CN113481944A - Dam surface hole connection girder supporting structure and construction method - Google Patents
Dam surface hole connection girder supporting structure and construction method Download PDFInfo
- Publication number
- CN113481944A CN113481944A CN202110846015.XA CN202110846015A CN113481944A CN 113481944 A CN113481944 A CN 113481944A CN 202110846015 A CN202110846015 A CN 202110846015A CN 113481944 A CN113481944 A CN 113481944A
- Authority
- CN
- China
- Prior art keywords
- precast concrete
- concrete beams
- beams
- construction
- pouring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B7/00—Barrages or weirs; Layout, construction, methods of, or devices for, making same
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
- E02D15/02—Handling of bulk concrete specially for foundation or hydraulic engineering purposes
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Mechanical Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The invention discloses a dam surface hole connection girder supporting structure and a construction method, wherein a plurality of parallel precast concrete beams are arranged between the top sides of every two adjacent surface hole gate piers, and a groove formed by combining every two adjacent precast concrete beams is used for pouring concrete; compared with the original method that a bottom template is erected at the top of the surface hole gate pier to form a bottom supporting structure by pouring, the method has the advantages that a plurality of prefabricated concrete beams are directly hoisted to be assembled into a plurality of grooves, concrete is directly poured into the grooves, a whole flat plate supporting structure is formed after forming, the steps of template presetting and dismantling are completely omitted, the prefabrication process of the prefabricated concrete beams can be completely and directly carried out on the ground in advance, the time is greatly shortened, the pouring construction process of subsequent connection of girders can be accelerated, the construction efficiency of the surface hole connection girders is improved, and the construction potential safety hazard is reduced.
Description
Technical Field
The invention relates to the technical field of dam concrete construction of hydroelectric engineering, in particular to a dam surface hole connection girder supporting structure and a construction method.
Background
The dam in the hydroelectric junction project is the most important water retaining building, and the concrete dam is generally provided with a certain number of surface holes at the riverbed dam section so as to facilitate flood discharge in the flood season and ensure normal operation of the construction of the junction project. The surface hole structure of the dam is complex, the construction difficulty is large, the dam has the capacity of coping with flood control and flood fighting after the construction of the middle hole, so the construction progress is tense, the surface hole connecting crossbeam is the most critical link in the first line construction of the surface hole and is an arc door support-twisted stress structure, the construction quality requirement is high, the construction of the part occupies a straight construction period, the progress pressure is large, the construction part four faces the air, and the safety risk is high. The existing surface hole connecting girder needs to prefabricate a template in advance at the top of the surface hole gate pier before pouring construction, then a bottom die of the surface hole connecting girder is poured and formed, the template needs to be dismantled after the completion, and the girder is connected to the bottom die to pour the construction process.
Disclosure of Invention
The invention aims to overcome the defects and provides a dam surface hole connection girder supporting structure and a construction method, which can remove the steps of template presetting and dismantling in the construction of connecting a girder bottom formwork, improve the construction efficiency of the surface hole connection girder and reduce the potential safety hazard of construction.
In order to solve the technical problems, the invention adopts the technical scheme that: a dam surface hole connection girder supporting structure is characterized in that a plurality of parallel precast concrete beams are arranged between the top sides of every two adjacent surface hole gate piers, and a groove formed by combining every two adjacent precast concrete beams is used for pouring concrete.
Preferably, a bracket is arranged on the top side of the meter hole gate pier, and the end part of the precast concrete beam is erected on the upper surface of the bracket.
Preferably, the cross section of the precast concrete beam positioned at the inner side is of a T-shaped structure, and the cross section of the precast concrete beam positioned at the lateral side is of an L-shaped structure.
Preferably, geotextile is laid at the connecting position of every two adjacent precast concrete beams.
Preferably, the connecting position of every two adjacent precast concrete beams is a wedge-shaped structure.
Preferably, reinforcing bars are also pre-inserted between the upper sides of the end portions of the two precast concrete girders at each opposite side and tied to each other.
Preferably, the depth of the groove formed between every two adjacent precast concrete beams in combination is 1 to 1.5 m.
In addition, the invention also discloses a construction method of the dam surface hole connection girder supporting structure, which comprises the following steps:
step 1): planning the construction period of the precast concrete beam in advance, and determining the prefabrication quantity according to the length of the gate pier and the width index of the connecting girder;
step 2): arranging reinforcing steel bars inside the precast concrete beam, transversely extending the reinforcing steel bars out of the end part of the precast concrete beam for a certain distance, pre-burying lifting lugs in advance, and pouring concrete after the warehouse preparation is finished;
step 3): removing the formwork for a period of time after the precast concrete beam is poured, then roughening the surface into a rough surface by using a roughening gun, and maintaining for a period of time;
step 4): before the top of the surface hole gate pier is constructed to the position of the bracket, the position of the bracket is preset with steel bars and is reserved, and then the steel bars and the top of the surface hole gate pier are synchronously cast and molded;
step 5): carrying out hoisting work on the precast concrete beams, wherein the precast concrete beams with the T-shaped cross sections are distributed in the middle, and the precast concrete beams with the L-shaped cross sections are positioned on the sides;
step 6): two ends of each precast concrete beam are placed on the bracket on the top side of the surface hole gate pier, each precast concrete beam is placed in parallel side by side, after the hoisting is finished, old concrete on the surface is chiseled, and reinforcing steel bars extending out of the upper sides of the end parts of the two opposite precast concrete beams are bound together;
step 7): carrying out a concrete pouring process on a groove formed by combining a plurality of precast concrete beams, wherein the height of the poured concrete is the depth of the groove, and the poured concrete is an integrated flat plate supporting structure serving as a supporting bottom die for the subsequent connection girder pouring construction;
step 8): and after the integral construction is finished, the girder can be connected to the flat plate supporting structure formed in the step 7) for pouring.
Preferably, the following steps are further included between step 6) and step 7): and geotextile is laid at the connecting position of the bottoms of every two adjacent precast concrete beams to prevent the problem of slurry leakage when concrete is poured in the groove.
The invention has the beneficial effects that:
1. compare in originally erecting the die block board at table hole gate pier top and pouring and form bottom sprag structure, this patent is direct to form a plurality of recesses through the equipment of many precast concrete roof beams of hoist and mount, directly pour the concrete in to the recess, form a monoblock flat plate support structure after the shaping, the step that the template was preset and was demolishd has been removed completely in the middle of this, and precast concrete roof beam's prefabrication process can go on directly on ground in advance completely, the time has been shortened greatly, can accelerate the pouring work progress of follow-up connection girder, the table hole connection girder efficiency of construction has been improved, construction potential safety hazard has been reduced.
2. The invention can ensure that the dam can still ensure high-strength construction even after reaching the surface hole complex structure, form the surface hole connecting section as soon as possible, strive for more time for the installation of the support winch and the arc door, improve the construction efficiency and effectively shorten the construction period.
3. The precast beam is convenient to install, is free from being dismantled in the later period, greatly reduces the construction risk, has greater economic benefit, and powerfully ensures the safety of a construction site.
Drawings
FIG. 1 is a schematic structural view of a supporting structure of a dam surface hole connection girder;
FIG. 2 is an enlarged schematic view of the front side area of the dam face opening of FIG. 1;
FIG. 3 is a schematic view illustrating a structure in which a plurality of grooves are formed by combining a plurality of precast concrete beams;
fig. 4 is a schematic structural view of geotextiles laid between two adjacent precast concrete beams;
fig. 5 is a perspective view of a precast concrete beam located at an inner side;
fig. 6 is a perspective view illustrating a precast concrete beam located at one side;
fig. 7 is a perspective view illustrating a precast concrete beam located at the other side.
Detailed Description
The invention is described in further detail below with reference to the figures and specific embodiments.
As shown in fig. 1 to 7, in the supporting structure of the surface hole connection girder of the dam, a plurality of precast concrete beams 2 parallel to each other are arranged between the top sides of every two adjacent surface hole gate piers 1, and a groove formed by combining every two adjacent precast concrete beams 2 is used for pouring concrete.
Preferably, a bracket 3 is arranged on the top side of the meter hole gate pier 1, and the end part of the precast concrete beam 2 is erected on the upper surface of the bracket 3. In this embodiment, the reinforcing steel bars are also preset in advance in the corbel 3, and the corbel can be synchronously poured and molded with the top of the surface hole gate pier 1 after the warehouse preparation is completed.
Preferably, the cross section of the precast concrete beam 2 located at the inner side is a T-shaped structure, and the cross section of the precast concrete beam 2 located at the lateral side is an L-shaped structure. As shown in the figure, in the assembling process, a single precast concrete beam 2 in a T-shaped structure is in two half groove structures, and can quickly form a groove structure after being assembled with an adjacent precast concrete beam 2 in the T-shaped structure, and compared with a groove body structure in a U-shaped structure, grooves formed by the precast concrete beams 2 in the T-shaped structure share a common edge, so that materials are greatly saved; and the cross section of the precast concrete beam 2 positioned at the side is of an L-shaped structure, so that the side can be folded.
Preferably, geotextile 4 is laid at the connecting position of every two adjacent precast concrete beams 2. After the design like this, can prevent to take place the problem of leaking thick liquid when concreting in the recess.
Preferably, the connecting position of every two adjacent precast concrete beams 2 is a wedge structure. Can lead to the bottom of recess to form the triangle-shaped recess after the design like this, the contact of two precast concrete roof beams 2 is compared in the plane contact inseparabler like this, also can fill geotechnological cloth 4 in the triangle-shaped recess moreover to form the shutoff, avoid taking place the problem of leaking the thick liquid.
Preferably, the two precast concrete girders 2 on each opposite side are also pre-inserted with reinforcing bars 5 between the upper sides of the ends thereof and bound to each other. This enables the precast concrete girders 2 between the plurality of meter hole gate piers 1 to be connected to each other, preventing lateral movement from occurring.
Preferably, the depth of the groove formed between every two adjacent precast concrete girders 2 in combination is 1-1.5 m. In this embodiment, the depth of the groove formed by combining every two adjacent precast concrete beams 2 is 1.2m, and the pouring height is 1.2m when the groove formed by combining a plurality of precast concrete beams 2 is subjected to a concrete pouring process.
In addition, the invention also discloses a construction method of the dam surface hole connection girder supporting structure, which comprises the following steps:
step 1): the construction period of the precast concrete beam 2 is planned in advance, and the prefabrication quantity is determined according to the length of the gate pier and the width index of the connecting girder; in this embodiment, the construction period of the top bracket 3 and the precast concrete beam 2 of the surface-hole gate pier 1 needs to be planned in advance, and the precast work of the precast concrete beam 2 is started 23 days before the bracket 3 is constructed.
Step 2): the steel bars 5 are arranged inside the precast concrete beam 2, the steel bars 5 transversely extend out of the end part of the precast concrete beam 2 for a certain distance, the lifting lugs are pre-embedded in advance, and concrete pouring is carried out after the warehouse preparation is finished; in this embodiment, the reinforcing bars 5 are extended laterally by a distance 2/3 from the ends of the two precast concrete beams 2 on the opposite side, which is the distance between the ends of the precast concrete beams 2.
Step 3): removing the formwork for a period of time after the precast concrete beam 2 is poured, then roughening the surface into a rough surface by using a roughening gun, and maintaining for a period of time; in this embodiment, the precast concrete beam 2 is demolded 2 to 3 days after the completion of casting, and then the surface is roughened to a rough surface by a roughening gun, and covered with geotextile, and maintained by water for 28 days.
Step 4): before the top of the surface hole gate pier 1 is constructed to the position of the bracket 3, the position of the bracket 3 is preset with steel bars and is reserved, and then the steel bars and the top of the surface hole gate pier 1 are synchronously cast and molded;
step 5): carrying out the hoisting work of the precast concrete beams 2, wherein the precast concrete beams 2 with the T-shaped cross sections are distributed in the middle, and the precast concrete beams 2 with the L-shaped cross sections are positioned at the sides; in the embodiment, the age of the precast concrete beam is more than 28 days, the pouring of the top of the gate pier is completed for 7 days, the lofting is completed, and the hoisting operation of the rear expandable precast concrete beam can be completed, and the hoisting can be performed by using a cable crane.
Step 6): two ends of each precast concrete beam 2 are placed on a bracket 3 on the top side of the surface hole gate pier 1, each precast concrete beam 2 is placed in parallel side by side, after the hoisting is finished, old concrete on the surface is chiseled, and reinforcing steel bars 5 extending out of the upper sides of the end parts of the two opposite precast concrete beams 2 are bound together; in this embodiment, the protruding reinforcing bars 5 are bound to each other by steel wires.
Step 7): the method comprises the following steps that a concrete pouring process is carried out on grooves formed by combining a plurality of precast concrete beams 2, the height of poured concrete is the depth of the grooves, and the poured concrete is an integrated flat plate supporting structure and serves as a supporting bottom die for the subsequent connection girder pouring construction; in this embodiment, when concrete is cast into the grooves formed by combining the plurality of precast concrete beams 2 with each other, each groove is subjected to a casting process one by one.
Step 8): and (4) after the integral construction is finished, the girder can be connected to the flat plate supporting structure formed in the step (7) for pouring construction. In the subsequent connection girder pouring construction process, the first layer and the second layer of the prepared cabin are not too thick, generally controlled according to 1.5-2.0m, and the rise thickness can be properly increased in the subsequent process according to the requirement.
Preferably, the following steps are further included between step 6) and step 7): and the geotextile 4 is laid at the connecting position of the bottoms of every two adjacent precast concrete beams 2 to prevent the problem of slurry leakage when concrete is poured in the groove.
The above-described embodiments are merely preferred embodiments of the present invention, and should not be construed as limiting the present invention, and features in the embodiments and examples in the present application may be arbitrarily combined with each other without conflict. The protection scope of the present invention is defined by the claims, and includes equivalents of technical features of the claims. I.e., equivalent alterations and modifications within the scope hereof, are also intended to be within the scope of the invention.
Claims (9)
1. The utility model provides a girder bearing structure is connected to dam table hole which characterized in that: a plurality of precast concrete beams (2) which are parallel to each other are arranged between the top sides of every two adjacent surface hole gate piers (1), and a groove formed by combining every two adjacent precast concrete beams (2) is used for pouring concrete.
2. The dam face hole connection girder support structure of claim 1, wherein: top side of table hole gate pier (1) is equipped with bracket (3), and precast concrete beam (2) tip erects in bracket (3) upper surface.
3. The dam face hole connection girder support structure of claim 1, wherein: the cross section of the precast concrete beam (2) positioned on the inner side is of a T-shaped structure, and the cross section of the precast concrete beam (2) positioned on the lateral side is of an L-shaped structure.
4. The dam face hole connection girder support structure of claim 1, wherein: and geotextile (4) is laid at the connecting position of every two adjacent precast concrete beams (2).
5. The dam face hole connection girder support structure of claim 1, wherein: the connecting position of every two adjacent precast concrete beams (2) is of a wedge-shaped structure.
6. The dam face hole connection girder support structure of claim 1, wherein: and reinforcing steel bars (5) are also pre-inserted between the upper sides of the end parts of the two precast concrete beams (2) on each opposite side and are bound with each other.
7. The dam face hole connection girder support structure of claim 1, wherein: the depth of the groove formed by combining every two adjacent precast concrete beams (2) is 1-1.5 m.
8. A construction method of a dam face-hole connection girder support structure according to any one of claims 1 to 7, comprising: it comprises the following steps:
step 1): planning the construction period of the precast concrete beam (2) in advance, and determining the prefabrication quantity according to the length of the gate pier and the width index of the connecting girder;
step 2): reinforcing steel bars (5) are arranged inside the precast concrete beam (2), the reinforcing steel bars (5) transversely extend out of the end part of the precast concrete beam (2) for a certain distance, lifting lugs are pre-embedded in advance, and concrete pouring is carried out after the warehouse preparation is finished;
step 3): removing the formwork for a period of time after the precast concrete beam (2) is poured, then roughening the surface into a rough surface by using a roughening gun, and maintaining for a period of time;
step 4): before the top of the meter hole gate pier (1) is constructed to the position of the bracket (3), the position of the bracket (3) is preset with steel bars and is reserved, and then the steel bars and the top of the meter hole gate pier (1) are synchronously cast and molded;
step 5): hoisting the precast concrete beams (2), wherein the precast concrete beams (2) with the T-shaped cross sections are distributed in the middle, and the precast concrete beams (2) with the L-shaped cross sections are positioned at the sides;
step 6): two ends of each precast concrete beam (2) are placed on the bracket (3) on the top side of the surface hole gate pier (1), each precast concrete beam (2) is placed in parallel side by side, old concrete on the surface is chiseled after hoisting is finished, and reinforcing steel bars (5) extending out of the upper sides of the end parts of the two opposite precast concrete beams (2) are bound together;
step 7): the method comprises the following steps that a concrete pouring process is carried out on a groove formed by combining a plurality of precast concrete beams (2), the height of poured concrete is the depth of the groove, and the poured concrete is an integrated flat plate supporting structure and serves as a supporting bottom die for the subsequent connection girder pouring construction;
step 8): and after the integral construction is finished, the girder can be connected to the flat plate supporting structure formed in the step 7) for pouring.
9. The method of constructing a dam face hole connection girder support structure according to claim 8, wherein: the method also comprises the following steps between the step 6) and the step 7): and geotextile (4) is laid at the connecting position of the bottoms of every two adjacent precast concrete beams (2) to prevent the problem of slurry leakage when concrete is poured in the groove.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110846015.XA CN113481944B (en) | 2021-07-26 | 2021-07-26 | Construction method of dam surface hole connection girder supporting structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110846015.XA CN113481944B (en) | 2021-07-26 | 2021-07-26 | Construction method of dam surface hole connection girder supporting structure |
Publications (2)
Publication Number | Publication Date |
---|---|
CN113481944A true CN113481944A (en) | 2021-10-08 |
CN113481944B CN113481944B (en) | 2022-07-15 |
Family
ID=77942569
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110846015.XA Active CN113481944B (en) | 2021-07-26 | 2021-07-26 | Construction method of dam surface hole connection girder supporting structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113481944B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114152242A (en) * | 2021-12-18 | 2022-03-08 | 浙江省正邦水电建设有限公司 | Dam horizontal displacement monitoring vertical line protection pipe pre-embedding construction method |
CN116791539A (en) * | 2023-08-16 | 2023-09-22 | 中国电建集团北京勘测设计研究院有限公司 | Gate Gao Hunning soil-fixed end beam supporting structure and construction method thereof |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202369276U (en) * | 2011-12-24 | 2012-08-08 | 中国葛洲坝集团股份有限公司 | In-situ pre-fabricating and lifting device of large-tonnage pre-fabricated beam |
CN102797242A (en) * | 2012-08-31 | 2012-11-28 | 黄河勘测规划设计有限公司 | Arrangement structure of overflow surface holes of arch dam |
CN205088638U (en) * | 2015-11-12 | 2016-03-16 | 中国电建集团成都勘测设计研究院有限公司 | Arch dam table hole gate pier girder |
CN105951683A (en) * | 2016-05-19 | 2016-09-21 | 中国葛洲坝集团第工程有限公司 | Construction method for corbel steel reinforcements of gate pier |
CN108755606A (en) * | 2018-07-12 | 2018-11-06 | 中国水利水电第八工程局有限公司 | A kind of arch dam support crossbeam formwork structure and construction method |
CN210712781U (en) * | 2019-09-20 | 2020-06-09 | 中国电建集团成都勘测设计研究院有限公司 | Combined meter hole water retaining structure of day-adjusting hydropower station |
US20200315144A1 (en) * | 2017-06-05 | 2020-10-08 | Yunnan University | A reservoir tail reverse regulation method for native fish protection |
-
2021
- 2021-07-26 CN CN202110846015.XA patent/CN113481944B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202369276U (en) * | 2011-12-24 | 2012-08-08 | 中国葛洲坝集团股份有限公司 | In-situ pre-fabricating and lifting device of large-tonnage pre-fabricated beam |
CN102797242A (en) * | 2012-08-31 | 2012-11-28 | 黄河勘测规划设计有限公司 | Arrangement structure of overflow surface holes of arch dam |
CN205088638U (en) * | 2015-11-12 | 2016-03-16 | 中国电建集团成都勘测设计研究院有限公司 | Arch dam table hole gate pier girder |
CN105951683A (en) * | 2016-05-19 | 2016-09-21 | 中国葛洲坝集团第工程有限公司 | Construction method for corbel steel reinforcements of gate pier |
US20200315144A1 (en) * | 2017-06-05 | 2020-10-08 | Yunnan University | A reservoir tail reverse regulation method for native fish protection |
CN108755606A (en) * | 2018-07-12 | 2018-11-06 | 中国水利水电第八工程局有限公司 | A kind of arch dam support crossbeam formwork structure and construction method |
CN210712781U (en) * | 2019-09-20 | 2020-06-09 | 中国电建集团成都勘测设计研究院有限公司 | Combined meter hole water retaining structure of day-adjusting hydropower station |
Non-Patent Citations (2)
Title |
---|
杨启贵等: "《湖北清江水布垭水电站设计技术丛书 2 泄水建筑物》", 31 December 2015 * |
黄丹勇等: "锦屏一级水电站大坝泄洪表孔混凝土施工技术", 《四川水利》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114152242A (en) * | 2021-12-18 | 2022-03-08 | 浙江省正邦水电建设有限公司 | Dam horizontal displacement monitoring vertical line protection pipe pre-embedding construction method |
CN114152242B (en) * | 2021-12-18 | 2024-04-05 | 浙江省正邦水电建设有限公司 | Dam horizontal displacement monitoring vertical line protection pipe pre-embedding construction method |
CN116791539A (en) * | 2023-08-16 | 2023-09-22 | 中国电建集团北京勘测设计研究院有限公司 | Gate Gao Hunning soil-fixed end beam supporting structure and construction method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN113481944B (en) | 2022-07-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN113481944B (en) | Construction method of dam surface hole connection girder supporting structure | |
CN110700105B (en) | Synchronous construction method for high pier column and tie beam and template used in same | |
CN108104284B (en) | Wallboard connecting structure of shear wall steel arm embedded floor slab and assembly method | |
CN214573434U (en) | Integral prefabricated box culvert template | |
CN206956979U (en) | A kind of Linear shear wall with fore-set | |
CN113027021A (en) | Support-free prefabricated floor slab with bracket | |
CN211714210U (en) | Reconstruction and extension engineering interface structure based on C-shaped occlusion beam | |
CN215405915U (en) | Dam surface hole connection girder supporting structure | |
CN115094912B (en) | Cross-partition forward and reverse combined construction method for super-large soft soil foundation pit upper building | |
CN217204165U (en) | Assembled anchor rod frame beam | |
CN216689076U (en) | A prefabricated apron that is used for hollow mound top to pour construction | |
CN110439267A (en) | A kind of aluminum alloy mould plate applied to laminated floor slab construction | |
CN210507298U (en) | Integrated template for wave dissipation hole breast wall | |
CN113059685A (en) | Precast beam construction system and construction method | |
CN111321712A (en) | Assembled fishway pool chamber structure and construction method | |
CN111851804A (en) | Assembly type formwork-dismantling-free structural body formwork and cast-in-place formwork-dismantling-free structural body | |
CN110748221A (en) | Prefabricated assembled pond guide wall | |
CN213572926U (en) | High side wall construction protective structure | |
CN220599116U (en) | Circular deep well work platform structure | |
CN218437202U (en) | Basement post-cast strip node with supporting structure | |
CN220768145U (en) | Prefabricated foundation beam and prefabricated foundation | |
CN116791539A (en) | Gate Gao Hunning soil-fixed end beam supporting structure and construction method thereof | |
CN216810448U (en) | Assembled formwork support integrated shear wall device | |
CN215053872U (en) | Assembled frame system | |
CN221001294U (en) | Assembled formwork-free channel structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20221221 Address after: 101100 room 206-20, 2nd floor, building 1, No.1 courtyard, Gongyuan street, Tongzhou District, Beijing Patentee after: China Three Gorges Construction Engineering (Group) Co.,Ltd. Patentee after: Three Gorges Technology Co.,Ltd. Address before: Three Gorges building, No.288, east section of Fucheng Avenue, high tech Zone, Chengdu, Sichuan 610042 Patentee before: China Three Gorges Construction Engineering (Group) Co.,Ltd. |