CN108537301A - A kind of accurate retroactive method of full process of aluminium alloy compression casting product - Google Patents

A kind of accurate retroactive method of full process of aluminium alloy compression casting product Download PDF

Info

Publication number
CN108537301A
CN108537301A CN201810235687.5A CN201810235687A CN108537301A CN 108537301 A CN108537301 A CN 108537301A CN 201810235687 A CN201810235687 A CN 201810235687A CN 108537301 A CN108537301 A CN 108537301A
Authority
CN
China
Prior art keywords
product
aluminium alloy
production
information
processing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810235687.5A
Other languages
Chinese (zh)
Other versions
CN108537301B (en
Inventor
吴绍方
赵善庆
卢广英
黎烨文
梁甲全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Hongtu Technology Holdings Co Ltd
Original Assignee
Guangdong Hongtu Technology Holdings Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Hongtu Technology Holdings Co Ltd filed Critical Guangdong Hongtu Technology Holdings Co Ltd
Priority to CN201810235687.5A priority Critical patent/CN108537301B/en
Publication of CN108537301A publication Critical patent/CN108537301A/en
Application granted granted Critical
Publication of CN108537301B publication Critical patent/CN108537301B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06KGRAPHICAL DATA READING; PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
    • G06K17/00Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations
    • G06K17/0022Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisious for transferring data to distant stations, e.g. from a sensing device
    • G06K17/0025Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisious for transferring data to distant stations, e.g. from a sensing device the arrangement consisting of a wireless interrogation device in combination with a device for optically marking the record carrier
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/04Manufacturing
    • GPHYSICS
    • G07CHECKING-DEVICES
    • G07CTIME OR ATTENDANCE REGISTERS; REGISTERING OR INDICATING THE WORKING OF MACHINES; GENERATING RANDOM NUMBERS; VOTING OR LOTTERY APPARATUS; ARRANGEMENTS, SYSTEMS OR APPARATUS FOR CHECKING NOT PROVIDED FOR ELSEWHERE
    • G07C3/00Registering or indicating the condition or the working of machines or other apparatus, other than vehicles
    • G07C3/005Registering or indicating the condition or the working of machines or other apparatus, other than vehicles during manufacturing process
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Manufacturing & Machinery (AREA)
  • Marketing (AREA)
  • Economics (AREA)
  • General Business, Economics & Management (AREA)
  • Data Mining & Analysis (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • General Engineering & Computer Science (AREA)
  • General Factory Administration (AREA)

Abstract

The invention discloses provide a kind of accurate retroactive method of full process of aluminium alloy compression casting product, the every creation data of real time monitoring acquisition is recorded and scanned by Quick Response Code in the full process of aluminium alloy compression casting product, replace a large amount of and various, fallibility manual labor, whole process can be quickly restored, production process visualization carries out quantitative analysis to the abnormal problem detected, reduce retrospect range, product processing is locked, the fast throughput of anomalous event is improved, effectively reduces production cost.

Description

A kind of accurate retroactive method of full process of aluminium alloy compression casting product
Technical field
The invention belongs to processing technology fields, and in particular to a kind of accurate retroactive method of full process of aluminium alloy compression casting product.
Background technology
Nowadays, die casting class product is increasingly various, and individual product amount is big.In the case where shipment amount is big, equipment does not have data The OEE of acquisition, equipment can only be by demographic, and data result is inaccurate, causes scheduling of production accurate, increase personnel, The waste of board.Exception die casting, machine such as add, assemble system is not recorded at the technical parameters, and unrelated to be linked to product, product exists Without defective products management and process management and control in production process.If product client go wrong will cause product batch every From corresponding caused rework cost, Product transport expense can also rise.
Invention content
For at least one of prior art disadvantages described above or Improvement requirement, the present invention provides a kind of aluminium alloy compression castings The accurate retroactive method of the full process of product replaces a large amount of and various, fallibility manual labor, in the full process of aluminium alloy compression casting product The every creation data of real time monitoring acquisition can quickly restore whole process, production process visualization, to the exception detected Problem carries out quantitative analysis, reduces retrospect range, and locking product processing improves the fast throughput of anomalous event, effectively drops Low production cost.
To achieve the above object, according to one aspect of the present invention, a kind of full process essence of aluminium alloy compression casting product is provided Quasi- retroactive method, includes the following steps:
A, after the pickup of aluminium alloy compression casting machinery hand removes cinder ladle, product keeps drying, passes through on the blank after die casting Quick Response Code laser machine scribes the Quick Response Code of unique sequence numbers, and Quick Response Code association includes molten aluminum batch, the technological parameter of die casting, shift Information;
B, including aluminium alloy compression casting process, rear process, machining processes, assembly process, cleaning process, riveting acoustical panel In each process of process, press fitting oil sealing and assembly leak test process, it is both provided with industrial tablet terminal and two-dimensional code scanning rifle;
C, craft port and the industrial tablet terminal and the Quick Response Code are set in aluminium alloy compression casting Production equipment Scanner connect, it is described industry tablet terminal and the two-dimensional code scanning rifle connect with ERP system, production equipment output signal and The related information of the Quick Response Code links with the ERP system;
D, after scanning product Quick Response Code in process at once, the key process parameter of process i.e. storage at once is entered into described In ERP system, which board production the ERP system output is included in, the press fitting leak detection date, press fitting leak detection parameter, packs out The information on goods date;
E, when aluminium alloy compression casting product is led to the problem of in client, Quick Response Code on the product is scanned, export includes which sets Standby production, the date of manufacture, production process parameters information, judge whether there is exception, the suspicious product of aberrant batches are isolated, It does over again or scraps, involved abnormal production equipment is overhauled or replaced;
F, after producing a period of time, by the production monitoring of the ERP system, transferring each production equipment of collection includes Creation data, shutdown, failure, the information of maintenance data export global device efficiency OEE.
Preferably, in the die casting process, the computer of the Quick Response Code laser machine is carried out mutually with robot by IO communications It is dynamic, and it includes die casting parameter, the information of vacuum machine parameter, die heater parameter to adopt module reading by PLC numbers.
Preferably, in the rear process, before production goes into operation, operator, which swipes the card, logs in MES system, and work(is acquired in production and processing Can interface first select work order, mold, system recalls corresponding processing work order information, scans the Quick Response Code of feeding product, in verification Process performance, authentication failed then prompt to alarm, and product is returned to upper process processing, are verified, bind work after corresponding to The process information of sequence, processing staff's information, process time.
Preferably, in the machining processes, before production goes into operation, operator, which swipes the card, logs in MES system, is adopted in production and processing Collection function interface first selects work order, mold, system to recall corresponding processing work order information, scans the Quick Response Code of feeding product, tests Front-end-of-line performance is demonstrate,proved, leading portion leaks process or processing is unqualified, prompts to alarm, and product is returned to upper process processing, tests Card passes through the process information for then binding corresponding machining processes, processing staff's information, process for machining parameter, process time;Institute It states process for machining parameter and module reading is adopted by PLC numbers.
Preferably, in the assembly process, before production goes into operation, operator, which swipes the card, logs in MES system, is acquired in production and processing Function interface first selects work order, mold, system to recall corresponding assembly work order information, scans the Quick Response Code of feeding product, verification Front-end-of-line performance, leading portion leaks process or processing is unqualified, prompts to alarm, and product is returned to upper process processing, verification By then binding the process information of corresponding assembly process, processing staff's information, tool parameters, process time;The tool parameters Module is adopted by PLC numbers to read.
Preferably, in the cleaning process, module is adopted by PLC numbers and reads cleaning equipment parameter, if abnormal, passes through IO Communication module, which controls conveyer belt, to be stopped.
Preferably, in the riveting acoustical panel process, by plc data acquisition module read processing corresponding pressure value with The riveting point quantity of each product.
Preferably, in the press fitting oil sealing and assembly leak test process, corresponding pressure is read by plc data acquisition module Value, the oil sealing depth of parallelism, machine number, leak test value.
Preferably, the information that output overall situation device efficiency OEE is acquired further includes being docked by numerically-controlled machine tool PLC system With the industrial tablet terminal is installed, collect display and record every lathe, the pure lathe beat of every product, fluctuation situation;It is aobvious Show that record employee operates the cycle time of every product of production, fluctuation situation;Display records every lathe employee's clamping time, wave Emotionally condition;Each machining tool whole cutter lifetime data;The qualities such as display three coordinate measurements of record check data, each processing dimension Fluctuate situation.
Preferably, the information that is acquired of output overall situation device efficiency OEE is transmitted to MES system push simultaneously early warning in one's hands In machine or workshop billboard.
Above-mentioned preferred feature can be combined with each other as long as they do not conflict with each other.
In general, through the invention it is contemplated above technical scheme is compared with the prior art, have below beneficial to effect Fruit:The accurate retroactive method of the full process of aluminium alloy compression casting product of the present invention replaces a large amount of and various, fallibility manual labor, The every creation data of real time monitoring acquisition, can quickly restore whole process, produce in the full process of aluminium alloy compression casting product Journey visualizes, and realizes that product quality retrospect, technological process monitor to production process, realizes real-time property, the accuracy of production, Product back-tracing accuracy is improved, effective quality tracing data foundation is provided for client, the abnormal problem detected is determined Amount analysis, reduces retrospect range, and locking product processing improves the fast throughput of anomalous event, the later stage imitates global equipment Rate OEE is analyzed and counted, and is controlled in conjunction with production, and the arrangement to cope with production order is maintained with board, is improved production efficiency, is kept away Manpower-free's statistics leads to unnecessary consuming, accomplishes precisely to produce, and precisely traces, effectively reduces production cost.
Description of the drawings
Fig. 1 is the retrospect flow diagram of the embodiment of the present invention.
Specific implementation mode
In order to make the purpose , technical scheme and advantage of the present invention be clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.As long as in addition, technical characteristic involved in the various embodiments of the present invention described below It does not constitute a conflict with each other and can be combined with each other.The present invention is described in more detail With reference to embodiment.
As a kind of better embodiment of the present invention, as shown in Figure 1, a kind of aluminium alloy compression casting product of present invention offer is complete The accurate retroactive method of process, includes the following steps:
A, after the pickup of aluminium alloy compression casting machinery hand removes cinder ladle, product keeps drying, passes through on the blank after die casting Quick Response Code laser machine scribes the Quick Response Code of unique sequence numbers, and Quick Response Code association includes molten aluminum batch, the technological parameter of die casting, shift Information;
B, including aluminium alloy compression casting process, rear process, machining processes, assembly process, cleaning process, riveting acoustical panel In each process of process, press fitting oil sealing and assembly leak test process, it is both provided with industrial tablet terminal and two-dimensional code scanning rifle;
C, craft port and the industrial tablet terminal and the Quick Response Code are set in aluminium alloy compression casting Production equipment Scanner connection, the industry tablet terminal and the two-dimensional code scanning rifle and ERP system (enterprise resource planning The abbreviation of Enterprise Resource Planning) it connects, production equipment output signal is associated with letter with the Quick Response Code Breath links with the ERP system;
D, after scanning product Quick Response Code in process at once, the key process parameter of process i.e. storage at once is entered into described In ERP system, which board production the ERP system output is included in, the press fitting leak detection date, press fitting leak detection parameter, packs out The information on goods date;
E, when aluminium alloy compression casting product is led to the problem of in client, Quick Response Code on the product is scanned, export includes which sets Standby production, the date of manufacture, production process parameters information, judge whether there is exception, the suspicious product of aberrant batches are isolated, It does over again or scraps, involved abnormal production equipment is overhauled or replaced;
F, after producing a period of time, by the production monitoring of the ERP system, transferring each production equipment of collection includes Creation data, shutdown, failure, the information of maintenance data, output overall situation device efficiency OEE (overall equipment efficiency.comprehensive efficiency of equipment Overall The abbreviation of Equipment Effectiveness).
The information that output overall situation device efficiency OEE is acquired further includes passing through numerically-controlled machine tool PLC (Programmable logical controllers The abbreviation of device Programmable Logic Controller) system docking and the industrial tablet terminal is installed, collect display Record every lathe, the pure lathe beat of every product, fluctuation situation;Display record employee operates the period of every product of production Time, fluctuation situation;Display records every lathe employee's clamping time, fluctuation situation;Each machining tool whole cutter life number According to;The qualities such as display three coordinate measurements of record check that data, each processing dimension fluctuate situation.
The information that output overall situation device efficiency OEE is acquired is transmitted to MES system and push simultaneously early warning to mobile phone or vehicle Between in billboard.
In summary data, network analysis go out the OEE of board, and production control combines several OEE, come order of arranging production Arrangement is maintained with board, and reducing human hand statistics causes unnecessary equipment to waste, and accomplishes precisely to produce, precisely trace.
In the die casting process, the computer of the Quick Response Code laser machine, which is communicated with robot by IO, carries out interaction, and leads to It crosses PLC numbers and adopts the information such as module reading die casting parameter, vacuum machine parameter, die heater parameter.
After described in process, before production goes into operation, operator swipes the card, and (manufacturing enterprise's production process executes system to login MES system The abbreviation of system Manufacturing Execution System), first select work order, mould in production and processing acquisition function interface Tool, system recall corresponding processing work order information, and the product of a upper process (is put the folder of process at once by scanning feeding product Tool is known as feeding product in industry) Quick Response Code, process performance in verification, authentication failed then prompts to alarm, and product Process is processed in return, is verified, and the process information of process, processing staff's information, process time after corresponding to are bound.
In the machining processes, before production goes into operation, operator, which swipes the card, logs in MES system, and function is acquired in production and processing Interface first selects work order, mold, system to recall corresponding processing work order information, scans the Quick Response Code of feeding product, verifies leading portion Process performance, leading portion leaks process or processing is unqualified, prompts to alarm, and product is returned to upper process processing, is verified Then bind the process informations of corresponding machining processes, processing staff's information, process for machining parameter, process time;The machine adds Work technological parameter is adopted module by PLC numbers and is read.
In the assembly process, before production goes into operation, operator, which swipes the card, logs in MES system, and function circle is acquired in production and processing Face first selects work order, mold, system to recall corresponding assembly work order information, scans the Quick Response Code of feeding product, verifies leading portion work Sequence performance, leading portion leaks process or processing is unqualified, prompts to alarm, and product is returned to upper process processing, is verified then The process information of the corresponding assembly process of binding, processing staff's information, tool parameters, process time;The tool parameters pass through PLC Number adopts module reading.
In the cleaning process, module is adopted by PLC numbers and reads cleaning equipment parameter, if abnormal, mould is communicated by IO Block, which controls conveyer belt, to be stopped.
In the riveting acoustical panel process, processing corresponding pressure value and each production are read by plc data acquisition module The riveting point quantity of product.
In the press fitting oil sealing and assembly leak test process, it is flat that corresponding pressure value, oil sealing are read by plc data acquisition module Row degree, machine number, leak test value.
The concrete technology of the accurate retroactive method of the full process of aluminium alloy compression casting product of the present invention requires as follows:
It is bound simultaneously per the procedure condition of production, equipment situation, quality feelings 1. being docked with equipment PLC interface by Quick Response Code Condition carries out data acquisition, then quickly reflects and analyzes by system, required data are transported to demand personnel;
2. relevant personnel are categorized in one kind by system, workshop is swiped the card login by industrial tablet work card, will be different Role be presented different interfaces, but it is noted that later stage personnel change safeguards, plant personnel is needed to be existed according to actual conditions The ends MES PC are adjusted;
3. by the docking of numerically-controlled machine tool PLC system and mounting industrial tablet, combined by lathe and employee, collects board letter Breath then passes to MES system and push and in early warning to mobile phone or workshop billboard;
4., can by information such as the state of real-time collecting device, processing staff, converted products, machined parameters, process times Quickly reduction whole process is helped, problem is subjected to quantitative analysis, reduces retrospect range, locking product processing etc., effectively Reduce production cost;
5. by safeguarding producing line plan in systems, in conjunction with system automatic collection producing line processing quantity, to monitor production in real time Line processing progress;Real-time collecting device running state data, can real-time, accurate statistics equipment and producing line processing efficiency;And system Relevant report chart can be automatically generated, checks, analyze convenient for personnel, quick response and effective management and control schedule.
The accurate retroactive method of the full process of aluminium alloy compression casting product of the present invention replaces a large amount of and various, fallibility manpower labor Dynamic, the every creation data of real time monitoring acquisition, can quickly restore whole process in the full process of aluminium alloy compression casting product, raw Process visualization is produced, product quality retrospect, technological process, which monitor, to be realized to production process, realizes real-time property, the standard of production True property improves product back-tracing accuracy, effective quality tracing data foundation is provided for client, to the abnormal problem that detects into Row quantitative analysis, reduces retrospect range, and locking product processing improves the fast throughput of anomalous event, the later stage sets the overall situation Standby efficiency OEE is analyzed and counted, and is controlled in conjunction with production, and the arrangement to cope with production order is maintained with board, improves production effect Rate, avoiding manually counting leads to unnecessary consuming, accomplishes precisely to produce, and precisely traces, effectively reduces production cost.
As it will be easily appreciated by one skilled in the art that the foregoing is merely illustrative of the preferred embodiments of the present invention, not to The limitation present invention, all within the spirits and principles of the present invention made by all any modification, equivalent and improvement etc., should all include Within protection scope of the present invention.

Claims (10)

1. a kind of accurate retroactive method of full process of aluminium alloy compression casting product, which is characterized in that include the following steps:
A, after the pickup of aluminium alloy compression casting machinery hand removes cinder ladle, product keeps drying, passes through two dimension on the blank after die casting Code laser machine scribes the Quick Response Codes of unique sequence numbers, Quick Response Code association include molten aluminum batch, the technological parameter of die casting, shift letter Breath;
B, including aluminium alloy compression casting process, rear process, machining processes, assembly process, cleaning process, riveting acoustical panel work In each process of sequence, press fitting oil sealing and assembly leak test process, it is both provided with industrial tablet terminal and two-dimensional code scanning rifle;
C, craft port and the industrial tablet terminal and the two-dimensional code scanning are set in aluminium alloy compression casting Production equipment Rifle connect, it is described industry tablet terminal and the two-dimensional code scanning rifle connect with ERP system, production equipment output signal with it is described The related information of Quick Response Code links with the ERP system;
D, after scanning product Quick Response Code in process at once, the key process parameter of process stores and is entered into the ERP systems at once On system, the ERP system output is included in which board production, press fitting leak detection date, press fitting leak detection parameter, packaging shipment date Information;
E, when aluminium alloy compression casting product is led to the problem of in client, Quick Response Code on the product is scanned, export includes which equipment is given birth to Production, the date of manufacture, production process parameters information, judge whether there is exception, the suspicious product of aberrant batches be isolated, are done over again Or scrap, involved abnormal production equipment is overhauled or replaced;
F, after producing a period of time, by the production monitoring of the ERP system, it includes production to transfer and collect each production equipment Data, shutdown, failure, the information of maintenance data export global device efficiency OEE.
2. the accurate retroactive method of the full process of aluminium alloy compression casting product as described in claim 1, it is characterised in that:The die carter In sequence, the computer of the Quick Response Code laser machine, which is communicated with robot by IO, carries out interaction, and adopts module by PLC numbers and read packet Include die casting parameter, the information of vacuum machine parameter, die heater parameter.
3. the accurate retroactive method of the full process of aluminium alloy compression casting product as claimed in claim 2, it is characterised in that:Process after described In, before production goes into operation, operator, which swipes the card, logs in MES system, first selects work order, mold in production and processing acquisition function interface, is System recalls corresponding processing work order information, scans the Quick Response Code of feeding product, and process performance in verification, authentication failed then carries Show alarm, and product is returned to upper process processing, is verified, binds the process information of process after corresponding to, processing staff's letter Breath, process time.
4. the accurate retroactive method of the full process of aluminium alloy compression casting product as claimed in claim 3, it is characterised in that:The machining In process, before production goes into operation, operator, which swipes the card, logs in MES system, and work order, mould are first selected in production and processing acquisition function interface Tool, system recall corresponding processing work order information, scan the Quick Response Code of feeding product, verify front-end-of-line performance, leading portion It leaks process or processing is unqualified, prompt to alarm, and product is returned to upper process processing, be verified, bind corresponding machining The process information of process, processing staff's information, process for machining parameter, process time;The process for machining parameter passes through PLC Number adopts module reading.
5. the accurate retroactive method of the full process of aluminium alloy compression casting product as claimed in claim 4, it is characterised in that:The assembler In sequence, before production goes into operation, operator, which swipes the card, logs in MES system, and work order, mold are first selected in production and processing acquisition function interface, System recalls corresponding assembly work order information, scans the Quick Response Code of feeding product, verifies front-end-of-line performance, and leading portion leaks work Sequence or processing are unqualified, prompt to alarm, and product is returned to upper process processing, are verified, bind corresponding assembly process Process information, processing staff's information, tool parameters, process time;The tool parameters are adopted module by PLC numbers and are read.
6. the accurate retroactive method of the full process of aluminium alloy compression casting product as claimed in claim 5, it is characterised in that:The scavenger In sequence, module is adopted by PLC numbers and reads cleaning equipment parameter, if abnormal, conveyer belt controlled by IO communication modules and is stopped.
7. the accurate retroactive method of the full process of aluminium alloy compression casting product as claimed in claim 6, it is characterised in that:The riveting disappears In soundboard process, the riveting point quantity of processing corresponding pressure value and each product is read by plc data acquisition module.
8. the accurate retroactive method of the full process of aluminium alloy compression casting product as claimed in claim 7, it is characterised in that:The press fitting oil In envelope and assembly leak test process, corresponding pressure value, the oil sealing depth of parallelism, machine number, leak test are read by plc data acquisition module Value.
9. the accurate retroactive method of the full process of aluminium alloy compression casting product as described in claim 1, it is characterised in that:The output overall situation is set The information that standby efficiency OEE is acquired further includes docking and installing the industrial tablet terminal by numerically-controlled machine tool PLC system, is received Collection display records every lathe, the pure lathe beat of every product, fluctuation situation;Display record employee operates every product of production Cycle time, fluctuation situation;Display records every lathe employee's clamping time, fluctuation situation;Each machining tool whole cutter Lifetime data;The qualities such as display three coordinate measurements of record check that data, each processing dimension fluctuate situation.
10. the accurate retroactive method of the full process of aluminium alloy compression casting product as claimed in claim 9, it is characterised in that:Output is global The information that device efficiency OEE is acquired is transmitted to MES system and push and in early warning to mobile phone or workshop billboard.
CN201810235687.5A 2018-03-21 2018-03-21 Full-process accurate tracing method for aluminum alloy die-casting product Active CN108537301B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810235687.5A CN108537301B (en) 2018-03-21 2018-03-21 Full-process accurate tracing method for aluminum alloy die-casting product

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810235687.5A CN108537301B (en) 2018-03-21 2018-03-21 Full-process accurate tracing method for aluminum alloy die-casting product

Publications (2)

Publication Number Publication Date
CN108537301A true CN108537301A (en) 2018-09-14
CN108537301B CN108537301B (en) 2021-06-11

Family

ID=63485022

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810235687.5A Active CN108537301B (en) 2018-03-21 2018-03-21 Full-process accurate tracing method for aluminum alloy die-casting product

Country Status (1)

Country Link
CN (1) CN108537301B (en)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109872166A (en) * 2019-02-21 2019-06-11 苏州天准科技股份有限公司 A kind of quality of production retroactive method based on big data technology
CN110109431A (en) * 2019-05-07 2019-08-09 重庆大学 A kind of die casting machine OEE Information Intelligent Extraction system
CN110322109A (en) * 2019-05-09 2019-10-11 中山易裁剪网络科技有限公司 Cloth management system for tracking and its method in a kind of clothes process
CN110703634A (en) * 2019-10-22 2020-01-17 深圳市裕展精密科技有限公司 Control device, machining control method, and readable storage medium
CN110889621A (en) * 2019-11-22 2020-03-17 惠州市德赛西威汽车电子股份有限公司 Error-proofing method for preventing assembly of failure material
CN110956241A (en) * 2019-12-17 2020-04-03 爱珂勒电子元器件(珠海)有限公司 Product identification tracking management method based on two-dimensional code
CN111260378A (en) * 2020-01-09 2020-06-09 Oppo(重庆)智能科技有限公司 MES-based quality tracing method and system
CN111695774A (en) * 2020-05-09 2020-09-22 江苏科瑞恩自动化科技有限公司 Real-name system authentication system and method
CN112232777A (en) * 2020-10-22 2021-01-15 中山市华盛家具制造有限公司 Method for acquiring product installation diagram
CN112784620A (en) * 2021-01-27 2021-05-11 深圳市长盈精密技术股份有限公司 Tracing method and tracing system for product manufacturing
CN113570184A (en) * 2021-06-07 2021-10-29 东莞盛翔精密金属有限公司 Tracing method, tracing system, electronic equipment and computer readable storage medium
CN113673941A (en) * 2020-05-13 2021-11-19 广达国际机械有限公司 Steel structure processing management method and system
CN113687623A (en) * 2021-07-20 2021-11-23 青岛奥利普自动化控制系统有限公司 Method and system for preventing error and fool of tire quality
CN114253234A (en) * 2021-12-07 2022-03-29 华天科技(南京)有限公司 Production line production automatic verification card control method and system
WO2023005097A1 (en) * 2021-07-26 2023-02-02 三门三友科技股份有限公司 Traceability system and method based on refined copper multi-parameter acquisition
CN116533235A (en) * 2023-05-09 2023-08-04 江苏中科云控智能工业装备有限公司 Big data-based die casting production data transmission system and method
CN117689256A (en) * 2023-12-12 2024-03-12 中南大学 Aluminum alloy casting product quality tracing method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103116821A (en) * 2013-01-21 2013-05-22 重庆大学 Whole course tracking method and whole course tracking system of discrete manufacturing workshop production process quality
CN107016456A (en) * 2017-03-14 2017-08-04 上海迈聘企业管理咨询有限公司 A kind of discreteness based on state-driven produces the prediction analysis method of trace platform
CN107368586A (en) * 2017-07-24 2017-11-21 华电重工股份有限公司 A kind of multisystem data analysing method and platform
CN107527154A (en) * 2017-08-31 2017-12-29 四川航天系统工程研究所 A kind of management planning and scheduling and executing system for being used for the scene of manufacturing

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103116821A (en) * 2013-01-21 2013-05-22 重庆大学 Whole course tracking method and whole course tracking system of discrete manufacturing workshop production process quality
CN107016456A (en) * 2017-03-14 2017-08-04 上海迈聘企业管理咨询有限公司 A kind of discreteness based on state-driven produces the prediction analysis method of trace platform
CN107368586A (en) * 2017-07-24 2017-11-21 华电重工股份有限公司 A kind of multisystem data analysing method and platform
CN107527154A (en) * 2017-08-31 2017-12-29 四川航天系统工程研究所 A kind of management planning and scheduling and executing system for being used for the scene of manufacturing

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109872166A (en) * 2019-02-21 2019-06-11 苏州天准科技股份有限公司 A kind of quality of production retroactive method based on big data technology
CN110109431A (en) * 2019-05-07 2019-08-09 重庆大学 A kind of die casting machine OEE Information Intelligent Extraction system
CN110322109A (en) * 2019-05-09 2019-10-11 中山易裁剪网络科技有限公司 Cloth management system for tracking and its method in a kind of clothes process
CN110703634A (en) * 2019-10-22 2020-01-17 深圳市裕展精密科技有限公司 Control device, machining control method, and readable storage medium
CN110889621A (en) * 2019-11-22 2020-03-17 惠州市德赛西威汽车电子股份有限公司 Error-proofing method for preventing assembly of failure material
CN110956241A (en) * 2019-12-17 2020-04-03 爱珂勒电子元器件(珠海)有限公司 Product identification tracking management method based on two-dimensional code
CN111260378A (en) * 2020-01-09 2020-06-09 Oppo(重庆)智能科技有限公司 MES-based quality tracing method and system
CN111695774A (en) * 2020-05-09 2020-09-22 江苏科瑞恩自动化科技有限公司 Real-name system authentication system and method
CN113673941A (en) * 2020-05-13 2021-11-19 广达国际机械有限公司 Steel structure processing management method and system
CN113673941B (en) * 2020-05-13 2024-02-02 广达国际机械有限公司 Steel structure processing management method and system thereof
CN112232777A (en) * 2020-10-22 2021-01-15 中山市华盛家具制造有限公司 Method for acquiring product installation diagram
CN112784620A (en) * 2021-01-27 2021-05-11 深圳市长盈精密技术股份有限公司 Tracing method and tracing system for product manufacturing
CN113570184A (en) * 2021-06-07 2021-10-29 东莞盛翔精密金属有限公司 Tracing method, tracing system, electronic equipment and computer readable storage medium
CN113687623A (en) * 2021-07-20 2021-11-23 青岛奥利普自动化控制系统有限公司 Method and system for preventing error and fool of tire quality
WO2023005097A1 (en) * 2021-07-26 2023-02-02 三门三友科技股份有限公司 Traceability system and method based on refined copper multi-parameter acquisition
CN114253234A (en) * 2021-12-07 2022-03-29 华天科技(南京)有限公司 Production line production automatic verification card control method and system
CN116533235A (en) * 2023-05-09 2023-08-04 江苏中科云控智能工业装备有限公司 Big data-based die casting production data transmission system and method
CN116533235B (en) * 2023-05-09 2023-12-12 江苏中科云控智能工业装备有限公司 Big data-based die casting production data transmission system and method
CN117689256A (en) * 2023-12-12 2024-03-12 中南大学 Aluminum alloy casting product quality tracing method

Also Published As

Publication number Publication date
CN108537301B (en) 2021-06-11

Similar Documents

Publication Publication Date Title
CN108537301A (en) A kind of accurate retroactive method of full process of aluminium alloy compression casting product
CN100468246C (en) Real time monitoring system for production processes and monitoring method
CN105404243B (en) Flow control and manufacturing execution system in industrial production line
CN105741053A (en) Whole life-cycle management model for intelligent gas device
CN110310134B (en) Customized furniture management tracing method based on coding information association
CN110705814A (en) MES system based on intelligent manufacturing management
CN101266494B (en) Quality improvement system
CN110956241A (en) Product identification tracking management method based on two-dimensional code
CN107390649B (en) Project type product processing Internet of things support system
CN110223152B (en) Method and system for acquiring plate production data in furniture manufacturing execution system
CN105607566B (en) A kind of self-adapting regulation method of production material
CN110597196A (en) Data acquisition system and data acquisition method
Pop Digitalization of the system of data analysis and collection in an automotive company
CN112130537B (en) Informationized management method and system for mixed-flow assembly line of engine
CN112184044A (en) Digitalized process management method, digitalized process management system and storage medium
CN111176249B (en) Intelligent manufacturing method of multi-station stamping forming and forming die
CN110874691A (en) General assembly offline control method and system
CN112700095B (en) Battery Pack Production Management System
CN113191738B (en) Multi-template management and control method for test equipment and related equipment
CN110597198B (en) Quality control device, quality control system and quality control method for TFT substrate glass
CN113011900A (en) Quality closed-loop tracing management and control system and method for aerospace products
CN112419081A (en) Electronic manufacturing industry comprehensive quality forward and reverse tracing system
CN117217672A (en) Account checking method and system and production management system
CN110826926A (en) Intelligent manufacturing execution system for surface assembly production line
CN114325550B (en) Automatic diagnosis system and method for abnormal meter positions of electric energy meter verification assembly line

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant