015-02-18 | 合肥极光科技股份有限公司 | Tea garden production management method |
CN104573999A (en) * | 2015-01-30 | 2015-04-29 | 浙江精工钢结构集团有限公司 | Application method of steel structure BIM (building information modeling) information platform |
CN204856612U (en) * | 2015-06-17 | 2015-12-09 | 中国建筑股份有限公司 | Steel construction construction management system based on mobile internet |
CN105139151A (en) * | 2015-09-25 | 2015-12-09 | 佛山市中格威电子有限公司 | Information management system based on two-dimensional code technology |
CN106022695A (en) * | 2016-05-31 | 2016-10-12 | 浙江精工钢结构集团有限公司 | Steel structure delivery and matched detection early warning method based on BIM technology |
CN106296014A (en) * | 2016-08-15 | 2017-01-04 | 上海宝冶集团有限公司 | Steel construction based on BIM and Quick Response Code produces delivery system |
CN107169539A (en) * | 2016-03-08 | 2017-09-15 | 上海宝冶集团有限公司 | Reinforcing bar automation processing delivery system and method based on two-dimensional bar code |
CN107358353A (en) * | 2017-07-07 | 2017-11-17 | 山东华宇航天空间技术有限公司 | A kind of industrial production wire management system and its method based on planar bar code technology |
CN107506929A (en) * | 2017-08-28 | 2017-12-22 | 中国铁道科学研究院铁道建筑研究所 | A kind of high-strength bolt construction information monitoring system and method |
CN108537301A (en) * | 2018-03-21 | 2018-09-14 | 广东鸿图科技股份有限公司 | A kind of accurate retroactive method of full process of aluminium alloy compression casting product |
JP2019008683A (en) * | 2017-06-28 | 2019-01-17 | 株式会社ア−キテック | Reinforcing-bar management system |
CN109523279A (en) * | 2018-11-23 | 2019-03-26 | 安徽师范大学 | A kind of building thermal insulation material quality tracing method |
KR102064490B1 (en) * | 2019-07-04 | 2020-01-10 | 세아전자(주) | System for managing manufacturing and production process |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7035877B2 (en) * | 2001-12-28 | 2006-04-25 | Kimberly-Clark Worldwide, Inc. | Quality management and intelligent manufacturing with labels and smart tags in event-based product manufacturing |
TW201250612A (en) * | 2012-08-14 | 2012-12-16 | H C Integration Ltd | Method and system for maintaining and managing |
US8985437B2 (en) * | 2013-08-07 | 2015-03-24 | International Business Machines Corporation | Creation and management of dynamic quick response (QR) codes |
CN108470235A (en) * | 2018-02-07 | 2018-08-31 | 深圳市伟博思技术有限公司 | A kind of industrial equipment management system, method and relevant apparatus |
CN111130007B (en) * | 2019-12-11 | 2021-08-24 | 深圳供电局有限公司 | Sequential power transmission line field operation method and system |
-
2020
- 2020-05-13 TW TW109115827A patent/TWI804727B/en active
-
2021
- 2021-04-15 CN CN202110404288.9A patent/CN113673941B/en active Active
- 2021-04-19 KR KR1020210050438A patent/KR20210141342A/en not_active Application Discontinuation
Patent Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103337006A (en) * | 2013-05-31 | 2013-10-02 | 中建钢构有限公司 | Management method of steel structured project management system |
CN104361522A (en) * | 2014-10-24 | 2015-02-18 | 合肥极光科技股份有限公司 | Tea garden production management method |
CN104573999A (en) * | 2015-01-30 | 2015-04-29 | 浙江精工钢结构集团有限公司 | Application method of steel structure BIM (building information modeling) information platform |
CN204856612U (en) * | 2015-06-17 | 2015-12-09 | 中国建筑股份有限公司 | Steel construction construction management system based on mobile internet |
CN105139151A (en) * | 2015-09-25 | 2015-12-09 | 佛山市中格威电子有限公司 | Information management system based on two-dimensional code technology |
CN107169539A (en) * | 2016-03-08 | 2017-09-15 | 上海宝冶集团有限公司 | Reinforcing bar automation processing delivery system and method based on two-dimensional bar code |
CN106022695A (en) * | 2016-05-31 | 2016-10-12 | 浙江精工钢结构集团有限公司 | Steel structure delivery and matched detection early warning method based on BIM technology |
CN106296014A (en) * | 2016-08-15 | 2017-01-04 | 上海宝冶集团有限公司 | Steel construction based on BIM and Quick Response Code produces delivery system |
JP2019008683A (en) * | 2017-06-28 | 2019-01-17 | 株式会社ア−キテック | Reinforcing-bar management system |
CN107358353A (en) * | 2017-07-07 | 2017-11-17 | 山东华宇航天空间技术有限公司 | A kind of industrial production wire management system and its method based on planar bar code technology |
CN107506929A (en) * | 2017-08-28 | 2017-12-22 | 中国铁道科学研究院铁道建筑研究所 | A kind of high-strength bolt construction information monitoring system and method |
CN108537301A (en) * | 2018-03-21 | 2018-09-14 | 广东鸿图科技股份有限公司 | A kind of accurate retroactive method of full process of aluminium alloy compression casting product |
CN109523279A (en) * | 2018-11-23 | 2019-03-26 | 安徽师范大学 | A kind of building thermal insulation material quality tracing method |
KR102064490B1 (en) * | 2019-07-04 | 2020-01-10 | 세아전자(주) | System for managing manufacturing and production process |
Also Published As
Publication number | Publication date |
---|---|
KR20210141342A (en) | 2021-11-23 |
TW202143128A (en) | 2021-11-16 |
CN113673941A (en) | 2021-11-19 |
TWI804727B (en) | 2023-06-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206921161U (en) | It is a kind of to include inspection management and defect processing and the intelligent inspection system of examination | |
CN109559069B (en) | Production management method and device based on assembly type building platform and terminal equipment | |
CN111814240B (en) | Highway engineering farmer management system based on BIM technology | |
CN108229782B (en) | Cloud-based visual production management platform | |
CN109557934B (en) | Unmanned aerial vehicle cruise control method and device based on fabricated building platform | |
CN102867237A (en) | Intelligent production management method | |
CN106447156A (en) | Attendance management method and system | |
Bärring et al. | A VSM approach to support data collection for a simulation model | |
US20140058963A1 (en) | Facility control system (fcs-c2) (introduction of traveler form) to manage assets planning, design, construction, fabrication, operating, maintence and products fabrication | |
CN113673941B (en) | Steel structure processing management method and system thereof | |
CN112288054B (en) | Tracing system and method for recording maintenance history of product workpiece | |
Katyare et al. | Construction Productivity Analysis in Construction Industry: An Indian Perspective | |
Ma et al. | A BIM based approach for quality supervision of construction projects | |
JP2017194808A (en) | Behavioral characteristic analyzer and behavioral characteristic analysis system | |
CN114626954A (en) | Intelligent manufacturing cooperative system | |
JP3709538B2 (en) | Patrol inspection system | |
CN107194840A (en) | A kind of student is in school monitoring management system | |
Urban et al. | Case studies of the process-oriented approach to technology management | |
Wijaya et al. | Inhouse quality check system improvement with Kanban system and analysis quality control circle | |
CN108563202B (en) | MES-based information input emergency system and processing method thereof | |
CN114692371A (en) | Digital twin modeling system and method for discrete manufacturing process | |
Driate et al. | Knowledge management for manufacturing smes using industrial iot | |
CN206505440U (en) | Test assignment dispatching system | |
Shahin et al. | Radio frequency identification (RFID): a technology for enhancing computerized maintenance system (CMMS) | |
TWI723861B (en) | Externally-connected shop floor control system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |