CN113494292B - High and large point column in-situ collapse recovery method - Google Patents

High and large point column in-situ collapse recovery method Download PDF

Info

Publication number
CN113494292B
CN113494292B CN202110843524.7A CN202110843524A CN113494292B CN 113494292 B CN113494292 B CN 113494292B CN 202110843524 A CN202110843524 A CN 202110843524A CN 113494292 B CN113494292 B CN 113494292B
Authority
CN
China
Prior art keywords
filling
ore
point column
ore removal
point
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110843524.7A
Other languages
Chinese (zh)
Other versions
CN113494292A (en
Inventor
孙健
曹港
欧任泽
林卫星
周礼
朱晨迪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha Institute of Mining Research Co Ltd
Original Assignee
Changsha Institute of Mining Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changsha Institute of Mining Research Co Ltd filed Critical Changsha Institute of Mining Research Co Ltd
Priority to CN202110843524.7A priority Critical patent/CN113494292B/en
Publication of CN113494292A publication Critical patent/CN113494292A/en
Application granted granted Critical
Publication of CN113494292B publication Critical patent/CN113494292B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/22Methods of underground mining; Layouts therefor for ores, e.g. mining placers
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F1/00Ventilation of mines or tunnels; Distribution of ventilating currents
    • E21F1/006Ventilation at the working face of galleries or tunnels
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F13/00Transport specially adapted to underground conditions
    • E21F13/06Transport of mined material at or adjacent to the working face
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D3/00Particular applications of blasting techniques

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Remote Sensing (AREA)
  • Mechanical Engineering (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

The invention discloses an in-situ collapsing and extracting method for a high and large point column. Filling a goaf twice, reserving an empty roof space when the goaf is filled for the first time, and constructing a filling retaining wall on a first filling body before the second filling is connected with the roof to form a personnel and equipment access passage; after the filling body reaches the design strength, a roof cutting space is formed at the upper part of the point column, a panel transportation lane, an ore removal approach and a cutting raise are constructed in the bottom plate rock mass, then a downward parallel medium-length hole blast hole is constructed around the cutting raise in the roof cutting space, the cutting raise is used as a free surface, millisecond differential blasting is adopted for ore caving, an ore removal funnel is formed at the bottom while ore is caving, the caving ore falls into the ore removal approach from the ore removal funnel, a scraper conveyor is adopted to cooperate with a mining truck for ore removal, and after the point column stoping is finished, the goaf is sealed or subjected to subsequent filling treatment. The method has high safety, low engineering construction difficulty, low cost, high extraction efficiency and high ore pillar recovery rate.

Description

High and large point column in-situ collapse recovery method
Technical Field
The invention relates to the technical field of underground metal mine mining, in particular to an in-situ collapsing and stoping method for high and large point pillar ore bodies in mines mined by a comprehensive method and a room-pillar method.
Background
Mines mined by a comprehensive method and a room-pillar method usually leave a large number of pillar-point ore bodies for controlling ground pressure and ensuring operation safety, most pillar-point ore bodies have higher grade and higher economic value, and if the pillar-point ore bodies are reserved for a long time, resource waste is caused. The extraction of the point column has great technical and economic difficulty, and the current point column extraction technology mainly comprises the following steps: the method comprises a pillar cutting method, an extraction method, a concrete pillar replacement method, a full filling subsequent stoping method, a bagged filling body surrounding dead zone mining pillar method and an artificial false roadway partitioned filling stoping method. The recovery rate of the stope is low by adopting a pillar cutting method and an extraction method, and personnel and equipment enter the dead zone for operation, so that the safety is poor, and the recovery adaptability to high and large point pillars is poor; the concrete pillar replacement method firstly needs to construct an artificial concrete pillar, and then carries out the stoping of the pillar, the construction efficiency of the artificial concrete pillar is low, the cost is high, and personnel and equipment need to enter the dead zone operation; the artificial false roadway partition filling stoping method firstly builds the artificial false roadway in the goaf, fills the goaf and then carries out stoping of ore pillars. The method is applied in practice, but the recovery of the high-point pillar ore body has the problems of high safety risk, low efficiency, high cost and the like.
Disclosure of Invention
In order to solve the technical problems, the invention provides an in-situ collapsing and extracting method for a high and large point column, which comprises the following steps:
step 1, dividing the point columns into panels according to mine production capacity, filling capacity, mining cycle, point column occurrence characteristics and project status, organizing mining operation according to the panels, and planning mining sequence among the point columns in the panels according to a backward mining mode;
step 2, according to the divided panel areas, blocking the entrances and exits on the periphery of the stoping panel area and filling the empty area for the first time, wherein the empty space is reserved according to the first filling requirement, and the height of the empty space needs to meet the normal operation requirements of personnel and mining equipment;
step 3, after the strength of the filling body filled for the first time reaches a design index, danger is eliminated on a top plate of the empty-top space, personnel and equipment access routes are set in the panel area according to a planned stoping sequence, then filling retaining walls are erected on boundaries on two sides of the personnel and equipment access routes, the empty area is filled for the second time and is connected with the top, and a space reserved on the inner side of each retaining wall forms a personnel and equipment access channel;
step 4, after the strength of the filling body filled for the second time reaches the design index, performing topping on the upper part of the point column to be stoped to form a topping space;
step 5, constructing panel transportation lanes in panel bottom plate rock masses, and constructing ore removal access roads through the panel transportation lanes, wherein the ore removal access roads reach the bottom plate positions corresponding to the centers of all the points;
step 6, constructing a cut patio run-through ore removal access at the bottom and a roof cutting space at the upper part at the center of the point pillar to form a stope ventilation loop;
7, constructing downward parallel medium-length hole blast holes around the cutting raise in the top cutting space, taking the cutting raise as a free surface, and blasting once or repeatedly by millisecond differential to form an ore discharge funnel at the bottom while caving ore;
step 8, falling the collapsed ore into an ore removal route from an ore removal funnel, and removing the ore by adopting a scraper conveyor in combination with a mining truck;
and 9, adopting a retreating type sequence to carry out stoping on the point columns in the panel area, and sealing or filling the goaf after stoping of all the point columns in the panel area is finished.
Preferably, when the empty area is filled for the first time, the height of the empty space is ensured to be 3-4 m; and when the empty area is filled for the second time, the top contact of filling is ensured.
Preferably, the first filling and the second filling require that the uniaxial compressive strength of the filling body is more than or equal to 1.0MPa in 28 days.
Further, the width of the personnel and equipment access passage is determined by combining personnel and equipment access and ventilation requirements.
Furthermore, during the top cutting operation in the step 4, a bar column or a point column is reserved for supporting the top plate, and the top plate is supported by adopting a gunite, an anchor rod and a hanging net, so that the operation safety of personnel is ensured.
Further, the arrangement depth of the panel transportation lane and the ore removal route in the bottom plate rock body in the step 5 is determined according to the form of the stoping point column and the design lean loss index.
Further, with the cutting raise as a center, the depth of the blast holes of the downward parallel medium-length holes in the step 7 is reduced row by row, and the specific depth of each downward parallel medium-length hole is determined according to the inclined plane inclination angle of the ore removal funnel and the natural repose angle of the ore.
Advantageous effects
Compared with the prior art and the method, the in-situ collapsing and extracting method for the high and large point column provided by the invention has the following beneficial effects:
(1) the recovery operation is safe. The goaf is completely filled and connected with the roof except for the personnel equipment access passage, so that the ground pressure activity caused by stoping of ore pillars is reduced; the panel transport lane and the ore removal route are positioned below the bottom plate of the ore pillar, so that the danger of ore removal of personnel and equipment in the dead zone is avoided; and strip columns or point columns are reserved on the cut top to support a top plate, and are supported in other modes such as spray anchoring and the like, when the raise is cut in the ore pillar, a raise drilling machine can be used for construction, and the safety in construction operation is greatly improved.
(2) The engineering construction difficulty is lower, and the recovery efficiency is high. The personnel and equipment access passage between the pillars is constructed by a filling retaining wall (the height is 3-4 m); the panel transport lane and the ore removal route are positioned below the bottom plate and covered with a filling body, and no dead zone influence exists in the construction process; the medium-length hole blasting takes the cutting raise as a free surface, a corresponding funnel ore removal structure is formed according to the hole depth, the stoping blasting process is easy to control, and the stoping efficiency is high.
(3) The ore recovery rate is high. The recovery rate index can reach more than 85 percent, the loss and waste of ore pillars are reduced, and the comprehensive cost of the stoping is low.
Drawings
The present invention will be described in further detail with reference to the accompanying drawings.
FIG. 1 is a front view of a typical scheme of the in-situ collapsing extraction method for a high and large point column of the present invention;
FIG. 2 is a schematic sectional view taken along line B-B in FIG. 1;
FIG. 3 is a schematic cross-sectional view taken along line C-C of FIG. 1;
FIG. 4 is a schematic cross-sectional view taken along line D-D of FIG. 1;
in the figure: 1-point column; 2-a filling body; 3-roof rock mass; 4-a baseplate rock mass; 5-cutting the raise; 6-downward parallel medium-length holes; 7-ore removal and access; 8-a bar; 9-anchor rod; 10-filling the retaining wall; 11-personnel equipment access.
Detailed Description
The technical solutions of the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings, and it is to be understood that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments; all other embodiments, which can be derived by a person skilled in the art from the embodiments of the present invention without any inventive step, are within the scope of the present invention.
As shown in fig. 1-4, the in-situ collapsing extraction method for the high and large point column provided by the invention comprises the following steps:
step 1, dividing the point columns into panels according to mine production capacity, filling capacity, mining cycle, point column occurrence characteristics and project status, organizing mining operation according to the panels, and planning mining sequence among the point columns 1 in the panels according to a backward mining mode;
and 2, according to the divided panel areas, blocking the entrances and exits on the periphery of the panel area to be stoped and filling the empty area for the first time, wherein the first filling requirement is not top contact, an upper empty top space is reserved, the height of the empty top space needs to meet the requirement of normal operation height of personnel and mining equipment, and preferably, the empty top height of the empty area is 3-4 m.
And 3, the 28-day uniaxial compressive strength of the filling body 2 required by the first filling is more than or equal to 1.0 MPa. After the strength of the filling body 2 filled for the first time reaches a design index, the top plate of the empty-top space is subjected to danger elimination, personnel equipment access routes and the width thereof are set in the panel area according to a planned stoping sequence, then filling retaining walls 10 are erected on the boundaries at the two sides of the personnel equipment access routes, the empty area is subjected to second filling and top connection, a space reserved on the inner sides of the retaining walls forms a personnel equipment access passage 11, and the width of the personnel equipment access passage 11 is determined by combining personnel and equipment access and ventilation requirements.
And 4, the 28-day uniaxial compressive strength of the filling body 2 required by the second filling is more than or equal to 1.0MPa, and after the strength of the filling body 2 of the second filling reaches a design index, the top cutting is carried out on the upper part of the point column 1 to be mined, so that a top cutting space is formed. When cutting the top, a bar column 8 or a point column is reserved for supporting the top plate, and the top plate is supported by adopting gunite, an anchor rod 9 and a hanging net so as to ensure the operation safety of personnel.
And 5, constructing a panel transportation lane in the panel bottom plate rock mass, and constructing a ore removal route 7 through the panel transportation lane, wherein the ore removal route 7 reaches the bottom plate position corresponding to the center of each point column 1. The arrangement depth of the panel transport lane and the ore removal route 7 in the bottom plate rock mass is determined according to the form and the design lean loss index of the stoping point column 1.
Step 6, constructing a cutting raise 5 at the corresponding position of the center of the point column 1, wherein the cutting raise penetrates through a mine removal access 7 at the bottom and a roof cutting space at the upper part to form a ventilation loop of a stope;
and 7, constructing downward parallel medium-length holes 6 around the cutting raise 5 in the top cutting space, taking the cutting raise 5 as a center, reducing the blast hole depth of the downward parallel medium-length holes 6 backward row by row, and determining the specific depth of each downward parallel medium-length hole 6 according to the inclined plane inclination angle of the ore removal funnel and the natural ore repose angle. And (3) taking the cutting raise 5 as a free surface, adopting millisecond differential blasting once or for times, and forming an ore removal funnel at the bottom while ore is collapsed.
Step 8, falling the collapsed ore into an ore removal route 7 through an ore removal funnel, and removing the ore by adopting a scraper conveyor in combination with a mining truck;
and 9, adopting a backward type sequence to perform stoping on the point pillars 1 in the panel area, and sealing or filling the goaf after stoping of all the point pillars 1 in the panel area is finished.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and the technical solutions and the inventive concepts thereof according to the present invention should be equivalent or changed within the scope of the present invention.

Claims (7)

1. A high and large point column in-situ collapsing and extracting method is characterized by comprising the following steps:
step 1, dividing the point columns into panels according to mine production capacity, filling capacity, mining cycle, point column occurrence characteristics and project status, organizing mining operation according to the panels, and planning mining sequence among the point columns according to backward mining in the panels;
step 2, according to the divided panel areas, blocking the entrances and exits on the periphery of the panel areas and filling the empty areas for the first time, wherein empty top spaces are reserved according to the first filling requirement, and the height of the empty top spaces needs to meet the normal operation requirements of personnel and mining equipment;
step 3, after the strength of the filling body filled for the first time reaches a design index, danger is eliminated for a top plate of the empty-top space, personnel and equipment access routes are set in the panel area according to a planned stoping sequence, then filling retaining walls are erected on boundaries on two sides of the personnel and equipment access routes, the empty area is filled for the second time and is connected with the top, and a space reserved on the inner sides of the retaining walls forms personnel and equipment access channels;
step 4, after the strength of the filling body filled for the second time reaches the design index, performing topping on the upper part of the point column to be stoped to form a topping space;
step 5, constructing panel transportation lanes in panel bottom plate rock masses, and constructing ore removal access roads through the panel transportation lanes, wherein the ore removal access roads reach the bottom plate positions corresponding to the centers of all the points;
step 6, constructing a cut patio ore removal access path penetrating through the bottom and a roof cutting space at the upper part at the corresponding position of the center of the point pillar to form a stope ventilation loop;
7, constructing downward parallel medium-length holes around the cutting raise in the top cutting space, taking the cutting raise as a free surface, and blasting once or repeatedly by millisecond differential blasting to form an ore removal funnel at the bottom while caving ore;
step 8, falling the collapsed ore into an ore removal route from an ore removal funnel, and removing the ore by adopting a scraper conveyor in combination with a mining truck;
and 9, adopting a retreating type sequence to carry out stoping on the point columns in the panel area, and sealing or filling the goaf after stoping of all the point columns in the panel area is finished.
2. The method for in-situ collapsing and extracting the high and large point column according to claim 1, wherein: when the empty area is filled for the first time, the height of the empty space is ensured to be 3-4 m; and when the empty area is filled for the second time, the top contact of filling is ensured.
3. The high-large-point column in-situ collapsing extraction method according to claim 1, wherein: the first filling and the second filling require that the uniaxial compressive strength of the filling body is more than or equal to 1.0MPa in 28 days.
4. The high-large-point column in-situ collapsing extraction method according to claim 1, wherein: the width of the personnel and equipment access passage is determined by combining personnel and equipment access and ventilation requirements.
5. The high-large-point column in-situ collapsing extraction method according to claim 1, wherein: and (4) during top cutting operation in the step (4), reserving a bar column or a point column for supporting the top plate, and supporting the top plate by adopting a guniting method, an anchor rod and a hanging net so as to ensure the operation safety of personnel.
6. The high-large-point column in-situ collapsing extraction method according to claim 1, wherein: and 5, determining the arrangement depth of the panel transport lane and the ore removal route in the bottom plate rock mass according to the form and grade index of the stoping point column.
7. The high-large-point column in-situ collapsing extraction method according to claim 1, wherein: and (4) taking the cutting raise as a center, reducing the depth of blast holes of the downward parallel medium-length holes in the step (7) backward row by row, and determining the specific depth of each downward parallel medium-length hole according to the inclined plane inclination angle of the ore removal funnel and the natural ore repose angle.
CN202110843524.7A 2021-07-26 2021-07-26 High and large point column in-situ collapse recovery method Active CN113494292B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110843524.7A CN113494292B (en) 2021-07-26 2021-07-26 High and large point column in-situ collapse recovery method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110843524.7A CN113494292B (en) 2021-07-26 2021-07-26 High and large point column in-situ collapse recovery method

Publications (2)

Publication Number Publication Date
CN113494292A CN113494292A (en) 2021-10-12
CN113494292B true CN113494292B (en) 2022-07-05

Family

ID=77996319

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110843524.7A Active CN113494292B (en) 2021-07-26 2021-07-26 High and large point column in-situ collapse recovery method

Country Status (1)

Country Link
CN (1) CN113494292B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114086959B (en) * 2021-11-16 2024-08-16 铜陵有色金属集团股份有限公司 Large-diameter high-neck funnel bottom structure, construction method and stoping method
CN114856693B (en) * 2022-04-19 2023-03-21 中南大学 Filling and extracting method for point column ore body

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100441831C (en) * 2003-12-11 2008-12-10 云南驰宏锌锗股份有限公司 Ladder type mining method using united pillars to support roof and partition stope
CN105332733A (en) * 2015-09-25 2016-02-17 山东科技大学 Strip filling method of conventional mining face goaf pumping cementing materials
CN107178366B (en) * 2017-07-28 2019-11-05 长沙矿山研究院有限责任公司 A kind of stoping method of column ore body
CN108547618A (en) * 2018-04-04 2018-09-18 长沙有色冶金设计研究院有限公司 A kind of two steps mining methods leave the recovery process of studding
CN112267885A (en) * 2020-11-16 2021-01-26 中国铝业股份有限公司 Mining method for two-step strip-cutting stoping subsequent barren rock cemented filling

Also Published As

Publication number Publication date
CN113494292A (en) 2021-10-12

Similar Documents

Publication Publication Date Title
CN108661646B (en) False roof pillar type shrinkage and post filling mining method
CN110259451B (en) Pre-control roof efficient mining method for gently inclined medium-thickness ore body
CN113494292B (en) High and large point column in-situ collapse recovery method
CN110331978B (en) Environment reconstruction segmented medium-length hole subsequent filling mining method
CN104806244A (en) Filling mining method for slant middle-thick ore body
CN110043263B (en) Zone pre-control roof-based medium-deep hole reinforcement mining method for gently-inclined broken ore deposit
CN104895566A (en) Mining method with residual ore recovery function
CN112682041B (en) Filling mining method for broken and slowly-inclined thick and large ore body of upper disc
CN109026005B (en) Comprehensive mechanized ore-breaking layered caving mining method
CN112177612B (en) Downward high-layering cemented filling mining method
CN111456729A (en) Mining method of steeply inclined thin ore body
CN111594170B (en) Method for stoping residual ore body on top and bottom plates of gently inclined ore body
CN111894591A (en) Collaborative mining method for inclined thick and large ore body panel and panel interval column
CN110219650B (en) Deep hole subsequent filling mining method in environment reconstruction stage
CN113356851B (en) Continuous downward medium-length hole segmented open stoping subsequent filling mining method for medium-thickness ore body
CN113847029B (en) Surrounding column extraction method for underground mine high and large point column
CN113482611B (en) Mining method for alternately ascending continuous mining thick and large broken ore bodies
CN111894667B (en) Upward double-layered drift filling mining method for recoverable support shield of broken ore body
CN103982185B (en) Upright opening and lateral aperture work in coordination with the mechanization sublevel cut and fill method of back production
CN115163074A (en) Method for recovering top pillars and studs in sill-pillar-free shallow hole shrinkage and subsequent filling mining method
CN115288684A (en) Downward segmented filling mining method suitable for thick, large and broken ore bodies
CN110905510B (en) Strip and block stoping method for horizontal ore pillar of metal ore body
CN114562266A (en) Panel type cutting roadway two-step segmented open stope subsequent filling mining method
CN113914863A (en) Mechanical mining method of near-horizontal thin ore body intelligent heading machine
CN113187481A (en) Filling mining method for overburden rock concentrated grouting caving stoping

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant