CN113584983B - Asphalt pavement structure capable of automatically collecting rainwater and construction method - Google Patents

Asphalt pavement structure capable of automatically collecting rainwater and construction method Download PDF

Info

Publication number
CN113584983B
CN113584983B CN202110860260.6A CN202110860260A CN113584983B CN 113584983 B CN113584983 B CN 113584983B CN 202110860260 A CN202110860260 A CN 202110860260A CN 113584983 B CN113584983 B CN 113584983B
Authority
CN
China
Prior art keywords
layer
water
permeable
asphalt
base layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110860260.6A
Other languages
Chinese (zh)
Other versions
CN113584983A (en
Inventor
卞佳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhangjiagang Jida Municipal Road And Bridge Engineering Co ltd
Original Assignee
Zhangjiagang Jida Municipal Road And Bridge Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhangjiagang Jida Municipal Road And Bridge Engineering Co ltd filed Critical Zhangjiagang Jida Municipal Road And Bridge Engineering Co ltd
Priority to CN202110860260.6A priority Critical patent/CN113584983B/en
Publication of CN113584983A publication Critical patent/CN113584983A/en
Application granted granted Critical
Publication of CN113584983B publication Critical patent/CN113584983B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/18Coherent pavings made in situ made of road-metal and binders of road-metal and bituminous binders
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D29/00Filters with filtering elements stationary during filtration, e.g. pressure or suction filters, not covered by groups B01D24/00 - B01D27/00; Filtering elements therefor
    • B01D29/01Filters with filtering elements stationary during filtration, e.g. pressure or suction filters, not covered by groups B01D24/00 - B01D27/00; Filtering elements therefor with flat filtering elements
    • B01D29/03Filters with filtering elements stationary during filtration, e.g. pressure or suction filters, not covered by groups B01D24/00 - B01D27/00; Filtering elements therefor with flat filtering elements self-supporting
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • E01C11/225Paving specially adapted for through-the-surfacing drainage, e.g. perforated, porous; Preformed paving elements comprising, or adapted to form, passageways for carrying off drainage
    • E01C11/226Coherent pavings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • E01C11/227Gutters; Channels ; Roof drainage discharge ducts set in sidewalks
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/24Methods or arrangements for preventing slipperiness or protecting against influences of the weather
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/32Coherent pavings made in situ made of road-metal and binders of courses of different kind made in situ
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B3/00Methods or installations for obtaining or collecting drinking water or tap water
    • E03B3/02Methods or installations for obtaining or collecting drinking water or tap water from rain-water
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/04Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
    • E03F5/0401Gullies for use in roads or pavements
    • E03F5/0404Gullies for use in roads or pavements with a permanent or temporary filtering device; Filtering devices specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/10Collecting-tanks; Equalising-tanks for regulating the run-off; Laying-up basins
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/14Devices for separating liquid or solid substances from sewage, e.g. sand or sludge traps, rakes or grates
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/108Rainwater harvesting

Abstract

The utility model relates to an automatic collect bituminous paving structure of rainwater, including laying the bituminous paving layer at the earth's surface, bituminous paving layer below is equipped with the permeable bed, part the permeable bed passes bituminous paving layer setting, the permeable bed is inside to be inlayed and is equipped with a plurality of pipes of permeating water, the below of permeable bed is equipped with the basic unit, be equipped with the water collection portion in the basic unit, the pipe of permeating water is linked together with the water collection portion, the top of water collection portion flushes with the upper surface of basic unit, the below of basic unit is equipped with the underlayment, the below of underlayment is equipped with the bed course, the bottom of water collection portion is located in the bed course. This application has partial permeable bed and passes the setting of pitch road surface layer, rainwater inflow permeable bed during rainy day, and the intraformational pipe that permeates water absorbs the rainwater and with its transmission to the water-collecting part to collect the rainwater, be convenient for carry out cyclic utilization's effect.

Description

Asphalt pavement structure capable of automatically collecting rainwater and construction method
Technical Field
The application relates to the field of asphalt pavement construction, in particular to an asphalt pavement structure capable of automatically collecting rainwater and a construction method.
Background
Asphalt pavement refers to various types of pavement made by incorporating road asphalt material in mineral material. The asphalt binder improves the capability of the paving aggregate to resist damage of traveling vehicles and natural factors to the pavement, and enables the pavement to be smooth, less in dust, impermeable and durable. Accordingly, asphalt pavement is one of the most widely used premium pavements in road construction.
The existing asphalt pavement is simple in structure, and asphalt is directly paved on a base layer. Because pitch does not possess the ability of permeating water, the road surface easily produces ponding when the rainy day, and ponding can't be got rid of from the road surface fast to lead to unable rainwater to be collected, reach rainwater cyclic utilization's effect.
Disclosure of Invention
In order to solve the problem that asphalt does not have the water permeability, the rainwater cannot be collected, and the rainwater recycling is achieved, the application provides an asphalt pavement structure capable of automatically collecting rainwater and a construction method.
The utility model provides an automatic asphalt pavement structure of collection rainwater adopts following technical scheme:
the utility model provides an automatic collect bituminous paving structure of rainwater, is including laying the bituminous paving layer at the earth's surface, bituminous paving layer below is equipped with the permeable bed, part the permeable bed passes bituminous paving layer setting, the permeable bed is inside to be inlayed and is equipped with a plurality of pipes that permeate water, the below of permeable bed is equipped with the basic unit, be equipped with the water collection portion in the basic unit, the pipe that permeates water is linked together with the water collection portion, the top of water collection portion flushes with the upper surface of basic unit, the below of basic unit is equipped with the subbase, the below of subbase is equipped with the bed course, the bottom of water collection portion is located in the bed course.
Through adopting above-mentioned technical scheme, partial permeable bed passes the setting of pitch surface course, and the rainwater flows into the permeable bed during rainy day, and the intraformational permeable tube that permeates water absorbs the rainwater and transmits it to the water portion that catchments to collect the rainwater, be convenient for carry out cyclic utilization.
Preferably, the permeable layer comprises a permeable base layer and a permeable surface layer, the permeable base layer is formed by laying coarse aggregate with the thickness of 7-10cm, the permeable surface layer is formed by laying fine aggregate with the thickness of 3-5cm, and the permeable pipe is arranged inside the permeable base layer.
Through adopting above-mentioned technical scheme, the aggregate thickness on the top layer that permeates water is less to can play the stable effect in support road surface, permeate water the pipe and locate the basic unit that permeates water inside, can not influence the support effect on the top layer that permeates water.
Preferably, the water collecting part includes the water storage tank, the pipe of permeating water is linked together with the water storage tank, the both ends of pitch road surface layer all are equipped with the drain tank, the water storage tank be two and with the drain tank one-to-one, wear to be equipped with the drain pipe with the drain tank intercommunication on the water storage tank, the top of drain tank is higher than pitch road surface layer, the opening has been seted up on the drain tank, the opening is located the lateral wall of drain tank protrusion pitch road surface layer.
Through adopting above-mentioned technical scheme, the rainwater of being convenient for to the pipe collection of permeating water is stored in setting up of holding water tank, also can prevent that the rainfall is too big to lead to the drainage box to be irritated full, causes the condition emergence that the rainwater spilt.
Preferably, the top of passing the permeable bed that the pitch pavement layer set up is equipped with the apron, be equipped with a plurality of through-hole on the apron.
Through adopting above-mentioned technical scheme, the setting of apron has improved the planarization on road surface, avoids causing road surface unevenness by the permeable bed that fine aggregate constitutes, influences normal driving.
Preferably, the top of the pipe of permeating water is equipped with the drainage board, the drainage board inlays and locates the top layer of permeating water, a plurality of drainage hole has been seted up on the drainage board, the drainage board is made by the soft foaming granule of polyurethane and the metal particle mixture, be equipped with a plurality of conducting strips on the drainage board.
Through adopting above-mentioned technical scheme, the soft foaming granule of polyurethane absorbs the rainwater and makes self be heated evenly through metal particle, accelerates the evaporation of moisture, carries out the drying to the drainage board.
Preferably, the periphery of the water storage tank is provided with a reinforcing beam, and the top end of the reinforcing beam is flush with the top end of the water storage tank.
Through adopting above-mentioned technical scheme, the stiffening beam structure is firm, can avoid the pressure of each layer of road surface that the water storage tank received too big, and the setting up of stiffening beam has protected the water storage tank to be difficult to by the crushing.
In a second aspect, the present application provides an asphalt pavement construction method for automatically collecting rainwater, which adopts the following technical scheme:
an asphalt pavement construction method for automatically collecting rainwater comprises the following steps:
s1, ramming plain soil layer: removing sundries on the original road surface and flattening soil on the original road surface;
s2, pouring a cushion layer: paving coarse-grained soil on the plain soil layer to form a cushion layer, embedding a water collecting part in the cushion layer and smoothing the upper surface of the cushion layer;
s3, pouring a subbase layer: after water is sprayed on the gravel with the particle size not larger than 40ram, the wet gravel is laid on the cushion layer to form an underlayer, and the upper surface of the underlayer is leveled;
s4, pouring a base layer: paving broken stones with the particle size not larger than 30ram on the subbase layer to form a base layer, and enabling the upper surface of the base layer to be flush with the upper surface of the water collecting part;
s5, pouring a permeable layer: paving 7-10cm thick coarse aggregate on a base layer to form a permeable base layer, leveling the paved coarse aggregate, paving 3-5cm thick fine aggregate to form a permeable surface layer, embedding a plurality of permeable pipes in the permeable base layer, embedding a water filtering plate provided with a heat conducting sheet in the permeable surface layer, and embedding two drainage boxes at two ends of the permeable pipes in the permeable base layer;
s6, pouring an asphalt pavement layer: mixing asphalt materials and mineral aggregates to form asphalt concrete, paving the asphalt concrete on the permeable layer, flattening the asphalt concrete by a compactor, continuously paving the asphalt concrete at intervals, and compacting the asphalt concrete;
s7, pouring a permeable pavement layer: paving fine aggregates with the thickness of 3-5cm between adjacent asphalt pavement layers, placing a cover plate at the top end of the paved fine aggregates, and performing secondary compaction on the asphalt pavement layers through a compactor.
Through adopting above-mentioned technical scheme, the rainwater flows into permeable stratum and is collected by the pipe of permeating water of permeable stratum inside after falling to ground, and the rainwater of collecting is deposited into in the water storage tank, waits for cyclic utilization in the rivers of water storage tank advance the drainage case.
Preferably, the step of laying coarse aggregate with the thickness of 7-10cm on the base layer to form a permeable base layer, laying fine aggregate with the thickness of 3-5cm after floating the laid coarse aggregate to form a permeable surface layer, embedding a plurality of permeable pipes in the permeable base layer, embedding a water filter plate provided with a heat conducting sheet in the permeable surface layer, and embedding two drainage boxes positioned at two ends of each permeable pipe in the permeable base layer comprises: the water filtering plate is prepared by mixing polyurethane soft foaming particles and metal particles, and the proportion of the polyurethane soft foaming particles to the metal particles is regulated and controlled according to the environment.
Through adopting above-mentioned technical scheme, the hydroscopicity of the soft foaming granule of polyurethane is better, and metal particles's heat absorption effect is better, can make the soft foaming granule of polyurethane heat absorption more comprehensive through mixing the soft foaming granule of polyurethane with metal particles, has promoted the efficiency of moisture evaporation.
Preferably, the steps of mixing the bituminous material and the mineral aggregate to form bituminous concrete, laying the bituminous concrete on the water-permeable layer, pressing the bituminous concrete by the compactor, and continuing to lay the bituminous concrete at a distance and compact the bituminous concrete further comprise: a high-pressure suction fan is arranged on one side of the permeable layer, and is opened when the asphalt concrete is laid, so that harmful gas emitted by the asphalt concrete is sucked by the high-pressure suction fan.
Through adopting above-mentioned technical scheme, asphalt concrete can distribute harmful gas, siphons away harmful gas through the high pressure suction fan and can avoid harmful gas to cause the harm to staff's health, has improved the security of construction.
Preferably, the step of paving fine aggregates with a thickness of 3-5cm between adjacent asphalt pavement layers, placing a cover plate on the top ends of the paved fine aggregates, and performing secondary compaction on the asphalt pavement layers through a compactor further comprises: the asphalt concrete is laid along the length direction of the pavement when being laid, the compactor moves along the length direction of the pavement, and the length of a compression roller of the compactor is smaller than the width of the asphalt concrete.
By adopting the technical scheme, the asphalt concrete laying direction is consistent with the moving direction of the compactor, the condition that the compactor presses the cover plate to cause the cover plate to be crushed can be avoided, and the integrity of the pressing plate is ensured.
In summary, the present application includes at least one of the following beneficial technical effects:
1. rainwater flows into the permeable layer in rainy days, and the permeable pipes in the permeable layer absorb the rainwater and transmit the rainwater to the water collecting part, so that the rainwater is collected and is convenient to recycle;
2. the water filter plate supported by the soft polyurethane foam particles and the metal particles in a mixed mode can absorb part of rainwater and enable the water filter plate to be heated uniformly through the metal particles, evaporation of the absorbed rainwater is accelerated, and therefore the effect of cooling the road surface is achieved.
Drawings
Fig. 1 is a schematic cross-sectional structure view of an asphalt pavement structure for automatically collecting rainwater according to an embodiment of the present application.
Fig. 2 is an overall structural schematic diagram of an asphalt pavement structure capable of automatically collecting rainwater in the embodiment of the present application.
FIG. 3 is a schematic view of the overall structure of a water-permeable plate according to an embodiment of the present application.
Fig. 4 is a schematic flow chart of an asphalt pavement construction method for automatically collecting rainwater according to an embodiment of the present application.
Description of reference numerals: 1. an asphalt pavement layer; 2. a water permeable layer; 21. a water permeable base layer; 22. a water permeable surface layer; 3. a water permeable pipe; 4. a base layer; 5. a water collection part; 51. a water storage tank; 52. a drain tank; 6. an underlayer; 7. a cushion layer; 8. a drain pipe; 9. a port; 10. a cover plate; 11. a through hole; 12. a water filter plate; 13. water filtering holes; 14. a heat conductive sheet; 15. and (4) reinforcing the beam.
Detailed Description
The present application is described in further detail below with reference to figures 1-4.
The embodiment of the application discloses an automatic asphalt pavement structure and a construction method for collecting rainwater.
Example 1
Referring to fig. 1 and 2, an asphalt pavement structure for automatically collecting rainwater includes a mat layer 7, a sub-base layer 6, a base layer 4, a permeable layer 2, and an asphalt pavement layer 1. The mat 7 is disposed on the original road surface, the mat 7 is composed of coarse earth, and the mat 7 is disposed along the length direction of the road. The surface of bed course 7 is level and smooth, and bed course 7 embeds is equipped with water-collecting part 5. Specifically, the water collecting part 5 includes a water storage tank 51 and a reinforcing beam 15, the bottom of the water storage tank 51 is embedded in the cushion 7, the reinforcing beam 15 is disposed around the sidewall of the water storage tank 51, and the top end of the reinforcing beam 15 is flush with the top end of the water storage tank 51. The subbase 6 is laid on the upper side of the cushion layer 7, the subbase 6 is composed of crushed stones with the grain diameter not larger than 40ram, and the water storage tank 51 is arranged through the subbase 6. The base course 4 is laid above the subbase 6, the base course 4 is composed of gravels with the grain diameter not larger than 30ram, and the top end of the water storage tank 51 is flush with the upper surface of the base course 4. The reinforcing beam 15 is composed of a plurality of reinforcing bars, the strength of the reinforcing bars is large, and the reinforcing beam 15 composed of the reinforcing bars can relieve the pressure applied to the water storage tank 51 by the peripheral gravels of the water storage tank 51, so that the water storage tank 51 is protected from being easily crushed.
Referring to fig. 1 and 2, the permeable layer 2 is laid on the surface of the base layer 4, and specifically, the permeable layer 2 includes a permeable base layer 21 and a permeable surface layer 22, and the permeable surface layer 22 is laid on the upper surface of the permeable base layer 21. The permeable base layer 21 is formed by paving 7-10cm thick coarse aggregate, and the permeable surface layer 22 is formed by paving 3-5cm thick fine aggregate. The base layer 21 that permeates water is inside to be inlayed and is equipped with the pipe 3 that permeates water, and water storage tank 51 has two, and the both ends of the pipe 3 that permeates water are worn to establish respectively into two water storage tank 51 inside make the pipe 3 that permeates water be linked together with water storage tank 51.
In implementation, the gaps between the fine aggregates forming the permeable surface layer 22 are small, so that the stability of the foundation can be improved, and the gaps between the coarse aggregates forming the permeable base layer 21 are large, so that rainwater can permeate conveniently. The water permeable pipe 3 collects rainwater and transmits the collected rainwater to the water storage tank 51, thereby realizing the collection of the rainwater.
Referring to fig. 1 and 3, a water filtering plate 12 is disposed above the water permeable pipe 3, the water filtering plate 12 is embedded inside the water permeable surface, and a plurality of water filtering holes 13 are disposed on the water filtering plate 12. Specifically, the water filter 12 is made by mixing polyurethane soft foam particles and metal particles, the water permeable pipe 3 at the bottom end of the water filter 12 is located right below the water filtering hole 13 on the water filter 12, and the top end of the water filter 12 is provided with a plurality of heat conducting fins 14. The polyurethane soft foaming particles have the effects of absorbing rainwater and evaporating the rainwater, and the metal particles have good thermal conductivity.
In implementation, the water filtering plate 12 allows rainwater to flow to the upper side of the water permeable pipe 3 through the water filtering holes 13, so as to facilitate the collection of rainwater by the water permeable pipe 3. The water filtering plate 12 absorbs rainwater and makes itself heated uniformly through metal particles, thereby accelerating the evaporation of rainwater on the surface of the water filtering plate 12 and avoiding the accumulation of rainwater on the surface of the water filtering plate 12 to influence the structure of the water permeable layer 2. The heat conductive sheet 14 absorbs heat of the asphalt pavement to accelerate evaporation of rainwater.
Referring to fig. 1 and 2, an asphalt pavement layer 1 is laid on the top of a permeable layer 2, the asphalt pavement layer 1 is arranged along the length direction of the pavement, a plurality of gaps are arranged along the width direction of the pavement, part of the permeable layer 2 penetrates through the asphalt pavement layer 1 and is arranged in the gaps, and the permeable layer 2 in the gaps is formed by laying fine aggregates with the thickness of 3-5 cm. Locate 2 tops of permeable layer inside the gap and be equipped with apron 10, and seted up a plurality of through-hole 11 on the apron 10, the upper surface of apron 10 flushes with the upper surface of pitch road surface layer 1 mutually.
Referring to fig. 1 and 2, both ends of the asphalt pavement 1 are provided with drain boxes 52, and the upper surfaces of the drain boxes 52 are higher than the upper surface of the asphalt pavement 1. The two drain tanks 52 correspond to the two water storage tanks 51 one by one, and the drain pipes 8 communicating with the corresponding water storage tanks 51 are formed through the drain tanks 52. The side wall of the drainage tank 52 close to the asphalt pavement layer 1 is provided with a through hole 9, and the through hole 9 is positioned at the part of the side wall higher than the asphalt pavement layer 1. In operation, a part of rainwater on the road surface flows into the drain tank 52 through the through port 9, and another part of rainwater on the road surface passes through the water permeable layer 2 to be absorbed by the water permeable pipe 3 to flow into the water storage tank 51, thereby collecting the rainwater.
The implementation principle of the embodiment 1 is as follows: the rainwater sees through the permeable bed 2 between the adjacent asphalt concrete layer and flows to strainer plate 12 department, and the rainwater flows to the pipe 3 of permeating water through strainer plate 12's drainage hole 13, and the pipe 3 of permeating water transmits the rainwater of collecting to inside the reservoir 51 to the realization is to the collection of rainwater.
Example 2
Referring to fig. 4, a construction method of an asphalt pavement automatically collecting rainwater includes the steps of:
s1, ramming plain soil layer: the weeds on the original pavement are removed by a weeding machine, the pits of the original pavement are filled with soil, and the soil on the original pavement is flattened by a compactor.
S2, pouring a cushion layer 7: coarse soil is laid on the plain soil layer to form a mat 7, the water collection part 5 is placed on the top end of the plain soil layer before the coarse soil is laid, so that the bottom end of the water collection part 5 is embedded in the mat 7, and the mat 7 is flattened by a compactor.
S3, pouring a subbase layer 6: water is sprayed on crushed stones having a particle size of not more than 40ram and the sprayed crushed stones are laid on the upper surface of the bed 7 to form the base layer 4, and the upper surface of the sub-base layer 6 is flattened by a compactor to flatten the sub-base layer 6.
S4, pouring a base layer 4: and paving broken stones with the grain size of not more than 30ram on the subbase 6 to form the base layer 4, wherein the upper surface of the base layer 4 is flush with the upper surface of the water collecting part 5.
S5, pouring a permeable layer 2: coarse aggregate with the thickness of 7-10cm is paved on the base layer 4 to form a permeable base layer 21, and the permeable pipe 3 is paved in the permeable base layer 21 when the coarse aggregate is paved. Laying fine aggregate with the thickness of 3-5cm on a permeable base layer 21 to form a permeable surface layer 22, embedding and installing a water filtering plate 12 on the permeable surface layer 22 when laying the fine aggregate, enabling water filtering holes 13 on the water filtering plate 12 to be positioned right above permeable pipes 3, and embedding two drainage boxes 52 at two ends of the permeable pipes 3 in the permeable base layer 21.
The water filter 12 is made by mixing polyurethane soft foam particles and metal particles, and the ratio of the polyurethane soft foam particles to the metal particles is regulated and controlled according to the environment. The metal particles have better heat conductivity, and the metal particles can be heated evenly with the soft foaming particles of polyurethane so that the water filtering plate 12 is heated evenly, thereby the evaporation of water content after the soft foaming particles of polyurethane absorb rainwater is accelerated, thereby the water filtering plate 12 is dried to avoid the rainwater on the surface of the water filtering plate 12 to pile up and influence the 2-layer structure of permeating water.
S6, pouring an asphalt pavement layer: mixing and stirring asphalt materials and mineral aggregates to form asphalt concrete, paving the stirred asphalt concrete on the permeable layer 2 along the length direction of the pavement to form an asphalt pavement layer 1, and compacting the asphalt concrete by a compactor; after the compaction is finished, asphalt concrete is continuously paved along the width direction of the pavement at intervals and the length direction of the pavement to form an asphalt pavement layer 1, and the asphalt pavement layer is compacted.
When laying the asphalt concrete, a high-pressure suction fan is arranged on one side of the permeable layer 2, and the high-pressure suction fan is opened when laying the asphalt concrete because the asphalt concrete can emit harmful gas. The high-pressure suction fan absorbs harmful gas emitted by the asphalt concrete, so that the harmful gas is prevented from damaging the bodies of workers, and the construction safety is improved.
S7, pouring a permeable pavement layer: paving fine aggregates with the thickness of 3-5cm between the adjacent asphalt pavement layers 1, placing a cover plate 10 at the top end of the paved fine aggregates, and carrying out secondary compaction on the asphalt pavement layers 1 through a compactor. The fine aggregate laid contacts with the fine aggregate of the water permeable surface layer 22, and both belong to the water permeable surface layer 22.
The direction of the asphalt concrete pavement coincides with the direction of movement of the compactor, the length of the compactor rolls being less than the width of the asphalt concrete pavement. The compactor will only roll the asphalt concrete layers and will not roll the water permeable layers 2 between adjacent asphalt concrete layers, thereby avoiding the situation that the compactor presses the cover plate 10 to cause the cover plate 10 to be crushed.
The above are preferred embodiments of the present application, and the scope of protection of the present application is not limited thereto, so: equivalent changes in structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (4)

1. The utility model provides an automatic collect bituminous paving construction method of rainwater, construction method includes the bituminous paving structure of an automatic collection rainwater, its characterized in that: the structure comprises an asphalt pavement layer (1) paved on the ground surface, a permeable layer (2) is arranged below the asphalt pavement layer (1), part of the permeable layer (2) passes through the asphalt pavement layer (1) to be arranged, a plurality of permeable pipes (3) are embedded inside the permeable layer (2), a base layer (4) is arranged below the permeable layer (2), a water collecting part (5) is arranged in the base layer (4), the permeable pipes (3) are communicated with the water collecting part (5), the top end of the water collecting part (5) is flush with the upper surface of the base layer (4), a lower base layer (6) is arranged below the base layer (4), a cushion layer (7) is arranged below the lower base layer (6), the bottom end of the water collecting part (5) is arranged in the cushion layer (7) and passes through a cover plate (10) arranged on the top end of the permeable layer (2) arranged on the asphalt pavement layer (1), a plurality of through holes (11) are arranged on the cover plate (10), a water filter plate (12) is arranged above the permeable pipe (3), the water filter plate (12) is embedded in the water filter plate (22), a plurality of water filter plate (12), and a plurality of foaming water filter plates (12) are arranged on the polyurethane soft water filter plate (12), and a plurality of foaming particles (12) are made into a plurality of water filter plate (12) and a plurality of foaming particles (12) and a plurality of water filter plate (12) which are made of polyurethane particle water filter plate (12) and a plurality of polyurethane particle filter plate (12) made into a plurality of water filter plate (12) and a plurality of water filter plate (12) which are made of water filter plate (14) made of water filter plate) and a plurality of water filter plate, the two sides of each water filtering hole (13) are respectively corresponding to one heat conducting sheet (14), each water permeable layer (2) comprises a water permeable base layer (21) and a water permeable surface layer (22), each water permeable base layer (21) is formed by paving coarse aggregates with the thickness of 7-10cm, each water permeable surface layer (22) is formed by paving fine aggregates with the thickness of 3-5cm, each water permeable pipe (3) is arranged inside each water permeable base layer (21), each water collecting part (5) comprises a water storage tank (51), each water permeable pipe (3) is communicated with the corresponding water storage tank (51), the two ends of each asphalt road surface layer (1) are respectively provided with a drainage tank (52), the two water storage tanks (51) are respectively corresponding to the drainage tanks (52), drainage pipes (8) communicated with the drainage tanks (52) penetrate through the water storage tanks (51), the top ends of the asphalt road surface layers (1) are higher than the tops of the asphalt road surface layers (1), each drainage tank (52) is provided with a through hole (9), the drainage holes (9) are positioned on the side wall of the asphalt road surface layer (1) protruding from the water storage tanks (52), and the top ends of the reinforcement beams (51) are flush with the drainage beams (15);
the construction method comprises the following steps:
s1, ramming plain soil layer: removing sundries on the original road surface and flattening soil on the original road surface;
s2, pouring a cushion layer (7): paving coarse-grained soil on the plain soil layer to form a cushion layer (7), embedding a water collecting part (5) in the cushion layer (7) and troweling the upper surface of the cushion layer (7);
s3, pouring a subbase layer (6): after water is sprayed on the gravels with the grain diameter not larger than 40ram, the wet gravels are paved on the cushion layer (7) to form an underlayer (6), and the upper surface of the underlayer (6) is smoothed;
s4, pouring a base layer (4): paving broken stones with the particle size not larger than 30ram on the subbase layer (6) to form a base layer (4), so that the upper surface of the base layer (4) is flush with the upper surface of the water collecting part (5);
s5, pouring a permeable layer (2): paving 7-10cm thick coarse aggregate on a base layer (4) to form a permeable base layer (21), leveling the paved coarse aggregate, paving 3-5cm thick fine aggregate to form a permeable surface layer (22), embedding a plurality of permeable pipes (3) in the permeable base layer (21), embedding a water filter plate (12) provided with a heat conducting sheet (14) in the permeable surface layer (22), and embedding two drainage boxes (52) positioned at two ends of the permeable pipes (3) in the permeable base layer (21);
s6, pouring an asphalt pavement layer (1): mixing asphalt materials and mineral aggregates to form asphalt concrete, paving the asphalt concrete on the permeable layer (2), flattening the asphalt concrete by a compactor, continuously paving the asphalt concrete at intervals, and compacting the asphalt concrete;
s7, pouring a permeable pavement layer (2): paving fine aggregates with the thickness of 3-5cm between the adjacent asphalt pavement layers (1), placing a cover plate (10) at the top end of the paved fine aggregates, and performing secondary compaction on the asphalt pavement layers (1) by a compactor.
2. The asphalt pavement construction method for automatically collecting rainwater according to claim 1, characterized in that: lay the coarse aggregate of thickness at 7-10cm on basic unit (4) and form basic unit (21) of permeating water, lay the fine aggregate that thickness is 3-5cm after will laying the coarse aggregate trowelling and form superficial layer (22) of permeating water again, at the basic unit (21) of permeating water embedded a plurality of root and permeate water pipe (3), at the embedded water strainer (12) of installing conducting strip (14) of establishing on superficial layer (22) of permeating water, the embedded step that is equipped with two drain boxes (52) that are located the pipe (3) both ends of permeating water of being equipped with of basic unit (21) of permeating water includes: the water filter plate (12) is prepared by mixing polyurethane soft foaming particles and metal particles, and the proportion of the polyurethane soft foaming particles to the metal particles is regulated and controlled according to the environment.
3. The asphalt pavement construction method for automatically collecting rainwater according to claim 1, characterized in that: the steps of mixing asphalt materials and mineral aggregates to form asphalt concrete, laying the asphalt concrete on the water permeable layer (2), flattening the asphalt concrete by a compactor, continuously laying the asphalt concrete at intervals, and compacting the asphalt concrete further comprise: a high-pressure suction fan is arranged on one side of the permeable layer (2), and is opened when asphalt concrete is laid, so that harmful gas emitted by the asphalt concrete is sucked by the high-pressure suction fan.
4. The asphalt pavement construction method for automatically collecting rainwater according to claim 1, characterized in that: paving fine aggregates with the thickness of 3-5cm between the adjacent asphalt pavement layers (1), placing a cover plate (10) on the top end of the paved fine aggregates, and performing secondary compaction on the asphalt pavement layers (1) by a compactor, wherein the secondary compaction step further comprises the following steps: the asphalt concrete is laid along the length of the pavement as it is being laid, and the compactor is moved along the length of the pavement, the length of the compactor rolls being less than the width of the asphalt concrete pavement.
CN202110860260.6A 2021-07-28 2021-07-28 Asphalt pavement structure capable of automatically collecting rainwater and construction method Active CN113584983B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110860260.6A CN113584983B (en) 2021-07-28 2021-07-28 Asphalt pavement structure capable of automatically collecting rainwater and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110860260.6A CN113584983B (en) 2021-07-28 2021-07-28 Asphalt pavement structure capable of automatically collecting rainwater and construction method

Publications (2)

Publication Number Publication Date
CN113584983A CN113584983A (en) 2021-11-02
CN113584983B true CN113584983B (en) 2022-10-11

Family

ID=78251398

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110860260.6A Active CN113584983B (en) 2021-07-28 2021-07-28 Asphalt pavement structure capable of automatically collecting rainwater and construction method

Country Status (1)

Country Link
CN (1) CN113584983B (en)

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205501770U (en) * 2016-01-04 2016-08-24 张宇 Water environmental protection type road surface structure is held to high efficiency
CN109098064B (en) * 2018-09-17 2020-08-18 佛山市南海建翔建筑工程有限公司 Sponge urban road structure capable of avoiding rainwater deposition on road surface
CN210797147U (en) * 2019-06-06 2020-06-19 河南硕远海绵城市建设发展有限公司 Natural permeable quarrying paving structure for sponge city
CN110761140B (en) * 2019-10-25 2021-06-22 安徽亚顺工程管理有限公司 Asphalt pavement and construction method thereof
CN213571359U (en) * 2020-09-17 2021-06-29 深圳市粤鹏建筑工程有限公司 Natural permeable quarrying paving structure for sponge city

Also Published As

Publication number Publication date
CN113584983A (en) 2021-11-02

Similar Documents

Publication Publication Date Title
CN103510441B (en) Three-dimensional-drainage roadbed structure for preventing water damage of road in cold region and construction method thereof
CN206928164U (en) A kind of drainage type concrete road
CN106894311A (en) A kind of sponge-type urban water-through bituminous paving
CN203498721U (en) Three-dimensional drainage roadbed structure preventing damage by water of road in cold region
CN205653671U (en) Bituminous paving permeates water in sponge type city
CN106436523A (en) New-structure grass planting brick produced by recycled aggregates
CN110820456A (en) Anti-settling and replacement-filling alternate airport runway and construction method thereof
CN213804678U (en) Sponge city ecological road roadbed structure
CN113584983B (en) Asphalt pavement structure capable of automatically collecting rainwater and construction method
CN211596259U (en) Sponge city structure of mating formation of permeating water
CN105887616B (en) A kind of method that sponge urban ground strengthens water suction by underlay charcoal
CN109989474B (en) Construction method of rainwater collection system
KR20110121374A (en) Water permeability way road pave method
US7431536B2 (en) Method of making a flat foundation for a floor without substantial excavation and foundation made by said method
CN109763388B (en) Roadbed structure and construction method thereof
CN113062297A (en) Alkali system is arranged in sponge city saline and alkaline land
JPH0453205B2 (en)
CN111287040A (en) Method for constructing liquid soil road
CN220450596U (en) Frozen soil region toe heat preservation drainage structures
CN218812963U (en) Pervious concrete pavement using construction waste as aggregate
CN219342721U (en) Roadbed filled by construction waste
CN215482016U (en) Durable type full-transparent asphalt pavement structure for resource recycling
CN213681563U (en) Sidewalk rainwater drainage and reuse structure
CN220846895U (en) Roadbed structure for filling phyllite filler into high embankment
CN216809408U (en) Green type road surface structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant