CN113545213B - Sidewalk tree pool pre-setting integrated device and construction method - Google Patents

Sidewalk tree pool pre-setting integrated device and construction method Download PDF

Info

Publication number
CN113545213B
CN113545213B CN202110735939.2A CN202110735939A CN113545213B CN 113545213 B CN113545213 B CN 113545213B CN 202110735939 A CN202110735939 A CN 202110735939A CN 113545213 B CN113545213 B CN 113545213B
Authority
CN
China
Prior art keywords
water
pipe
fertilizer
ball control
structural layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110735939.2A
Other languages
Chinese (zh)
Other versions
CN113545213A (en
Inventor
倪守增
王红磊
张海峰
王远鹏
房立红
董勇男
杨欣
李娟�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan Urban Construction Group Co Ltd
Shandong Quanjian Engineering Testing Co Ltd
Jinan Municipal Engineering Construction Group Co Ltd
Shandong Huitong Construction Group Co Ltd
Shandong Huiyou Municipal Garden Group Co Ltd
Original Assignee
Jinan Urban Construction Group Co Ltd
Shandong Quanjian Engineering Testing Co Ltd
Jinan Municipal Engineering Construction Group Co Ltd
Shandong Huitong Construction Group Co Ltd
Shandong Huiyou Municipal Garden Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinan Urban Construction Group Co Ltd, Shandong Quanjian Engineering Testing Co Ltd, Jinan Municipal Engineering Construction Group Co Ltd, Shandong Huitong Construction Group Co Ltd, Shandong Huiyou Municipal Garden Group Co Ltd filed Critical Jinan Urban Construction Group Co Ltd
Priority to CN202110735939.2A priority Critical patent/CN113545213B/en
Publication of CN113545213A publication Critical patent/CN113545213A/en
Application granted granted Critical
Publication of CN113545213B publication Critical patent/CN113545213B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01CPLANTING; SOWING; FERTILISING
    • A01C23/00Distributing devices specially adapted for liquid manure or other fertilising liquid, including ammonia, e.g. transport tanks or sprinkling wagons
    • A01C23/02Special arrangements for delivering the liquid directly into the soil
    • A01C23/021Sludge injectors, i.e. liquid manure injectors
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G23/00Forestry
    • A01G23/02Transplanting, uprooting, felling or delimbing trees
    • A01G23/04Transplanting trees; Devices for grasping the root ball, e.g. stump forceps; Wrappings or packages for transporting trees
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C9/00Special pavings; Pavings for special parts of roads or airfields
    • E01C9/004Pavings specially adapted for allowing vegetation

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Environmental Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Soil Sciences (AREA)
  • Water Supply & Treatment (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Architecture (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Ecology (AREA)
  • Forests & Forestry (AREA)
  • Cultivation Receptacles Or Flower-Pots, Or Pots For Seedlings (AREA)
  • Cultivation Of Plants (AREA)

Abstract

The invention belongs to the field of municipal garden engineering, and particularly relates to a sidewalk tree pool pre-arranging integrated device and a construction method, wherein the sidewalk tree pool pre-arranging integrated device comprises a support frame, a structural layer panel, a soil ball control frame and a positioning pile are sequentially fixed downwards by the support frame, and a hydroelectric pre-buried pipe is fixedly connected to the soil ball control frame; the upper surface of the positioning pile is provided with a central point, and the lower end of the positioning pile is in a pointed cone shape; the structural layer panel is provided with round holes at four corners respectively, the round holes are connected with the pressure water replenishing device, the round holes are downwards connected with the water and fertilizer infiltration pipe, and the water and fertilizer infiltration pipe is connected with the capillary infiltration pipe. The device controls the planting position and height of the nursery stock through the positioning pile, ensures the growth space of the nursery stock root system through the soil ball control frame, ensures the stability of the stone foundation along the building edge through embedding the structural layer panel into the structural layer, can quickly realize modular construction as a prefabricated member, improves the civil engineering and greening construction efficiency of a sidewalk, and ensures the construction quality.

Description

Sidewalk tree pool pre-setting integrated device and construction method
Technical Field
The invention belongs to the field of municipal garden engineering, and particularly relates to a sidewalk tree pool pre-setting integrated device and a construction method.
Background
At present, the construction of a tree pool of a sidewalk is that after the construction of a structural layer of the sidewalk is completed, a road structural layer of a tree pool area is subjected to removing and reverse excavation, then seedling planting is carried out, and vertical curbs are installed after planting is completed. The damage to the structural layer around the tree pool is caused because the damage process disturbs the structural layer of the surrounding roads. The traditional construction method ensures that the seedling planting must be constructed after the civil engineering construction is completed, the seedling planting range is limited to the inner side of the vertical edge stone, the installation quality of the vertical edge stone cannot be guaranteed due to the damage of a road structure layer, and the vertical edge stone and the peripheral pavement settlement are often caused in the later stage. In addition, the traditional construction method causes the nursery stock to be limited by narrow planting time and space, the survival rate is low, the water and fertilizer environment is poor, water and fertilizer are difficult to supply, and the soil porosity is low, so that the potential difference of the later period is caused. Along with the demand of beautifying city environment, big tree water and electricity of monomer installation demand is more and more, can not reserve the facility because traditional tree pool construction water and electricity installation, need anti-dig, cause personnel extravagant and mat formation harmful effects such as destruction.
Disclosure of Invention
The invention provides a sidewalk tree pool presetting integrated device and a construction method for overcoming the defects of the prior art.
The invention is realized by the following technical scheme:
a sidewalk tree pool pre-arranging integrated device comprises a supporting frame, wherein the bottom of the supporting frame is fixed on a supporting frame, the bottom surface of the supporting frame is fixedly connected with a structural layer panel, the structural layer panel is downwards fixedly connected with a soil ball control frame, the central position of the bottom of the soil ball control frame is fixedly connected with a positioning pile, and a hydroelectric pre-embedded pipe is fixedly connected on the soil ball control frame; the upper surface of the positioning pile is provided with a central point, and the lower end of the positioning pile is in a pointed cone shape; the four corners of the structural layer panel are respectively provided with round holes, the round holes are downwards connected with the water and fertilizer infiltration pipes, the side surfaces of the water and fertilizer infiltration pipes are connected with a plurality of capillary infiltration pipes from top to bottom towards the inner direction of the soil ball control frame, and the water and fertilizer infiltration pipes and the capillary infiltration pipes are positioned in the soil ball control frame; the circular hole is upwards connected with a pressure water supply device, and a cylinder body of the pressure water supply device is inserted into the water and fertilizer infiltration pipe; the pressure water replenishing device comprises a piston handle, and a one-way air valve is arranged in the middle of a cylinder body of the pressure water replenishing device.
Furthermore, the side surface of the lower part of the pressure water compensator is provided with an external pipe, the pipe orifice of the external pipe is provided with a one-way water inlet valve, the one-way water inlet valve is connected with a water fertilizer pressure tank through a pipe, and the bottom of the cylinder body of the pressure water compensator is also provided with a one-way water outlet valve.
Furthermore, the upper part of the supporting frame is provided with an adjusting ring.
The construction method of the pavement tree pool pre-setting integrated device comprises the following steps:
after determining coordinates through GPS dotting, inserting a positioning pile into the ground, and enabling the central point of the positioning pile to be located at the GPS dotting position;
(II) the positioning pile is upwards fixedly connected with a soil ball control frame;
thirdly, filling soil into the soil ball control frame to place the seedling soil balls;
(IV) the soil ball control frame upwards connects the structural layer panel, connects the structural layer panel with the surrounding road structural layer:
