CN113465461A - Large-section tunnel blasting hole-reducing layout method - Google Patents

Large-section tunnel blasting hole-reducing layout method Download PDF

Info

Publication number
CN113465461A
CN113465461A CN202110883327.8A CN202110883327A CN113465461A CN 113465461 A CN113465461 A CN 113465461A CN 202110883327 A CN202110883327 A CN 202110883327A CN 113465461 A CN113465461 A CN 113465461A
Authority
CN
China
Prior art keywords
hole
blasting
tunnel
holes
blast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110883327.8A
Other languages
Chinese (zh)
Other versions
CN113465461B (en
Inventor
陶铁军
田兴朝
何军
娄乾星
贾健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Huayu Qiancheng Technology Service Co ltd
Original Assignee
Guizhou Huayu Qiancheng Technology Service Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Huayu Qiancheng Technology Service Co ltd filed Critical Guizhou Huayu Qiancheng Technology Service Co ltd
Priority to CN202110883327.8A priority Critical patent/CN113465461B/en
Publication of CN113465461A publication Critical patent/CN113465461A/en
Application granted granted Critical
Publication of CN113465461B publication Critical patent/CN113465461B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/006Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by making use of blasting methods
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping
    • F42D1/08Tamping methods; Methods for loading boreholes with explosives; Apparatus therefor
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D3/00Particular applications of blasting techniques
    • F42D3/04Particular applications of blasting techniques for rock blasting
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N3/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N3/30Investigating strength properties of solid materials by application of mechanical stress by applying a single impulsive force, e.g. by falling weight
    • G01N3/313Investigating strength properties of solid materials by application of mechanical stress by applying a single impulsive force, e.g. by falling weight generated by explosives
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

The invention discloses a large-section tunnel blasting hole-reducing layout method, which is characterized by comprising the following steps of: the method sets the opening position of the wedge-shaped cut hole at a position which is at a minimum distance d1 from the design contour line of the tunnel, so that the reserved rock mass outside the design contour line cannot be damaged during the blasting of the wedge-shaped cut hole; and then carrying out wide hole spacing hole distribution on the surrounding rock at the center of the face separated by the pre-cracks, then carrying out tunnel auxiliary hole distribution by adopting a step blasting wide hole spacing small row spacing hole distribution mode, and finally carrying out peripheral hole distribution by adopting a deflection angle mode.

Description

Large-section tunnel blasting hole-reducing layout method
Technical Field
The invention relates to the technical field of large-section tunnel excavation, in particular to a blasting hole-reducing layout method for a large-section tunnel.
Background
With the rapid development of economic society, the traditional small-section tunnel cannot meet the requirement of road transportation, and large-section tunnels such as three lanes and four lanes are widely used in roads built in recent years. The drilling and blasting method has the advantages of high efficiency and economy, is a main method for tunnel excavation in China, but if blasting hole meshes of a large-section tunnel are distributed according to a traditional method, the number of drilled holes is increased, the drilling cost is increased, and the project progress is influenced.
The arrangement of the blast hole meshes is always a research hotspot of tunnel blasting, and a large number of expert scholars carry out a plurality of researches on the arrangement: the blasting action mechanism of the distance between the blast holes and the empty holes on the rock mass is researched by thunder warfare and the like, the fracture guide effect between the double blast holes and the empty holes on two sides under different distances between the empty holes and the blast holes is obtained, and the stress change rule of the measuring points around the empty holes is analyzed. Lihongwei and the like research the influence rule of different blast hole distances on the expansion of explosive cracks of rocks (hornrocks). Trade-mark et al studied the effect of hole spacing on smooth blasting from the principle of blasting, fracture mechanics and empirical methods to calculate the hole spacing suitable for engineering blasting. The single-core light provides a quasi-straight-hole cutting mode, overcomes the defects of straight-hole cutting and inclined-hole cutting, and improves the rock drift tunneling speed. The method is characterized in that the residual strength and the like are calculated according to a blasting theory and an empirical formula, and the selection of reasonable undermining modes, blast hole depths and undermining hole arrangement parameters under the condition of the hard rock roadway is introduced by combining the specific conditions of a test working face. The damage of the rock in the blasting process is analyzed by the Zhang-March-Zengh method, the arrangement of blast holes in the blasting scheme is optimized by a numerical simulation method, and the field blasting effect is evaluated by a damage factor D. The numerical simulation is carried out on the coupled charging blasting process of the peripheral holes by Shuyanming and the like, so that the more reasonable blast hole spacing of the peripheral holes is obtained, the disturbance to the surrounding rock is reduced as much as possible, and the normal collapse of the rock is ensured. The gentle-helping trees and the like optimize smooth blasting parameters, cut hole layout schemes and maximum single-hole loading parameters of tunnel excavation by developing field tunneling blasting tests and layered rock mass failure mechanism analysis, and control engineering problems of over excavation and tunnel face bottom underexcavation caused by easy delamination of tunnel arches due to blasting excavation. Wu megahua and the like researches the fracture expansion condition and the fracture ring range around the blast hole after deep hole blasting by adopting a method of combining theoretical analysis and numerical simulation. Liu catch on the equal study drilling machine of large cross section tunnel blasting, combine smooth blasting design principle, proposed the smooth blasting scheme that is applicable to the large cross section tunnel that adopts airleg rock drill drilling. Yaohou and the like provide a short-footage shallow hole weak blasting scheme, and solve the problem of stability of surrounding rock in the blasting process under the condition of water-rich soft surrounding rock. The research of Fihland and the like obtains a calculation formula which accords with the actual fracture zone range, analyzes a calculation method of the fracture zone range under the condition of air uncoupled charging, calculates the radius of the rock fracture zone existing in the initial damage and crushing zone, and considers the secondary expansion of the fracture under the quasi-static action of explosive gas by applying the Abel principle and the rock crack arrest condition on the basis.
The research solves a plurality of problems of a tunnel blasting operation field, the result is quite abundant, but along with the increase of the tunnel section, how to reduce the arrangement of blast holes is a scientific difficult problem to be solved urgently, and the research on the aspect of reducing the arrangement of holes is rarely reported.
Disclosure of Invention
The invention aims to provide a large-section tunnel blasting hole-reducing layout method, which is used for pushing outwards the positions of wedge-shaped cut holes to the maximum extent and releasing most of the tunnel faces in the center of a tunnel, verifying the blasting effect of the method by developing field test research, reducing the number of blast holes, improving the tunneling efficiency and ensuring the engineering quality so as to overcome the defects in the prior art.
In order to achieve the purpose, the invention provides the following technical scheme:
a large-section tunnel blasting hole-reducing layout method is characterized in that the opening position of a wedge-shaped cut hole is arranged at a position which is at a minimum distance d1 from a design contour line of a tunnel, and at the moment, the reserved rock mass outside the design contour line cannot be damaged during wedge-shaped cut hole blasting; and then carrying out wide hole spacing hole distribution on surrounding rock at the center of the face separated by the pre-cracks, then carrying out tunnel auxiliary hole distribution by adopting a step blasting wide hole spacing small row spacing hole distribution mode, and finally carrying out peripheral hole distribution by adopting an oblique angle mode.
As a further scheme of the invention: the determination method of the value of the minimum distance d1 is as follows: according to the detonation wave theory, when the columnar explosive bag is exploded under the condition of non-coupled charging, the initial impact pressure on the rock wall of the blast hole is as follows:
Figure BDA0003191389340000031
in the formula: rho0Is density, g.cm-3;D1M.s for detonation velocity-1;dcIs the diameter of the charge, dbThe diameter of the blast hole; lcFor the length of the charge, /)bThe length of the blast hole is; the detonation product impacts the wall of the explosive chamber to obviously increase the pressure, and n is an increase multiple;
according to the attenuation law of stress wave at specific distance
Figure BDA0003191389340000032
The formula for calculating the peak value of the radial compressive stress is as follows:
Figure BDA0003191389340000033
in the formula:
Figure BDA0003191389340000034
d1to calculate the distance, r, from the point to the center of the boreholebThe radius of the blast hole is; the compressive strength of the surrounding rock of the current tunnel section is Rc when sigma isrmax<At Rc, canThe blasting is considered not to cause damage to the reserved rock mass outside the design contour line, so that the minimum distance d from the opening position of the wedge-shaped cut hole to the design contour line of the tunnel can be calculated1
Compared with the prior art, the invention has the beneficial effects that: the invention provides a large-section tunnel blasting hole-reducing layout method, which is characterized in that the minimum distance d1 from a wedge-shaped cut hole to a tunnel design contour line is determined, the surrounding rock at the center of a tunnel face and the peripheral holes of a tunnel are arranged at a wide hole distance, the number of drilled holes is greatly reduced, the construction efficiency is improved, the blast hole utilization rate of each blast hole is improved, and the construction cost is greatly saved.
Drawings
FIG. 1 is a schematic diagram of a mesh arrangement in a conventional tunnel blasting method;
FIG. 2 is a schematic diagram of the optimization of the detonation sequence in the present invention;
FIG. 3 is a schematic plan view of arrangement of upper-step blastholes in the invention;
FIG. 4 is a schematic view of the charge structure of the blast hole, the cut hole and the auxiliary hole in the invention;
figure 5 is a schematic diagram of a perimeter hole charge configuration according to the present invention.
In the figure: 1. cut holes in conventional tunnel blasting; 2. auxiliary holes in conventional tunnel blasting; 3. peripheral holes in conventional tunnel blasting; 4. blasting with a center wide hole distance of the tunnel face; 5. pre-forming seams by blasting the cut holes; 6. blasting and breaking rock by using auxiliary holes; 7. blasting the peripheral holes to control the contour effect; 8. a tampon; 9. an explosive; 10. a detonator; 11. a detonating cord.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution:
large-section tunnel hole-reducing layout method
1. Traditional hole distribution mode
The traditional tunnel blasting method has the initiation sequence of cut hole blasting, auxiliary hole blasting and peripheral hole blasting, the cut hole blasting is firstly carried out in the center of a tunnel face, a rock mass in the center of the tunnel face is extruded outwards to form a slot cavity and provide a free face for the auxiliary hole blasting, during the auxiliary hole blasting, an explosive stress wave is reflected on the free face to form a tensile wave, the rock breaking effect is achieved, and finally the peripheral hole blasting is carried out to control the tunnel profile. The method is suitable for blasting of the small-section tunnel, and the number of blast holes is estimated according to the section area of the tunnel and the firmness coefficient of rocks:
Figure BDA0003191389340000041
for a large-section tunnel, taking iv-grade surrounding rock, a rock firmness coefficient f of 6 and a tunnel section area S of 150m2 as examples, the number of holes to be drilled in the whole section can reach more than 170, and the drilling workload is huge. The current automatic tunnel drilling equipment is not mature and mainly depends on manual drilling, the drilling efficiency of workers is generally about 3 holes/hour (the hole depth is about 4.2m), and the drilling time is about 4.5 hours per cycle calculated by 13 people in one drilling class. The traditional tunnel blasting method has the advantages that the mesh layout is shown in figure 1, the number of drilled holes is large, the punching time is long, and the requirements of large-section tunnel blasting on high efficiency and economy cannot be met.
2. Reducing hole layout method (see figure 2)
The aim of the cut blasting is to provide a free face for auxiliary hole blasting, reduce the clamping effect, enable the explosive stress wave to reflect and stretch rock breaking on the free face, and for large-section tunnel blasting, the cut holes are not necessarily arranged in the center of the tunnel face. A method for arranging the reducing holes of a large-section tunnel is provided according to the requirements of field blasting engineering, and as shown in figure 2, the method pushes the opening positions of wedge-shaped cut holes outwards to the minimum distance d from the design contour line of the tunnel1At the moment, the wedge-shaped cut hole blasting cannot damage the reserved rock mass outside the designed contour line. First, performing wedge-shaped cut hole blasting to formAnd pre-cracking, wherein most surrounding rocks in the center of the face are separated from surrounding rocks at the periphery, the surrounding rocks in the center of the face separated by the pre-cracking can be subjected to wide-hole-distance blasting, and the number of blast holes is reduced. Due to the existence of the pre-cracks, the explosion stress wave is reflected and stretched at the position, the total resistance of explosion is only the shearing resistance action of the bottom surface, the clamping action is greatly reduced, and the damage of the rock mass and the explosion vibration are reduced.
The method is characterized in that the minimum distance d is determined1The value of (2) can not only ensure that the rock mass is not damaged, but also furthest push the opening position of the wedge-shaped cut hole outwards. According to the detonation wave theory, when the columnar explosive bag is exploded under the condition of non-coupled charging, the initial impact pressure on the rock wall of the blast hole is as follows:
Figure BDA0003191389340000051
in the formula: rho0Is density, g.cm-3;D1M.s for detonation velocity-1;dcIs the diameter of the charge, dbThe diameter of the blast hole; lcFor the length of the charge, /)bThe length of the blast hole is; the detonation product impacts the wall of the explosive chamber to obviously increase the pressure, and n is an increase multiple and takes a value of 8-11.
The number 2 rock emulsion explosive is selected for calculation, and the density rho0=1.24g·cm-3Detonation velocity D1 ═ 4200m · s-1Diameter of charge dc32mm, diameter d of blast holeb42mm, charge length lc2.4m, blast hole length lbThe initial impact pressure P of the rock wall of the blast hole is 535.25MPa according to the calculation result of 4.8 m.
According to the attenuation law of stress wave at specific distance
Figure BDA0003191389340000061
The formula for calculating the peak value of the radial compressive stress is as follows:
Figure BDA0003191389340000062
in the formula:
Figure BDA0003191389340000063
d1to calculate the distance, r, from the point to the center of the boreholebIs the radius of the blast hole.
According to the on-site geological exploration report, the surrounding rock of the research section is slate, the compressive strength Rc is 25MPa, and when sigma isrmax<During Rc, the blasting can be considered not to damage the reserved rock mass outside the design contour line, so that the minimum distance d from the opening position of the wedge-shaped cut hole to the design contour line of the tunnel can be calculated1=2.96m。
Therefore, the opening positions of the wedge-shaped cut holes are arranged at the positions 2.96m away from the design contour line of the tunnel, the initiation sequence is optimized to control the tunnel contour through wedge-shaped cut hole blasting presplitting crack-blasting of the surrounding rock wide hole distance at the center of the tunnel face-blasting of the auxiliary hole wide hole distance and small row distance blasting rock breaking-peripheral hole blasting. On the basis of forming pre-cracks in the wedge-shaped cut holes, a design concept of step blasting wide-hole-pitch and small-row-pitch hole arrangement is introduced into large-section tunnel blasting, the arrangement of hole network parameters is increased, and the hole network arrangement is shown in figure 3.
Second, engineering background
1. Overview of the engineering
The white bamboo mountain tunnel is a separated extra-long tunnel, the right tunnel is 4404m long, the maximum buried depth is 323m, the left tunnel is 4358m long, the maximum buried depth is 318m, and the distance between the left and right measuring lines of the tunnel is 16 m-41 m. The tunnel is a herringbone slope tunnel, the right longitudinal slope is 2.0 percent to 1.35 percent, the left longitudinal slope is 2.0 percent to 1.35 percent in sequence. The lithology of the surrounding rock in the research section is medium weathering thin-medium thick layered tuff, and the grade of the surrounding rock is III-grade surrounding rock.
2. Idea of design (see FIG. 3)
1) Considering the structure of a field excavation trolley and the operability of manual drilling, the distance from No. 14 and No. 15 wedge cut holes to the design contour line of the tunnel is 2.96m, 6 pairs of horizontal wedge cut holes are arranged, the distance between the wedge cut holes is 0.6m, the inclination angle (the included angle with the face, the later-mentioned inclination angle is the included angle with the face) is 60 degrees, the hole depth is 4.8m, and the horizontal distance is 5.0 m.
2) Two blast-relieving holes are distributed in the center of the tunnel face, large rocks are decomposed into small rocks, and the depth of the blast-relieving holes is 3m, and the distance between the blast-relieving holes is 1.0 m.
3) The auxiliary holes are distributed in three rows, the row spacing is the same, the distance between the auxiliary holes is gradually reduced from inside to outside, the inclination angle is gradually increased, a large-spacing small-row-spacing blasting process is adopted, and the auxiliary hole depth is 4.2 m.
4) The peripheral holes are uniformly distributed 600mm away from the third row of auxiliary holes, and are inclined at a certain angle to form an inclined angle for facilitating punching, the hole bottoms exceed the designed contour line by about 100mm, and the deviation contour line of the opening of the orifice is controlled within the contour line and is about less than 100 mm.
3. Engineering applications
A large-section tunnel hole-reducing blasting method field test is carried out by taking ZK19+ 984-ZK 19+954 sections of the white bamboo mountain tunnel as test sections, an upper step blast hole layout diagram is shown in figure 3, and specific blasting parameters are shown in table 1.
TABLE 1 blasting parameter table
Figure BDA0003191389340000071
Different loadings were used for different lithologies, the specific loadings are shown in table 2.
TABLE 2 different lithology charge for each blast hole
Figure BDA0003191389340000072
Figure BDA0003191389340000081
According to the advanced geological forecast detection report of the ZK19+ 984-ZK 19+954 section of the white bamboo mountain tunnel, the lithology of the surrounding rock of the section belongs to medium-hard rock, so the explosive loading of each blast hole is as follows: the explosive releasing hole is 5 pieces multiplied by 0.3kg which is 1.5kg, and the linear explosive loading density is 0.5 kg/m; 8 slotted holes are multiplied by 0.3kg, namely 2.4kg, and the linear medicine loading density is 0.5 kg/m; the auxiliary holes are 7 pieces multiplied by 0.3kg, namely 2.1kg, and the thread loading density is 0.5 kg/m; 4 peripheral holes are multiplied by 0.3kg, namely 1.2kg, and the thread loading density is 0.29 kg/m; the bottom hole has 7 pieces × 0.3kg ═ 2.1kg, and the thread loading density is 0.5 kg/m.
The hole charge configuration is shown in fig. 4 and 5, and the initiation sequence is shown in table 3.
TABLE 3 detonation sequence
Figure BDA0003191389340000082
The blast hole blockage has great influence on the blasting effect, when the blast hole is not blocked and blasted, most of the blasting energy is consumed in the air to generate larger air shock waves, the rock mass is crushed less, so that the reasonable blast hole blockage is needed, the blockage length is more than 50cm, and the stemming prepared by sand and clay according to the ratio of 4:6 is used as a blocking material.
Third, blasting effect and analysis
1. Number of drilled holes
The ZK19+ 984-ZK 19+954 section of the white bamboo mountain tunnel is IV-grade surrounding rock, the coefficient f of Pythagorean is 6, the area S of the excavated section is 97.4m2, and the traditional blast hole number empirical formula is adopted
Figure BDA0003191389340000083
And calculating that the number of holes required to be drilled on the whole section reaches 128, and according to the wide hole distance blasting design scheme of the large-section tunnel, the whole section of the section only needs to be drilled with 105 holes, and the number of drilled holes per cycle is reduced by 23. 13 workers on site drill holes by using 13 drilling machines, the drilling efficiency of the workers is about 3 holes/hour, the drilling time per cycle is about 3.3 hours according to the traditional blasting scheme, the drilling time per cycle is about 2.7 hours according to the blasting scheme designed herein, the drilling time per cycle is saved by 0.6 hour, and the drilling time of a full-line 59km tunnel is saved by about 8850 hours. For the three-lane, four-lane and other extra-large section tunnels, according to the large section tunnel wide hole distance blasting design scheme provided by the text, the number of drilled holes is greatly reduced, the drilling time is saved, and the construction efficiency is improved.
2. Utilization rate of blast hole
According to the large-section tunnel wide-hole-distance blasting design scheme provided by the text, 5 field blasting tests are carried out on the ZK19+ 984-ZK 19+954 sections of the white bamboo mountain tunnel, the utilization rate of blast holes is counted, and the results are shown in table 4.
TABLE 4 statistical table of blast hole utilization
Figure BDA0003191389340000091
As can be seen from table 4, the average blast hole utilization rate of the wedge-shaped cut hole is 82.1%, the average blast hole utilization rate of the remaining blast holes is 91.9%, the blast hole utilization rate of each blast hole is high, the sill can be reduced, the gun repair caused by the sill can be avoided, the blasting quality is improved, and the construction progress is accelerated.
3. Overbreak control effect
And after each cycle of blasting is finished, measuring the overbreak and underexcavation of the tunnel by using a total station, wherein the result is shown in table 5, and counting the actual consumption of sprayed concrete, and the result is shown in table 6.
TABLE 5 statistical table of the overbreak and undermining conditions
Figure BDA0003191389340000101
TABLE 6 statistics table for concrete over-consumption
Figure BDA0003191389340000102
From tables 5 and 6, according to the large-section tunnel wide-hole-distance blasting design scheme provided by the invention, the overbreak thickness can be controlled within 15cm, the average overbreak square amount is 3.02m3/m, the average overbreak consumption of spraying and mixing is 3.75m3/m, and the overbreak rate of spraying and mixing can be controlled within 90%. The initial measurement and calculation result shows that the direct construction cost can be reduced by about 1500 yuan for every 10cm reduction of the tunnel, and the construction cost can be reduced by 8700 ten thousand yuan for the whole 59km tunnel.
Fourth, conclusion
In this embodiment, the sections ZK19+ 984-ZK 19+954 of the white bamboo mountain tunnel are taken as research objects, field test research is carried out, the number of drilled holes, the utilization rate of blast holes after blasting and the overbreak control effect are analyzed, and the following conclusions are obtained:
1) a large-section tunnel blasting hole-reducing layout method is provided, the minimum distance from a wedge-shaped cut hole to a tunnel design contour line is 2.96m, and the surrounding rock at the center of a tunnel face is blasted at a wide hole distance by adopting two blasting holes, so that the number of blasting holes is reduced.
2) According to the large-section tunnel blasting hole-reducing layout method, the number of holes drilled in each cycle is reduced by 23, the drilling time is saved by 0.6 hour, and the drilling time of a full-line 59km tunnel is saved by about 8850 hours. For the three-lane, four-lane and other extra-large section tunnels, the blasting scheme is laid according to the reduction of holes of the large section tunnel provided by the text, so that the number of drilled holes is greatly reduced, and the construction efficiency is improved.
3) The average blast hole utilization rate of the wedge-shaped cut hole is 82.1 percent, the average blast hole utilization rate of the rest blast holes is 91.9 percent, and the blast hole utilization rate of each blast hole is higher.
4) The over-excavation thickness is controlled within 15cm, the average over-excavation square amount is 3.02m3/m, the average over-consumption of spraying and mixing is 3.75m3/m, the over-consumption rate of spraying and mixing is controlled within 90%, and the construction cost is expected to be reduced by about 8700 ten thousand yuan.
Those not described in detail in this specification are within the skill of the art.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that various changes in the embodiments and/or modifications of the invention can be made, and equivalents and modifications of some features of the invention can be made without departing from the spirit and scope of the invention.

Claims (2)

1. A large-section tunnel blasting hole-reducing layout method is characterized by comprising the following steps: the method sets the opening position of the wedge-shaped cut hole at a position which is at a minimum distance d1 from the design contour line of the tunnel, so that the reserved rock mass outside the design contour line cannot be damaged during the blasting of the wedge-shaped cut hole; and then carrying out wide hole spacing hole distribution on surrounding rock at the center of the face separated by the pre-cracks, then carrying out tunnel auxiliary hole distribution by adopting a step blasting wide hole spacing small row spacing hole distribution mode, and finally carrying out peripheral hole distribution by adopting an oblique angle mode.
2. The large-section tunnel blasting hole-reducing layout method according to claim 1, wherein the determination method of the value of the minimum distance d1 is as follows: according to the detonation wave theory, when the columnar explosive bag is exploded under the condition of non-coupled charging, the initial impact pressure on the rock wall of the blast hole is as follows:
Figure FDA0003191389330000011
in the formula: rho0Is density, g.cm-3;D1M.s for detonation velocity-1;dcIs the diameter of the charge, dbThe diameter of the blast hole; lcFor the length of the charge, /)bThe length of the blast hole is; the detonation product impacts the wall of the explosive chamber to obviously increase the pressure, and n is an increase multiple;
according to the attenuation law of stress wave at specific distance
Figure FDA0003191389330000012
The formula for calculating the peak value of the radial compressive stress is as follows:
Figure FDA0003191389330000013
in the formula:
Figure FDA0003191389330000014
d1to calculate the distance, r, from the point to the center of the boreholebThe radius of the blast hole is; the compressive strength of the surrounding rock of the current tunnel section is Rc when sigma isrmax<During Rc, the blasting can be considered not to damage the reserved rock mass outside the design contour line, so that the minimum distance d from the opening position of the wedge-shaped cut hole to the design contour line of the tunnel can be calculated1
CN202110883327.8A 2021-08-02 2021-08-02 Large-section tunnel blasting hole-reducing layout method Active CN113465461B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110883327.8A CN113465461B (en) 2021-08-02 2021-08-02 Large-section tunnel blasting hole-reducing layout method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110883327.8A CN113465461B (en) 2021-08-02 2021-08-02 Large-section tunnel blasting hole-reducing layout method

Publications (2)

Publication Number Publication Date
CN113465461A true CN113465461A (en) 2021-10-01
CN113465461B CN113465461B (en) 2023-04-11

Family

ID=77883858

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110883327.8A Active CN113465461B (en) 2021-08-02 2021-08-02 Large-section tunnel blasting hole-reducing layout method

Country Status (1)

Country Link
CN (1) CN113465461B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114352300A (en) * 2021-12-07 2022-04-15 江苏徐工工程机械研究院有限公司 Digital drilling and blasting excavation system and excavation method
CN114547721A (en) * 2021-12-21 2022-05-27 沈阳工业大学 Blasting control method for differential directional fracture of local area of deep-buried tunnel
CN114754639A (en) * 2022-03-31 2022-07-15 中国电建市政建设集团有限公司 Blasting method for improving single-cycle footage of V-level surrounding rock of high-speed rail tunnel
CN116556980A (en) * 2023-05-27 2023-08-08 中煤第三建设(集团)有限责任公司 Quick tunneling construction method for water-rich large-section roadway in mining area
CN117634292A (en) * 2023-11-17 2024-03-01 深圳市特区铁工建设集团有限公司 Method, device, terminal and storage medium for arranging excavation blast holes of tunnel face

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018193678A (en) * 2017-05-12 2018-12-06 株式会社増岡組 Tunnel drilling method
CN110440649A (en) * 2019-08-09 2019-11-12 中铁隧道局集团有限公司 Hydraulic drill ring drilling large cross-section tunnel steel for shot structure and blasting method
CN111351408A (en) * 2020-05-11 2020-06-30 中铁上海工程局集团有限公司 Surrounding rock tunnel ultra-short excavation blasting construction method
CN112964144A (en) * 2021-04-21 2021-06-15 中铁二十三局集团第一工程有限公司 Soft rock railway tunnel blasting construction method in stress environment

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018193678A (en) * 2017-05-12 2018-12-06 株式会社増岡組 Tunnel drilling method
CN110440649A (en) * 2019-08-09 2019-11-12 中铁隧道局集团有限公司 Hydraulic drill ring drilling large cross-section tunnel steel for shot structure and blasting method
CN111351408A (en) * 2020-05-11 2020-06-30 中铁上海工程局集团有限公司 Surrounding rock tunnel ultra-short excavation blasting construction method
CN112964144A (en) * 2021-04-21 2021-06-15 中铁二十三局集团第一工程有限公司 Soft rock railway tunnel blasting construction method in stress environment

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
汪海旭: "围压作用下岩石爆炸应力分布及衰减特性模型试验研究", 《中国优秀博硕士学位论文全文数据库(硕士)基础科学辑》 *
陈琳: "公路隧道大体积掏槽光面爆破技术", 《铁道建筑技术》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114352300A (en) * 2021-12-07 2022-04-15 江苏徐工工程机械研究院有限公司 Digital drilling and blasting excavation system and excavation method
CN114352300B (en) * 2021-12-07 2024-02-02 江苏徐工工程机械研究院有限公司 Digital drilling and blasting excavation system and excavation method
CN114547721A (en) * 2021-12-21 2022-05-27 沈阳工业大学 Blasting control method for differential directional fracture of local area of deep-buried tunnel
CN114547721B (en) * 2021-12-21 2022-10-25 沈阳工业大学 Blasting control method for differential directional fracture of local area of deep-buried tunnel
CN114754639A (en) * 2022-03-31 2022-07-15 中国电建市政建设集团有限公司 Blasting method for improving single-cycle footage of V-level surrounding rock of high-speed rail tunnel
CN116556980A (en) * 2023-05-27 2023-08-08 中煤第三建设(集团)有限责任公司 Quick tunneling construction method for water-rich large-section roadway in mining area
CN116556980B (en) * 2023-05-27 2024-03-19 中煤第三建设(集团)有限责任公司 Quick tunneling construction method for water-rich large-section roadway in mining area
CN117634292A (en) * 2023-11-17 2024-03-01 深圳市特区铁工建设集团有限公司 Method, device, terminal and storage medium for arranging excavation blast holes of tunnel face

Also Published As

Publication number Publication date
CN113465461B (en) 2023-04-11

Similar Documents

Publication Publication Date Title
CN113465461B (en) Large-section tunnel blasting hole-reducing layout method
CN110132084B (en) Tunnel over-under-excavation control method
CN102937398B (en) Rockburst active control method based on blasting excavation disturbance control
CN113959283A (en) Blasting construction method for large-section tunnel
CN111043926B (en) 400m is realized based on electron detonator2Blasting excavation method for tunnel with large cross section
CN112964144B (en) Soft rock railway tunnel blasting construction method in stress environment
CN102269554A (en) Method for treating underground mine goaf by forming covering layer by chamber blasting technology
CN104913696A (en) Side slope excavation smooth-surface blasting-method construction method
CN111442701A (en) Refined blasting construction method for narrow deep foundation pit under complex geological condition
CN111256549A (en) Rock drift deep hole multiple wedge straight hole internal segmentation differential cut blasting method
CN104296609A (en) Different-hardness-degree rock stratum blasting control method used in deep-hole bench blasting
CN110196002B (en) Safe and efficient blasting construction method for vertical shaft wall beam nest
CN111043924A (en) Efficient blasting method for blocking stemming of tunnel soft rock full-section multistage ultra-deep hole double-end stemming
CN110725685A (en) Hydraulic fracturing combined hydraulic blasting roadway large-footage tunneling method and fracturing device
Zhang et al. Dam foundation excavation techniques in China: a review
CN103233739A (en) Mining method for thick and large ore pillar under filling body package
CN101672613A (en) Vibration-reducing blasting construction method of air spring
CN116971785A (en) Method for arranging blastholes according to drilling parameters of tunnel rock drill
US20230168069A1 (en) Annular shaped-charge housing for blasting and method of using the same
US20230030467A1 (en) Method for slope geological disaster treatment and mineral resource recovery
CN114322686A (en) Detonating network structure and control method for safety blasting of underground excavation tunnel
CN112539686A (en) Construction method for reducing blasting vibration of adjacent structure of urban tunnel
Ma et al. Blast testing and numerical simulation analysis of diversion tunnel upper section for Qianping reservoir
CN112211639A (en) One-step well completion method for high-depth large-section medium-deep hole
CN110906822A (en) Deep hole blasting charge and detonation method for reducing root bottom based on digital detonator

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant