CN113555871A - Intelligent main-distribution integrated load transfer method based on pruning algorithm - Google Patents

Intelligent main-distribution integrated load transfer method based on pruning algorithm Download PDF

Info

Publication number
CN113555871A
CN113555871A CN202110848888.4A CN202110848888A CN113555871A CN 113555871 A CN113555871 A CN 113555871A CN 202110848888 A CN202110848888 A CN 202110848888A CN 113555871 A CN113555871 A CN 113555871A
Authority
CN
China
Prior art keywords
load
load transfer
steps
power supply
transfer method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110848888.4A
Other languages
Chinese (zh)
Other versions
CN113555871B (en
Inventor
孙峤
李昂
王冬阳
齐昕
李强
王原
张苗苗
张志军
王冲
张思涵
李昭
曹卓然
何忠意
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Tianjin Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN202110848888.4A priority Critical patent/CN113555871B/en
Publication of CN113555871A publication Critical patent/CN113555871A/en
Application granted granted Critical
Publication of CN113555871B publication Critical patent/CN113555871B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00001Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by the display of information or by user interaction, e.g. supervisory control and data acquisition systems [SCADA] or graphical user interfaces [GUI]
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00032Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/007Arrangements for selectively connecting the load or loads to one or several among a plurality of power lines or power sources
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/10Power transmission or distribution systems management focussing at grid-level, e.g. load flow analysis, node profile computation, meshed network optimisation, active network management or spinning reserve management
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/16Electric power substations

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Human Computer Interaction (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention relates to an intelligent main distribution integrated load transfer method based on a pruning algorithm, which aims at the problems of quick power restoration in dispatching accident processing and planned power failure mode adjustment, and is characterized in that a load transfer scheme is obtained by calculating based on the pruning algorithm after main distribution splicing, section butt joint and important user splicing are carried out by regulating and controlling a cloud substation 10kV outgoing switch to be matched with a substation 10kV outgoing switch in a d5000 system, the load transfer scheme is obtained, the scheme sorting is carried out according to the fact that the load rate of a new power supply after transfer is minimum, remote control operation is more, whether the important user has power failure risk or not, the load transfer scheme is sorted, and meanwhile, surface display is carried out on a man-machine interface.

Description

Intelligent main-distribution integrated load transfer method based on pruning algorithm
Technical Field
The invention belongs to the technical field of power grid dispatching, and particularly relates to an intelligent main-distribution integrated load transfer method based on a pruning algorithm.
Background
The construction of the power distribution automation system has strong practical engineering application significance and value, and the primary significance is the realization of visual scheduling and automatic FA (fault location, fault isolation and power supply recovery). Secondly, the distribution automation system has the function of distribution network automatic voltage control, can realize the distribution network reactive compensation and the automatic optimization control of voltage, and on the premise of ensuring the voltage quality, the distribution automation system reduces the network loss as much as possible, improves the economical efficiency of the operation of the power network, and simultaneously reduces the operation times of the equipment to the maximum extent, reduces the control cost, reduces the accident probability and ensures the safety of the operation of the power network. Finally, the distribution automation system has the function of network reconstruction, when the feeder is overloaded, the load of the overloaded feeder is transferred to other feeders by changing the operation mode of the power grid, so that the load distribution of the power grid is more balanced, the heavy load of the feeder is eliminated, and the load rate and the change of the load rate of each feeder before and after the network reconstruction are counted
At present, when a substation is completely stopped due to incoming line or bus faults in the operation process of a power distribution network, the power distribution network generates large-area power failure, and how to quickly recover loads in a power supply area becomes the primary problem of power distribution network scheduling. The method is characterized in that after faults are quickly isolated by a power distribution automation system, power failure loads are transferred out through a network, the loads are transferred to the opposite side in a conventional method, if the main transformer or line is overloaded after the transfer, the load transfer amount is reduced, and the overload constraint is met.
Disclosure of Invention
The invention aims to overcome the defects of the prior art, provides an intelligent main-distribution integrated load transfer method based on a pruning algorithm, can maintain the stable operation of a power grid, can quickly and accurately provide an optimal load transfer scheme, greatly improves the working efficiency of a dispatcher, and ensures the safe and stable operation of the power grid.
The technical problem to be solved by the invention is realized by adopting the following technical scheme:
an intelligent main distribution integrated load transfer method based on a pruning algorithm comprises the following steps:
step 1, matching a regulation and control cloud substation 10kV outgoing switch with a d5000 system substation 10kV outgoing switch, and performing main matching and splicing;
step 2, butting the remote measuring and remote signaling sections of the cloud substation;
step 3, splicing the d5000 system with important users;
step 4, calculating load transfer through a pruning algorithm, and obtaining a load transfer scheme;
step 5, sorting the load transfer schemes;
and 6, displaying the sequenced load transfer scheme on a human-computer interaction interface.
Moreover, the specific implementation method of the step 1 is as follows: fuzzy matching and automatic splicing are carried out through the cloud transformer substation, the feeder line name and the switch number, and meanwhile, splicing modification and manual splicing are carried out in cooperation with a human-computer interaction interface.
Moreover, the specific implementation method of the step 2 is as follows: storing the remote measurement and remote signaling sections of the cloud substation in an E file format, sending the sections at regular time through sftp, and setting to receive the information sent once at intervals.
Moreover, the specific implementation method of step 3 is as follows: and setting an Excel table of the important user derived at each interval of time, and matching the scheduling number of the important user with the d5000 system.
Further, the step 4 includes the steps of:
step 4.1, setting power grid operation equipment which is out of operation or has overhigh load and can not be used for recovering the load;
step 4.2, judging whether the power grid operation equipment can carry out load adjustment by reducing output, if so, carrying out step 5, otherwise, carrying out step 4.3;
4.3, searching downstream equipment, judging whether equipment which is out of operation or has an excessively high load exists on the power supply side, if so, performing the step 4.4, otherwise, returning to the step 4.3;
step 4.4, judging whether the pruning condition is met, if the pruning condition is met, carrying out load transfer and step 4.5, otherwise, returning to the step 4.3;
and 4.6, if not, judging whether the load is transferred completely, if so, performing the step 5, otherwise, returning to the step 4.3.
Moreover, the specific implementation method of the step 4.2 is as follows: and searching a downstream bus of the power grid operation equipment, searching a standby power supply according to the downstream bus, recording the operation quantity and the load condition of the new power supply after the new power supply and the standby power supply are turned to, performing load flow calculation and performing step 5 if the new power supply cannot be loaded or cannot be found, and performing step 4.3.
Moreover, the pruning conditions in the step 4.4 comprise:
the method comprises the steps that power failure equipment is not contained in power grid operation equipment which is quitted from operation or downstream equipment of equipment with overhigh load;
and secondly, after each load is supplied, the load rate of the new power supply is recorded, and the load rate does not exceed the first ten.
The single power supply risk and even the power failure risk of important users are not caused in the process of transferring the load and the power supply;
fourthly, recording the number of the operation steps, wherein the number of the operation steps is not more than ten.
Moreover, the sorting method of the step 5 is as follows: and according to the scheme optimal sequencing condition that the load rate of the new power supply is minimum after the power supply is transferred, the number of remote control operations is large, and the power failure risk of important users is small.
Moreover, the specific implementation method of step 6 is as follows: and displaying the old power supply point, the new power supply point, the previous load and the after-conversion load of the load on the man-machine interaction page.
The invention has the advantages and positive effects that:
aiming at the problems of rapid power restoration in dispatching accident processing and adjustment of a planned power failure mode, the load transfer is obtained through the calculation of a pruning algorithm after the adjustment of a cloud substation 10kV outgoing switch is matched with a d5000 system substation 10kV outgoing switch, main distribution splicing, section butt joint and important user splicing are carried out, a load transfer scheme is obtained, the load transfer scheme is sequenced according to regulations, and meanwhile, surface display is carried out on a man-machine interface.
Drawings
FIG. 1 is a flow chart of calculating load forwarding through a pruning algorithm and obtaining the load forwarding according to the present invention.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
An intelligent main distribution integrated load transfer method based on a pruning algorithm comprises the following steps:
step 1, matching a regulation and control cloud substation 10kV outgoing switch with a d5000 system substation 10kV outgoing switch, and performing main matching and splicing. Fuzzy matching and automatic splicing are carried out through the cloud transformer substation, the feeder line name and the switch number, and meanwhile, splicing modification and manual splicing are carried out in cooperation with a human-computer interaction interface.
And 2, butting the remote measuring and remote signaling sections of the cloud substation. Storing the remote measurement and remote signaling sections of the cloud substation in an E file format, sending the sections at regular time through sftp, and setting to receive the sent information once every 5 minutes.
And 3, splicing the d5000 system with important users. And setting an Excel table of the important user derived at each interval of time, and matching the scheduling number of the important user with the d5000 system.
And 4, calculating load transfer through a pruning algorithm and obtaining a load transfer scheme as shown in the figure 1.
And 4.1, setting the grid operation equipment which is out of operation or has too high load and cannot be used for recovering the load.
And 4.2, judging whether the power grid operation equipment can carry out load adjustment by reducing the output power, if so, carrying out the step 5, otherwise, carrying out the step 4.3.
The specific implementation method of the step is as follows: and searching a downstream bus of the power grid operation equipment, searching a standby power supply according to the downstream bus, recording the operation quantity and the load condition of the new power supply after the new power supply and the standby power supply are turned to, performing load flow calculation and performing step 5 if the new power supply cannot be loaded or cannot be found, and performing step 4.3.
And 4.3, searching for downstream equipment, judging whether equipment which is out of operation or has an excessively high load exists on the power supply side, if so, performing the step 4.4, otherwise, returning to the step 4.3.
And meanwhile, if the downstream equipment cannot be found until the last time, finding a contact switch of the 10kV outgoing line, and finding another power supply of the contact switch after finding the contact switch. The load is diverted to a new power source. And recording the number of operations and the load condition of the new power supply after the new power supply is turned. Recording whether important users are in the system to cause the risk of power failure or single power supply.
And 4.4, judging whether the pruning condition is met, if so, carrying out load transfer and the step 4.5, otherwise, returning to the step 4.3.
The pruning conditions include:
the method comprises the steps that power failure equipment is not contained in power grid operation equipment which is quitted from operation or downstream equipment of equipment with overhigh load;
and secondly, after each load is supplied, the load rate of the new power supply is recorded, and the load rate does not exceed the first ten.
The single power supply risk and even the power failure risk of important users are not caused in the process of transferring the load and the power supply;
fourthly, recording the number of the operation steps, wherein the number of the operation steps is not more than ten.
And 4.6, if not, judging whether the load is transferred completely, if so, performing the step 5, otherwise, returning to the step 4.3.
And 5, sequencing the load transfer schemes. The sequencing method comprises the following steps: and according to the scheme optimal sequencing condition that the load rate of the new power supply is minimum after the power supply is transferred, the number of remote control operations is large, and the power failure risk of important users is small.
And 6, displaying the sequenced load transfer scheme on a human-computer interaction interface. And displaying the old power supply point, the new power supply point, the previous load and the after-conversion load of the load on the man-machine interaction page. Meanwhile, the operation order is generated by one key, so that the operation order is very convenient.
It should be emphasized that the embodiments described herein are illustrative rather than restrictive, and thus the present invention is not limited to the embodiments described in the detailed description, but also includes other embodiments that can be derived from the technical solutions of the present invention by those skilled in the art.

Claims (9)

1. An intelligent main-matching integrated load transfer method based on a pruning algorithm is characterized in that: the method comprises the following steps:
step 1, matching a regulation and control cloud substation 10kV outgoing switch with a d5000 system substation 10kV outgoing switch, and performing main matching and splicing;
step 2, butting the remote measuring and remote signaling sections of the cloud substation;
step 3, splicing the d5000 system with important users;
step 4, calculating load transfer through a pruning algorithm, and obtaining a load transfer scheme;
step 5, sorting the load transfer schemes;
and 6, displaying the sequenced load transfer scheme on a human-computer interaction interface.
2. The intelligent main-matching-body load transfer method based on the pruning algorithm according to claim 1, wherein the load transfer method comprises the following steps: the specific implementation method of the step 1 comprises the following steps: fuzzy matching and automatic splicing are carried out through the cloud transformer substation, the feeder line name and the switch number, and meanwhile, splicing modification and manual splicing are carried out in cooperation with a human-computer interaction interface.
3. The intelligent main-matching-body load transfer method based on the pruning algorithm according to claim 1, wherein the load transfer method comprises the following steps: the specific implementation method of the step 2 comprises the following steps: storing the remote measurement and remote signaling sections of the cloud substation in an E file format, sending the sections at regular time through sftp, and setting to receive the information sent once at intervals.
4. The intelligent main-matching-body load transfer method based on the pruning algorithm according to claim 1, wherein the load transfer method comprises the following steps: the specific implementation method of the step 3 is as follows: and setting an Excel table of the important user derived at each interval of time, and matching the scheduling number of the important user with the d5000 system.
5. The intelligent main-matching-body load transfer method based on the pruning algorithm according to claim 1, wherein the load transfer method comprises the following steps: the step 4 comprises the following steps:
step 4.1, setting power grid operation equipment which is out of operation or has overhigh load and can not be used for recovering the load;
step 4.2, judging whether the power grid operation equipment can carry out load adjustment by reducing output, if so, carrying out step 5, otherwise, carrying out step 4.3;
4.3, searching downstream equipment, judging whether equipment which is out of operation or has an excessively high load exists on the power supply side, if so, performing the step 4.4, otherwise, returning to the step 4.3;
step 4.4, judging whether the pruning condition is met, if the pruning condition is met, carrying out load transfer and step 4.5, otherwise, returning to the step 4.3;
and 4.6, if not, judging whether the load is transferred completely, if so, performing the step 5, otherwise, returning to the step 4.3.
6. The intelligent main-matching-body load transfer method based on the pruning algorithm according to claim 5, wherein the load transfer method comprises the following steps: the specific implementation method of the step 4.2 is as follows: and searching a downstream bus of the power grid operation equipment, searching a standby power supply according to the downstream bus, recording the operation quantity and the load condition of the new power supply after the new power supply and the standby power supply are turned to, performing load flow calculation and performing step 5 if the new power supply cannot be loaded or cannot be found, and performing step 4.3.
7. The intelligent main-matching-body load transfer method based on the pruning algorithm according to claim 5, wherein the load transfer method comprises the following steps: the pruning conditions in the step 4.4 comprise:
the method comprises the steps that power failure equipment is not contained in power grid operation equipment which is quitted from operation or downstream equipment of equipment with overhigh load;
and secondly, after each load is supplied, the load rate of the new power supply is recorded, and the load rate does not exceed the first ten.
The single power supply risk and even the power failure risk of important users are not caused in the process of transferring the load and the power supply;
fourthly, recording the number of the operation steps, wherein the number of the operation steps is not more than ten.
8. The intelligent main-matching-body load transfer method based on the pruning algorithm according to claim 1, wherein the load transfer method comprises the following steps: the sorting method of the step 5 comprises the following steps: and according to the scheme optimal sequencing condition that the load rate of the new power supply is minimum after the power supply is transferred, the number of remote control operations is large, and the power failure risk of important users is small.
9. The intelligent main-matching-body load transfer method based on the pruning algorithm according to claim 1, wherein the load transfer method comprises the following steps: the specific implementation method of the step 6 comprises the following steps: and displaying the old power supply point, the new power supply point, the previous load and the after-conversion load of the load on the man-machine interaction page.
CN202110848888.4A 2021-07-26 2021-07-26 Intelligent main-distribution integrated load transfer method based on pruning algorithm Active CN113555871B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110848888.4A CN113555871B (en) 2021-07-26 2021-07-26 Intelligent main-distribution integrated load transfer method based on pruning algorithm

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110848888.4A CN113555871B (en) 2021-07-26 2021-07-26 Intelligent main-distribution integrated load transfer method based on pruning algorithm

Publications (2)

Publication Number Publication Date
CN113555871A true CN113555871A (en) 2021-10-26
CN113555871B CN113555871B (en) 2023-10-31

Family

ID=78132900

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110848888.4A Active CN113555871B (en) 2021-07-26 2021-07-26 Intelligent main-distribution integrated load transfer method based on pruning algorithm

Country Status (1)

Country Link
CN (1) CN113555871B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115663814A (en) * 2022-12-30 2023-01-31 国网山西省电力公司长治供电公司 220kV transformer substation transformer load reverse connection method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006246692A (en) * 2005-02-07 2006-09-14 Tokyo Electric Power Co Inc:The Method and program for preparing system recovery procedure
CN106099916A (en) * 2016-06-30 2016-11-09 国网上海市电力公司 The method that a kind of 110kV transformer station load transfer scheme quickly determines
CN107516896A (en) * 2017-08-28 2017-12-26 国网江苏省电力公司技能培训中心 A kind of load restoration scheme generation method based on decision tree pruning algorithms
CN107749620A (en) * 2017-10-13 2018-03-02 国网河北能源技术服务有限公司 A kind of method of service restoration containing distributed power distribution network
CN110601188A (en) * 2019-09-20 2019-12-20 国网天津市电力公司 Rapid processing method for large-area power failure of power distribution network based on optimal regional load transfer strategy
CN112186746A (en) * 2020-09-18 2021-01-05 国网山东省电力公司淄博供电公司 Method suitable for rapid load transfer of distribution network line of transformer substation
CN112542833A (en) * 2020-12-11 2021-03-23 深圳供电局有限公司 Method for quickly recovering 10kV bus voltage loss of transformer substation

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006246692A (en) * 2005-02-07 2006-09-14 Tokyo Electric Power Co Inc:The Method and program for preparing system recovery procedure
CN106099916A (en) * 2016-06-30 2016-11-09 国网上海市电力公司 The method that a kind of 110kV transformer station load transfer scheme quickly determines
CN107516896A (en) * 2017-08-28 2017-12-26 国网江苏省电力公司技能培训中心 A kind of load restoration scheme generation method based on decision tree pruning algorithms
CN107749620A (en) * 2017-10-13 2018-03-02 国网河北能源技术服务有限公司 A kind of method of service restoration containing distributed power distribution network
CN110601188A (en) * 2019-09-20 2019-12-20 国网天津市电力公司 Rapid processing method for large-area power failure of power distribution network based on optimal regional load transfer strategy
CN112186746A (en) * 2020-09-18 2021-01-05 国网山东省电力公司淄博供电公司 Method suitable for rapid load transfer of distribution network line of transformer substation
CN112542833A (en) * 2020-12-11 2021-03-23 深圳供电局有限公司 Method for quickly recovering 10kV bus voltage loss of transformer substation

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘明慧;张东英;邹品元;许君德;雷兴;: "能在线应用的地区电网故障恢复系统", 电网技术, no. 18, pages 35 - 44 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115663814A (en) * 2022-12-30 2023-01-31 国网山西省电力公司长治供电公司 220kV transformer substation transformer load reverse connection method

Also Published As

Publication number Publication date
CN113555871B (en) 2023-10-31

Similar Documents

Publication Publication Date Title
CN100403619C (en) Distribution-type real-time voltage power-less optimized controlling method
CN110137939B (en) Method for converting full-stop load of transformer substation into power supply
CN112561248A (en) Intelligent analysis and control method and system for power failure plan of main and distribution network dispatching
CN201294482Y (en) Economic operation intelligent control device for distribution transformer
CN108631298B (en) Unit distribution power grid recovery strategy generation method based on load balanced distribution
CN110148934B (en) Power distribution network load transfer method considering secondary transfer
CN113555871A (en) Intelligent main-distribution integrated load transfer method based on pruning algorithm
CN104283222A (en) Regional power grid reactive voltage control system
CN114825617A (en) Cloud-edge service interaction method based on power Internet of things
CN107394790B (en) Power supply for coping with load off-line impact and considering unit adjusting capacity and load emergency control method
CN107181321B (en) Method for realizing rapid load pulling based on power grid topological structure
CN111581777A (en) Power transfer weak ring quantitative identification method influencing power distribution network fault recovery
CN114069689A (en) Three-stage topology operation optimization method based on load importance
CN111047115B (en) Regional power grid recovery control optimization decision method, system and storage medium
CN106684852B (en) Flexible direct current power grid voltage management center and voltage stability control method thereof
CN109245117B (en) Automatic generation method for static safety aid decision of regional power grid
CN111600305A (en) Method for recombination optimization analysis of batch supply scheme of distribution network feeder
CN104319779A (en) Regional power grid reactive voltage control method
CN112016705A (en) Active first-aid repair method based on power Internet of things
CN113300465B (en) Intelligent interaction system and method for network load of receiving end power grid
CN115224687A (en) Power failure overhaul safety checking method and system for power transmission and transformation equipment below 220KV
CN113205671A (en) Mobile communication low-delay distributed power system auxiliary service device and method
Lin et al. Research on Fault Recovery Coordination Strategy of Transmission and Distribution Network Based on Multi-Source Data
CN112542833A (en) Method for quickly recovering 10kV bus voltage loss of transformer substation
CN214205067U (en) Multi-power-supply railway communication base station

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant