CN113338947A - Sand-flowing-preventing water-gushing working well for water-rich sand layer and construction method thereof - Google Patents

Sand-flowing-preventing water-gushing working well for water-rich sand layer and construction method thereof Download PDF

Info

Publication number
CN113338947A
CN113338947A CN202110401247.4A CN202110401247A CN113338947A CN 113338947 A CN113338947 A CN 113338947A CN 202110401247 A CN202110401247 A CN 202110401247A CN 113338947 A CN113338947 A CN 113338947A
Authority
CN
China
Prior art keywords
water
working well
pipe
embedded
underground continuous
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110401247.4A
Other languages
Chinese (zh)
Other versions
CN113338947B (en
Inventor
刘伟
干红钢
刘唐华
罗明
马国鑫
陆佳枫
任江涛
丁云凯
奚铮松
尹扬帆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Communications Construction Group Co Ltd
Original Assignee
Zhejiang Communications Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Communications Construction Group Co Ltd filed Critical Zhejiang Communications Construction Group Co Ltd
Priority to CN202110401247.4A priority Critical patent/CN113338947B/en
Publication of CN113338947A publication Critical patent/CN113338947A/en
Application granted granted Critical
Publication of CN113338947B publication Critical patent/CN113338947B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/107Reinforcing elements therefor; Holders for the reinforcing elements
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/103Dams, e.g. for ventilation

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention relates to a water-rich sand layer sand flow-proof water burst working well and a construction method thereof, wherein the working well structure comprises an underground continuous wall and a grid cement-soil wall arranged at the inlet and outlet sides of the underground continuous wall, the underground continuous wall comprises a reinforcement cage made of reinforcing steel bars and concrete poured in the reinforcement cage, an embedded steel ring and embedded bolts are circumferentially arranged at the inner side of the reinforcement cage, an annular waterproof ring is arranged at the inner side of the underground continuous wall, water-swelling rubber is arranged between the annular waterproof ring and the embedded steel ring, the annular waterproof ring is fixed with the embedded steel ring through a steel pressing plate and the embedded bolts, the annular waterproof ring is made of an elastic material, and the inner diameter of the annular waterproof ring is smaller than the outer diameter of a jacking pipe, so that the annular waterproof ring is tightly attached to the jacking pipe and deforms along the advancing direction of the jacking pipe.

Description

Sand-flowing-preventing water-gushing working well for water-rich sand layer and construction method thereof
Technical Field
The invention relates to the technical field of construction engineering, in particular to a sand-flowing-preventing water-inrush working well for a water-rich sand layer and a construction method thereof.
Background
The pipe construction technology has been rapidly developed in China in recent years, and is widely applied to underground passage engineering and comprehensive pipe gallery engineering. The pipe jacking method is used as a non-grooving construction method, and has the greatest advantage that a non-grooving underground excavation mode is adopted, so that the direct influence of an operation surface on an overground building or a structure is avoided. At present, the size of a domestic jacking pipe is generally smaller than 3600mm, the pipe is mostly circular, the geological and hydrological conditions in most areas are good, and the construction risk is low; however, as an underground excavation method, large-section special-shaped pipe jacking construction in a water-rich weak stratum belongs to high-risk operation, a tunnel portal is in a continuous starting state in the pipe jacking process, the risk of water burst and sand burst of the tunnel portal is extremely high under the influence of engineering geology, hydrology, structural dimension, jacking length and the like, water and soil loss is easy to occur, ground settlement is further caused, adverse social influence is generated, and in addition, in construction, casualties and property loss are often caused by sudden accidents, and the engineering progress is very influenced. Therefore, the research on the technology for preventing the inrush of the tunnel portal in the pipe jacking construction in the special stratum becomes the difficult point, the key point and the hot point problem of the development of the large-section special-shaped pipe jacking.
Disclosure of Invention
In order to solve the problems in the prior art, the invention provides a water-rich sand layer running sand water burst prevention working well with good waterproof effect and low construction risk, the working well structure comprises an underground continuous wall and a grid cement soil wall arranged at the inlet and outlet sides of the underground continuous wall, the underground continuous wall comprises a reinforcement cage made of reinforcing steel bars and concrete poured in the reinforcement cage, an embedded steel ring and embedded bolts are circumferentially arranged at the inner side of the reinforcement cage, an annular waterproof ring is arranged at the inner side of the underground continuous wall, water-swelling rubber is arranged between the annular waterproof ring and the embedded steel ring, the annular waterproof ring is fixed with the embedded steel ring through a steel pressing plate and the embedded bolts, the annular waterproof ring is made of an elastic material, the inner diameter of the annular waterproof ring is smaller than the outer diameter of a jacking pipe, so that the annular waterproof ring is tightly attached to the jacking pipe and deforms along the advancing direction of the jacking pipe, and the annular waterproof ring is made of the elastic material in the technical scheme, the inner diameter of the annular waterproof ring is smaller than the outer diameter of the jacking pipe, when the jacking pipe enters and exits, the annular waterproof ring stretches the annular waterproof ring through extrusion force and drives the annular waterproof ring to deform towards the advancing direction of the jacking pipe, and the annular waterproof ring is closely attached to the jacking pipe, so that underground water can be prevented from permeating into the working well along the gap between the jacking pipe and the opening; the annular waterproof ring is fixedly arranged on the embedded steel ring by the steel pressing plate and the water-swelling rubber, so that the waterproof ring has a good waterproof effect and is very firm.
Preferably, the grid cement-soil wall adopts a multi-layer grid type, and at least part of the cement-soil wall is closely attached to the upper part of the outer wall of the underground continuous wall; the arrangement mode in the technical scheme can be used for reinforcing the soil body at the hole opening in a large range, has a good waterproof effect and prevents surrounding underground water from entering the hole opening of the jacking pipe.
According to the preferable scheme, a linear steel sheet pile is inserted into one layer of the grid cement soil wall tightly attached to the underground continuous wall; according to the technical scheme, the support capability and the water stop are provided for the broken hole and the jacking pipe before entering and exiting the hole, and the linear steel sheet pile is pulled out during entering and exiting hole construction.
Preferably, a plurality of grouting pipes are arranged on the side, close to the inlet and the outlet of the working well, of the grid cement-soil wall; the grouting pipe is arranged in the technical scheme, so that grouting plugging can be performed when the hole leaks water.
According to the technical scheme, the glass fiber reinforcements and the foam concrete are arranged at the opening of the working well in a square shape, damage to the embedded steel ring and the embedded bolts is prevented, the two ends of the glass fiber reinforcements are in lap joint with the reinforcements of the underground continuous wall, the glass fiber reinforcements and the foam concrete are easy to break manually, and damage to the embedded steel ring and the embedded bolts during hole breaking can be prevented.
According to the preferable scheme, the embedded steel ring and the embedded bolts are wrapped and protected by the plastic film, so that the embedded parts are prevented from being damaged, and the hole and the embedded parts are conveniently cleaned at the broken hole.
As the preferred scheme, the cross section of the embedded steel ring is L-shaped, and the effect of fixing the annular waterproof ring is better.
Preferably, the grouting pipe is a steel pipe wrapping the filter cloth, and grouting holes are formed in the steel pipe.
The invention also provides a construction method of the sand-flowing-preventing water-inrush working well for the water-rich sand layer, which comprises the following steps:
s1 construction of the grid cement soil wall: a cement-soil mixing pile machine is adopted to drive a grid cement-soil wall on one side of a jacking pipe in and out hole of the working well, the grid cement-soil wall is of a multi-layer cement-soil wall structure and partially surrounds an underground continuous wall of the working well, and the depth of the grid cement-soil wall exceeds a certain depth of a working well opening;
s2, installing a linear steel sheet pile and a grouting pipe: inserting linear steel plate piles into a layer of wall, close to the working well, of the grid cement soil wall, wherein the linear steel plate piles are overlapped through lock catches to form a curtain, and the insertion depth of the linear steel plate piles exceeds a certain depth of the hole; inserting a plurality of grouting pipes into two sides of a hole between the linear steel sheet pile and the underground continuous wall, wherein the insertion depth of the grouting pipes exceeds the hole by a certain depth; the grouting pipe is a steel pipe wrapping the filter cloth, and small holes are punched on the steel pipe within the depth range of the hole to serve as grouting holes.
S3 binding the reinforcement cage of the underground continuous wall: adopting a glass fiber rib at the position of the jacking pipe entering and exiting hole, wherein two ends of the glass fiber rib are lapped with the reinforcing steel bar and are fixed by a U-shaped card; and fixedly welding an embedded steel ring and an embedded bolt in an underground continuous wall steel reinforcement cage at the position where the jacking pipe enters and exits the hole, and wrapping the surfaces of the embedded steel ring and the embedded bolt by plastic films.
S4, pouring the underground continuous wall: carrying out grooving operation on the underground diaphragm wall by using a grooving machine, placing a reinforcement cage after grooving, and then pouring concrete; when the groove width concrete of the opening is poured, firstly pouring concrete, then pouring foam concrete in the opening area, and finally pouring concrete.
S5 working well excavation: and after the concrete of the underground diaphragm wall reaches the design strength, excavating the working well to the design elevation, and then sealing the bottom.
S6 artificially breaking the hole: before the jacking pipe enters the tunnel, firstly, manually breaking foam concrete at the tunnel opening, paying attention to protect the embedded steel ring and the embedded bolt when breaking the foam concrete, uncovering the protective film and cleaning the surfaces of the embedded steel ring and the embedded bolt.
S7, installing an annular waterproof ring: firstly, a layer of water-swelling rubber is arranged on an embedded steel ring, then an annular waterproof ring is arranged, and then a layer of steel pressing plate is arranged and fixed through embedded bolts.
And S8, if water leakage and sand gushing occur after the hole is broken, grouting reinforcement is carried out by using the grouting pipe.
S9, jacking pipe to enter the hole: pulling out the linear steel sheet pile, reinforcing and removing cement soil wall damage caused by the steel sheet pile by grouting through a grouting pipe, enabling a jacking pipe to enter a drill from a hole or exit the hole from the opposite direction, and penetrating out of the center of the annular waterproof ring to drive the annular waterproof ring to deform to play a waterproof role; by adopting the construction method, the construction risk is reduced, the phenomena of water gushing and sand gushing are avoided, and the construction time is saved.
Drawings
FIG. 1 is a plan view of the structure of the present invention.
FIG. 2 is a cross-sectional view of the present invention.
Fig. 3 is a structural schematic diagram of installation of the annular waterproof ring.
Fig. 4 is a structural elevation view of the present invention.
Wherein, 1, underground continuous wall; 2. a grid cement soil wall; 3. reinforcing steel bars; 4. concrete; 5. pre-burying a steel ring; 6. embedding bolts in advance; 7. an annular waterproof ring; 8. water-swellable rubber; 9. a steel pressing plate; 10. jacking pipes; 11. a linear steel sheet pile; 12. a grouting pipe; 13. a hole; 14. a glass fiber rib; 15. foam concrete.
Detailed Description
Reference will now be made in detail to embodiments of the present invention, examples of which are illustrated in the accompanying drawings, wherein like or similar reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below with reference to the drawings are illustrative and intended to be illustrative of the invention and are not to be construed as limiting the invention.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "clockwise", "counterclockwise", and the like, indicate positional relationships based on the orientations and positional relationships shown in the drawings, are only for convenience of description and simplicity of description, and do not indicate or imply that the method or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be taken as limiting the present invention.
In the present invention, unless otherwise expressly specified or limited, the terms "mounted," "connected," "secured," "retained," and the like are to be construed broadly, e.g., as meaning fixedly connected, detachably connected, or integrally connected; the two elements can be directly connected or indirectly connected through an intermediate medium, and the two elements can be communicated with each other at the inner sections. The specific meanings of the above terms in the present invention can be understood by those skilled in the art according to specific situations.
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is described in further detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
As shown in fig. 1 to 4, the embodiment of the invention provides a water-rich sand layer running sand water burst prevention working well with good waterproof effect and low construction risk, the working well structure comprises an underground continuous wall 1 and a grid cement soil wall 2 arranged at the inlet and outlet sides of the underground continuous wall 1, the underground continuous wall 1 comprises a reinforcement cage made of steel bars 3 and concrete 4 poured in the reinforcement cage, an embedded steel ring 5 and an embedded bolt 6 are circumferentially arranged at the inner side of the reinforcement cage, an annular waterproof ring 7 is arranged at the inner side of the underground continuous wall 1, water-swelling rubber 8 is arranged between the annular waterproof ring 7 and the embedded steel ring 5, the annular waterproof ring 7 is fixed with the embedded steel ring 5 through a steel pressing plate 9 and the embedded bolt 6, the annular waterproof ring 7 is made of an elastic material, and the inner diameter of the annular waterproof ring 7 is smaller than the outer diameter of a top pipe 10, so that the annular waterproof ring 7 is tightly attached to the top pipe 10 and deforms along the advancing direction of the top pipe 10, in the technical scheme, the annular waterproof ring 7 is made of elastic materials, the inner diameter of the annular waterproof ring 7 is smaller than the outer diameter of the top pipe 10, when the top pipe 10 enters or exits, the annular waterproof ring 7 stretches the annular waterproof ring 7 through extrusion force and drives the annular waterproof ring 7 to deform towards the advancing direction of the top pipe 10, and the annular waterproof ring 7 is closely attached to the top pipe 10, so that underground water can be prevented from permeating into a working well along a gap between the top pipe 10 and the opening 13; the annular waterproof ring 7 is fixedly arranged on the embedded steel ring 5 by using the steel pressing plate 9 and the water-swelling rubber 8, has a good waterproof effect and is very firm.
In some specific embodiments, as shown in fig. 1 and fig. 2, the grid cement-soil wall 2 is in a multi-layer grid type, and the cement-soil wall is at least partially arranged on the upper part of the outer wall of the underground continuous wall 1 in a close fit manner; the arrangement mode in the technical scheme can reinforce the soil body of the opening 13 in a large range, has a good waterproof effect and prevents surrounding underground water from entering the top pipe 10 and entering the opening 13.
In other specific embodiments, as shown in fig. 1 and 2, a straight steel sheet pile 11 is inserted into the grid cement soil wall 2 tightly attached to one layer of the underground continuous wall 1; according to the technical scheme, the support capability and the water stop are provided for the broken hole and the jacking pipe 10 before entering and exiting the hole, and the linear steel sheet pile 11 is pulled out during the entering and exiting construction.
Further preferably, a plurality of grouting pipes 12 are arranged on the grid cement soil wall 2 close to the inlet and outlet sides of the working well; in the technical scheme, a grouting pipe 12 is arranged to perform grouting plugging when a hole 13 leaks water, please refer to fig. 1.
Furthermore, the glass fiber bars 14 and the foam concrete 15 are arranged at the working well opening 13 in a square shape to prevent damage to the embedded steel ring 5 and the embedded bolts 6, and two ends of the glass fiber bars 14 are in lap joint with the steel bars 3 of the underground continuous wall 1.
Further, the embedded steel ring 5 and the embedded bolt 6 are wrapped and protected by a plastic film, damage to the embedded part is avoided, and the opening 13 and the embedded part are conveniently cleaned at the broken opening 13.
Further, as shown in fig. 3, the cross section of the embedded steel ring 5 is L-shaped, so that the effect of fixing the annular waterproof ring 7 is better.
Further, the grouting pipe 12 is a steel pipe wrapping the filter cloth, and grouting holes are formed in the steel pipe.
A construction method of a water-rich sand layer sand flow prevention water burst working well comprises the following steps:
s1 construction of the grid cement soil wall 2: a grid cement-soil wall 2 is arranged on one side of a top pipe 10 of the working well, which enters and exits the hole, by a cement-soil mixing pile machine, the grid cement-soil wall 2 is of a multi-layer cement-soil wall structure and partially surrounds an underground continuous wall 1 of the working well, and the depth of the grid cement-soil wall 2 exceeds a working well opening 13 by a certain depth;
s2, installing the linear steel sheet pile 11 and the grouting pipe 12: inserting linear steel sheet piles 11 into a layer of wall, close to a working well, of the grid cement soil wall 2, wherein the linear steel sheet piles 11 are overlapped through lock catches to form a curtain, and the insertion depth of the linear steel sheet piles 11 exceeds a certain depth of the hole 13; a plurality of grouting pipes 12 are inserted into two sides of a hole 13 between the linear steel sheet pile 11 and the underground continuous wall 1, and the insertion depth of the grouting pipes 12 exceeds the hole 13 by a certain depth; the grouting pipe 12 is a steel pipe wrapped with filter cloth, and small holes are punched on the steel pipe within the depth range of the hole 13 to serve as grouting holes.
S3 binding the reinforcement cage of the underground continuous wall: adopting a glass fiber rib 14 at the position where the top pipe 10 enters and exits the hole, wherein two ends of the glass fiber rib 14 are lapped with the reinforcing steel bar 3 and are fixed by a U-shaped card; fixedly welding an embedded steel ring 5 and an embedded bolt 6 in 3 cages of the underground continuous wall 1 at the position where the jacking pipe 10 enters and exits the hole, and wrapping the surfaces of the embedded steel ring 5 and the embedded bolt 6 with plastic films.
S4 pouring the underground continuous wall 1: carrying out grooving operation on the underground diaphragm wall 1 by using a grooving machine, putting down a reinforcement 3 cage after grooving, and then pouring concrete 4; when the groove width concrete 4 of the opening 13 is poured, firstly, the concrete 4 is poured, then, the foam concrete 15 is poured in the area of the opening 13, and finally, the concrete 4 is poured.
S5 working well excavation: and after the concrete 4 of the underground continuous wall 1 reaches the design strength, excavating the working well to the design elevation, and then sealing the bottom.
S6 manual breaking of the hole 13: before the jacking pipe 10 enters the tunnel, firstly, manually breaking the foam concrete 15 at the tunnel opening 13, paying attention to protect the embedded steel ring 5 and the embedded bolt 6 when breaking the foam concrete 15, uncovering the protective film and cleaning the surfaces of the embedded steel ring 5 and the embedded bolt 6.
S7 installing the annular waterproof ring 7: firstly, a layer of water-swelling rubber 8 is arranged on an embedded steel ring 5, then an annular waterproof ring 7 is arranged, and a layer of steel pressing plate 9 is arranged and fixed through embedded bolts 6.
And S8, if water leakage and sand gushing occur after the hole is broken, grouting reinforcement is carried out by using the grouting pipe 12.
S9, pushing the pipe jacking 10 into the hole: pulling out a linear steel sheet pile 11, utilizing a grouting pipe 12 to perform grouting reinforcement to remove cement soil wall damage caused by the steel sheet pile, enabling a jacking pipe 10 to enter a drilling hole from a hole opening 13 or exit the hole from the opposite direction, and penetrating out from the center of the annular waterproof ring 7 to drive the annular waterproof ring 7 to deform to play a waterproof role; by adopting the construction method, the construction risk is reduced, the phenomena of water gushing and sand gushing are avoided, and the construction time is saved.
It should be noted that the above embodiments are merely representative examples of the present invention. Many variations of the invention are possible. Any simple modification, equivalent change and modification of the above embodiments according to the spirit of the present invention should be considered to be within the protection scope of the present invention.

Claims (9)

1. The utility model provides a sand that flows is prevented on rich water sand bed and is gushed water work well which characterized in that: the working well structure comprises an underground continuous wall (1) and a grid cement-soil wall (2) arranged at the inlet and outlet sides of the underground continuous wall (1), the underground continuous wall comprises a reinforcement cage made of reinforcement (3) and concrete (4) poured in the reinforcement cage, an embedded steel ring (5) and an embedded bolt (6) are circumferentially arranged on the inner side of the steel reinforcement cage, an annular waterproof ring (7) is arranged on the inner side of the underground continuous wall (1), water-swelling rubber (8) is arranged between the annular waterproof ring (7) and the embedded steel ring (5), and the annular waterproof ring (7) is fixed with the embedded steel ring (5) through a steel pressure plate (9) and an embedded bolt (6), the annular waterproof ring (7) is made of elastic material, the inner diameter of the annular waterproof ring (7) is smaller than the outer diameter of the top pipe (10), so that the annular waterproof ring (7) is tightly attached to the top pipe (10) and deforms along the advancing direction of the top pipe (10).
2. The sand-flowing-out and water-inrush preventing working well for the water-rich sand layer is characterized in that the grid cement-soil wall (2) is in a multi-layer grid type, and at least part of the grid cement-soil wall (2) is arranged on the upper part of the outer wall of the underground continuous wall (1) in a clinging mode.
3. The sand-flowing and water-inrush preventing working well for the water-rich sand layer is characterized in that a straight steel sheet pile (11) is inserted into one layer of the grid cement-soil wall (2) close to the underground continuous wall (1).
4. The sand flow and water inrush preventing working well for the water-rich sand layer is characterized in that a plurality of grouting pipes (12) are arranged on the grid cement-soil wall (2) close to the inlet and outlet sides of the working well.
5. The working well of claim 1, characterized in that glass fiber reinforcement (14) and foam concrete (15) are arranged in a square shape at the opening (13) of the working well, damage to the embedded steel ring (5) and the embedded bolt (6) is prevented, and two ends of the glass fiber reinforcement (14) are in lap joint with the steel bar (3) of the underground continuous wall (1).
6. The working well of claim 1, characterized in that the embedded steel ring (5) and the embedded bolt (6) are wrapped by plastic film.
7. The working well for preventing the flowing sand from gushing water in the water-rich sand layer as claimed in claim 1, wherein the cross section of the embedded steel ring (5) is L-shaped.
8. The working well for preventing flowing sand from gushing water in the water-rich sand layer as claimed in claim 4, wherein the grouting pipe (12) is a steel pipe wrapped with filter cloth, and grouting holes are arranged on the steel pipe.
9. The construction method of the water-rich sand layer flowing sand water inrush preventing working well as claimed in any one of claims 1 to 8, characterized by comprising the following steps:
s1 construction of the grid cement-soil wall (2): a cement-soil mixing pile machine is adopted to drive a grid cement-soil wall on the hole-entering side of a jacking pipe (10) of the working well, the grid cement-soil wall is of a multi-layer cement-soil wall structure and partially surrounds an underground continuous wall (1) of the working well, and the depth of the grid cement-soil wall exceeds a working well hole (13) by a certain depth;
s2, installing a linear steel sheet pile (11) and a grouting pipe (12): inserting linear steel plate piles (11) into a layer of wall, close to the working well, of the grid cement soil wall, wherein the linear steel plate piles (11) are overlapped through lock catches to form a curtain, and the insertion depth of the linear steel plate piles (11) exceeds a hole (13) by a certain depth; a plurality of grouting pipes (12) are inserted into two sides of a hole (13) between the linear steel sheet pile (11) and the underground continuous wall (1), and the insertion depth of each grouting pipe (12) exceeds the hole (13) by a certain depth; the grouting pipe (12) is a steel pipe wrapped with filter cloth, and small holes are punched on the steel pipe within the depth range of the hole (13) to serve as grouting holes;
s3 binding the reinforcement cage of the underground continuous wall: adopting a glass fiber rib (14) at the position where the top pipe (10) enters and exits the hole, wherein two ends of the glass fiber rib (14) are lapped with the reinforcing steel bar (3) and are fixed by a U-shaped card; fixedly welding an embedded steel ring (5) and an embedded bolt (6) in a reinforcement (3) cage of the underground continuous wall (1) at the position where the jacking pipe (10) enters and exits the hole, and wrapping the surfaces of the embedded steel ring (5) and the embedded bolt (6) by plastic films;
s4 casting the underground continuous wall (1): carrying out grooving operation on the underground continuous wall (1) by using a grooving machine, putting a reinforcement (3) cage down after grooving, and then pouring concrete (4); when the groove width concrete (4) where the hole (13) is located is poured, firstly, the concrete (4) is poured, then, the foam concrete (15) is poured in the area of the hole (13), and finally, the concrete (4) is poured;
s5 working well excavation: after the concrete (4) of the underground continuous wall (1) reaches the design strength, excavating a working well to a design elevation, and then sealing the bottom;
s6 manual breaking hole (13): before the jacking pipe (10) enters the tunnel, firstly manually breaking foam concrete (15) at a tunnel opening (13), paying attention to protect the embedded steel ring (5) and the embedded bolt (6) when breaking the foam concrete (15), uncovering a protective film and cleaning the surfaces of the embedded steel ring (5) and the embedded bolt (6);
s7, installing an annular waterproof ring (7): firstly, installing a layer of water-swelling rubber (8) on an embedded steel ring (5), then installing an annular waterproof ring (7), then installing a layer of steel pressing plate (9), and fixing through embedded bolts (6);
s8, grouting reinforcement is carried out by using a grouting pipe (12) if water leakage and sand gushing occur after the hole is broken;
s9, entering the jacking pipe (10): the straight steel sheet pile (11) is pulled out, the grouting pipe (12) is utilized to perform grouting reinforcement to remove cement soil wall damage caused by the steel sheet pile, the jacking pipe (10) enters the hole from the hole opening (13) to be drilled or goes out of the hole from the opposite direction, penetrates out of the center of the annular waterproof ring (7), and drives the annular waterproof ring (7) to deform to play a waterproof role.
CN202110401247.4A 2021-04-14 2021-04-14 Water-rich sand layer anti-flowing sand water-surge working well and construction method thereof Active CN113338947B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110401247.4A CN113338947B (en) 2021-04-14 2021-04-14 Water-rich sand layer anti-flowing sand water-surge working well and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110401247.4A CN113338947B (en) 2021-04-14 2021-04-14 Water-rich sand layer anti-flowing sand water-surge working well and construction method thereof

Publications (2)

Publication Number Publication Date
CN113338947A true CN113338947A (en) 2021-09-03
CN113338947B CN113338947B (en) 2024-04-09

Family

ID=77468049

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110401247.4A Active CN113338947B (en) 2021-04-14 2021-04-14 Water-rich sand layer anti-flowing sand water-surge working well and construction method thereof

Country Status (1)

Country Link
CN (1) CN113338947B (en)

Citations (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07138942A (en) * 1993-11-16 1995-05-30 Kumagai Gumi Co Ltd Cut-off joint for underground continuous wall
CN103410175A (en) * 2013-08-05 2013-11-27 中铁十二局集团有限公司 Water seepage control construction method for karst water-rich geological underground structure waterproof construction
CN204000963U (en) * 2014-07-01 2014-12-10 国家电网公司 The water-stopping structure of push pipe work well reserving hole
CN105041322A (en) * 2015-06-08 2015-11-11 上海隧道工程有限公司 Method and system for reinforcing hole for push bench to go in and out
CN205329674U (en) * 2015-09-29 2016-06-22 昆明理工大学 Underground continuous wall structure under fluid bowl or channelling geological conditions
CN205977244U (en) * 2016-08-16 2017-02-22 郑州水务建筑工程股份有限公司 Push pipe construction entrance to a cave sealing device
CN107268688A (en) * 2017-05-19 2017-10-20 中铁隧道集团有限公司 I-shaped steel joint of diaphragm wall reinforces the construction method of sealing
JP2017214798A (en) * 2016-06-02 2017-12-07 鹿島建設株式会社 Construction method of underground continuous wall and underground continuous wall
CN107524174A (en) * 2017-08-24 2017-12-29 中铁隧道勘测设计院有限公司 A kind of diaphragm wall I-shaped steel joint provided with water expandable waterstop
CN208236429U (en) * 2018-04-18 2018-12-14 中铁十四局集团有限公司 A kind of new pipe-roof method active well ruggedized construction
CN109209396A (en) * 2018-11-16 2019-01-15 海南大学 A kind of shield tunnel end joint reinforcement structure and construction method
CN109386293A (en) * 2018-12-28 2019-02-26 中铁隧道集团三处有限公司 The sealed reception construction method of large section rectangular top pipe
CN109881694A (en) * 2019-04-04 2019-06-14 中铁十一局集团城市轨道工程有限公司 A kind of constructing structure blocked for foundation pit substrate Sand and method
CN110258640A (en) * 2019-07-11 2019-09-20 吉林大学 A kind of construction method of the overlapping wall system of covered back-digging
CN110528501A (en) * 2019-07-24 2019-12-03 青岛理工大学 High rich water faces sea area diaphragm wall and connects sealing device
CN111321764A (en) * 2020-03-09 2020-06-23 刘小文 Underground continuous wall joint water stopping process and device thereof
US20200248551A1 (en) * 2019-08-08 2020-08-06 Infrastructure Renewal Institute of Southern China Rectangular working well with preset pipe jacking hole and sliding back wall in water-rich stratum and construction method thereof
CN111535328A (en) * 2020-04-08 2020-08-14 浙江省建筑设计研究院 Pit shaft type underground garage foundation pit supporting system in water-rich stratum and construction method
CN211312489U (en) * 2019-07-24 2020-08-21 青岛理工大学 High rich water faces sea area diaphragm wall and connects sealing device
WO2020173100A1 (en) * 2019-02-26 2020-09-03 济南轨道交通集团有限公司 Reinforcement apparatus and construction method for local freezing reinforcement of deep foundation pit in water-rich sand gravel stratum
CN112049105A (en) * 2020-08-26 2020-12-08 中国铁建投资集团有限公司 Construction method for sealing and stopping water of tunnel diaphragm wall by water-rich sand layer mining method
CN112253162A (en) * 2020-11-10 2021-01-22 中铁四局集团有限公司 Water-rich sand layer large-diameter jacking pipe group entrance and exit reinforcing structure and construction method
CN112281810A (en) * 2020-10-21 2021-01-29 江苏旭辰交通科技发展有限公司 Construction method of underground diaphragm wall with water-rich fine sand layer
CN215486037U (en) * 2021-04-14 2022-01-11 浙江交工集团股份有限公司 Water-rich sand layer sand flow-proof water burst working well

Patent Citations (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07138942A (en) * 1993-11-16 1995-05-30 Kumagai Gumi Co Ltd Cut-off joint for underground continuous wall
CN103410175A (en) * 2013-08-05 2013-11-27 中铁十二局集团有限公司 Water seepage control construction method for karst water-rich geological underground structure waterproof construction
CN204000963U (en) * 2014-07-01 2014-12-10 国家电网公司 The water-stopping structure of push pipe work well reserving hole
CN105041322A (en) * 2015-06-08 2015-11-11 上海隧道工程有限公司 Method and system for reinforcing hole for push bench to go in and out
CN205329674U (en) * 2015-09-29 2016-06-22 昆明理工大学 Underground continuous wall structure under fluid bowl or channelling geological conditions
JP2017214798A (en) * 2016-06-02 2017-12-07 鹿島建設株式会社 Construction method of underground continuous wall and underground continuous wall
CN205977244U (en) * 2016-08-16 2017-02-22 郑州水务建筑工程股份有限公司 Push pipe construction entrance to a cave sealing device
CN107268688A (en) * 2017-05-19 2017-10-20 中铁隧道集团有限公司 I-shaped steel joint of diaphragm wall reinforces the construction method of sealing
CN107524174A (en) * 2017-08-24 2017-12-29 中铁隧道勘测设计院有限公司 A kind of diaphragm wall I-shaped steel joint provided with water expandable waterstop
CN208236429U (en) * 2018-04-18 2018-12-14 中铁十四局集团有限公司 A kind of new pipe-roof method active well ruggedized construction
CN109209396A (en) * 2018-11-16 2019-01-15 海南大学 A kind of shield tunnel end joint reinforcement structure and construction method
CN109386293A (en) * 2018-12-28 2019-02-26 中铁隧道集团三处有限公司 The sealed reception construction method of large section rectangular top pipe
WO2020173100A1 (en) * 2019-02-26 2020-09-03 济南轨道交通集团有限公司 Reinforcement apparatus and construction method for local freezing reinforcement of deep foundation pit in water-rich sand gravel stratum
CN109881694A (en) * 2019-04-04 2019-06-14 中铁十一局集团城市轨道工程有限公司 A kind of constructing structure blocked for foundation pit substrate Sand and method
CN110258640A (en) * 2019-07-11 2019-09-20 吉林大学 A kind of construction method of the overlapping wall system of covered back-digging
CN110528501A (en) * 2019-07-24 2019-12-03 青岛理工大学 High rich water faces sea area diaphragm wall and connects sealing device
CN211312489U (en) * 2019-07-24 2020-08-21 青岛理工大学 High rich water faces sea area diaphragm wall and connects sealing device
US20200248551A1 (en) * 2019-08-08 2020-08-06 Infrastructure Renewal Institute of Southern China Rectangular working well with preset pipe jacking hole and sliding back wall in water-rich stratum and construction method thereof
CN111321764A (en) * 2020-03-09 2020-06-23 刘小文 Underground continuous wall joint water stopping process and device thereof
CN111535328A (en) * 2020-04-08 2020-08-14 浙江省建筑设计研究院 Pit shaft type underground garage foundation pit supporting system in water-rich stratum and construction method
CN112049105A (en) * 2020-08-26 2020-12-08 中国铁建投资集团有限公司 Construction method for sealing and stopping water of tunnel diaphragm wall by water-rich sand layer mining method
CN112281810A (en) * 2020-10-21 2021-01-29 江苏旭辰交通科技发展有限公司 Construction method of underground diaphragm wall with water-rich fine sand layer
CN112253162A (en) * 2020-11-10 2021-01-22 中铁四局集团有限公司 Water-rich sand layer large-diameter jacking pipe group entrance and exit reinforcing structure and construction method
CN215486037U (en) * 2021-04-14 2022-01-11 浙江交工集团股份有限公司 Water-rich sand layer sand flow-proof water burst working well

Also Published As

Publication number Publication date
CN113338947B (en) 2024-04-09

Similar Documents

Publication Publication Date Title
JP4255462B2 (en) Condensate well structure
CN106351230B (en) Soft clay area basement construction method for supporting
CN110219313B (en) Drainage system and construction method for underground construction blind well
CN107859145A (en) A kind of drainpipe is plugged into construction method under water
KR100877452B1 (en) Construction method of middle wall of three arch excavation tunnel
LU500273B1 (en) New comprehensive dewatering and drainage method and drainage device for mudstone subway station
CN108797404A (en) A kind of underground pipe gallery is across river section river water flow guiding structure and its construction method
KR20010010803A (en) An apparatus and method for multi-step grouting using FRP tube
CN109339079B (en) Foundation pit water stopping system adjacent to river permeable stratum and construction process thereof
CN215486037U (en) Water-rich sand layer sand flow-proof water burst working well
CN114855846A (en) Underground seepage-proofing pressure-reducing anti-floating blind pipe structure and construction method thereof
CN206157860U (en) Drainage pipeline
CN209260739U (en) A kind of foundation pit water-stopping system close to river permeable stratum
CN113338947A (en) Sand-flowing-preventing water-gushing working well for water-rich sand layer and construction method thereof
CN114382073B (en) Underground continuous wall system for protecting spring vein or underground water and construction method thereof
CN214497606U (en) Prevention of seepage water reinforced structure based on independent basis of frame post
CN214194494U (en) Equipment for preventing concrete material from flowing around during construction of diaphragm wall for isolating river water seepage
JP3663541B2 (en) Impermeable mountain retaining wall with groundwater flow conservation function and its groundwater flow conservation method
CN104213936B (en) A kind of method utilizing the auxiliary shutoff water bursting in mine of anchor cable
CN219033269U (en) Pressurized water pumping and draining device for rock stratum crushing zone
CN218970086U (en) A row of stifled comprehensive treatment system that is used for anti floating of basement structure to stop oozing
CN217870574U (en) Structure for applying locking steel sheet pile to water-stop curtain between piles
CN113622996B (en) Water seepage control construction method for construction of water-rich geological underground structure
CN221277762U (en) Underground excavation tunnel waterproof structure of embedded grouting pipe
CN115404888B (en) Deep foundation pit bottom water treatment method for finished main body structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant