CN113567015B - Stress detection device based on hydraulic transmission type fiber bragg grating - Google Patents

Stress detection device based on hydraulic transmission type fiber bragg grating Download PDF

Info

Publication number
CN113567015B
CN113567015B CN202110830596.8A CN202110830596A CN113567015B CN 113567015 B CN113567015 B CN 113567015B CN 202110830596 A CN202110830596 A CN 202110830596A CN 113567015 B CN113567015 B CN 113567015B
Authority
CN
China
Prior art keywords
push rod
cantilever beam
zero setting
piston shaft
housing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110830596.8A
Other languages
Chinese (zh)
Other versions
CN113567015A (en
Inventor
宋成祥
张航
潘心栋
孟凡龙
蒋绪军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Guang'an Intelligent Technology Co ltd
Original Assignee
Shandong Guang'an Intelligent Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Guang'an Intelligent Technology Co ltd filed Critical Shandong Guang'an Intelligent Technology Co ltd
Priority to CN202110830596.8A priority Critical patent/CN113567015B/en
Publication of CN113567015A publication Critical patent/CN113567015A/en
Application granted granted Critical
Publication of CN113567015B publication Critical patent/CN113567015B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01LMEASURING FORCE, STRESS, TORQUE, WORK, MECHANICAL POWER, MECHANICAL EFFICIENCY, OR FLUID PRESSURE
    • G01L1/00Measuring force or stress, in general
    • G01L1/24Measuring force or stress, in general by measuring variations of optical properties of material when it is stressed, e.g. by photoelastic stress analysis using infrared, visible light, ultraviolet
    • G01L1/242Measuring force or stress, in general by measuring variations of optical properties of material when it is stressed, e.g. by photoelastic stress analysis using infrared, visible light, ultraviolet the material being an optical fibre
    • G01L1/246Measuring force or stress, in general by measuring variations of optical properties of material when it is stressed, e.g. by photoelastic stress analysis using infrared, visible light, ultraviolet the material being an optical fibre using integrated gratings, e.g. Bragg gratings

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Arrangements For Transmission Of Measured Signals (AREA)
  • Measuring Fluid Pressure (AREA)

Abstract

The utility model provides a large amount of Cheng Mao pole cable stress monitoring sensor of mining visual fiber grating, includes anchor pole cable stress induction system, one-level transmission system, second grade transmission system, display device and remote monitering system, anchor pole cable stress induction system receives the stress that the anchor pole cable transmission was come to transmit to display device in through one-level transmission system and second grade transmission system, display device includes panel board and second casing, be equipped with push rod and transmission portion in the second casing, the push rod is connected with second grade transmission system, transmission portion one end is connected with the push rod, and the other end passes through the connecting axle and is connected with the panel board, remote monitering system includes host computer and cantilever beam, fiber grating has been arranged on the cantilever beam, cantilever beam top and push rod contact, the displacement change of push rod can drive the cantilever beam top and buckle, fiber grating links to each other with remote host computer. The sensor is convenient to install on site, visible on site, passive monitoring, high in measurement precision and wide in range.

Description

Stress detection device based on hydraulic transmission type fiber bragg grating
The application is with application number 202010732162.X, the invention is named as follows, namely, the invention is applied for 27 at 07 month in 2020: the patent refers to the field of 'measuring strain and measuring strain'.
Technical Field
The invention relates to the technical field of coal mine safety monitoring, in particular to a stress detection device based on a hydraulic transmission type fiber bragg grating.
Background
Most of the existing mine pressure detection devices in the market are electronic products, the transmission mode is wireless and bus type, the detection devices are easily interfered by large-scale coal mining equipment, the data transmission stability is poor, the transmission distance is short, when large-area detection is carried out, sensors and substations have complicated field power supply, and particularly in an underground humid environment, the electronic products are easily affected by humidity, so that the system is unstable; the existing fiber grating sensor has complex on-site recovery and repeated installation process and does not have the on-site display function required by coal safety.
Disclosure of Invention
Aiming at the defects of the prior art, the invention provides a large quantity of Cheng Mao pole cable stress monitoring sensors of visual fiber bragg gratings for mines, which are more suitable for the stress monitoring requirements of roof plates and two sides of coal mine tunnels, and the large quantity of Cheng Mao pole cable stress monitoring sensors of the fiber bragg gratings provide a sensor which is convenient to install on site, visible on site, passive monitoring, high in measurement precision, large in range and safe in essence, wherein the communication distance between a host and the sensors is 20 kilometers, and a single host can be accessed to more than 200 monitoring points, and can perform real-time local display and remote real-time monitoring, early warning and forecasting.
In order to achieve the technical purpose, the technical solution of the invention is as follows:
a large number of Cheng Mao rod cable stress monitoring sensors for a mine visual fiber grating comprises an anchor rod cable stress sensing device, a transmission system, a display device and a remote monitoring system.
The utility model provides an anchor rod cable stress induction device, including first casing, first piston shaft and upper cover, first casing intracavity splendid attire has lubricating oil, first casing top is equipped with the upper cover, first piston shaft assembly is at first casing intracavity, the stock has been worn to first casing, first piston shaft and upper cover inside, the stock is equipped with the briquetting with first piston shaft top contact position, and when the stock atress effect pushed down, the briquetting can promote first piston shaft and move down in first casing.
The transmission system comprises a first shell, a first piston shaft, a connecting stud and a second piston shaft, wherein the connecting stud is arranged between an inner cavity of the first shell and the display device, the second piston shaft is arranged in the inner cavity of the connecting stud, and when the first piston shaft moves downwards in the first shell, lubricating oil can be pushed to enter the inner cavity of the connecting stud and push the second piston shaft to act.
The display device comprises an instrument panel and a second shell, wherein the instrument panel is positioned on the upper portion of the second shell, a push rod and a transmission portion are arranged in the second shell, the push rod is directly connected with a second piston shaft or connected through an intermediate connecting piece, and the action of the second piston shaft can drive the push rod to act. One end of the transmission part is connected with the push rod, the other end of the transmission part is connected with the instrument panel through the connecting shaft, a pointer and scales are arranged on the instrument panel, and when the push rod acts, the transmission part is driven to act, so that the pointer on the instrument panel is driven to act, and the stress condition of the current anchor rod cable is displayed.
Further, the transmission part comprises a rack and a gear, and the push rod is transmitted to the pointer of the instrument panel in a stressed mode through gear and rack transmission. The rack is connected with the push rod, the gear comprises one or more gears, and one gear is coaxially connected with a pointer on the instrument panel. When the push rod moves, the rack can be driven to move, the movement of the rack drives the gear to rotate, and the gear rotates to drive the pointer connected with the coaxial shaft to rotate.
Remote monitering system includes host computer and cantilever beam, cantilever beam fixed mounting has arranged fiber grating on it in the second casing, cantilever beam top and push rod contact, the displacement of push rod changes and to drive the cantilever beam top crooked, fiber grating links to each other with long-range host computer, through analytic fiber grating wavelength change, can demodulate out stock cable stress variation situation in long-range real time, has greatly reduced technical staff and has gone into the well and look over data, alleviate personnel intensity of labour.
Preferably, this anchor rod cable stress monitoring sensor still includes second grade transmission system, second grade transmission system includes third casing, third piston shaft, fourth casing and fourth piston shaft, the third piston shaft is arranged in the inside cavity of third casing, and its one end links to each other with the second piston shaft, communicate through the connecting pipe between third casing and the fourth casing, arrange the fourth piston shaft in the fourth casing, the fourth piston shaft is connected with the push rod.
Further, the effective area S1 of the inner cavity of the first shell is greater than the effective area S2 of the inner cavity of the connection stud, the effective area S2 of the inner cavity of the connection stud is greater than the effective area S3 of the inner cavity of the third shell, and the effective area S3 of the inner cavity of the third shell is greater than the effective area S4 of the inner cavity of the fourth shell. The effective area of the transmission system passing through the inner cavity of each shell is designed to be gradually reduced, so that the pressure transmitted from the anchor rod cable can be gradually reduced, and the parts at the push rod and the cantilever beam are prevented from being damaged due to overlarge stress.
The anchor rod cable stress monitoring sensor further comprises a zero setting system, the zero setting system comprises a zero setting bolt, the bottom of the zero setting bolt is directly connected with the push rod or connected with the push rod through a transition piece, the top of the zero setting bolt faces the outer wall of the second shell, a zero setting port is formed in the outer wall of the second shell, and a plug covers the zero setting port. When the instrument panel needs to be adjusted on site, a tool can be inserted on the zero adjusting bolt, the push rod is pushed to move by rotating the zero adjusting bolt, and then the transmission part is driven to adjust the pointer on the instrument panel.
According to the anchor rod cable stress monitoring sensor, the push rod comprises a U-shaped push rod, the opening of the U-shaped push rod faces the zero setting bolt, one side of the U-shaped push rod is connected with the transmission part, the other side of the U-shaped push rod is connected with the zero setting positioning seat, and the zero setting bolt is in threaded connection with the zero setting positioning seat.
Further, zero-setting system still includes guide rail slider, spring, cantilever beam support and zero-setting bolt support, zero-setting bolt support links to each other with zero-setting bolt top, and its both ends are equipped with the cantilever beam support, are fixed with the cantilever beam on one of them cantilever beam support, guide rail slider links to each other with U type push rod open end, and its both sides sliding connection is between the cantilever beam support at zero-setting bolt support both ends, zero-setting bolt passes zero-setting bolt support and guide rail slider in proper order and is connected with the zero-setting positioning seat, the spring has been worn in the zero-setting bolt outside between guide rail slider and the zero-setting bolt support.
According to the anchor rod cable stress monitoring sensor, one side of the push rod is connected with the inclined iron, and the inclined iron is in contact with the top of the cantilever beam.
Further, the cantilever beam includes mount pad and V type seat, the mount pad is kept away from to V type seat, is located the cantilever beam top, V type seat bottom and the contact of tapered iron. When the wedge moves along with the push rod, the V-shaped seat at the top of the cantilever beam is bent upwards under the influence of the inclination angle of the wedge, so that the wavelength of the fiber grating is changed.
Preferably, the second housing includes two cantilever beams, the two cantilever beams are uniformly provided with the fiber bragg grating, the top of one of the cantilever beams is contacted with the push rod, and the other cantilever beam is not contacted with any other object and is used for detecting the temperature change in the second housing. The problem that the grating is pasted on two sides of a single cantilever beam and the change of the grating is inconsistent is solved by adopting the double-strain-gauge structure, errors caused by temperature can be eliminated by pasting the grating on the double-strain-gauge structure, and the detection precision is improved.
According to the anchor rod cable stress monitoring sensor, the appearance of the sensor is designed by adopting a stainless steel material, and the protection grade is IP65.
The invention has the beneficial effects that:
1. the anchor rod cable stress monitoring sensor disclosed by the invention solves the problem that a large amount of Cheng Mao rod cable stress monitoring sensors of passive fiber bragg gratings cannot locally display the stress variation of a top plate by utilizing the hydraulic transmission and precise gear transmission principles, is compatible with the local display of the traditional sensor and realizes the real-time online dynamic monitoring of the stress of the top plate and two sides of a roadway.
2. The anchor rod cable stress monitoring sensor disclosed by the invention adopts a double-strain gauge structure to solve the problem that the grating tension and compression grating change is inconsistent when the grating is pasted on two sides of a single cantilever, and the error caused by temperature is eliminated by pasting the grating through the double-strain gauge.
3. The anchor rod cable stress monitoring sensor disclosed by the invention is designed to solve the problems of engineering installation and recovery, realizes the problems of field stress monitoring of the sensor and installation and repeated installation of the sensor by using a unique hydraulic transmission mechanism, improves the utilization rate of the sensor, greatly reduces the data for technical personnel to go into a well to check, lightens the labor intensity of the personnel and solves the coal mining cost.
4. The anchor rod cable stress monitoring sensor disclosed by the invention is realized by adopting the fiber bragg grating, the fiber bragg grating has the advantages of high measurement precision, no source and electromagnetic interference resistance, is a sensitive element and is an information transmission medium, and the transmission distance can reach 20 kilometers. Whole sensor mechanism and driving medium are all stainless steel and passive, have solved the unable work problem that current electron leads to because of humidity, water.
Drawings
The aspects and advantages of the present application will become apparent to those of ordinary skill in the art upon reading the following detailed description of the preferred embodiments. The drawings are only for purposes of illustrating the preferred embodiments and are not to be construed as limiting the invention.
In the drawings:
fig. 1 is a schematic structural diagram of an anchor rod cable stress monitoring sensor in the embodiment 1;
FIG. 2 is a front view of the anchor cable stress monitoring sensor of the embodiment 1;
FIG. 3 is a schematic structural view of the anchor rod cable stress monitoring sensor with the second housing removed;
FIG. 4 is a drive train diagram of the anchor rod cable stress monitoring sensor;
FIG. 5 is a schematic view of a first piston shaft;
FIG. 6 is a schematic view of a second piston shaft;
FIG. 7 is a schematic view of a third piston shaft;
FIG. 8 is a schematic structural diagram of the first housing;
FIG. 9 is a front view of FIG. 8;
FIG. 10 is a schematic structural view of a third housing;
FIG. 11 is a top view of FIG. 10;
FIG. 12 is a schematic structural view of a fourth housing;
FIG. 13 is a top view of FIG. 12;
FIG. 14 is a schematic view of a connection stud;
FIG. 15 is a schematic structural view of a U-shaped fixing push rod;
FIG. 16 is a schematic structural view of the zeroing fixture;
FIG. 17 is a schematic structural view of the first cantilever mount;
FIG. 18 is a schematic structural view of a second outrigger bracket;
FIG. 19 is a schematic view of the structure of the rail block;
FIG. 20 is a schematic structural view of the first cantilever;
the components represented by the reference numerals in the figures are:
1. primary transmission system, 2, secondary transmission system, 3, anchor rod, 4, anchor rod nut, 5, first housing, 501, first cavity, 502, second cavity, 503, connecting stud connecting cavity, 504, first boss, 6, second housing, 7, third housing, 701, third cavity, 702, fourth cavity, 8, fourth housing, 801, fifth cavity, 802, sixth cavity, 9, upper cover, 10, first piston shaft, 1001, second boss, 1002, first sliding end, 1003, first spring groove, 1004, second sliding part, 11, second piston shaft, 1101, first connecting hole, 12, third piston shaft, 1201, connecting rod, 13, fourth piston shaft, 14, first spring, 15, second spring, 16, connecting stud 1601, seventh cavity, 1601, eighth cavity, 17, elbow, 18, U-shaped fixing push rod, 1801, rack connecting hole, 1802, the cable assembly comprises a wedge connecting hole, 1803, a second connecting hole, 1804, a third connecting hole, 19, a rack, 20, a wedge, 21, a first gear, 22, a second gear, 23, a zero setting positioning seat, 2301, a fourth connecting hole, 24, a guide rail sliding block, 2401, a second spring groove, 2402, a sliding bump, 2403, a fifth connecting hole, 2404, a sixth connecting hole, 25, a first cantilever beam bracket, 2501, a first sliding groove, 2502, a third boss, 2503, a cantilever beam fixing hole, 26, a second cantilever beam bracket, 2601, a second sliding groove, 27, a zero setting bolt, 28, a plug, 29, a first cable waterproof joint, 30, a second cable waterproof joint, 31, a zero setting bolt bracket, 32, a first cantilever beam, 3201, a mounting seat, 3202, a V-shaped seat, 3203, a relief hole, 33, a second cantilever beam, 34, a cantilever beam fixing gasket, 35, an instrument window cover, 36, an instrument panel, 38 and a tray.
Detailed Description
Exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. It should be noted that these embodiments are provided so that this disclosure can be more completely understood and fully conveyed to those skilled in the art, and the present disclosure may be implemented in various forms without being limited to the embodiments set forth herein.
The directions "front and back", "left and right", etc. mentioned in the present invention are only used to express the relative positional relationship, and are not restricted by any specific directional references in practical application.
Example 1
Referring to fig. 1 to 4, fig. 1 to 4 are schematic structural diagrams of a large quantity Cheng Mao rod cable stress monitoring sensor for a visual fiber grating for mining according to this embodiment, and specifically include a rod cable stress sensing device, a primary transmission system 1, a secondary transmission system 2, a display device, and a remote monitoring system.
Anchor rod cable stress-sensing device is used for responding to the pressure that the stock transmitted and comes, specifically includes first casing 5, first piston shaft 10 and upper cover 9, 5 intracavity splendid attire in the first casing have lubricating oil, 5 tops of first casing are equipped with upper cover 9, first piston shaft 10 assembles at 5 intracavity in the first casing, anchor rod 3 has been worn to first casing 5, first piston shaft 10 and upper cover 9 intermediate position, anchor rod 3 is equipped with stock nut 4 with first piston shaft 10 top contact position, and when 3 atress effects of anchor rod pushed down, stock nut 4 can promote first piston shaft 10 and move down in first casing 5.
Referring to fig. 8 and 9, a first cavity 501 and a second cavity 502 are arranged in the first housing 5 from top to bottom, the first piston shaft 10 is placed in the first cavity 501, the volume of the second cavity 502 is smaller than that of the first cavity 501, a first boss 504 is arranged at the bottom of the second cavity 502, and a cavity is arranged in the first boss 504. One side of the second cavity 502 is connected with a connecting stud connecting cavity 503, and the connecting stud connecting cavity 503 is communicated with the outer wall of the first shell 5.
Further, the first piston shaft 10 is configured, as shown in fig. 5, to include a first slide 1002 and a second slide 1004, the first slide 1002 being sized to be diametrically sized to fit the first cavity 501, and the second slide 1004 being sized to be diametrically sized to fit the inner cavity of the first boss 504. The first piston shaft 10 is movable in the first housing 5 in the direction of the central axis of the first housing 5, and presses the lubricating oil from the second chamber 502 to the connecting stud connecting chamber 503.
Preferably, the lower portion of the first sliding portion 1002 of the first piston shaft 10 is further provided with a first spring groove 1003 for placing the first spring 14, and the lower end of the first spring 14 is placed between the second chamber 502 and the first boss 504. The rebound speed of the first piston shaft 10 can be increased by pushing back the first piston shaft 10 by the first spring 14.
In this embodiment, a second boss 1001 is further provided on the top of the first sliding portion 1002 of the first piston shaft 10, and the second boss 1001 is higher than the upper cover 9 so as to be in contact with the bolt nut 4.
In this embodiment, the primary transmission system 1 includes a first housing 5, a first piston shaft 10, a connecting stud 16, and a second piston shaft 11, where the connecting stud 16 is disposed between an inner cavity of the first housing 5 and the display device, the second piston shaft 11 is disposed in the inner cavity of the connecting stud 16, and when the first piston shaft 10 moves down in the first housing 5, the first piston shaft pushes the lubricating oil into the inner cavity of the connecting stud 16, and pushes the second piston shaft 11 to act.
Referring to fig. 14, a seventh cavity 1601 and an eighth cavity 1602 are provided inside the connecting stud 16, one end of the seventh cavity 1601 is connected to the connecting stud connecting cavity 503 of the first housing 5, the eighth cavity 1602 is connected to the display device, and a second piston shaft 11 is provided in the eighth cavity 1602, as shown in fig. 4.
Further, the structure of the second piston shaft 11 is shown in fig. 6, a head of the second piston shaft 11 is provided with a plurality of O-ring connecting grooves, and a bottom of the second piston shaft 11 is provided with a first connecting hole 1101.
In the present embodiment, a two-stage transmission system 2 is connected downstream of the primary transmission system 1, said two-stage transmission system 2 comprising a third housing 7, a third piston shaft 12, a fourth housing 8 and a fourth piston shaft 13, see fig. 4. The third piston shaft 12 is arranged in the inner cavity of the third housing 7, one end of the third piston shaft is connected with the second piston shaft 11, the third housing 7 is communicated with the fourth housing 8 through a bent pipe 17, a fourth piston shaft 13 is arranged in the fourth housing 8, and the fourth piston shaft 13 is connected with a push rod.
The internal structure of the third housing 7 will be specifically described with reference to fig. 10 and 11, a third cavity 701 and a fourth cavity 702 are provided inside the third housing 7, the volume of the third cavity 701 is larger than that of the fourth cavity 702, the third cavity 701 opens into an eighth cavity 1602 facing the connecting stud 16, a third piston shaft 12 is disposed inside the third cavity 701, an outlet of the fourth cavity 702 opens on the side of the third housing 7, and the inside of the fourth cavity is communicated with the third cavity 701. When the third piston shaft 12 extends and retracts in the third chamber 701, the lubricating oil is pushed to flow from the third chamber 701 to the fourth chamber 702.
Referring to fig. 7, a specific structure of the third piston shaft 12 will be described, wherein one end of the third piston shaft 12 is provided with an O-ring connecting groove, and the other end is provided with a connecting rod 1201, and the connecting rod 1201 is inserted into the first connecting hole 1101 at the bottom of the second piston shaft 11, so that the third piston shaft 12 and the second piston shaft 11 are connected together.
Referring to fig. 12 and 13, the fourth housing 8 is similar to the third housing 7 in structure, and has a fifth chamber 801 and a sixth chamber 802 inside thereof, openings of the fifth chamber 801 and the sixth chamber 802 are arranged on different end faces of the fourth housing 8, the fifth chamber 801 and the sixth chamber 802 communicate with each other inside the fourth housing 8, the fifth chamber 801 is provided with a fourth piston shaft 13 inside thereof, the fourth piston shaft 13 is similar to the second piston shaft 11 in structure, and the bottom thereof is connected with a push rod. The sixth cavity 802 is connected to an elbow 17, and the other end of the elbow 17 is communicated with the fourth cavity 702 of the third housing 7.
Preferably, the effective area S1 of the inner cavity of the first housing 5 is greater than the effective area S2 of the inner cavity of the connecting stud 16, the effective area S2 of the inner cavity of the connecting stud 16 is greater than the effective area S3 of the inner cavity of the third housing 7, and the effective area S3 of the inner cavity of the third housing 7 is greater than the effective area S4 of the inner cavity of the fourth housing 8. The effective area of the inner cavity of each shell of the transmission system is designed to be gradually reduced, so that the pressure transmitted from the anchor rod 3 cable can be gradually reduced, and the parts at the push rod and the cantilever beam are prevented from being damaged due to overlarge stress. Of course, under the condition of sufficient space, a more-stage transmission system can be arranged to further reduce the pressure and prolong the service life of the anchor cable stress monitoring sensor.
In the present embodiment, the display device includes an instrument panel 36 and the second housing 6, the instrument panel 36 is located on the upper portion of the second housing 6, an instrument window cover 35 is provided above the instrument panel 36, a fixing plate 37 is provided on the lower portion, and the components of the secondary transmission system 2 are assembled on the fixing plate 37, see fig. 3.
Furthermore, a push rod and a transmission part are arranged in the second shell 6, the push rod is connected with a fourth piston shaft 13, and the action of the fourth piston shaft 13 can drive the push rod to act. One end of the transmission part is connected with the push rod, the other end of the transmission part is connected with the instrument panel 36 through the connecting shaft, a pointer and scales are arranged on the instrument panel 36, and when the push rod acts, the transmission part is driven to act, so that the pointer on the instrument panel 36 is driven to act, and the stress condition of the current anchor rod is displayed.
Referring to fig. 15, the push rod is a U-shaped fixed push rod 18 wrapped around the central axis of the pointer, and the top of the push rod is provided with a second connecting hole 1803 for connecting with the fourth piston shaft 13.
In the present embodiment, the transmission portion includes a rack 19, a first gear 21 and a second gear 22, and the U-shaped fixing push rod 18 is provided with a rack connecting hole 1801 for fixing the rack 19. The first gear 21 is coaxially connected with a pointer on an instrument panel 36, and the second gear 22 is connected between the first gear 21 and the rack 19. When the U-shaped fixed push rod 18 acts, the rack 19 can be driven to act, the action of the rack 19 drives the gear to rotate, and the gear rotates to drive the pointer connected with the coaxial shaft to rotate.
Further, the U-shaped fixed push rod 18 is further provided with a wedge connecting hole 1802 for connecting a wedge 20 on the side surface of the U-shaped fixed push rod 18, and the upper surface of the wedge 20 is an inclined surface. Of course, the U-shaped fixing push rod 18 may be provided with an inclined surface directly.
In this embodiment, remote monitering system includes host computer and cantilever beam, cantilever beam fixed mounting has arranged fiber grating on it in second casing 6, the contact of the sloping 20 of cantilever beam top and the 18 sides of U type fixed push rod, U type fixed push rod 18 can drive the crooked cantilever beam top when receiving the pushing action production displacement change of fourth piston shaft 13, fiber grating links to each other with long-range host computer, and through analysis fiber grating wavelength change, can demodulate out stock cable stress variation situation in long-range real time, greatly reduced the technical staff and gone into the well and look over data, alleviate personnel intensity of labour.
In this embodiment, a zero-setting system is further disposed at a lower portion of the U-shaped fixed push rod 18, and the zero-setting system includes a zero-setting bolt 27, a zero-setting positioning seat 23, a guide rail slider 24, a second spring 15, a first cantilever bracket 25, a second cantilever bracket 26, and a zero-setting bolt bracket 31. The top of the zero adjusting bolt 27 faces the outer wall of the second shell 6, the tail of the zero adjusting bolt faces the U-shaped fixed push rod 18, a zero adjusting bolt support 31 is arranged at the top of the zero adjusting bolt 27, a first cantilever beam support 25 and a second cantilever beam support 26 are respectively arranged at two ends of the zero adjusting bolt support 31, a first cantilever beam 32 is fixed on the first cantilever beam support 25, the guide rail slide block 24 is connected with the open end of the U-shaped fixed push rod 18, two sides of the guide rail slide block are slidably connected between the cantilever beam supports at two ends of the zero adjusting bolt support 31, the zero adjusting bolt 27 sequentially penetrates through the zero adjusting bolt support 31 and the guide rail slide block 24 and then is connected with the zero adjusting positioning seat 23, the zero adjusting positioning seat 23 is fixedly connected with the U-shaped fixed push rod 18, and the second spring 15 penetrates through the outside of the zero adjusting bolt 27 between the guide rail slide block 24 and the zero adjusting bolt support 31.
Referring to fig. 16, the zero setting positioning seat 23 is a U-shaped plate, the opening of the U-shaped plate is clamped at two ends of the U-shaped fixing push rod 18, the head of the U-shaped plate is provided with a fourth connecting hole 2301, and the zero setting bolt 27 passes through the fourth connecting hole 2301 and is in threaded connection with the zero setting positioning seat 23.
Referring to fig. 17 and 18, the first cantilever beam bracket 25 and the second cantilever beam bracket 26 are similar in structure, and have a first sliding slot 2501 and a second sliding slot 2601 on the end surfaces of the opposite sides, respectively, and the guide slider 24 has two ends slidable in the first sliding slot 2501 and the second sliding slot 2601. The first cantilever beam bracket 25 is further provided with a third boss 2502 on the back of the first sliding slot 2501, the third boss 2502 is provided with a cantilever beam fixing hole 2503, and the first cantilever beam 32 is placed on the third boss 2502 and fixed by a cantilever beam fixing pad 34.
Referring to fig. 19, the guide rail slider 24 is provided with a sliding protrusion 2402 at each end thereof for sliding in the first sliding slot 2501 and the second sliding slot 2601. A second spring slot 2401 is formed in the middle of the guide rail sliding block 24 and used for placing a second spring 15, and a fifth connecting hole 2403 is formed in the middle of the second spring slot 2401 and used for allowing a zero adjusting bolt 27 to penetrate through. And sixth connecting holes 2404 are respectively arranged at two sides of the second spring slot 2401, and the positions of the two sixth connecting holes 2404 correspond to the position of the third connecting hole 1804 at the lower end of the U-shaped fixed push rod 18, so that the guide rail sliding block 24 is connected with the U-shaped fixed push rod 18.
When the instrument panel 36 needs to be adjusted on site, the plug 28 can be taken down, a tool is inserted onto the zero adjusting bolt 27, the zero adjusting positioning plate 23 is driven to move up and down by rotating the zero adjusting bolt 27, and then the U-shaped fixed push rod 18 and the guide rail sliding block 24 are driven to move together, so that the distance between the wedge 20 on one side of the U-shaped fixed push rod 18 and the first cantilever beam bracket 25 and the position of the pointer on the instrument panel 36 are adjusted.
Referring to fig. 20, the first cantilever beam 32 in this embodiment includes a mounting seat 3201 and a V-shaped seat 3202, the mounting seat 3201 is used for connecting with the first cantilever beam bracket 25, the V-shaped seat 3202 is far away from the mounting seat 3201 and is positioned at the top of the first cantilever beam 32, and the bottom of the V-shaped seat 3202 is in contact with the wedge 20. When the wedge 20 moves along with the U-shaped fixed push rod 18, the V-shaped seat 3202 is bent upward under the influence of the inclination angle of the wedge 20, so that the wavelength of the fiber grating changes.
Preferably, the first cantilever beam 32 is further provided with a relief hole 3203 at a central position close to the V-shaped seat 3202, so as to relieve the force applied to the V-shaped seat 3202.
In this embodiment, the second housing 6 includes a first cantilever 32 and a second cantilever 33 of two cantilevers, fiber gratings are disposed on the two cantilevers, the top of the first cantilever 32 contacts with the wedge 20, and the second cantilever 33 does not contact with any other object, so as to detect a temperature change in the second housing 6. The problem that the grating is pasted on two sides of a single cantilever beam and the change of the grating is inconsistent is solved by adopting the double-strain-gauge structure, errors caused by temperature can be eliminated by pasting the grating on the double-strain-gauge structure, and the detection precision is improved.
Preferably, the second cantilever beam 33 is assembled on the fixed disc 37 near the first cantilever beam 32, the second housing 6 near the first cantilever beam 32 and the second cantilever beam 33 is provided with a first waterproof cable joint 29 for fiber grating access, and the second housing 6 is further provided with a second waterproof cable joint 30 for fiber grating access. The connected fiber bragg grating can be connected with a plurality of anchor rod cable stress monitoring sensors and then connected to a host.
In the present embodiment, the tray 38 is supported on the lower portion of the first housing 5, and the appearance of the sensor is designed by using stainless steel material, and the protection grade is IP65.
The concrete working principle of the anchor rod cable stress monitoring sensor is divided into three parts: 1) A hydraulic transmission part; 2) The field dial plate is visually displayed in real time; 3) And uploading strain data in a remote real-time manner.
1) Hydraulic transmission part
The hydraulic transmission utilizes the Pascal law, which is a hydrostatic law.
The sensor adopts two-stage hydraulic transmission, and the first-stage hydraulic transmission consists of a first shell 5, an upper cover 9, a first piston shaft 10, a second piston shaft 11 and a connecting stud 16; the second stage hydraulic transmission is composed of a third housing 7, a third piston shaft 12, a fourth housing 8, a fourth piston shaft 13 and a bent pipe 17.
F4=(F1/S1)*S2/S3*S4 (1)
Wherein S1 is an effective area inside the first housing 5, F1 is a pressure applied to the top of the first piston shaft 10, S2 is an effective area inside the connecting stud 16, S3 is an effective area inside the third housing 7, S4 is an effective area inside the fourth housing 8, and F4 is a pressure of the fourth piston shaft 13 against the second spring 15.
The length Δ x1 of the second spring 15 is related to the spring force by F (spring force) = K × Δ x1, where K is the spring rate, and F (spring force) is equal to F4, depending on the diameter, material and pitch of the second spring 15 itself.
The flexural strain ε M can be reduced to a hydraulic drive multiplying the amount of deformation of the first beam 32 inside the sensor by a factor, namely:
εM=K*△x2 (2)
where k is the coefficient and Δ x2 is the amount of deformation of the first beam 32, which is equivalent to the length Δ x1 of the spring extension.
△λ=εM/K (3)
In the formula, delta lambda is the central wavelength change of the Fiber Bragg Grating (FBG), and K is the calibration coefficient of the stress of the sensor and the wavelength change of the grating.
The relation between the stress of the anchor rod cable and the change of the central wavelength of the fiber bragg grating can be deduced through the formulas.
2) Real-time visual display of on-site dial plate
When first piston shaft 10 receives external force extrusion, can be down in first casing 5, promote lubricating oil to connecting stud 16 direction, promote second piston 11 and third piston shaft 12 removal then to finally transmit for fourth piston shaft 13 through certain transmission proportion, fourth piston shaft 13 promotes rectangular rack 19 down, rack 19 drives two-stage gear revolve, and it is rotatory to drive the pointer through the transmission shaft above the gear, and the scene personnel can be convenient reads out the stock cable atress condition from panel board 36.
3) Remote real-time data uploading of strain data
When the fourth piston shaft 13 moves downwards, the fourth piston shaft 13 pushes the U-shaped fixed push rod 18 to move downwards, the inclined iron 20 is installed on the side surface of the U-shaped fixed push rod 18, the inclined iron 20 is in contact with the first cantilever beam 32, and the displacement change of the U-shaped fixed push rod 18 causes the first cantilever beam 32 to change, so that the wavelength of the fiber bragg grating on the first cantilever beam 32 is driven to change. The fiber grating wavelength of the first cantilever beam 32 is demodulated in real time by the remote host, and the working personnel can know the stress condition of the anchor cable on site in real time from a remote place.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any changes or additions or substitutions that can be easily conceived by those skilled in the art within the technical scope of the present invention are also included in the scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims (10)

1. The utility model provides a stress detection device based on hydraulic drive formula fiber grating, a serial communication port, including display device, display device passes through connecting stud (16) and connects induction system, the intracavity of connecting stud (16) is equipped with second piston axle (11), display device includes panel board (36) and second casing (6), panel board (36) are located second casing (6) upper portion, be equipped with push rod and transmission portion in second casing (6), the push rod is connected with second piston axle (11) are direct or through intermediate junction spare, transmission portion one end is connected with the push rod, and the other end passes through the connecting axle to be connected with panel board (36), fixed mounting has the cantilever beam in second casing (6), fiber grating has been arranged on the cantilever beam, cantilever beam top and push rod contact, the displacement of push rod changes and can drive the bending of cantilever beam top, fiber grating links to each other with long-range host computer.
2. The fiber bragg grating stress detection device based on the hydraulic transmission type according to claim 1, further comprising a secondary transmission system (2), wherein the secondary transmission system (2) comprises a third housing (7), a third piston shaft (12), a fourth housing (8) and a fourth piston shaft (13), the third piston shaft (12) is arranged in an inner cavity of the third housing (7), one end of the third piston shaft is connected with the second piston shaft (11), the third housing (7) and the fourth housing (8) are communicated through a connecting pipe, the fourth piston shaft (13) is arranged in the fourth housing (8), and the fourth piston shaft (13) is connected with a push rod.
3. The fiber bragg grating stress detection device based on the hydraulic transmission type according to claim 2, wherein the effective area S2 of the inner cavity of the connecting stud (16) is larger than the effective area S3 of the inner cavity of the third shell (7), and the effective area S3 of the inner cavity of the third shell (7) is larger than the effective area S4 of the inner cavity of the fourth shell (8).
4. The fiber bragg grating stress detection device based on the hydraulic transmission type according to any one of claims 1 to 3, further comprising a zero setting system, wherein the zero setting system comprises a zero setting bolt (27), the bottom of the zero setting bolt (27) is connected with the push rod directly or through a transition piece, the top of the zero setting bolt (27) faces the outer wall of the second shell (6), a zero setting port is formed in the outer wall of the second shell (6), and a plug (28) covers the zero setting port.
5. The fiber bragg grating stress detection device based on the hydraulic transmission type according to claim 4, wherein the push rod comprises a U-shaped push rod, an opening of the U-shaped push rod faces to the zero setting bolt (27), one side of the U-shaped push rod is connected with the transmission part, the other side of the U-shaped push rod is connected with the zero setting positioning seat (23), and the zero setting bolt (27) is in threaded connection with the zero setting positioning seat (23).
6. The fiber bragg grating stress detection device based on the hydraulic transmission type according to claim 5, wherein the zero setting system further comprises a guide rail sliding block (24), a spring, cantilever beam supports and zero setting bolt supports (31), the zero setting bolt supports (31) are connected with the tops of the zero setting bolts (27), the cantilever beam supports are arranged at two ends of each zero setting bolt support, a cantilever beam is fixed on one of the cantilever beam supports, the guide rail sliding block (24) is connected with the opening end of the U-shaped push rod, two sides of each zero setting bolt support are connected between the cantilever beam supports at two ends of the zero setting bolt support (31) in a sliding mode, the zero setting bolts (27) sequentially penetrate through the zero setting bolt supports (31) and the guide rail sliding block (24) and then are connected with the zero setting positioning seat (23), and the spring penetrates through the outer sides of the zero setting bolts (27) between the guide rail sliding block (24) and the zero setting bolt supports (31).
7. The fiber bragg grating stress detection device based on the hydraulic transmission type according to claim 5 or 6, wherein an inclined iron (20) is connected to one side of the push rod, and the inclined iron (20) is in contact with the top of the cantilever beam.
8. The hydraulically driven fiber grating-based stress detection device of claim 7, wherein the cantilever beam comprises a mounting seat (3201) and a V-shaped seat (3202), wherein the V-shaped seat (3202) is away from the mounting seat (3201) and is located at the top of the cantilever beam, and the bottom of the V-shaped seat (3202) is in contact with the wedge (20).
9. The fiber bragg grating stress detection device based on the hydraulic transmission type according to claim 1, wherein the second housing (6) comprises two cantilever beams, the fiber bragg gratings are arranged on the two cantilever beams, the top of one cantilever beam is in contact with the push rod, and the other cantilever beam is not in contact with any other object and is used for detecting temperature changes in the second housing (6).
10. A sensor for monitoring stress of a large number of Cheng Mao rod cables of a visual fiber grating for a mine, which is characterized by comprising the device for detecting stress of the fiber grating based on hydraulic transmission according to claim 1, and further comprising a device for sensing stress of the anchor rod cables.
CN202110830596.8A 2020-07-27 2020-07-27 Stress detection device based on hydraulic transmission type fiber bragg grating Active CN113567015B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110830596.8A CN113567015B (en) 2020-07-27 2020-07-27 Stress detection device based on hydraulic transmission type fiber bragg grating

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN202010732162.XA CN111928982B (en) 2020-07-27 2020-07-27 Mining visual fiber grating wide-range anchor rod cable stress monitoring sensor
CN202110830596.8A CN113567015B (en) 2020-07-27 2020-07-27 Stress detection device based on hydraulic transmission type fiber bragg grating

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN202010732162.XA Division CN111928982B (en) 2020-07-27 2020-07-27 Mining visual fiber grating wide-range anchor rod cable stress monitoring sensor

Publications (2)

Publication Number Publication Date
CN113567015A CN113567015A (en) 2021-10-29
CN113567015B true CN113567015B (en) 2023-01-17

Family

ID=73314229

Family Applications (2)

Application Number Title Priority Date Filing Date
CN202110830596.8A Active CN113567015B (en) 2020-07-27 2020-07-27 Stress detection device based on hydraulic transmission type fiber bragg grating
CN202010732162.XA Active CN111928982B (en) 2020-07-27 2020-07-27 Mining visual fiber grating wide-range anchor rod cable stress monitoring sensor

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN202010732162.XA Active CN111928982B (en) 2020-07-27 2020-07-27 Mining visual fiber grating wide-range anchor rod cable stress monitoring sensor

Country Status (1)

Country Link
CN (2) CN113567015B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114858322B (en) * 2022-03-22 2024-04-30 山东道宽智能科技有限公司 Waterproof mining optical fiber anchor rod stress sensor based on 5G fusion technology
CN114812423A (en) * 2022-04-25 2022-07-29 山东光安智能科技有限公司 Mechanical digital disc type roof separation layer sensor
CN115655091B (en) * 2022-10-19 2023-05-12 秦皇岛市政建设集团有限公司 Assembled beam column node warp early warning monitoring devices
CN117647340B (en) * 2024-01-30 2024-03-29 成都工业职业技术学院 Mining roof pressure detection device based on optical fiber sensor

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001033325A (en) * 1999-07-22 2001-02-09 Hitachi Cable Ltd Optical pressure sensor
CN201364218Y (en) * 2008-11-14 2009-12-16 西安长庆科技工程有限责任公司 Petroleum storage tank local pressure gauge
CN101793542A (en) * 2010-03-16 2010-08-04 合肥工业大学 High-sensitivity optical fiber grating liquid level/fluid pressure sensor
CN202582820U (en) * 2012-04-18 2012-12-05 珠海三德艺电子有限公司 Diaphragm type pressure gauge
CN203083765U (en) * 2012-12-27 2013-07-24 上海减压器厂有限公司 Photoelectric induction type vehicle gas pressure meter
CN203259273U (en) * 2013-04-26 2013-10-30 中国矿业大学 Mining fiber grating anchor pole/cable dynamometer
CN204666302U (en) * 2015-03-19 2015-09-23 张军飞 A kind of liquefied gas tensimeter
CN105043642A (en) * 2015-08-15 2015-11-11 重庆布莱迪仪器仪表有限公司 Hydraulic transmission pressure gauge
CN105157577A (en) * 2015-06-09 2015-12-16 中铁五局(集团)有限公司 Optical fiber grating sensor for engineering displacement measurement
CN107121158A (en) * 2017-06-21 2017-09-01 西北工业大学 A kind of internal enclosed cantilever beam fiber-optic grating sensor
CN107167280A (en) * 2017-04-27 2017-09-15 太原理工大学 A kind of measuring method of water level and pore water pressure fiber-optic grating sensor
CN208872458U (en) * 2018-08-27 2019-05-17 中国计量大学 A kind of teletransmission diaphragm based on long period PCF grating
CN110439618A (en) * 2019-08-16 2019-11-12 山东道宽智能科技有限公司 A kind of mine optical fiber top plate dynamic monitoring and broken governing system
CN110657903A (en) * 2019-10-31 2020-01-07 安徽南自电气股份有限公司 Pressure gauge with alarm function and manufacturing process thereof
CN110793675A (en) * 2019-11-19 2020-02-14 大连理工大学 Fiber grating soil pressure sensor

Family Cites Families (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4599901A (en) * 1982-09-30 1986-07-15 University Of California Pressure-sensitive optrode
US5038622A (en) * 1989-12-22 1991-08-13 Tijmann Willem B Strain gage assembly for measuring excessive tensile strain of a flexible elongated member, such as a steel structural cable, or an electrical transmission cable, or a glass fiber optic communication cable, which may slightly twist under tensile strain
CN101846561B (en) * 2010-06-18 2011-07-20 长沙理工大学 Mollisol area friction pile load transference curve tester
US9103736B2 (en) * 2010-12-03 2015-08-11 Baker Hughes Incorporated Modeling an interpretation of real time compaction modeling data from multi-section monitoring system
CN202255738U (en) * 2011-07-15 2012-05-30 武汉理工光科股份有限公司 Novel fiber bragg grating temperature pressure sensor
CN103207036A (en) * 2012-01-17 2013-07-17 上海启鹏工程材料科技有限公司 Fiber grating force-measuring device
US9116304B2 (en) * 2012-04-16 2015-08-25 The United States Of America, As Represented By The Secretary Of The Navy Fiber optic cantilever acoustic vector sensor
CN102798492A (en) * 2012-08-30 2012-11-28 西安科技大学 Fiber bragg grating detection system device and method for detecting anchoring force of anchor rod
CN103196481B (en) * 2013-04-18 2015-04-29 中国矿业大学 Calibrating device and calibrating method of mine fiber grating sensor
CN103868632B (en) * 2014-03-12 2016-04-13 北京工业大学 A kind of contactless axis force of anchor measuring method based on eddy current impedance method
CN104568274B (en) * 2015-01-21 2017-02-22 安徽理工大学 Anchoring force pre-warning device for anchor rod
CN204373826U (en) * 2015-01-21 2015-06-03 安徽理工大学 A kind of anchor-holding force of anchor bolt prior-warning device
KR102544041B1 (en) * 2015-03-31 2023-06-15 가부시키가이샤 네지로 Conducting path sub-materials, patterning method of current path, method of measuring member change
CN104897335B (en) * 2015-06-17 2017-07-04 承德石油高等专科学校 The fibre optic compression sensor of Wavelength demodulation is realized based on array wavelength division multiplexer technology
CN105403339A (en) * 2015-12-15 2016-03-16 中国电建集团中南勘测设计研究院有限公司 Anchor pole force measuring apparatus, anchor pole and anchor pole tension measuring method
CN106523008B (en) * 2016-12-23 2023-07-21 山东科技大学 Anchor rod stress measuring, reading and early warning device and use method
CN107152952A (en) * 2017-04-27 2017-09-12 太原理工大学 A kind of fiber-optic grating sensor of water level and pore water pressure measurement
CN107328503B (en) * 2017-07-11 2019-12-06 中国矿业大学 coal mine tunnel roof stress on-line monitoring system and method based on fiber bragg grating sensor
CN109387311A (en) * 2017-08-02 2019-02-26 北京道冲泰科科技有限公司 It is a kind of for measuring the on-Line Monitor Device of ground internal stress
CN108613763B (en) * 2018-05-11 2023-11-03 上海市建筑科学研究院 Fiber bragg grating type inhaul cable force monitoring sensor and sensing method based on frequency method
CN110444442B (en) * 2019-09-04 2023-09-26 上海乐研电气有限公司 Remote gas density relay system and verification method thereof
CN110907397A (en) * 2019-12-19 2020-03-24 山东光安智能科技有限公司 ARM-based underground laser multi-gas beam tube sampling system

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001033325A (en) * 1999-07-22 2001-02-09 Hitachi Cable Ltd Optical pressure sensor
CN201364218Y (en) * 2008-11-14 2009-12-16 西安长庆科技工程有限责任公司 Petroleum storage tank local pressure gauge
CN101793542A (en) * 2010-03-16 2010-08-04 合肥工业大学 High-sensitivity optical fiber grating liquid level/fluid pressure sensor
CN202582820U (en) * 2012-04-18 2012-12-05 珠海三德艺电子有限公司 Diaphragm type pressure gauge
CN203083765U (en) * 2012-12-27 2013-07-24 上海减压器厂有限公司 Photoelectric induction type vehicle gas pressure meter
CN203259273U (en) * 2013-04-26 2013-10-30 中国矿业大学 Mining fiber grating anchor pole/cable dynamometer
CN204666302U (en) * 2015-03-19 2015-09-23 张军飞 A kind of liquefied gas tensimeter
CN105157577A (en) * 2015-06-09 2015-12-16 中铁五局(集团)有限公司 Optical fiber grating sensor for engineering displacement measurement
CN105043642A (en) * 2015-08-15 2015-11-11 重庆布莱迪仪器仪表有限公司 Hydraulic transmission pressure gauge
CN107167280A (en) * 2017-04-27 2017-09-15 太原理工大学 A kind of measuring method of water level and pore water pressure fiber-optic grating sensor
CN107121158A (en) * 2017-06-21 2017-09-01 西北工业大学 A kind of internal enclosed cantilever beam fiber-optic grating sensor
CN208872458U (en) * 2018-08-27 2019-05-17 中国计量大学 A kind of teletransmission diaphragm based on long period PCF grating
CN110439618A (en) * 2019-08-16 2019-11-12 山东道宽智能科技有限公司 A kind of mine optical fiber top plate dynamic monitoring and broken governing system
CN110657903A (en) * 2019-10-31 2020-01-07 安徽南自电气股份有限公司 Pressure gauge with alarm function and manufacturing process thereof
CN110793675A (en) * 2019-11-19 2020-02-14 大连理工大学 Fiber grating soil pressure sensor

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
光纤光栅传感器在顶板监测应用中的安装工艺;张书林等;《煤矿现代化》;20150415(第02期);85-87 *

Also Published As

Publication number Publication date
CN111928982B (en) 2021-09-10
CN113567015A (en) 2021-10-29
CN111928982A (en) 2020-11-13

Similar Documents

Publication Publication Date Title
CN113567015B (en) Stress detection device based on hydraulic transmission type fiber bragg grating
CN201884024U (en) Fiber grating sensor-based system used for monitoring coalbed methane well
CN104792563B (en) The test system of flitting fully mechanized mining outfit mechanical characteristic
CN102798492A (en) Fiber bragg grating detection system device and method for detecting anchoring force of anchor rod
CN103257009A (en) Working face mine pressure on-line monitoring system based on fiber grating sensing
CN101280690A (en) Pressure sensor
CN106705877A (en) High-sensitivity fiber Bragg grating strain sensor based on flexible hinges
CN104806238B (en) Coal winning machine cutting bit mechanical characteristic Online Transaction Processing
CN115479711B (en) Hard shell inclusion stress meter and monitoring system for three-dimensional stress of underground engineering
CN105115835A (en) Shearing test device for simulating rock structural plane failure and method
CN105888651A (en) Mining online pressure-measuring device based on optical fiber
CN112484656A (en) Optical fiber type convergence meter and using method thereof
CN113029427B (en) Mine wind pressure measuring device, mine wind pressure detecting system and mine wind pressure detecting method based on fiber bragg grating
CN204286374U (en) A kind of hydro-structure distortion distributed optical fiber sensing device
CN209927104U (en) All-round sensitization tilt angle sensor of fiber grating
CN202991008U (en) Dynamometric device for simulating mechanical characteristic of bottom-hole assembly
CN100501326C (en) Strata displacement monitor and system
CN102062730B (en) Buried oil pipeline external-corrosion real-time monitoring device based on optical fiber sensor
CN107356243A (en) Support operation posture on-line monitoring method based on optical fiber grating sensing
CN204694386U (en) Rib internal stress test macro under simulation well
CN210603212U (en) Fiber grating bedrock displacement meter with temperature monitoring function
CN104776993B (en) Guide sliding shoe of coal-winning machine mechanical characteristic real-time detection apparatus
CN216246110U (en) Roadway displacement monitoring system in similar simulation test
CN203412630U (en) Coal mine tunnel roof monitoring system based on optical fiber grating
CN105806544A (en) Mining random high-voltage lossless optical fiber Bragg grating single prop pressure sensor system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: Building D12, CRRC Zhihui City, No. 3777 Chunxuan Road, High tech Zone, Jinan City, Shandong Province, 250000

Patentee after: Shandong Guang'an Intelligent Technology Co.,Ltd.

Address before: Block B, physicochemical building, 3666 Century Avenue, high tech Zone, Jinan City, Shandong Province

Patentee before: Shandong Guang'an Intelligent Technology Co.,Ltd.

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A Fiber Bragg Grating Stress Detection Device Based on Hydraulic Transmission

Effective date of registration: 20231219

Granted publication date: 20230117

Pledgee: Bank of Beijing Co.,Ltd. Jinan Branch

Pledgor: Shandong Guang'an Intelligent Technology Co.,Ltd.

Registration number: Y2023980072789