CN113356232A - Assembled profile steel combined foundation pit supporting method - Google Patents

Assembled profile steel combined foundation pit supporting method Download PDF

Info

Publication number
CN113356232A
CN113356232A CN202110732763.5A CN202110732763A CN113356232A CN 113356232 A CN113356232 A CN 113356232A CN 202110732763 A CN202110732763 A CN 202110732763A CN 113356232 A CN113356232 A CN 113356232A
Authority
CN
China
Prior art keywords
steel
profile
embedded
support
profile steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110732763.5A
Other languages
Chinese (zh)
Inventor
杜海鹏
程霞霞
常胜伟
高三虎
赵文君
张靖华
李梦超
杨天龙
武超
卢建宇
武娜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Fifth Construction Group Co Ltd
Original Assignee
Shanxi Fifth Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Fifth Construction Group Co Ltd filed Critical Shanxi Fifth Construction Group Co Ltd
Priority to CN202110732763.5A priority Critical patent/CN113356232A/en
Publication of CN113356232A publication Critical patent/CN113356232A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Foundations (AREA)

Abstract

The invention belongs to the technical field of foundation pit supporting, and particularly relates to a supporting method of an assembled profile steel combined foundation pit. After the construction of the SMW construction method pile is completed, the top end of the SMW construction method pile is welded with a steel bar of a crown beam, and then the crown beam is poured; the part of the embedded steel bar in the crown beam, which extends out of the crown beam, is spot-welded with a steel bar connector, and the steel bar connector is connected with the profile steel purlin through a screw; welding a profile steel bracket on one side of the embedded steel plate, mounting a profile steel support on the top of the profile steel bracket, and connecting the profile steel support with the profile steel purlin by using bolts; arranging a steel support triangular piece at the oblique intersection of the profile steel support and the profile steel purlin; set up the shaped steel stand in the central authorities that shaped steel supported, the bottom of shaped steel stand is pre-buried in the bored concrete pile, and the pre-buried steel bar welding that bracket and shaped steel supported passes through high strength bolt connection between crossbeam and every shaped steel support. The invention has low cost and easy quality control, and greatly reduces energy consumption; the construction space is reduced, the construction efficiency is improved, the construction speed is high, the stress loss is effectively prevented, and the safety is ensured.

Description

Assembled profile steel combined foundation pit supporting method
Technical Field
The invention belongs to the technical field of foundation pit supporting, and particularly relates to a supporting method of an assembled profile steel combined foundation pit.
Background
Aiming at the construction environment with complex surrounding environment, the existing enclosure structure can not be used. For example, the total area of a certain project of the warehouse constructed by the applicant is 18500 square meters, the peripheral environment is complex, the warehouse is close to the existing buildings, is a dense area of residents in the city center, the construction period is short, and the geological condition is complex. The traditional combined enclosing structure of the triaxial mixing pile, the cast-in-place pile and the profile steel enclosing purlin is adopted, so that the construction surface is large, the construction period is long, and the surrounding can not be completely avoided by the existing buildings.
Disclosure of Invention
The invention provides a method for supporting an assembled profile steel combined foundation pit, aiming at solving the difficult problems that the construction surface is narrow, the periphery of the construction surface is the existing building, and the house is densely constructed.
The invention is realized by adopting the following technical scheme: a supporting method of an assembled type section steel combined foundation pit comprises the steps of firstly constructing a pile in an SMW construction method, welding reinforcing steel bars of a crown beam at the top end of the pile in the SMW construction method after the construction of the pile in the SMW construction method is completed, and then pouring the crown beam; pre-embedded steel bars are pre-embedded in the crown beam, part of the pre-embedded steel bars extending out of the crown beam is spot-welded with a steel bar connector, and the steel bar connector is connected with the profile steel purlin through a screw; one side of the SMW construction method pile is pre-embedded with an embedded steel plate, one side of the embedded steel plate is welded with a profile steel bracket, a profile steel support is installed at the top of the profile steel bracket, and the profile steel support is connected with a profile steel purlin by bolts; arranging a steel support triangular piece at the oblique intersection of the profile steel support and the profile steel purlin, and anchoring embedded steel bars of the steel support triangular piece into the crown beam; set up the shaped steel stand at the central authorities that shaped steel supported, the bottom of shaped steel stand is pre-buried in the bored concrete pile, sets up stagnant water piece, crossbeam and bracket on shaped steel supports, and the bracket welds with the pre-buried reinforcing bar that shaped steel supported, supports between crossbeam and every shaped steel through high strength bolt connection.
Furthermore, each limb steel supported by the steel section is connected with a cover plate.
Furthermore, the bracket is connected with the embedded steel bar supported by the section steel by fillet welding, and the height of the welding seam is 6 mm.
Further, the shaped steel supports for the H shaped steel of seting up a plurality of screw holes.
Furthermore, the cross beam is connected with each section steel support by at least two high-strength bolts.
Furthermore, the embedded steel bars of the steel support triangular parts are anchored into the crown beam by 300 mm.
Compared with the prior art, the invention has the beneficial effects that:
1. the method has the advantages of low manufacturing cost, easy quality control, great reduction of energy consumption and construction waste, and higher social and economic benefits and environmental protection;
2. according to the construction method, the SMW construction method is adopted to support the section steel by the piles, and the section steel upright column is arranged in the center of the section steel support, so that the construction space is reduced, the construction efficiency is improved, the construction speed is high, the waterproof and anti-permeability effects are good, the stress loss is effectively prevented, the efficiency is improved, and the safety is ensured, so that the construction method has a wide application prospect; the method is particularly suitable for construction projects with narrow construction surfaces, existing buildings around the construction projects, dense houses and tight construction period.
Drawings
FIG. 1 is a construction plan view;
FIG. 2 is a schematic connection diagram of a crown beam, a profile steel purlin and a profile steel support;
FIG. 3 is a schematic view of a section steel column;
FIG. 4 is a schematic view of a steel support triangle;
FIG. 5 is a schematic view of pre-buried steel bars;
FIG. 6 is a schematic view of a section steel support;
FIG. 7 is a schematic view of a cover plate;
FIG. 8 is a schematic view of connection of section steel and a section steel purlin;
in the figure: the method comprises the following steps of 1-SMW construction method piles, 2-crown beams, 3-section steel purlins, 4-section steel supports, 5-section steel brackets, 6-section steel columns, 7-cross beams, 8-brackets, 9-water stop sheets, 10-cast-in-place piles, 11-steel support triangular pieces, 12-cover plates, 13-embedded steel plates, 14-steel bar connectors, 15-embedded steel bars, 16-screws and 17-bolts.
Detailed Description
The following description of the embodiments of the present invention is provided for illustrative purposes, and other advantages and effects of the present invention will become apparent to those skilled in the art from the present disclosure.
It should be understood that the structures, ratios, sizes, and the like shown in the drawings and described in the specification are only used for matching with the disclosure of the specification, so as to be understood and read by those skilled in the art, and are not used to limit the conditions under which the present invention can be implemented, so that the present invention has no technical significance, and any structural modification, ratio relationship change, or size adjustment should still fall within the scope of the present invention without affecting the efficacy and the achievable purpose of the present invention. In addition, the terms "upper", "lower", "left", "right", "middle" and "one" used in the present specification are for clarity of description, and are not intended to limit the scope of the present invention, and the relative relationship between the terms and the terms is not to be construed as a scope of the present invention.
Referring to fig. 1 to 8, the present invention provides a technical solution: a supporting method of an assembled type section steel combined foundation pit comprises the steps of firstly constructing a pile 1 in an SMW construction method, welding reinforcing steel bars of a crown beam 2 at the top end of the pile 1 in the SMW construction method after the construction is finished, and then pouring the crown beam 2; pre-embedded steel bars 15 are pre-embedded in the crown beam 2, a part of the pre-embedded steel bars 15 extending out of the crown beam 2 is spot-welded with a steel bar connector 14, and the steel bar connector 14 is connected with the profile steel surrounding purlin 3 through a screw 16; an embedded steel plate 13 is embedded in one side of the SMW construction method pile 1, a profile steel bracket 5 is welded on one side of the embedded steel plate 13, a profile steel support 4 is installed at the top of the profile steel bracket 5, and the profile steel support 4 is connected with a profile steel surrounding purlin 3 through bolts; arranging a steel support triangular piece 11 at the oblique intersection of the profile steel support 4 and the profile steel purlin 3, and anchoring embedded steel bars of the steel support triangular piece 11 into the crown beam 2; set up shaped steel stand 6 at the central authorities that shaped steel supported 4, the bottom of shaped steel stand 6 is pre-buried in bored concrete pile 10, sets up stagnant water piece 9, crossbeam 7 and bracket 8 on shaped steel supports 4, and bracket 8 and shaped steel support 4's embedded reinforcement welding pass through high strength bolt between crossbeam 7 and every shaped steel support 4.
A cover plate 12 is connected to each limb steel of the steel section support 4.
The bracket 8 is connected with the embedded steel bar of the section steel support 4 by fillet weld, and the height of the weld is 6 mm.
The section steel support 4 is H-shaped steel provided with a plurality of threaded holes.
The cross beam 7 is connected with each section steel support 4 by at least two high-strength bolts.
The embedded steel bars of the steel support triangular piece 11 are anchored into the crown beam by 2300 mm.
The embedded steel bars 15 in the crown beam 2 are HRB400E with the diameter of 25 mm.
The cross beam 7 and the bracket 8 are made of H300X 10X 15 section steel.
The reinforcing bar connector 14 is M24 × 70; the screw 16 is M24 × 60.
The bolt for connecting the section steel support 4 and the section steel purlin 3 is M24 & 80.
The section steel support 4 adopts standard parts, has the size of 4-12m, and can be pre-assembled in advance according to the actual situation on site.
The foregoing embodiments are merely illustrative of the principles and utilities of the present invention and are not intended to limit the invention. Any person skilled in the art can modify or change the above-mentioned embodiments without departing from the spirit and scope of the present invention. Accordingly, it is intended that all equivalent modifications or changes which can be made by those skilled in the art without departing from the spirit and technical spirit of the present invention be covered by the claims of the present invention.

Claims (6)

1. The assembled profile steel combined foundation pit supporting method is characterized by comprising the following steps of: firstly, constructing a pile (1) in an SMW construction method, welding a reinforcing steel bar of a crown beam (2) at the top end of the pile (1) in the SMW construction method after the construction is finished, and then pouring the crown beam (2); pre-embedded steel bars (15) are pre-embedded in the crown beam (2), a part of the pre-embedded steel bars (15) extending out of the crown beam (2) is spot-welded with a steel bar connector (14), and the steel bar connector (14) is connected with the profile steel surrounding purlin (3) through a screw (16); an embedded steel plate (13) is embedded in one side of the SMW construction method pile (1), a profile steel bracket (5) is welded on one side of the embedded steel plate (13), a profile steel support (4) is installed at the top of the profile steel bracket (5), and the profile steel support (4) is connected with a profile steel purlin (3) through bolts (17); arranging a steel support triangular piece (11) at the oblique crossing position of the profile steel support (4) and the profile steel purlin (3), and anchoring an embedded steel bar of the steel support triangular piece (11) into the crown beam (2); set up shaped steel stand (6) at the central authorities that shaped steel supported (4), the bottom of shaped steel stand (6) is pre-buried in bored concrete pile (10), sets up stagnant water piece (9), crossbeam (7) and bracket (8) on shaped steel supports (4), and bracket (8) and the pre-buried reinforcing bar welding of shaped steel support (4) pass through high strength bolt between crossbeam (7) and every way shaped steel support (4).
2. The assembled type steel combined foundation pit supporting method according to claim 1, characterized in that: and a cover plate (12) is connected to each limb steel of the section steel support (4).
3. The assembled type steel combined foundation pit supporting method according to claim 1, characterized in that: the bracket (8) is connected with the embedded steel bars of the section steel support (4) through fillet welds, and the height of the welds is 6 mm.
4. The assembled type steel combined foundation pit supporting method according to claim 1, characterized in that: the section steel support (4) is H-shaped steel provided with a plurality of threaded holes.
5. The assembled type steel section combined foundation pit supporting method according to any one of claims 1-4, wherein the method comprises the following steps: the cross beam (7) is connected with each section steel support (4) by at least two high-strength bolts.
6. The assembled type steel combined foundation pit supporting method according to claim 5, wherein the method comprises the following steps: and the embedded steel bars of the steel support triangular piece (11) are anchored into the crown beam (2) by 300 mm.
CN202110732763.5A 2021-06-30 2021-06-30 Assembled profile steel combined foundation pit supporting method Pending CN113356232A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110732763.5A CN113356232A (en) 2021-06-30 2021-06-30 Assembled profile steel combined foundation pit supporting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110732763.5A CN113356232A (en) 2021-06-30 2021-06-30 Assembled profile steel combined foundation pit supporting method

Publications (1)

Publication Number Publication Date
CN113356232A true CN113356232A (en) 2021-09-07

Family

ID=77537274

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110732763.5A Pending CN113356232A (en) 2021-06-30 2021-06-30 Assembled profile steel combined foundation pit supporting method

Country Status (1)

Country Link
CN (1) CN113356232A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020071725A1 (en) * 2000-12-07 2002-06-13 Jakiel Robert L. Earth support and permanent structural foundation wall
CN102505695A (en) * 2011-10-09 2012-06-20 浙江荣邦房地产开发有限公司 Construction method for deep foundation pit of three-dimensional garage
CN102704491A (en) * 2012-06-11 2012-10-03 上海强劲地基工程股份有限公司 Sectional steel and reinforced concrete beam combination foundation pit supporting protection surrounding purlin and construction method of purlin
CN103243722A (en) * 2012-02-13 2013-08-14 郑鸿彰 Construction method of novel inner support of foundation trench
CN104790595A (en) * 2015-05-15 2015-07-22 山西五建集团有限公司 Construction method for adjustable tile hanging system of pitched roof
CN104947682A (en) * 2015-05-06 2015-09-30 中国地质大学(武汉) Foundation pit support construction method and device thereof
CN109610477A (en) * 2019-01-31 2019-04-12 上海宝钢工程咨询有限公司 Large area mud liquid soil layer foundation pit suspension supporting integrated construction structures and methods
CN110424411A (en) * 2019-08-27 2019-11-08 南京市测绘勘察研究院股份有限公司 A kind of irregular foundation pit assembled steel support device and its construction and application method
CN110485429A (en) * 2019-03-21 2019-11-22 安徽省第一建筑工程有限公司 A kind of prestressing force fashioned iron assembled combination inner support construction method

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020071725A1 (en) * 2000-12-07 2002-06-13 Jakiel Robert L. Earth support and permanent structural foundation wall
CN102505695A (en) * 2011-10-09 2012-06-20 浙江荣邦房地产开发有限公司 Construction method for deep foundation pit of three-dimensional garage
CN103243722A (en) * 2012-02-13 2013-08-14 郑鸿彰 Construction method of novel inner support of foundation trench
CN102704491A (en) * 2012-06-11 2012-10-03 上海强劲地基工程股份有限公司 Sectional steel and reinforced concrete beam combination foundation pit supporting protection surrounding purlin and construction method of purlin
CN104947682A (en) * 2015-05-06 2015-09-30 中国地质大学(武汉) Foundation pit support construction method and device thereof
CN104790595A (en) * 2015-05-15 2015-07-22 山西五建集团有限公司 Construction method for adjustable tile hanging system of pitched roof
CN109610477A (en) * 2019-01-31 2019-04-12 上海宝钢工程咨询有限公司 Large area mud liquid soil layer foundation pit suspension supporting integrated construction structures and methods
CN110485429A (en) * 2019-03-21 2019-11-22 安徽省第一建筑工程有限公司 A kind of prestressing force fashioned iron assembled combination inner support construction method
CN110424411A (en) * 2019-08-27 2019-11-08 南京市测绘勘察研究院股份有限公司 A kind of irregular foundation pit assembled steel support device and its construction and application method

Similar Documents

Publication Publication Date Title
CN215367377U (en) Fully-assembled wind generating set foundation and wind generating set
CN111663449A (en) Combined cast-in-place box girder support system and construction method
CN110629664A (en) Prefabricated assembled UHPC lattice type bridge pier column structure and construction method thereof
CN207017483U (en) The full precast shear wall structural system of regenerative steel skeleton
CN202430876U (en) Floor system with structure of steel and concrete precast slabs
CN212897482U (en) Construction platform for high-rise building overhanging structural layer
CN111749364B (en) Assembled composite wall based on C-shaped steel and construction method thereof
CN216740195U (en) Shear wall mixed structure system connected by grouting sleeve
CN113356232A (en) Assembled profile steel combined foundation pit supporting method
CN213572357U (en) Basement board reinforcing structure under one-column one-pile working condition of top-down construction method
CN210887229U (en) Irregular foundation pit assembled steel strutting arrangement
CN111206592B (en) Construction method of prefabricated steel-concrete combined support foundation pit supporting structure
CN207314532U (en) A kind of box column-H-type joist steel frame joint
CN221077312U (en) High-level water tank bracket and system for indirect air cooling system
CN216197082U (en) Assembled enclosure based on recycled lightweight aggregate concrete
CN220927926U (en) Assembled spiral anchor foundation
CN209874075U (en) Circular steel core concrete column and unequal-height I-shaped beam connecting structure
CN215629403U (en) Supporting system for temporary via hole of bridge girder erection machine
CN217352174U (en) Pier edge side span cast-in-place support
CN219931744U (en) Supporting system of cast-in-situ concrete beam plate structure of large pipeline
CN218028319U (en) Prefabricated wall of prefabricated steel structure frame and concrete combined structure house
CN214695213U (en) Arch ring formwork system of porous arch bridge
CN219118366U (en) Large-span assembled steel bar support
CN215715337U (en) Integrated lattice column structure suitable for underground single structure and foundation pit support structure
CN217810967U (en) Supporting structure adopting prefabricated section steel concrete square pile as stand column

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20210907

RJ01 Rejection of invention patent application after publication