(V) the upwards fixed connection braced frame of structural layer panel, the fixed connection support frame on braced frame:
if the liquid is needed to be supplemented to the nursery stock, the liquid is firstly filled into the water and fertilizer infiltration pipe through the round hole, then the cylinder body of the pressure water supplementing device is inserted into the water and fertilizer infiltration pipe, the piston handle is pulled up and down to apply pressure to the water and fertilizer infiltration pipe, and the liquid is conveyed to the root of the nursery stock; the liquid manure pressure tank can also be connected with a one-way water inlet valve of the pressure water replenishing device through a pipe, and liquid is pressurized and conveyed into the liquid manure infiltration pipe through the liquid manure pressure tank;
and (seventhly), if water and electricity are required to be accessed, connecting the water and electricity embedded pipes in the roadside mold of the road through the water and electricity embedded pipes.
The invention has the beneficial effects that:
(1) In the traditional greening construction, a tree pool area is dug for seedling planting after civil engineering is completed, so that the seedling anti-season planting construction is often caused by civil engineering construction.
(2) The invention adopts the coordinate preset positioning pile to determine the geographic information coordinate of the seedling planting position, realizes the pre-control of the seedling planting position and the elevation through GPS dotting positioning, can control the seedling planting position and the height through the coordinate positioning of the positioning pile, and ensures the planting quality.
(3) Compared with the traditional construction method of removing the structural layer and excavating the tree pool area, the invention enlarges the backfilling space of the underground part of the tree pool, ensures the growth space of the root system of the nursery stock and enlarges the survival space of the nursery stock.
(4) According to the device, the epitaxial structure on the upper part of the soil ball control frame is embedded into the road structure layer, so that the stability of the vertical edge stone foundation is ensured, and the later settlement of the vertical edge stone pavement is avoided.
(5) The device integrally connects the seedling support frame with the positioning pile, the soil ball control frame and the structural layer panel through integral connection, ensures the stability and firmness of the device, and does not occupy the space except for the vertical edge stone.
(6) The device can be used as a prefabricated member to quickly realize modular construction, improve the civil engineering and greening construction efficiency of the sidewalk and ensure the construction quality.
(7) According to the invention, liquid is pumped into the water and fertilizer infiltration pipe through the pressure water replenisher, and water and fertilizer, nutrient solution, rooting powder and the like required by the roots of plants are rapidly and uniformly supplied through the capillary infiltration pipe externally connected with the water and fertilizer infiltration cylinder, so that large-range infiltration type fertilization can be realized, the absorption space of the root system of the fertilization is expanded, and compared with the traditional method of expanding the root system by depending on the growth of plants and supplementing water through root pressure, the efficiency is improved by multiple times.
(8) The mode of connecting the hydropower through the pre-buried union coupling of hydropower pre-buried union coupling road side form water and electricity has avoided the secondary construction that the device within range water and electricity inserts, provides good access passageway for the installation of tree body water and electricity, builds better view water and electricity effect.
Drawings
FIG. 1 is a schematic view of the structure of the present invention.
FIG. 2 is a schematic structural diagram of the construction process of the present invention.
FIG. 3 is a schematic view of another angle structure of the present invention.
Fig. 4 is a schematic structural view of the structural layer panel of the present invention embedded into a road structural layer.
Fig. 5 is a schematic structural view of the pressure water replenisher and the water and fertilizer pressure tank.
In the figure, 1 a positioning pile, 2 a central point, 3 a soil ball control frame, 4 structural layer panels, 5 a supporting frame, 6 a supporting frame, 7 an adjusting ring, 8 a water and fertilizer infiltration pipe, 9 a capillary infiltration pipe, 10 a hydroelectric pre-buried pipe, 11 a pressure water replenishing device, 12 a piston handle, 13 a one-way air valve, 14 a one-way water outlet valve, 16 a one-way water inlet valve, 17 a water and fertilizer pressure tank, 18 round holes, 19 soil balls and 20 air inlets.
Detailed Description
The following embodiments are given as examples of the present invention, and it should be noted that the present invention is not limited to the following embodiments, and all equivalent changes based on the technical solutions of the present invention are included in the protection scope of the present invention.
The integral tree pool presetting device for the sidewalk comprises a support frame 6 for fixedly supporting the nursery stock at the upper part, the support frame 6 is not specially limited, the existing support frame 6 for supporting the nursery stock can be adopted, the support frame 6 with an adjusting ring 7 at the upper part can be optimized, the adjusting ring 7 can ensure the integral stability, and the regular tightness can be realized to avoid the tightening marks on the nursery stock. The prior art support frame 6 is not described in detail, and the following description focuses on the innovative points of the present invention.
The invention has the innovation points that the support frame 6 is fixedly connected with a support frame 5 downwards, the support frame 5 is fixedly connected with a structural layer panel 4 downwards, the structural layer panel 4 is fixedly connected with a soil ball control frame 3 downwards, and the central position of the bottom surface of the soil ball control frame 3 is fixedly connected with the positioning pile 1 downwards.
Above-mentioned structural layer panel 4 imbeds road structure layer all around, guarantees the stability of the vertical edge stone foundation who lays in later stage, owing to be overall structure, has also avoided setting up the later stage subsides after stone is laid.
The soil ball control frame 3 is used for placing the nursery stock soil balls 19, the soil ball control frame 3 goes deep into the road structure layer, the soil ball control frame 3 ensures a backfilling space, and the survival space of nursery stock root systems is enlarged and ensured.
The soil ball control frame 3 is fixed with the hydroelectric embedded pipe 10 in a preset mode, the preset hydroelectric embedded pipe 10 corresponds to the later-stage road side-form hydroelectric embedded pipe, secondary construction of hydroelectric access in a tree pool area for creating a better landscape hydroelectric effect is avoided, and a preset access channel is provided for later tree hydroelectric installation.
The central point 2 is arranged on the upper surface of the positioning pile 1, the central point 2 is a positioning point, the planting position and the elevation of the nursery stock are determined through GPS dotting positioning, and the central point 2 is positioned on the GPS dotting position during placement, so that the pre-control of the planting position and the elevation of the nursery stock is realized, the uniqueness is realized, and the planting quality is ensured. The lower end of the positioning pile 1 is in a sharp cone shape, so that the positioning pile is convenient to drive into a soil body.
And water and fertilizer infiltration pipes 8 are arranged at four corners inside the soil ball control frame 3, and the water and fertilizer infiltration pipes 8 are infiltration pipes with holes on the side surfaces. The liquid manure infiltration pipe 8 is also connected with a plurality of capillary infiltration pipes 9 from top to bottom, the capillary infiltration pipes 9 face the direction of the soil ball 19, and the surface of the capillary infiltration pipes 9 is densely distributed with infiltration holes. The upper end of the water and fertilizer infiltration pipe 8 is inserted into a round hole 18 above, and the round hole 18 is a round hole 18 formed on the structural layer panel 4.
The round hole 18 is connected with the pressure water replenishing device 11 upwards, and the cylinder body of the pressure water replenishing device 11 is inserted into the water and fertilizer infiltration pipe 8. The pressure water replenisher 11 is used for inputting liquid such as water, fertilizer, liquid medicine and the like into the water and fertilizer infiltration pipe 8 and the capillary infiltration pipe 9 under pressure, and the input liquid can rapidly and uniformly infiltrate into the root of the nursery stock.
The pressure water replenishing device 11 comprises a piston handle 12, an air inlet 20 is arranged at the upper end of a cylinder body of the pressure water replenishing device 11, a one-way air valve 13 is arranged in the middle of the cylinder body, and a one-way water outlet valve 14 is arranged at the bottom of the cylinder body. The pressure water supply device 11 has a working principle similar to that of an inflator, liquid to be input into the root of the nursery stock is filled through the water-fertilizer infiltration pipe 8, and then high-pressure gas is input into the water-fertilizer infiltration pipe 8 through compressed air of the pressure water supply device 11, so that the liquid can be rapidly and uniformly diffused in the water-fertilizer infiltration pipe 8 and the capillary infiltration pipe 9. When the piston handle 12 is pulled upwards, the one-way air valve 13 is opened, air enters the cylinder of the pressure water replenisher 11 from the air inlet 20, the piston handle 12 presses down the compressed air, the one-way air valve 13 is closed, the compressed air forms high-pressure airflow and is sent into the water and fertilizer infiltration pipe 8, and the high-pressure airflow pushes liquid filled in the water and fertilizer infiltration pipe 8 to rapidly flow and infiltrate.
In order to conveniently fill liquid into the liquid manure infiltration pipe 8, the liquid manure infiltration pipe 8 is preferably filled with liquid through a liquid manure pressure tank 17. The bottom of the pressure water compensator 11 is provided with a one-way water outlet valve 14, the side surface of the lower part of the pressure water compensator 11 is provided with an external connecting pipe, the pipe orifice of the external connecting pipe is provided with a one-way water inlet valve 16, and the one-way water inlet valve 16 is connected with a water fertilizer pressure tank 17 through a pipe. The liquid fertilizer pressure tank 17 directly inputs the liquid into the liquid fertilizer permeation tube 8 through the one-way water inlet valve 16, the external connection tube and the one-way water outlet valve 14 under certain pressure, and can further carry out pressurization conveying through the piston handle 12 if necessary.
The construction method of the sidewalk tree pool presetting integrated device comprises the following steps:
firstly, determining coordinates through GPS dotting, inserting the positioning pile 1 into the ground, enabling a central point 2 of the positioning pile 1 to be located at the GPS dotting position, and determining the planting position and height of the nursery stock.
And (II) after the positioning pile 1 is well driven, the positioning pile 1 is upwards fixedly connected with a soil ball control frame 3.
And (III) filling soil into the soil ball control frame 3 to place the seedling soil balls 19.
And (IV) the soil ball control frame 3 is upwards connected with the structural layer panel 4, and the structural layer panel 4 is connected with the peripheral road structural layer.
And (V) the structural layer panel 4 is upwards fixedly connected with a supporting frame 5, and a supporting frame 6 is fixedly connected on the supporting frame 5, so that the planting stability and firmness of the upper part of the nursery stock are ensured. Adjust adjustable ring 7 for accord with nursery stock tree footpath size, later stage in the nursery stock growth process, can regularly adjust adjustable ring 7, in order to avoid nursery stock to grow up adjustable ring 7 and cause the strangling mark to the nursery stock.
And (VI) when water, fertilizer, liquid medicine, rooting powder and other liquid need to be supplemented to the nursery stock, the liquid can be firstly filled into the water and fertilizer infiltration pipe 8 through the round hole 18, then the cylinder body of the pressure water replenisher 11 is inserted into the water and fertilizer infiltration pipe 8, the piston handle 12 is pulled up and down to apply pressure to the water and fertilizer infiltration pipe 8, and the liquid is uniformly and quickly conveyed to the root of the nursery stock through the water and fertilizer infiltration pipe 8 and the capillary infiltration pipe 9. Or the liquid manure pressure tank 17 is connected with a one-way water inlet valve 16 of the pressure water supply device 11 through a pipe, and liquid is pressurized and conveyed into the liquid manure seepage pipe 8 through the liquid manure pressure tank 17. In order to facilitate faster liquid conveying, the pressure water replenishing device 11 and the water and fertilizer pressure tank 17 can be used for pressurizing together to convey liquid.
And (seventhly), if the hydropower access is needed in the later stage, the hydropower embedded pipe 10 is directly connected with the hydropower embedded pipe in the road side mold.
The above-described embodiment is only one of the preferred embodiments of the present invention, and general changes and substitutions by those skilled in the art within the technical scope of the present invention are included in the protection scope of the present invention.

Claims (4)

1. The utility model provides a integrative device is predetermine to people moving walkways tree pool, includes support frame (6), support frame (6) bottom is fixed on braced frame (5), its characterized in that: the bottom surface of the supporting frame (5) is fixedly connected with a structural layer panel (4), the structural layer panel (4) is connected with a peripheral road structural layer, the structural layer panel (4) is downwards fixedly connected with a soil ball control frame (3), the center of the bottom of the soil ball control frame (3) is fixedly connected with a positioning pile (1), and the soil ball control frame (3) is fixedly connected with a hydroelectric pre-buried pipe (10); the upper surface of the positioning pile (1) is provided with a central point (2), and the lower end of the positioning pile (1) is in a sharp cone shape; four corners of the structural layer panel (4) are respectively provided with a round hole (18), the round holes (18) are downwards connected with a water and fertilizer infiltration pipe (8), the side surface of the water and fertilizer infiltration pipe (8) is connected with a plurality of capillary infiltration pipes (9) from top to bottom towards the inner direction of the soil ball control frame (3), and the water and fertilizer infiltration pipes (8) and the capillary infiltration pipes (9) are both positioned in the soil ball control frame (3); the circular hole (18) is upwards connected with a pressure water replenishing device (11), and a cylinder body of the pressure water replenishing device (11) is inserted into the water and fertilizer seepage pipe (8); the pressure water replenishing device (11) comprises a piston handle (12), and a one-way air valve (13) is arranged in the middle of a cylinder body of the pressure water replenishing device (11).
2. The sidewalk tree pool preset integrated device as claimed in claim 1, wherein: the side surface of the lower part of the pressure water supply device (11) is provided with an external pipe, the pipe orifice of the external pipe is provided with a one-way water inlet valve (16), and the one-way water inlet valve (16) is connected with a water fertilizer pressure tank (17) through a pipe; the bottom of the cylinder body of the pressure water replenishing device (11) is provided with a one-way water outlet valve (14).
3. The sidewalk tree pool preset integrated device as claimed in claim 1, wherein: the upper part of the supporting frame (6) is provided with an adjusting ring (7).
4. A construction method of a sidewalk tree pool pre-setting integrated device comprises the following steps:
after coordinates are determined through GPS dotting, inserting a positioning pile (1) into the ground, and enabling a central point (2) of the positioning pile (1) to be located at the GPS dotting position;
(II) the positioning pile (1) is upwards fixedly connected with a soil ball control frame (3);
thirdly, filling soil into the soil ball control frame (3) and placing nursery stock soil balls (19);
(IV) native ball control frame (3) connection structure layer panel (4) that makes progress is connected structure layer panel (4) and peripheral road structure layer:
(V) the structural layer panel (4) is upwards fixedly connected with a supporting frame (5), and a supporting frame (6) is fixedly connected on the supporting frame (5):
if liquid needs to be supplemented to the nursery stock, the liquid is firstly filled into the water and fertilizer infiltration pipe (8) through the round hole (18), then the cylinder body of the pressure water replenisher (11) is inserted into the water and fertilizer infiltration pipe (8), the piston handle (12) is pulled up and down to apply pressure to the water and fertilizer infiltration pipe (8), and the liquid is conveyed to the root of the nursery stock; or the water-fertilizer pressure tank (17) is connected with a one-way water inlet valve (16) of the pressure water supply device (11) through a pipe, and liquid is pressurized and conveyed into the water-fertilizer infiltration pipe (8) through the water-fertilizer pressure tank (17);
and (seventhly), if water and electricity are required to be accessed, the water and electricity embedded pipe (10) is connected with the water and electricity embedded pipe in the road side mold.
CN202110735939.2A 2021-06-30 2021-06-30 Sidewalk tree pool pre-setting integrated device and construction method Active CN113545213B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110735939.2A CN113545213B (en) 2021-06-30 2021-06-30 Sidewalk tree pool pre-setting integrated device and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110735939.2A CN113545213B (en) 2021-06-30 2021-06-30 Sidewalk tree pool pre-setting integrated device and construction method

Publications (2)

Publication Number Publication Date
CN113545213A CN113545213A (en) 2021-10-26
CN113545213B true CN113545213B (en) 2022-10-28

Family

ID=78131129

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110735939.2A Active CN113545213B (en) 2021-06-30 2021-06-30 Sidewalk tree pool pre-setting integrated device and construction method

Country Status (1)

Country Link
CN (1) CN113545213B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB9804700D0 (en) * 1997-03-07 1998-04-29 Toho Leo Kabushiki Kaisha Method of providing support to tree,as well as tree base support member and root ball retainer for use in the method
US6112455A (en) * 1996-03-18 2000-09-05 Toho Leo Kabushiki Kaisha Support member for supporting base of tree for use in operation for supporting tree and method of supporting tree by using said support member
KR101298352B1 (en) * 2013-03-05 2013-08-20 최인웅 A tree transplanting device
CN205727371U (en) * 2016-04-27 2016-11-30 广州市珧凯园林设计有限公司 Trees fender pile and tree stabilizing system
CN106818164A (en) * 2017-01-19 2017-06-13 北京乾景园林股份有限公司 A kind of salt-soda soil arbor implantation methods
CN109729904A (en) * 2019-03-11 2019-05-10 山东海岱园林集团有限公司 A kind of method and device for planting landscape trees in pond
CN209787968U (en) * 2019-04-10 2019-12-17 南京林业大学 Ecological tree pond of sponge city pavement
CN111466274A (en) * 2020-05-12 2020-07-31 创景园林建设有限公司 Greening tree transplanting structure and transplanting method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6112455A (en) * 1996-03-18 2000-09-05 Toho Leo Kabushiki Kaisha Support member for supporting base of tree for use in operation for supporting tree and method of supporting tree by using said support member
GB9804700D0 (en) * 1997-03-07 1998-04-29 Toho Leo Kabushiki Kaisha Method of providing support to tree,as well as tree base support member and root ball retainer for use in the method
KR101298352B1 (en) * 2013-03-05 2013-08-20 최인웅 A tree transplanting device
CN205727371U (en) * 2016-04-27 2016-11-30 广州市珧凯园林设计有限公司 Trees fender pile and tree stabilizing system
CN106818164A (en) * 2017-01-19 2017-06-13 北京乾景园林股份有限公司 A kind of salt-soda soil arbor implantation methods
CN109729904A (en) * 2019-03-11 2019-05-10 山东海岱园林集团有限公司 A kind of method and device for planting landscape trees in pond
CN209787968U (en) * 2019-04-10 2019-12-17 南京林业大学 Ecological tree pond of sponge city pavement
CN111466274A (en) * 2020-05-12 2020-07-31 创景园林建设有限公司 Greening tree transplanting structure and transplanting method

Also Published As

Publication number Publication date
CN113545213A (en) 2021-10-26

Similar Documents

Publication Publication Date Title
CN104652360B (en) Vegetation bag ecological slope protection construction method and vegetation bag rainwater treatment system
CN110984189A (en) Slope ecological restoration system and method
CN103650838B (en) A kind of husky training cold-season type lawn implantation methods
CN109113129A (en) A kind of construction method of irrigation and drainage system and canal for water conveyance
CN111631060A (en) Construction method of large-diameter-at-breast arbor in non-planting season in rainwater-dense area
CN103650837A (en) Sand culture cool season type layered lawn
CN113545213B (en) Sidewalk tree pool pre-setting integrated device and construction method
CN106717413A (en) A kind of sponge urban afforestation irrigation system and its construction method
CN100435616C (en) Re-greening technology of high gradient slope in stone pit
CN105507344B (en) A kind of automatic water collecting supplies water ecological retaining wall and implementation
CN211721298U (en) Laying structure of soil is planted to city green space pavement tree
CN210315936U (en) Expandable water storage system for field irrigation
CN210168641U (en) Full-automatic efficient irrigation device
CN209179019U (en) A kind of foundation pit enclosure structure
CN114145188A (en) Construction method for transforming common green land into natural lawn football field
CN207011349U (en) A kind of blueberry is taken shelter from rain, irrigates integrated canopy body structure
CN102518113B (en) Ecological desert control method
CN109983969A (en) Mine high and steep slope recovery treatment blocking-discharging-storing-irrigation pipe maintenance system and pipe maintenance method thereof
CN114382054B (en) Hydraulic engineering ecological environment-friendly slope protection structure, slope protection system and construction method
CN219679313U (en) Greening device for steep side slope
CN110432121A (en) A kind of stable hydraulic pressure irrigation system of water storage
CN213756099U (en) Gardens microrelief afforestation irrigation system
CN204560396U (en) A kind of outdoor stereo greening apparatus
CN216586596U (en) Rock wool hole type stone slope greening device
CN214628404U (en) Afforestation cultivation device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant