CN213572926U - High side wall construction protective structure - Google Patents

High side wall construction protective structure Download PDF

Info

Publication number
CN213572926U
CN213572926U CN202021932026.7U CN202021932026U CN213572926U CN 213572926 U CN213572926 U CN 213572926U CN 202021932026 U CN202021932026 U CN 202021932026U CN 213572926 U CN213572926 U CN 213572926U
Authority
CN
China
Prior art keywords
side wall
crossbeam
protective structure
high side
construction protective
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021932026.7U
Other languages
Chinese (zh)
Inventor
张生琴
何帮恒
王家豪
陈学发
杨海
鱼龙
冯前磊
陆兆继
倪书兵
刘华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group Co Ltd
Original Assignee
China Gezhouba Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group Co Ltd filed Critical China Gezhouba Group Co Ltd
Priority to CN202021932026.7U priority Critical patent/CN213572926U/en
Application granted granted Critical
Publication of CN213572926U publication Critical patent/CN213572926U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a high side wall construction protective structure, includes the crossbeam, and the crossbeam is fixed in former side wall top and the local concrete that buries and increase the side wall, and operation platform is arranged on crossbeam upper portion, and the crossbeam both sides face limit position and arrange and prevent guardrail bar, and the first structural reinforcement who prevents guardrail bar, the other end and increase the side wall is connected to anti-pull rod spare one end. The utility model provides a pair of high side wall construction protective structure, greatly reduced the construction degree of difficulty to a large amount of material cost and cost of labor have been practiced thrift.

Description

High side wall construction protective structure
Technical Field
The utility model belongs to the technical field of the construction and specifically relates to a high side wall construction protective structure for the construction of hydraulic fishway, aqueduct, bridge etc..
Background
Conventional thin-walled structure concrete placement who faces the sky face highly adopts precast concrete or sets up full load-bearing bent structure as operation platform, and precast concrete structure need match corresponding hoisting equipment and hoist, and full load-bearing bent structure construction material input is many, and the construction degree of difficulty is big.
Disclosure of Invention
The utility model aims to solve the technical problem that a high side wall construction protective structure is provided, greatly reduced the construction degree of difficulty to a large amount of material cost and cost of labor have been practiced thrift. For the concrete pouring of the thin-wall structure with the high free surface, the construction method using the protection platform is simpler, more convenient, more efficient and more energy-saving.
In order to solve the technical problem, the utility model discloses the technical scheme who adopts is:
the utility model provides a high side wall construction protective structure, includes the crossbeam, and the crossbeam is fixed in former side wall top and the local concrete that buries and increase the side wall, and operation platform is arranged on crossbeam upper portion, and the crossbeam both sides face limit position and arrange and prevent guardrail bar, and the first structural reinforcement who prevents guardrail bar, the other end and increase the side wall is connected to anti-pull rod spare one end.
The beam is made of section steel, erected on the upper parts of the two original side walls and welded and fixed with the second structural steel bars on the original side walls.
The utility model relates to a high side wall construction protective structure has following technological effect:
1) the cross beams are arranged on the upper portions of the side walls on the two sides and are welded with the second structural steel bars in the primary side wall, construction operation is simple and convenient, and reliability is high.
2) The protective handrail is welded through the reverse pull rod piece, and the safety and reliability of the protective handrail are guaranteed.
3) After concrete pouring is completed, exposed parts of the section steel cross beams are cut off, the operating platform and the protective railing are dismantled, the building and dismantling construction operation is simple and convenient, and the investment of construction auxiliary materials is reduced.
4) If the thin-wall structure concrete of the high overhead surface is poured, the pouring quality of the concrete cannot be guaranteed by using a construction method of prefabricating or erecting full-hall bent frames, and the safety is difficult to guarantee. Construction is carried out through this application, can guarantee to pour the quality, improves work efficiency, and safety also obtains the guarantee simultaneously.
Drawings
The invention will be further explained with reference to the following figures and examples:
fig. 1 is a schematic view of the present invention.
In the figure: crossbeam 1, operation platform 2, guard rail 3, anti-pull rod piece 4, second structural reinforcement 5, first structural reinforcement 6, former side wall 7 heightens side wall 8.
Detailed Description
As shown in fig. 1, the high side wall construction protection structure comprises cross beams 1, wherein a plurality of cross beams 1 are erected on the upper parts of primary side walls 7 on two sides and are welded and fixed with second structural steel bars 5 of the primary side walls 7. And is partially buried in the concrete structure at the time of concrete casting of the heightened side wall 8.
The beam 1 is used as a supporting piece, the operating platform 2 is directly arranged on the upper portion of the supporting piece, and the guard rails 3 are arranged at the positions of two side edges. The guard rail 3 is connected to the 4 one end of anti-member of pulling rod, the other end is connected with the first constructional steel bar 6 of the heightened lateral wall 8 that adds newly, connects the reinforcement to whole guard rail 3 then.
And (4) pouring the heightened side wall 8, and dismantling the operating platform 2 and the protective railing 3 when the concrete reaches the age. The erection and dismantling construction is simple and convenient, and the investment of construction auxiliary materials is reduced.
The working principle and the process are as follows:
1) and beam installation: the beam 1 is arranged at the top of the primary side wall 7, and the beam 1 needs to be firmly welded and fixed with the second structural steel bars 5 in the primary side wall.
2) And installing a reverse pull rod piece: one end of the counter-pull rod 4 is fixedly connected with the protective railing 3, and the other end of the counter-pull rod is fixed with the first structural steel bar 6 in the newly heightened side wall 8.
3) Operation platform and guard rail's installation and demolition: the operation platform 2 and the guard rail 3 are fixed with the cross beam 1. When the pouring of the newly heightened side walls on the two sides is completed and the concrete reaches the age, only the operating platform 2 and the protective railings 3 need to be removed, and the exposed parts of the cross beams 1 are cut off, so that the operation is simple, convenient, safe and reliable.

Claims (2)

1. The utility model provides a high side wall construction protective structure which characterized in that: including crossbeam (1), crossbeam (1) is fixed at former side wall (7) top and during the local concrete of burying increase side wall (8), and operation platform (2) are arranged on crossbeam (1) upper portion, and protection railing (3) are arranged to the border position in crossbeam (1) both sides, and protection railing (3), the other end are connected with first structural reinforcement (6) of increasing side wall (8) to tie member (4) one end.
2. The high side wall construction protective structure of claim 1, wherein: the beam (1) is made of section steel, and the beam (1) is erected on the upper parts of the two original side walls (7) and is welded and fixed with second structural steel bars (5) on the original side walls (7).
CN202021932026.7U 2020-09-07 2020-09-07 High side wall construction protective structure Active CN213572926U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021932026.7U CN213572926U (en) 2020-09-07 2020-09-07 High side wall construction protective structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021932026.7U CN213572926U (en) 2020-09-07 2020-09-07 High side wall construction protective structure

Publications (1)

Publication Number Publication Date
CN213572926U true CN213572926U (en) 2021-06-29

Family

ID=76570557

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021932026.7U Active CN213572926U (en) 2020-09-07 2020-09-07 High side wall construction protective structure

Country Status (1)

Country Link
CN (1) CN213572926U (en)

Similar Documents

Publication Publication Date Title
CN201339250Y (en) Stiffness structure framework beam preformed steel reinforcement framework structure
CN106337555A (en) Method for constructing triangular steel support for cantilever structure of outer wall of building
CN110409319B (en) Bracket for large-span steel-concrete composite beam cast-in-place bridge deck and construction method
CN105863253A (en) Integral formwork-supporting type asynchronous casting stairwell wall column formwork supporting system and construction method
CN113550578A (en) High-altitude overhanging structure formwork support and upper protection system construction method
CN106351180B (en) The all-hydraulic unlatching self-propelled template system of aqueduct
CN113481944B (en) Construction method of dam surface hole connection girder supporting structure
CN215717163U (en) Steel form suitable for super high-rise core tube inclined shear wall
CN113846746A (en) Basement structure beneficial to efficient construction and construction method
CN113882276A (en) Working platform for erecting bridge pier and construction method thereof
CN203034799U (en) Tower hoist standard knot bearing overhead support formwork steel platform structure
CN220394299U (en) Novel hydraulic climbing formwork overhanging operation platform
CN110878522B (en) Main tower lower cross beam construction system and construction method
CN213572926U (en) High side wall construction protective structure
KR100580225B1 (en) Upper structure raising method using bridge upper structure support and lift equipment and this
CN215977664U (en) Basement structure beneficial to efficient construction
CN111648411A (en) Downward-turning type post-cast strip support replacing structure, construction method and post-cast strip construction method
CN109763658A (en) A kind of support device and its construction method for arrangement material distributing machine in elevator
CN210530314U (en) Formwork frame is pour to steel concrete combination shear wall T type node
CN113502756A (en) Thin-wall pier hydraulic creeping formwork system and construction method thereof
CN210177369U (en) Supplementary platform of pouring of precast beam board
CN111321712A (en) Assembled fishway pool chamber structure and construction method
CN209923791U (en) Workpiece for cross-line construction of formwork suspension casting combined system
CN113338537A (en) Construction method of ultrahigh large-section concrete frame column
CN215405915U (en) Dam surface hole connection girder supporting structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant