CN113399926A - Tool for installing pipeline between water heating rooms of high-rise building - Google Patents

Tool for installing pipeline between water heating rooms of high-rise building Download PDF

Info

Publication number
CN113399926A
CN113399926A CN202110716571.5A CN202110716571A CN113399926A CN 113399926 A CN113399926 A CN 113399926A CN 202110716571 A CN202110716571 A CN 202110716571A CN 113399926 A CN113399926 A CN 113399926A
Authority
CN
China
Prior art keywords
connecting rod
pipeline
supporting
tool
installing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110716571.5A
Other languages
Chinese (zh)
Other versions
CN113399926B (en
Inventor
史显刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202110716571.5A priority Critical patent/CN113399926B/en
Publication of CN113399926A publication Critical patent/CN113399926A/en
Application granted granted Critical
Publication of CN113399926B publication Critical patent/CN113399926B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • B23K37/04Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
    • B23K37/053Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work aligning cylindrical work; Clamping devices therefor
    • B23K37/0533Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work aligning cylindrical work; Clamping devices therefor external pipe alignment clamps
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • B23K37/04Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
    • B23K37/0426Fixtures for other work
    • B23K37/0435Clamps
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K2101/00Articles made by soldering, welding or cutting
    • B23K2101/04Tubular or hollow articles
    • B23K2101/06Tubes
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]

Abstract

The invention relates to the technical field of pipeline installation, in particular to a tool for installing a pipeline between water heating rooms of a high-rise building, which comprises a supporting seat and a clamping and conveying mechanism, wherein the supporting seat is arranged on the supporting seat; supporting seat top is provided with the supporting component who is used for supporting the pipeline, centre gripping conveying mechanism is the annular and evenly is provided with the multiunit, centre gripping conveying mechanism includes the mount, connecting rod a, connecting rod b, connecting rod c, connecting rod d, the connecting rod, connect platform and push mechanism, mount one end sets up at the supporting seat top, the mount other end and connecting rod a fixed connection, the equal vertical setting of connecting rod a and connecting rod c, connecting rod a, connecting rod b, connecting rod c and connecting rod d articulate into parallelogram mechanism end to end in proper order, the connecting rod both ends are articulated with connecting rod b and connection platform respectively, be provided with the elevating system who is used for the drive to connect the platform to go up and down on the supporting seat. The invention can stably support and clamp the pipeline, can convey the pipeline upwards, conveniently passes through a building preformed hole, can be maintained in a stable state after being conveyed, and ensures the accuracy of subsequent welding.

Description

Tool for installing pipeline between water heating rooms of high-rise building
Technical Field
The invention relates to the technical field of pipeline installation, in particular to a tool for installing a pipeline between water heating rooms of a high-rise building.
Background
In a high-rise building, tap water is generally conveyed in a partition mode, the tap water is generally divided into a low conveying area, a middle conveying area and a high conveying area, the three areas are independently provided with respective water conveying pipelines, and the water conveying pipelines are connected to non-negative-pressure water supply equipment of a basement and convey water to floor users in the respective areas; heating in a high-rise building is generally divided into a high area and a low area, and respective water supply pipelines and water return pipelines are independently arranged in the high area and the low area; the tap water and heating water conveying pipelines are arranged in the water heating pipeline rooms on each floor of the high-rise building in a centralized manner.
The patent of Chinese patent application No. CN112393028A discloses a tool for installing a pipeline between water heating rooms of a high-rise building, and solves the problem of how to conveniently realize pipeline connection welding in the pipeline rooms of the high-rise building. The method comprises the steps of designing a frame body used in a water heating room for supporting welding connecting pipelines, arranging a lifting plate capable of vertically lifting on the frame body, arranging a jack between the lifting plate and the frame body, arranging a moving rail on the top surface of the lifting plate, movably arranging a pipe support bearing capable of moving along the rail on the moving rail, arranging a pipe support on the pipe support bearing, inserting a lower port of one layer of welding pipelines on the pipe support, enabling the welding pipelines to rotate more easily through the pipe support bearing, enabling a supporting plate of the welding pipelines to descend to be separated from the welding pipelines by descending the jack after welding of all the welding pipelines of more than one layer is completed, and finally transversely moving the frame body out from the position right below the welding pipelines to facilitate butt welding of the subsequent layer of pipelines and the basement pipelines.
However, the above technical solutions have the following disadvantages:
the lower port of pipeline is pegged graft on the conduit saddle, and the pipeline only the bottom obtains spacingly, rocks easily, is not convenient for insert the architectural preformed hole, can not maintain stable state, can not guarantee follow-up welded precision.
Disclosure of Invention
Objects of the invention
In order to solve the technical problems in the background art, the invention provides the tool for installing the high-rise building water heating room pipeline, which can stably support and clamp the pipeline, can convey the pipeline upwards, conveniently passes through a building reserved hole, can be maintained in a stable state after being conveyed, and ensures the accuracy of subsequent welding.
(II) technical scheme
The invention provides a tool for installing a water heating room pipeline of a high-rise building, which comprises a supporting seat and a clamping and conveying mechanism, wherein the supporting seat is arranged on the supporting seat; supporting seat top is provided with the supporting component who is used for supporting the pipeline, centre gripping conveying mechanism is the annular and evenly is provided with the multiunit, centre gripping conveying mechanism includes the mount, connecting rod a, connecting rod b, connecting rod c, connecting rod d, the connecting rod, connect platform and push mechanism, mount one end sets up at the supporting seat top, the mount other end and connecting rod a fixed connection, the equal vertical setting of connecting rod a and connecting rod c, connecting rod a, connecting rod b, connecting rod c and connecting rod d articulate into parallelogram mechanism end to end in proper order, the connecting rod both ends are articulated with connecting rod b and connection platform respectively, push mechanism sets up on connecting rod c, push mechanism is provided with the multiunit side by side along vertical direction, a plurality of connecting rod c all are located a plurality of connecting rod an inboards, be provided with the elevating system that is used for the drive to connect the platform to go up and down on the supporting seat.
Preferably, the supporting component comprises a supporting platform and a supporting column, the supporting column is vertically arranged at the top of the supporting seat, and the supporting platform is horizontally arranged at the top of the supporting column.
Preferably, the top of the support table is provided with a positioning piece which is of a rotary structure and comprises a rotary surface, and the inner diameter of the rotary surface is gradually reduced from bottom to top; the multiple groups of clamping and conveying mechanisms are uniformly arranged around the rotating central shaft of the positioning piece.
Preferably, the positioning part is a positioning table a, and the positioning table a is of a circular truncated cone structure.
Preferably, the positioning piece is a positioning table b which is of a conical structure, and the conical top of the positioning piece is arranged upwards.
Preferably, the lifting mechanism comprises a lifting platform, a motor, a screw rod and a screw nut, the motor is arranged on the supporting seat and is in driving connection with the screw rod, the screw rod is vertically arranged, the top end of the screw rod is rotatably connected with the supporting table, the screw rod is in threaded connection with the screw nut, the screw nut is connected with the lifting platform, and the lifting platform is connected with the connecting platform.
Preferably, the elevating platform is connected with the slider, is provided with the gliding spout of confession slider along vertical direction on the support column.
Preferably, folding covers are connected between the motor and the lifting platform and between the lifting platform and the supporting platform, the folding covers are cylindrical, and the screw rod is located on the inner side of the folding covers.
Preferably, push mechanism includes push wheel, antislip strip, mounting bracket and power device, and the antislip strip sets up on the push wheel outer peripheral face, and evenly is provided with a plurality ofly around push wheel center pin, and push wheel rotates and sets up on the mounting bracket, and power device is connected with the push wheel drive, and the mounting bracket setting is on connecting rod c.
The use method of the tool for installing the water heating room pipeline of the high-rise building comprises the following steps:
s1, moving the tool to the position below a preformed hole in a building floor slab;
s2, placing the pipeline to be installed on the supporting assembly, wherein the pipeline is positioned on the inner sides of the plurality of groups of clamping and conveying mechanisms;
s3, the connection table is driven to move downwards through the lifting mechanism, the connection table drives the connecting rod to move, the connecting rod drives the connecting rod c in the parallelogram mechanism to move inwards, the connecting rod c drives the pushing mechanism to move inwards until the pushing mechanism abuts against the pipeline, and at the moment, the plurality of pushing mechanisms clamp the pipeline;
s4, moving the tool to align the pipeline with the building preformed hole;
s5, conveying the pipeline upwards through a pushing mechanism, moving the pipeline upwards in a clamped state, and enabling the pipeline to pass through the reserved hole and extend to the height required by the upper layer installation;
and S6, installing the pipeline, and releasing the clamping of the pushing mechanism on the pipeline after the pipeline is installed.
Compared with the prior art, the technical scheme of the invention has the following beneficial technical effects:
the invention can stably support and clamp the pipeline, can convey the pipeline upwards, conveniently passes through a building preformed hole, can be maintained in a stable state after being conveyed, and ensures the accuracy of subsequent welding. When using, it is inboard with multiunit centre gripping conveying mechanism with the pipeline earlier, and put on the supporting component with it, then move down through elevating system drive connection platform, it drives parallelogram mechanism motion through the connecting rod to connect the platform, connecting rod an and connecting rod c remain vertical state throughout, a plurality of connecting rod c in the multiunit centre gripping conveying mechanism move to the inboard below in step, a plurality of pushing mechanism move along with connecting rod c, and press from both sides the pipeline tightly in the middle of a plurality of pushing mechanism, a plurality of pushing mechanism and the contact of the many places of pipeline periphery, including the ascending a plurality of contact points of circumference and vertical side, the pipeline can not rock, the stability of pipeline when by the centre gripping has been guaranteed. Move this frock to the position that the preformed hole was aimed at to the pipeline, start pushing mechanism, utilize pushing mechanism to carry the pipeline to the preformed hole, transportation process is steady, and the pipeline passes the preformed hole, carries out welding process with this pipeline and the pipeline that the top has been installed again, has guaranteed subsequent welding quality.
Drawings
FIG. 1 is a schematic structural view of a first embodiment of a tool for installing a water heating room pipeline of a high-rise building according to the present invention;
FIG. 2 is a schematic structural view of a lifting principle of a lifting platform in an embodiment of a tool for installing a water heating room pipeline of a high-rise building provided by the invention;
FIG. 3 is a schematic structural view of a pushing mechanism in an embodiment of a tool for installing a water heating room pipeline of a high-rise building according to the present invention;
fig. 4 is a schematic structural view of a positioning table b in a second embodiment of the tool for installing a water heating room pipeline of a high-rise building provided by the invention.
Reference numerals: 1. a support table; 2. a supporting seat; 3. a fixed mount; 41. a connecting rod a; 42. a connecting rod b; 43. a connecting rod c; 44. a connecting rod d; 5. a connecting rod; 6. a connecting table; 7. a lifting platform; 8. a motor; 9. a screw rod; 91. a feed screw nut; 10. a pushing mechanism; 101. a push wheel; 1011. anti-slip strips; 102. a mounting frame; 103. a power plant; 11. a slider; 12. a support pillar; 131. a positioning table a; 132. and a positioning table b.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention will be described in further detail with reference to the accompanying drawings in conjunction with the following detailed description.
Example one
As shown in fig. 1-3, the tool for installing a pipeline between a water heating room and a high-rise building provided by the invention comprises a supporting seat 2 and a clamping and conveying mechanism; supporting seat 2 top is provided with the supporting component who is used for supporting the pipeline, centre gripping conveying mechanism is the annular and evenly is provided with the multiunit, centre gripping conveying mechanism includes mount 3, connecting rod a41, connecting rod b42, connecting rod c43, connecting rod d44, connecting rod 5, connect platform 6 and push mechanism 10, 3 one end settings of mount are at supporting seat 2 top, the 3 other end of mount and connecting rod a41 fixed connection, connecting rod a41 and the equal vertical setting of connecting rod c43, connecting rod a41, connecting rod b42, connecting rod c43 and connecting rod d44 articulate into parallelogram mechanism head and the tail in proper order, connecting rod 5 both ends are articulated with connecting rod b42 and connecting platform 6 respectively, push mechanism 10 sets up on connecting rod c43, push mechanism 10 is provided with the multiunit along vertical direction side by side, a plurality of connecting rods c43 all are located a plurality of connecting rod a41 inboards, be provided with the elevating system that is used for.
The embodiment of the invention can stably support and clamp the pipeline, can convey the pipeline upwards, conveniently passes through the building preformed hole, can be maintained in a stable state after being conveyed, and ensures the accuracy of subsequent welding. When using, it is inboard with multiunit centre gripping conveying mechanism with the pipeline earlier, and put on the supporting component with it, then move down through elevating system drive connection platform 6, connection platform 6 passes through connecting rod 5 and drives the motion of parallelogram mechanism, connecting rod a41 and connecting rod c43 remain vertical state all the time, a plurality of connecting rod c43 among the multiunit centre gripping conveying mechanism move to the inboard below in step, a plurality of pushing mechanism 10 move along with connecting rod c43, and press from both sides the pipeline tight in the middle of a plurality of pushing mechanism 10, a plurality of pushing mechanism 10 and the contact of the multiple places of pipeline periphery, including circumference and the ascending a plurality of contact points of vertical side, the pipeline can not rock, the stability of pipeline when by the centre gripping has been guaranteed. Move this frock to the position that the preformed hole was aimed at to the pipeline, start push mechanism 10, utilize push mechanism 10 to carry the pipeline to the preformed hole, transportation process is steady, and the pipeline passes the preformed hole, carries out welding process with this pipeline and the pipeline that the top has been installed again, has guaranteed subsequent welding quality.
The supporting component comprises a supporting platform 1 and a supporting column 12, wherein the supporting column 12 is vertically arranged on the top of the supporting seat 2, and the supporting platform 1 is horizontally arranged on the top of the supporting column 12. The supporting table 1 can be used for flatly placing the pipeline and stably supporting the pipeline.
The top of the support table 1 is provided with a positioning piece which is of a rotary structure and comprises a rotary surface, and the inner diameter of the rotary surface is gradually reduced from bottom to top; the multiple groups of clamping and conveying mechanisms are uniformly arranged around the rotating central shaft of the positioning piece. When placing the pipeline, on putting the surface of revolution with the pipeline, make the inboard edge in pipeline bottom and the surface of revolution fully contact, the surface of revolution internal diameter is by supreme reducing gradually down, then can place the pipeline of different internal diameters on the surface of revolution, the pipeline homoenergetic of multiple specification is stable places on the setting element, and the application range of setting element is big, and the suitability is strong. When the pipeline is put on the locating piece, the pipeline position obtains prepositioning, and multiunit push mechanism 10 can press from both sides the pipeline tightly after removing same distance, can not push pipeline to the intermediate position to the inboard in the clamping process, prevents that the pipeline from taking place to topple over the condition.
The positioning piece is a positioning table a131, and the positioning table a131 is in a circular truncated cone structure. The pipeline can be accurately and stably supported by the positioning table a131 of the circular truncated cone structure, and the plurality of groups of clamping conveying mechanisms are uniformly distributed around the central shaft of the circular truncated cone, so that the pipeline can be synchronously clamped and released.
The lifting mechanism comprises a lifting platform 7, a motor 8, a screw rod 9 and a screw nut 91, the motor 8 is arranged on the supporting seat 2, the motor 8 is in driving connection with the screw rod 9, the screw rod 9 is vertically arranged, the top end of the screw rod 9 is rotationally connected with the supporting table 1, the screw rod 9 is in threaded connection with the screw nut 91, the screw nut 91 is connected with the lifting platform 7, and the lifting platform 7 is connected with the connecting platform 6. The motor 8 can drive the lead screw 9 to rotate, the lead screw 9 drives the lead screw nut 91 to lift, the lead screw nut 91 drives the lifting platform 7 to lift, the lifting platform 7 drives the connecting platform 6 to lift, when the lifting mechanism stops lifting the connecting platform 6, the connecting platform 6 can be stably maintained at the height due to the self-locking property of the threaded connection between the lead screw 9 and the lead screw nut 91, and therefore the clamped pipeline can be stably maintained at the corresponding height. The lifting platform 7 is connected with a sliding block 11, and a sliding groove for the sliding block 11 to slide is arranged on the supporting column 12 along the vertical direction. The slider 11 can slide along the vertical direction in the spout, and the slider 11 further leads and supports the removal process of elevating platform 7 for elevating platform 7 can be more stable goes up and down along the vertical direction.
Folding covers are connected between the motor 8 and the lifting platform 7 and between the lifting platform 7 and the supporting platform 1, the folding covers are cylindrical, and the screw rod 9 is located on the inner side of the folding covers. Folding cover can shelter from the protection to inboard lead screw 9, prevents that debris such as dust in the construction environment from attaching to lead screw 9, prevents to influence elevating system's normal operating.
Push mechanism 10 includes push wheel 101, antislip strip 1011, mounting bracket 102 and power device 103, and antislip strip 1011 sets up on push wheel 101 outer peripheral face, and evenly is provided with a plurality ofly around push wheel 101 center pin, and push wheel 101 rotates and sets up on mounting bracket 102, and power device 103 is connected with push wheel 101 drive, and mounting bracket 102 sets up on connecting rod c 43. After the power device 103 receives the starting instruction, the power device 103 drives the pushing wheel 101 to rotate, and the pushing wheel 101 drives the plurality of anti-slip strips 1011 to move, so that the pipeline can be firmly clamped and conveyed. The output end of the power device 103 can rotate forward and backward, so that the lifting of the pipeline can be controlled.
Example two
The difference between the second embodiment and the first embodiment is shown in fig. 4, in which the positioning element is a positioning table b132, and the positioning table b132 is a conical structure, and the conical top is disposed upward. The pipeline can be accurately and stably supported by the positioning table b132 of the conical structure, and the plurality of groups of clamping and conveying mechanisms are uniformly distributed around the central axis of the cone and can synchronously clamp and release the pipeline.
The use method of the tool for installing the water heating room pipeline of the high-rise building comprises the following steps:
s1, moving the tool to the position below a preformed hole in a building floor slab;
s2, placing the pipeline to be installed on the supporting assembly, wherein the pipeline is positioned on the inner sides of the plurality of groups of clamping and conveying mechanisms;
s3, the connection table 6 is driven to move downwards through the lifting mechanism, the connection table 6 drives the connecting rod 5 to move, the connecting rod 5 drives the connecting rod c43 in the parallelogram mechanism to move inwards, the connecting rod c43 drives the pushing mechanism 10 to move inwards until the pushing mechanism 10 abuts against the pipeline, at the moment, the multiple pushing mechanisms 10 clamp the pipeline, the pipeline is effectively clamped and fixed, the smoothness is high, and the pipeline cannot shake;
s4, moving the tool to align the pipeline with a building preformed hole to ensure the accuracy of upward pushing;
s5, conveying the pipeline upwards through the pushing mechanism 10, moving the pipeline upwards in a clamped state, and enabling the pipeline to pass through the reserved hole and reach a height required by upper-layer installation, wherein at the height, a worker can accurately install the pipeline, such as welding the pipeline with the pipeline installed above;
and S6, installing the pipeline, releasing the clamping of the pushing mechanism 10 on the pipeline after the pipeline is installed, removing the tool from the pipeline, moving the tool to an adjacent floor, and continuously installing the rest of pipelines.
It is to be understood that the above-described embodiments of the present invention are merely illustrative of or explaining the principles of the invention and are not to be construed as limiting the invention. Therefore, any modification, equivalent replacement, improvement and the like made without departing from the spirit and scope of the present invention should be included in the protection scope of the present invention.

Claims (10)

1. A tool for installing a water heating room pipeline of a high-rise building is characterized by comprising a supporting seat (2) and a clamping and conveying mechanism;
the top of the supporting seat (2) is provided with a supporting component for supporting a pipeline, a plurality of groups of clamping and conveying mechanisms are uniformly arranged in an annular shape, each clamping and conveying mechanism comprises a fixed frame (3), a connecting rod a (41), a connecting rod b (42), a connecting rod c (43), a connecting rod d (44), a connecting rod (5), a connecting platform (6) and a pushing mechanism (10), one end of each fixed frame (3) is arranged at the top of the supporting seat (2), the other end of each fixed frame (3) is fixedly connected with the corresponding connecting rod a (41), the corresponding connecting rod a (41) and the corresponding connecting rod c (43) are vertically arranged, the corresponding connecting rods a (41), the corresponding connecting rod b (42), the corresponding connecting rod c (43) and the corresponding connecting rod d (44) are sequentially hinged end to form a parallelogram mechanism, two ends of the corresponding connecting rod (5) are respectively hinged with the corresponding connecting rod b (42) and the corresponding connecting platform (6), the pushing mechanisms (10) are arranged on the corresponding connecting rods c (43), and the pushing mechanisms (10) are arranged in parallel in a plurality of groups in the vertical direction, the connecting rods c (43) are all positioned at the inner sides of the connecting rods a (41), and the supporting seat (2) is provided with a lifting mechanism for driving the connecting platform (6) to lift.
2. The tool for installing the water heating room pipeline of the high-rise building as claimed in claim 1, wherein the supporting assembly comprises a supporting platform (1) and a supporting column (12), the supporting column (12) is vertically arranged on the top of the supporting seat (2), and the supporting platform (1) is horizontally arranged on the top of the supporting column (12).
3. The tool for installing the water heating room pipeline of the high-rise building according to claim 2, wherein a positioning piece is arranged at the top of the supporting platform (1), the positioning piece is of a rotary structure and comprises a rotary surface, and the inner diameter of the rotary surface is gradually reduced from bottom to top; the multiple groups of clamping and conveying mechanisms are uniformly arranged around the rotating central shaft of the positioning piece.
4. The tool for installing the water heating room pipeline of the high-rise building according to claim 3, wherein the positioning part is a positioning table a (131), and the positioning table a (131) is of a circular truncated cone structure.
5. The tool for installing the water heating room pipeline of the high-rise building as claimed in claim 3, wherein the positioning member is a positioning table b (132), the positioning table b (132) is of a conical structure, and the conical top is arranged upwards.
6. The tool for installing the water heating room pipeline of the high-rise building as claimed in claim 2, wherein the lifting mechanism comprises a lifting table (7), a motor (8), a screw rod (9) and a screw nut (91), the motor (8) is arranged on the supporting seat (2), the motor (8) is in driving connection with the screw rod (9), the screw rod (9) is vertically arranged, the top end of the screw rod (9) is rotatably connected with the supporting table (1), the screw rod (9) is in threaded connection with the screw nut (91), the screw nut (91) is connected with the lifting table (7), and the lifting table (7) is connected with the connecting table (6).
7. The tool for installing the water heating room pipeline of the high-rise building according to claim 6, wherein the lifting platform (7) is connected with a sliding block (11), and a sliding groove for the sliding block (11) to slide is formed in the supporting column (12) in the vertical direction.
8. The tool for installing the water heating room pipeline of the high-rise building according to claim 6, wherein folding covers are connected between the motor (8) and the lifting platform (7) and between the lifting platform (7) and the supporting platform (1), the folding covers are cylindrical, and the screw rod (9) is located on the inner sides of the folding covers.
9. The tool for installing the water heating room pipeline of the high-rise building according to claim 1, wherein the pushing mechanism (10) comprises a pushing wheel (101), anti-slip strips (1011), an installation frame (102) and a power device (103), the anti-slip strips (1011) are arranged on the outer peripheral surface of the pushing wheel (101), a plurality of anti-slip strips are uniformly arranged around the central shaft of the pushing wheel (101), the pushing wheel (101) is rotatably arranged on the installation frame (102), the power device (103) is in driving connection with the pushing wheel (101), and the installation frame (102) is arranged on the connecting rod c (43).
10. The tool for installing the water heating room pipeline of the high-rise building according to any one of claims 1 to 9, wherein the using method comprises the following steps:
s1, moving the tool to the position below a preformed hole in a building floor slab;
s2, placing the pipeline to be installed on the supporting assembly, wherein the pipeline is positioned on the inner sides of the plurality of groups of clamping and conveying mechanisms;
s3, the connection table (6) is driven to move downwards through the lifting mechanism, the connection table (6) drives the connecting rod (5) to move, the connecting rod (5) drives the connecting rod c (43) in the parallelogram mechanism to move inwards, the connecting rod c (43) drives the pushing mechanism (10) to move inwards until the pushing mechanism (10) abuts against the pipeline, and at the moment, the plurality of pushing mechanisms (10) clamp the pipeline;
s4, moving the tool to align the pipeline with the building preformed hole;
s5, conveying the pipeline upwards through the pushing mechanism (10), moving the pipeline upwards in a clamped state, and enabling the pipeline to pass through the reserved hole and extend to the height required by the upper layer installation;
and S6, installing the pipeline, and releasing the clamping of the pushing mechanism (10) on the pipeline after the pipeline is installed.
CN202110716571.5A 2021-06-28 2021-06-28 Tool for installing pipeline between water heating rooms of high-rise building Active CN113399926B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110716571.5A CN113399926B (en) 2021-06-28 2021-06-28 Tool for installing pipeline between water heating rooms of high-rise building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110716571.5A CN113399926B (en) 2021-06-28 2021-06-28 Tool for installing pipeline between water heating rooms of high-rise building

Publications (2)

Publication Number Publication Date
CN113399926A true CN113399926A (en) 2021-09-17
CN113399926B CN113399926B (en) 2022-09-23

Family

ID=77679576

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110716571.5A Active CN113399926B (en) 2021-06-28 2021-06-28 Tool for installing pipeline between water heating rooms of high-rise building

Country Status (1)

Country Link
CN (1) CN113399926B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2671131A1 (en) * 1990-12-27 1992-07-03 Hugues Gilbert Self-locking device for lifting and handling tubes, pipes or other elongate elements
JPH0949332A (en) * 1995-08-07 1997-02-18 Fujita Corp Carriage having rotary stand to carry building member and carrying method of building member
CN101691772A (en) * 2009-10-28 2010-04-07 朱成三 Fabricated novel installation process for drain pipe
CN208952893U (en) * 2018-09-03 2019-06-07 南通市通佳工程质量检测有限公司 A kind of municipal works drainage pipeline straightness detection device
CN110937518A (en) * 2019-12-09 2020-03-31 王长波 Pipeline embedding device for hydraulic engineering
CN210635356U (en) * 2019-10-23 2020-05-29 邯郸学院 Hard belt material pre-tightening guide mechanism
CN112393028A (en) * 2020-11-24 2021-02-23 山西三建集团有限公司 Tool for installing pipeline between water heating rooms of high-rise building

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2671131A1 (en) * 1990-12-27 1992-07-03 Hugues Gilbert Self-locking device for lifting and handling tubes, pipes or other elongate elements
JPH0949332A (en) * 1995-08-07 1997-02-18 Fujita Corp Carriage having rotary stand to carry building member and carrying method of building member
CN101691772A (en) * 2009-10-28 2010-04-07 朱成三 Fabricated novel installation process for drain pipe
CN208952893U (en) * 2018-09-03 2019-06-07 南通市通佳工程质量检测有限公司 A kind of municipal works drainage pipeline straightness detection device
CN210635356U (en) * 2019-10-23 2020-05-29 邯郸学院 Hard belt material pre-tightening guide mechanism
CN110937518A (en) * 2019-12-09 2020-03-31 王长波 Pipeline embedding device for hydraulic engineering
CN112393028A (en) * 2020-11-24 2021-02-23 山西三建集团有限公司 Tool for installing pipeline between water heating rooms of high-rise building

Also Published As

Publication number Publication date
CN113399926B (en) 2022-09-23

Similar Documents

Publication Publication Date Title
US10520933B2 (en) System and method for removing a workpiece from a manufacturing fixture
CN108817783B (en) Welding equipment
CN113399926B (en) Tool for installing pipeline between water heating rooms of high-rise building
CN111545953A (en) Welding, assembling and assisting tool for elevator car bottom robot and welding method
CN113118854A (en) Mechanical automation applies to pipe fitting class processingequipment
CN116812737A (en) Construction fragment of brick handling equipment is built in room
CN116122594A (en) Assembling system for steel structure net rack
CN214851073U (en) Photovoltaic module installation device
CN206225096U (en) A kind of dip coating apparatus for support insulator application
CN114193481A (en) Flat cantilever production system and control method thereof
CN211201081U (en) Auxiliary paving apparatus for building ceramic tile
CN108487574B (en) Adjustable hanging structure for stone plate
CN216881826U (en) Ultra-thin wall metal filters pipe fitting bottom system hole device
CN218970685U (en) Auxiliary supporting device for installing vitrified guardrail
CN110836021A (en) Building block construction robot and construction method
CN217102771U (en) Vertical conveyer of lantern
CN218468568U (en) Electromechanical device assists installation device
CN217516166U (en) Pipe station transfer device
CN220182601U (en) Color steel tile electroplating lifting loading and unloading structure
CN220117793U (en) Building steel structure supporting device
CN213356638U (en) Prefabricated wallboard hoisting accessory
CN220845071U (en) Crane hoisting tool
CN216225129U (en) Automatic circumference rubber coating device
CN114228170B (en) Device and method for bonding protection layers and cabin sections of revolution bodies
CN215909864U (en) Positioning device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant