CN106099916A CN201610505604.0A CN201610505604A CN106099916A CN 106099916 A CN106099916 A CN 106099916A CN 201610505604 A CN201610505604 A CN 201610505604A CN 106099916 A CN106099916 A CN 106099916A
Authority
CN
China
Prior art keywords
load
transformer station
substation
rate
transfer scheme
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610505604.0A
Other languages
Chinese (zh)
Other versions
CN106099916B (en
Inventor
秦旷宇
黄超
黄一超
费斐
李亦农
庞爱莉
徐春华
杨雯
黄阮明
朱爱钧
李峰
李新聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Shanghai Electric Power Co Ltd
Original Assignee
State Grid Shanghai Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Shanghai Electric Power Co Ltd filed Critical State Grid Shanghai Electric Power Co Ltd
Priority to CN201610505604.0A priority Critical patent/CN106099916B/en
Publication of CN106099916A publication Critical patent/CN106099916A/en
Application granted granted Critical
Publication of CN106099916B publication Critical patent/CN106099916B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • H02J3/005

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本发明涉及一种110kV变电站负荷转供方案快速确定的方法,包括:设置初始负荷转供方案;获取最高负荷率下的10kV损失负荷率;根据最高负荷率下的转移负荷率调整110kV变电站的初始负荷转供方案。与现有技术相比,本发明利用专用互馈线对变电站负荷转供能力的影响,结合变电站自身的参数,自适应生成优选的负荷转供方案,从而保证不同变电站主变检修的稳定性。

The invention relates to a method for quickly determining a load transfer scheme of a 110kV substation, comprising: setting an initial load transfer scheme; obtaining the 10kV loss load rate under the highest load rate; Load transfer scheme. Compared with the prior art, the present invention uses the influence of the dedicated mutual feeder on the load transfer capability of the substation, and combines the parameters of the substation itself to adaptively generate an optimal load transfer scheme, thereby ensuring the stability of main transformer maintenance in different substations.

Description

一种110kV变电站负荷转供方案快速确定的方法A Method for Quickly Determining the Load Transfer Scheme of 110kV Substation

技术领域technical field

本发明涉及一种电力电子技术领域,尤其是涉及一种110kV变电站负荷转供方案快速确定的方法。The invention relates to the technical field of power electronics, in particular to a method for rapidly determining a load transfer scheme of a 110kV substation.

背景技术Background technique

随着社会经济和城市建设的发展,各地区配电系统已显示出负荷密度大、配电网络密集、电缆化率高、通道站址困难和投资费用大等国际化大都市城市电网的特点。近年来各地区电网用电增长呈现趋缓态势,但随着城市经济社会的发展,对电力供应安全可靠的要求日益提高,为了保证各地区电网对供电的可靠性,需要对专用互馈线进行合理的规划设计,以提高各地区电网的转供能力。互馈线具有防止全站停电、使变电站满足检修方式“N-1”(不存在短时失负荷)以及使变电站满足检修方式“N-1”(短时失少量负荷)的作用。With the development of social economy and urban construction, the power distribution system in various regions has shown the characteristics of international metropolitan urban power grids such as large load density, dense distribution network, high cable conversion rate, difficult channel site and large investment cost. In recent years, the power consumption growth of power grids in various regions has shown a slowing trend. However, with the development of urban economy and society, the requirements for safe and reliable power supply are increasing. planning and design to improve the transfer capacity of power grids in various regions. Mutual feeders have the functions of preventing power failure of the whole station, making substations meet maintenance mode "N-1" (no short-term load loss) and substations meeting maintenance mode "N-1" (short-time loss of a small amount of load).

检修方式N-1(即N-1-1):1台主变或1回线路计划停运情况下,同级电网中相关联的任一元件(不含母线)无故障或因故障断开。计划停运宜安排在不超过70%最高负荷期间。Maintenance mode N-1 (namely N-1-1): In the case of a planned outage of one main transformer or one circuit, any associated component (excluding the busbar) in the power grid at the same level is not faulty or disconnected due to a fault . The planned outage should be arranged during the peak load period not exceeding 70%.

转供能力:某一供电区域内,当电网元件或变电站停运时,电网转移负荷的能力,一般量化为可转移的负荷占区域总负荷的比例。Transfer capacity: In a certain power supply area, when the power grid components or substations are out of service, the ability of the grid to transfer loads is generally quantified as the ratio of transferable loads to the total regional load.

互馈线:为保障变电站全站失电后站用电源的恢复供电,连接变配电站中、低压侧,两侧均可送对端终端负荷的电力线路。Mutual feeder: In order to ensure the restoration of power supply for the station power supply after the entire substation loses power, it connects the medium and low voltage sides of the substation and the power line that can be sent to the opposite end terminal load on both sides.

发明内容Contents of the invention

本发明的目的就是为了克服上述现有技术存在的缺陷而提供一种110kV变电站负荷转供方案快速确定的方法,利用专用互馈线对变电站负荷转供能力的影响,结合变电站自身的参数,自适应生成优选的负荷转供方案,从而保证不同变电站主变检修的稳定性。The purpose of the present invention is to provide a method for quickly determining the load transfer scheme of a 110kV substation in order to overcome the above-mentioned defects in the prior art, using the influence of the special mutual feeder on the load transfer capacity of the substation, and combining the parameters of the substation itself, self-adaptive Generate an optimal load transfer scheme to ensure the stability of main transformer maintenance in different substations.

本发明的目的可以通过以下技术方案来实现:The purpose of the present invention can be achieved through the following technical solutions:

一种110kV变电站负荷转供方案快速确定的方法包括以下步骤:A method for quickly determining the load transfer scheme of a 110kV substation includes the following steps:

1)设置初始负荷转供方案:1) Set the initial load transfer scheme:

110kV变电站的初始负荷转供方案包括设置10kV专用互馈线和10kV联络线;The initial load transfer scheme of 110kV substation includes setting up 10kV dedicated mutual feeder and 10kV tie line;

2)根据采集的与110kV变电站的初始负荷转供方案有关的变电站参数获取最高负荷率下的10kV损失负荷率;2) Obtain the 10kV loss load rate under the highest load rate according to the collected substation parameters related to the initial load transfer scheme of the 110kV substation;

3)根据最高负荷率下的转移负荷率调整110kV变电站的初始负荷转供方案,并输出相应的调整负荷转供方案,使得最高负荷率下的10kV损失负荷率为0。3) Adjust the initial load transfer scheme of the 110kV substation according to the transfer load rate under the highest load rate, and output the corresponding adjusted load transfer plan, so that the 10kV loss load rate under the highest load rate is 0.

所述与110kV变电站的初始负荷转供方案有关的变电站参数包括110kV变电站的主变数量、主变容量、最高负载率、10kV专用互馈线的转移容量、10kV专用互馈线的个数和10kV变电站双电源比例。The substation parameters related to the initial load transfer scheme of the 110kV substation include the number of main transformers in the 110kV substation, the capacity of the main transformers, the highest load rate, the transfer capacity of the 10kV dedicated mutual feeder, the number of 10kV dedicated mutual feeders and the dual power ratio.

所述最高负荷率下的10kV转移负荷率γ满足以下公式:The 10kV transfer load rate γ under the maximum load rate satisfies the following formula:

式中,A′为110kV变电站的主变容量,B′为110kV变电站的最高负载率,q为10kV专用互馈线的个数,F4为10kV专用互馈线的转移容量,为10kV变电站双电源比例,N′为110kV变电站的主变数量。In the formula, A' is the main transformer capacity of the 110kV substation, B' is the highest load rate of the 110kV substation, q is the number of 10kV dedicated mutual feeders, F4 is the transfer capacity of the 10kV dedicated mutual feeders, is the ratio of dual power sources in the 10kV substation, and N' is the number of main transformers in the 110kV substation.

所述步骤3),110kV变电站的初始负荷转供方案针对主变数量为三台的220kV变电站优先调整10kV联络线的比例,针对主变数量为两台的220kV变电站优先调整是否设置10kV专用互馈线。In the step 3), the initial load transfer scheme of the 110kV substation shall give priority to adjusting the ratio of the 10kV tie line for the 220kV substation with three main transformers, and whether to set up a 10kV dedicated mutual feeder for the 220kV substation with two main transformers. .

所述步骤3)之后还包括步骤4):在调整负荷转供方案中加入变电站主接线的约束。Step 4) is also included after the step 3): adding constraints on the main wiring of the substation in the load transfer scheme for adjustment.

所述变电站主接线的约束为:The constraints of the main wiring of the substation are:

若其下级10kV站进线均来自此110kV变电站,则其进线来自接入不同110kV变压器并且没有通过联络开关相连的母线。If the incoming lines of its subordinate 10kV substation all come from this 110kV substation, then its incoming lines come from buses connected to different 110kV transformers and not connected through tie switches.

与现有技术相比,本发明具有以下优点:Compared with the prior art, the present invention has the following advantages:

1)利用专用互馈线对变电站负荷转供能力的影响,结合变电站自身的参数,自适应生成优选的负荷转供方案,从而保证不同变电站主变检修的稳定性。1) Using the influence of the dedicated mutual feeder on the load transfer capacity of the substation, combined with the parameters of the substation itself, the optimal load transfer scheme is adaptively generated, so as to ensure the stability of the main transformer maintenance of different substations.

2)将10kV转移负荷率作为评价110kV变电站的10kV负荷转供能力的指标, 进而提出相应的优选方案,从而提高110kV变电站的10kV负荷转供能力。2) Take the 10kV transfer load rate as an index to evaluate the 10kV load transfer capacity of the 110kV substation, and then put forward the corresponding optimal plan, so as to improve the 10kV load transfer capacity of the 110kV substation.

3)除了专用互馈线对电网负荷转供能力的影响,还考虑到变电站主接线对转供的限制,使得调整负荷转供方案更加全面完善。3) In addition to the impact of the dedicated mutual feeder on the load transfer capacity of the grid, the restrictions on the transfer by the main wiring of the substation are also considered, making the adjustment of the load transfer scheme more comprehensive and perfect.

附图说明Description of drawings

图1为本发明方法的流程图。Fig. 1 is the flowchart of the method of the present invention.

具体实施方式detailed description

下面结合附图和具体实施例对本发明进行详细说明。本实施例以本发明技术方案为前提进行实施,给出了详细的实施方式和具体的操作过程,但本发明的保护范围不限于下述的实施例。The present invention will be described in detail below in conjunction with the accompanying drawings and specific embodiments. This embodiment is carried out on the premise of the technical solution of the present invention, and detailed implementation and specific operation process are given, but the protection scope of the present invention is not limited to the following embodiments.

如图1所示,一种110kV变电站负荷转供方案快速确定的方法包括以下步骤:As shown in Figure 1, a method for quickly determining the load transfer scheme of a 110kV substation includes the following steps:

1)设置初始负荷转供方案:1) Set the initial load transfer scheme:

110kV变电站的初始负荷转供方案包括设置10kV专用互馈线和10kV联络线。The initial load transfer scheme of 110kV substation includes setting up 10kV dedicated mutual feeder and 10kV tie line.

2)根据采集的与110kV变电站的初始负荷转供方案有关的变电站参数获取最高负荷率下的10kV损失负荷率。2) Obtain the 10kV loss load rate under the highest load rate according to the collected substation parameters related to the initial load transfer scheme of the 110kV substation.

与110kV变电站的初始负荷转供方案有关的变电站参数包括110kV变电站的主变数量、主变容量、最高负载率、10kV专用互馈线的转移容量、10kV专用互馈线的个数和10kV变电站双电源比例。The substation parameters related to the initial load transfer scheme of the 110kV substation include the number of main transformers in the 110kV substation, the capacity of the main transformer, the highest load rate, the transfer capacity of the 10kV dedicated mutual feeder, the number of 10kV dedicated mutual feeders and the ratio of dual power sources in the 10kV substation .

最高负荷率下的10kV转移负荷率γ满足以下公式:The 10kV transfer load rate γ under the highest load rate satisfies the following formula:

式中,A′为110kV变电站的主变容量,B′为110kV变电站的最高负载率,q为10kV专用互馈线的个数,F4为10kV专用互馈线的转移容量,为10kV变电站双电源比例,N′为110kV变电站的主变数量。In the formula, A' is the main transformer capacity of the 110kV substation, B' is the highest load rate of the 110kV substation, q is the number of 10kV dedicated mutual feeders, F4 is the transfer capacity of the 10kV dedicated mutual feeders, is the ratio of dual power sources in the 10kV substation, and N' is the number of main transformers in the 110kV substation.

3)根据最高负荷率下的转移负荷率调整110kV变电站的初始负荷转供方案,并输出相应的调整负荷转供方案,使得最高负荷率下的10kV损失负荷率为0。3) Adjust the initial load transfer scheme of the 110kV substation according to the transfer load rate under the highest load rate, and output the corresponding adjusted load transfer plan, so that the 10kV loss load rate under the highest load rate is 0.

步骤3),110kV变电站的初始负荷转供方案针对主变数量为三台的220kV变电站优先调整10kV联络线的比例,针对主变数量为两台的220kV变电站优先调整 是否设置10kV专用互馈线。Step 3), the initial load transfer scheme of the 110kV substation prioritizes the adjustment of the proportion of 10kV tie lines for the 220kV substation with three main transformers, and whether to set up a 10kV dedicated mutual feeder for the 220kV substation with two main transformers.

4)在调整负荷转供方案中加入变电站主接线的约束,变电站主接线的约束为:4) Add the constraints of the main wiring of the substation to the scheme of adjusting the load transfer. The constraints of the main wiring of the substation are:

若其下级10kV站进线均来自此110kV变电站,则其进线来自接入不同110kV变压器并且没有通过联络开关相连的母线。If the incoming lines of its subordinate 10kV substation all come from this 110kV substation, then its incoming lines come from buses connected to different 110kV transformers and not connected through tie switches.

实例:以110/35kV专用互馈线提高上海110kV变电站转供能力为例,采用本发明方法进行研究:Example: Taking 110/35kV special mutual feeder to improve the transfer capacity of Shanghai 110kV substation as an example, the method of the present invention is used for research:

目前,上海市110kV变电站之间的10kV专用互馈线一般采用3×400mm2电缆,输送容量为6.24MVA,但原互馈线功能主要是保障站用变供电,此处考虑电网对转供能力的要求,需要较大的输送容量满足主变检修N-1时的负荷转供需求,因此本节研究的专用互馈线为双并3×400mm2电缆,输送容量为12.48MVA。利用本发明方法分析在110kV变电站主变检修N-1状态下,此10kV互馈线对110kV变电站10kV负荷转供能力的影响。10kV互馈线无法转移的负荷需要通过10kV站间联络线转移,目前上海10kV联络线比例约为30%。At present, the 10kV dedicated mutual feeder between the 110kV substations in Shanghai generally adopts 3×400mm 2 cables, and the transmission capacity is 6.24MVA, but the function of the original mutual feeder is mainly to ensure the substation power supply. Here, the requirements of the power grid for the transfer capacity are considered , a large transmission capacity is required to meet the load transfer demand during the maintenance of the main transformer N-1, so the special mutual feeder studied in this section is a double-parallel 3×400mm 2 cable with a transmission capacity of 12.48MVA. The method of the invention is used to analyze the influence of the 10kV mutual feeder on the 10kV load transfer capacity of the 110kV substation under the N-1 state of maintenance of the main transformer of the 110kV substation. The load that cannot be transferred by the 10kV mutual feeder needs to be transferred through the 10kV inter-station tie line, and the current ratio of the 10kV tie line in Shanghai is about 30%.

对于2台主变的110kV变压器,主变容量为A′,最高负载率为B′,主变检修时负载率为最高负荷的70%,此时,当一台主变检修,一台主变失电时,两台主变共需转移2*A′*B′*0.7的负荷。此处对主变容量31.5MVA、50MVA和110MVA的110kV变电站分别进行讨论。转移10kV负荷率=1-10kV负荷损失率。For the 110kV transformers of two main transformers, the capacity of the main transformer is A′, the maximum load rate is B′, and the load rate is 70% of the maximum load when the main transformer is overhauled. At this time, when one main transformer is overhauled, one main transformer When the power is off, the two main transformers need to transfer a load of 2*A′*B′*0.7 in total. Here, 110kV substations with main transformer capacities of 31.5MVA, 50MVA and 110MVA are discussed respectively. Transfer 10kV load rate = 1-10kV load loss rate.

表10 2台主变110kV变电站检修下N-1 10kV负荷转移表单位:%Table 10 N-1 10kV load transfer table under maintenance of 110kV substation with 2 main transformers Unit: %

注:表10-11可转移容量以12.48MVA计,下级供电区域内无电厂,本表仅考虑10kV专用互馈线所转移的10kV负荷率。Note: The transferable capacity in Table 10-11 is calculated as 12.48MVA. There is no power plant in the lower power supply area. This table only considers the 10kV load rate transferred by the 10kV dedicated mutual feeder.

由上述分析可知,若2台主变的110kV变电站主变检修N-1时,10kV互馈线只能转移较低比例的负荷,必须提高10kV联络线的比例才能保证110kV变电站主变N-1时,10kV负荷的正常供电。From the above analysis, it can be seen that if the main transformer of the 110kV substation with two main transformers is overhauled at N-1, the 10kV mutual feeder can only transfer a lower proportion of the load, and the proportion of the 10kV tie line must be increased to ensure that the main transformer of the 110kV substation is N-1. , Normal power supply of 10kV load.

对于3台主变的110kV变压器,主变容量为A′,最高负载率为B′,主变检修时负载率为最高负荷的70%,此时,当一台主变检修,一台主变失电时,第三台主变所能带的负荷总计为A′(不考虑过载),110kV变电站负荷总计为3*A′*B′*0.7,剩余一台主变无法承担的35kV侧负荷为2.1*A′*B′-A′,此部分负荷由10kV联络线或10kV专用互馈线转移。10kV专用互馈线所能转移的10kV侧负荷为F4,则专用互馈线和剩余一台主变共可以承担的10kV侧负荷为A′+F4,占10kV总负荷比例为(A′+F4)/(2.1*A′*B′),如表10所示。此处对主变容量31.5MVA、50MVA和110MVA的110kV变电站分别进行讨论10kV专用互馈线及第三台主变所能转移的负荷占10kV总负荷的比例。For the 110kV transformers of three main transformers, the capacity of the main transformer is A′, the maximum load rate is B′, and the load rate is 70% of the maximum load when the main transformer is overhauled. At this time, when one main transformer is overhauled, one main transformer When power is lost, the total load that the third main transformer can carry is A′ (overload is not considered), the total load of the 110kV substation is 3*A′*B′*0.7, and the 35kV side load that the remaining main transformer cannot bear It is 2.1*A'*B'-A', and this part of the load is transferred by 10kV tie line or 10kV dedicated mutual feeder. The 10kV side load that can be transferred by the 10kV dedicated mutual feeder is F 4 , then the total 10kV side load that the dedicated mutual feeder and the remaining main transformer can bear is A′+F 4 , and the proportion of the total 10kV load is (A′+F 4 )/(2.1*A'*B'), as shown in Table 10. Here, the 110kV substations with main transformer capacities of 31.5MVA, 50MVA and 110MVA are discussed respectively. The proportion of the 10kV dedicated mutual feeder and the load that can be transferred by the third main transformer to the total 10kV load is discussed.

表11 10kV专用互馈线及第三台主变所带110kV变电站负荷比例表单位:%Table 11 10kV dedicated mutual feeder and 110kV substation load ratio table of the third main transformer Unit: %

由上述分析可知,若3台主变的110kV变电站主变检修N-1时,在变电站投运初期,负载率较低在50%左右时,10kV互馈线便可以满足负荷转供的需求。但随着110kV变电站负载率的提高,仍需10kV联络线转移负荷,才可以保证10kV负荷在110kV变电站主变检修N-1时不失电。From the above analysis, it can be seen that if the main transformer of the 110kV substation with three main transformers is overhauled N-1, when the load rate is as low as about 50% at the initial stage of substation commissioning, the 10kV mutual feeder can meet the demand for load transfer. However, with the increase of the load rate of the 110kV substation, the 10kV tie line is still needed to transfer the load, so as to ensure that the 10kV load will not lose power when the main transformer of the 110kV substation is overhauled at N-1.

第三台主变所能带的负荷占总负荷比例为A′/(3*A′*B′*0.7),即为1/(B′*2.1),与主变容量无关,若无10kV专用互馈线及10kV联络线,10kV侧负荷损失率如表12所示。The ratio of the load that the third main transformer can carry to the total load is A'/(3*A'*B'*0.7), which is 1/(B'*2.1), which has nothing to do with the capacity of the main transformer. If there is no 10kV Table 12 shows the loss rate of 10kV side load for dedicated mutual feeder and 10kV tie line.

表12不考虑互馈线时110kV变电站检修下N-1 10kV负荷损失率单位:%Table 12 N-1 10kV load loss rate under maintenance of 110kV substation without considering mutual feeder unit: %

目前上海10kV站双电源比例已达30%,根据上表所得结果,对于3主变的110kV变电站,仅依靠10kV联络线便可以转移全部负荷。At present, the proportion of dual power sources in 10kV stations in Shanghai has reached 30%. According to the results obtained in the above table, for a 110kV substation with 3 main transformers, all loads can be transferred only by relying on 10kV tie lines.

Claims (6)

1. the method that a 110kV transformer station load transfer scheme quickly determines, it is characterised in that comprise the following steps:
1) initial load turning solution is set:
The initial load turning solution of 110kV transformer station includes arranging the special mutual feeder line of 10kV and 10kV interconnection;
2) maximum load rate is obtained according to the Substation parameters that the initial load turning solution with 110kV transformer station gathered is relevant Under 10kV lose rate of load condensate;
3) adjust the initial load turning solution of 110kV transformer station according to the transfer load rate under maximum load rate, and export phase The Load adjustment turning solution answered so that the 10kV loss rate of load condensate under maximum load rate is 0.
The method that a kind of 110kV transformer station the most according to claim 1 load transfer scheme quickly determines, its feature exists In, the described Substation parameters relevant with the initial load turning solution of 110kV transformer station includes the pricinpal variable of 110kV transformer station Transfer capacity, the number of the special mutual feeder line of 10kV and the 10kV of the special mutual feeder line of amount, main transformer capacity, high capacity rate, 10kV become Power station dual power supply ratio.
The method that a kind of 110kV transformer station the most according to claim 2 load transfer scheme quickly determines, its feature exists Below equation is met in, 10kV transfer load rate γ under described maximum load rate:
In formula, A ' is the main transformer capacity of 110kV transformer station, and B ' is the high capacity rate of 110kV transformer station, and q is that 10kV is special mutually The number of feeder line, F4For the transfer capacity of the special mutual feeder line of 10kV,For 10kV transformer station dual power supply ratio, N ' is 110kV power transformation The main transformer quantity stood.
The method that a kind of 110kV transformer station the most according to claim 1 load transfer scheme quickly determines, its feature exists In, described step 3), the initial load turning solution of 110kV transformer station is excellent for the 220kV transformer station that main transformer quantity is three First adjust the ratio of 10kV interconnection, for the 220kV transformer station that main transformer quantity is two, preferentially regulateing whether, 10kV is set special Use mutual feeder line.
The method that a kind of 110kV transformer station the most according to claim 1 load transfer scheme quickly determines, its feature exists In, described step 3) also include step 4 afterwards): in Load adjustment turning solution, add the constraint of Substation Bus Arrangement.
The method that a kind of 110kV transformer station the most according to claim 5 load transfer scheme quickly determines, its feature exists In, being constrained to of described Substation Bus Arrangement:
If its subordinate 10kV station inlet wire is all from this 110kV transformer station, then its inlet wire from access different 110kV transformator and The bus being connected not over interconnection switch.
CN201610505604.0A 2016-06-30 2016-06-30 A Method for Quickly Determining Load Transfer Scheme of 110kV Substation Active CN106099916B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610505604.0A CN106099916B (en) 2016-06-30 2016-06-30 A Method for Quickly Determining Load Transfer Scheme of 110kV Substation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610505604.0A CN106099916B (en) 2016-06-30 2016-06-30 A Method for Quickly Determining Load Transfer Scheme of 110kV Substation

Publications (2)

Publication Number Publication Date
CN106099916A true CN106099916A (en) 2016-11-09
CN106099916B CN106099916B (en) 2019-02-19

Family

ID=57214170

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610505604.0A Active CN106099916B (en) 2016-06-30 2016-06-30 A Method for Quickly Determining Load Transfer Scheme of 110kV Substation

Country Status (1)

Country Link
CN (1) CN106099916B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113555871A (en) * 2021-07-26 2021-10-26 国网天津市电力公司 Intelligent main-distribution integrated load transfer method based on pruning algorithm
CN115360713A (en) * 2022-09-01 2022-11-18 湖北春田电工技术有限公司 Flexible switching method for interconnected power distribution system of plant area

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101431238A (en) * 2008-09-12 2009-05-13 天津天大求实电力新技术股份有限公司 Power distribution network power supply capacity evaluation method considering N-1 criterion
CN103001216A (en) * 2012-03-28 2013-03-27 河海大学 Method for quickly restoring power supply of power distribution network containing distributed power source

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101431238A (en) * 2008-09-12 2009-05-13 天津天大求实电力新技术股份有限公司 Power distribution network power supply capacity evaluation method considering N-1 criterion
CN103001216A (en) * 2012-03-28 2013-03-27 河海大学 Method for quickly restoring power supply of power distribution network containing distributed power source

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
唐琪 等: "互馈线提高上海电网转供能力研究", 《电力与能源》 *
罗凤章 等: "一种简捷实用的配电系统供电能力计算方法", 《电网技术》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113555871A (en) * 2021-07-26 2021-10-26 国网天津市电力公司 Intelligent main-distribution integrated load transfer method based on pruning algorithm
CN113555871B (en) * 2021-07-26 2023-10-31 国网天津市电力公司 An intelligent main-distribution integrated load transfer method based on pruning algorithm
CN115360713A (en) * 2022-09-01 2022-11-18 湖北春田电工技术有限公司 Flexible switching method for interconnected power distribution system of plant area
CN115360713B (en) * 2022-09-01 2023-04-28 湖北春田电工技术有限公司 Flexible switching method of factory interconnection power distribution system

Also Published As

Publication number Publication date
CN106099916B (en) 2019-02-19

Similar Documents

Publication Publication Date Title
CN105846422B (en) A kind of large capacity grid short circuit current control stimulation optimization configuration method
CN109687496B (en) A Reliability Calculation Method for AC-DC Hybrid Flexible Distribution Network
CN106099917A (en) The method that a kind of transformer station load transfer scheme quickly determines
CN102368612A (en) Triple-double wiring way of medium-voltage electric distribution network
CN203895766U (en) Double busbar and double subsection based substation main wiring system
CN104882883A (en) 10 KV power distribution network system
CN103839116A (en) Transformer substation capacity allocation method based on different power supply areas
CN107959286A (en) A kind of power transmission network dynamic reconfiguration method based on 3/2 mode of connection
CN102208811B (en) Wiring structure of distribution network containing microgrid
CN204577857U (en) A kind of 110kV transformer station adopting novel wire connecting way
CN105305431A (en) Snowflake grid type grid construction method suitable for urban medium voltage distribution networks
CN106099916B (en) A Method for Quickly Determining Load Transfer Scheme of 110kV Substation
CN105024329B (en) A kind of empty trunk distribution network construction structure of middle pressure rack and its construction method
CN104732456B (en) A kind of District power network planning design method based on MATLAB
CN106130009A (en) The method that a kind of 220kV transformer station load transfer scheme quickly determines
CN202405780U (en) medium voltage distribution network
CN202817512U (en) Wiring system for 110kV transformer station
CN203787789U (en) T and pi mixed net rack wiring structure applied to high voltage distribution
Gilany et al. Reducing the short circuit levels in Kuwait transmission network (A case study)
CN207910471U (en) A kind of hybrid AC/DC power transmission systems containing specific load
Zhong et al. Chinese growing pains
CN203826779U (en) 35kV substation wiring system
CN205986167U (en) Cascade compensation device suitable for many loop lines way
CN205231747U (en) Reactive power compensation system for urban rail transit main transformer station
CN218352256U (en) Power standby power supply circuit for extra-high voltage converter station

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant