CN113323450A - Firm and ventilative ready-package design epidemic prevention access structure of structure - Google Patents

Firm and ventilative ready-package design epidemic prevention access structure of structure Download PDF

Info

Publication number
CN113323450A
CN113323450A CN202110563129.3A CN202110563129A CN113323450A CN 113323450 A CN113323450 A CN 113323450A CN 202110563129 A CN202110563129 A CN 202110563129A CN 113323450 A CN113323450 A CN 113323450A
Authority
CN
China
Prior art keywords
epidemic prevention
stable
skeleton
ready
breathable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110563129.3A
Other languages
Chinese (zh)
Inventor
杨斌
李章江
钱慕超
周书棋
胡红胜
马天安
章辉
靳国亮
卢瀚舟
常永清
董程旺
庞凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gold Mantis Fine Decoration Technology Suzhou Co Ltd
Original Assignee
Gold Mantis Fine Decoration Technology Suzhou Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gold Mantis Fine Decoration Technology Suzhou Co Ltd filed Critical Gold Mantis Fine Decoration Technology Suzhou Co Ltd
Priority to CN202110563129.3A priority Critical patent/CN113323450A/en
Publication of CN113323450A publication Critical patent/CN113323450A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/12Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
    • E04H1/1205Small buildings erected in the open air
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • E04B1/34315Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • E04B1/34384Assembling details for foldable, separable, collapsible or retractable structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/58Connections for building structures in general of bar-shaped building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/74Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
    • E04B1/76Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
    • E04B1/7608Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only comprising a prefabricated insulating layer, disposed between two other layers or panels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B7/00Roofs; Roof construction with regard to insulation
    • E04B7/02Roofs; Roof construction with regard to insulation with plane sloping surfaces, e.g. saddle roofs

Abstract

The invention discloses a fast-assembly epidemic prevention passage structure with stable and breathable structure, which comprises: two passageway lateral walls and roof, two passageway lateral walls parallel arrangement, the passageway lateral wall includes skeleton and decorative board, the skeleton includes the head tree, crossbeam and time stand, two head trees and two crossbeams pass through the connecting piece fixed and form the rectangular frame structure, be provided with a plurality of parallel arrangement's time stand between two head trees, the skeleton both sides are provided with symmetrical arrangement's decorative board, the decorative board passes through fossil fragments fixed mounting on the skeleton, the skeleton intussuseption between two decorative boards is filled with insulation material, roof both sides are fixed mounting respectively at two passageway lateral wall tops. Compared with the prior art, the anti-epidemic channel effectively solves the problems that the interior of the anti-epidemic channel is stuffy and hot and is easy to breed bacteria and viruses, and the anti-epidemic channel is stable in structure and does not shake.

Description

Firm and ventilative ready-package design epidemic prevention access structure of structure
Technical Field
The invention belongs to the technical field of assembled epidemic prevention channels, and particularly relates to a quick-assembly epidemic prevention channel structure which is stable in structure and breathable.
Background
After the epidemic situation takes place, in order to satisfy the epidemic prevention requirement, the large-scale population that strict control return and big tide of doing over again caused flows, and help economy, life realize orderly recovery, set up epidemic prevention passageway in the building entry usually and carry out epidemic situation prevention and control work, and the epidemic prevention passageway adopts closed frame construction usually, can install body temperature detection camera and disinfection atomization plant additional according to the demand, makes it have the function of body temperature detection, all-round real-time disinfection.
The epidemic prevention channel is required by a sudden and temporary building structure and has the capability of being quickly built, disassembled and reused. But the existing epidemic prevention passage structural materials mainly adopt 40 galvanized steel square pipes and plastic films. The method comprises the steps of firstly forming a steel skeleton structure by sawing and welding the 40 galvanized steel square pipes, and then fixedly mounting a plastic film on the steel skeleton structure formed by the 40 galvanized steel square pipes in an adhesive mode, thereby finally completing construction and building of the epidemic prevention passage. A temperature measurement and disinfection quick epidemic prevention passage device as disclosed in chinese patent CN202020290934.4, comprising: the device comprises a sealing detection device, a gas-liquid separation device and a gas-liquid separation device, wherein an inlet and an outlet for personnel to enter and exit are formed at two ends of the sealing detection device, and a passage for detecting and disinfecting the personnel is formed between the inlet and the outlet; the intelligent sensor module is arranged at the upper end of the sealing detection device and used for detecting people who enter and exit; and the atomizing device is arranged on the sealing detection device and can disinfect personnel in the sealing detection device. The utility model discloses a cost of using manpower sparingly greatly, can be quick disinfect to the personnel of inside, reduce the risk of personnel's infection, can carry out personnel's identification simultaneously and wear the detection of gauze mask, the effectual diffusion that prevents the epidemic situation, but the main body frame of its adoption is not standardized part component, can't realize reuse.
In the construction process of the epidemic prevention passageway, standardized parts are not adopted, so that a large amount of field processing is required, quick construction cannot be realized, the construction efficiency is greatly influenced, and meanwhile, the construction and installation process is high in requirement, the structural strength is unstable, and potential safety hazards exist. In addition, the epidemic prevention passageway structure does not adopt standardized parts, and can not achieve the purpose of being detachable and reusable, so that the construction cost of the epidemic prevention passageway is high, and huge economic burden and huge resource waste are caused.
Because the existing epidemic prevention channel adopts a structure that a plastic film is adhered to the surface of a galvanized steel square tube, the problems of water accumulation, water leakage or water seepage are easy to occur in the weather of wind and rain. And the space formed by the plastic film is airtight and not favorable for air circulation, and the epidemic prevention channel is not only stuffy and hot in hot weather, but also easy to breed bacteria and viruses.
Disclosure of Invention
The invention aims to: the utility model provides a firm and ventilative ready-package design epidemic prevention access structure of structure, adopt aluminum alloy ex-trusions and assembled construction process to form the skeleton texture of epidemic prevention passageway, can realize building fast and can dismantle reuse, the heat preservation rock wool of packing between the calcium silicate decorative board and the calcium silicate decorative board of both sides on the skeleton texture effectively solves the inside stifled hot of epidemic prevention passageway, easily breeds the problem of bacterial virus to epidemic prevention access structure is stable not rock.
In order to achieve the purpose, the invention adopts the following technical scheme: a firm and ventilative ready-package design epidemic prevention access structure of structure includes: two passageway lateral walls and roof, two passageway lateral walls parallel arrangement, the passageway lateral wall includes skeleton and decorative board, the skeleton includes the head tree, crossbeam and time stand, two head trees and two crossbeams pass through the connecting piece fixed and form the rectangular frame structure, be provided with a plurality of parallel arrangement's time stand between two head trees, the skeleton both sides are provided with symmetrical arrangement's decorative board, the decorative board passes through fossil fragments fixed mounting on the skeleton, the skeleton intussuseption between two decorative boards is filled with insulation material, roof both sides are fixed mounting respectively at two passageway lateral wall tops.
As a further description of the above technical solution:
the connecting piece comprises a first connecting plate and a second connecting plate which are perpendicular to each other, the first connecting plate is fixedly installed on the main upright post, and the second connecting plate is fixedly installed on the cross beam.
As a further description of the above technical solution:
the secondary upright post comprises a first secondary upright post unit and a second secondary upright post unit which are arranged in parallel.
As a further description of the above technical solution:
be provided with the gypsum board between first time stand unit and the second time stand unit, the gypsum board passes through fastening bolt fixed mounting on the skeleton.
As a further description of the above technical solution:
fastening bolt's head sliding connection is in the first spout of first time stand unit, and fastening bolt passes through the nut fixed, is provided with the breach that the position corresponds the nut on the side of gypsum board, and the breach amalgamation of two adjacent gypsum boards forms the round hole, and the nut joint is in the round hole, and fastening bolt's the body of rod stretches into in the first spout of second time stand unit.
As a further description of the above technical solution:
the gypsum board is a perforated gypsum board.
As a further description of the above technical solution:
the veneer is a calcium silicate board.
As a further description of the above technical solution:
the heat-insulating material is double-layer heat-insulating rock wool.
As a further description of the above technical solution:
the keel is a light steel keel, and a plurality of waist-shaped holes which are arranged along the length direction of the keel at equal intervals are arranged on the keel.
As a further description of the above technical solution:
the top wall is obliquely arranged.
In summary, due to the adoption of the technical scheme, the invention has the beneficial effects that:
1. according to the invention, the main upright post, the cross beam and the secondary upright post which are components of the channel side wall framework are all made of aluminum alloy sections and are fixed through connecting pieces, so that the rapid construction and the detachable and reusable are realized, the heat-preservation rock wool filled between the calcium silicate veneer on the framework structure and the calcium silicate veneer on two sides effectively solves the problems of stuffiness and high possibility of breeding bacteria and viruses in the epidemic prevention channel, and the epidemic prevention channel is stable in structure and does not shake. The structure of roof is the same with the structure of passageway lateral wall, also supports the skeleton by aluminum alloy ex-trusions and passes through fossil fragments with decorative board fixed mounting on the skeleton, finally forms the roof. Two passageway lateral walls one is high one low for the roof forms the slope setting that one side is high, one side is low, avoids rubbish or rainwater to pile up on the roof, the reuse epidemic prevention passageway of being convenient for.
2. In the invention, the secondary upright post consists of the first secondary upright post unit and the second secondary upright post unit which are arranged in parallel, so that the calcium silicate veneer on the inner side and the outer side of the side wall of the channel has higher independence during installation, is convenient to detach and replace, and reduces the installation difficulty. In addition, the gypsum board between the first-time stand column unit and the second-time stand column unit is fixed through clamping of the first-time stand column unit and the second-time stand column unit, the structure of the gypsum board is not damaged, and quick building and detachable recycling are facilitated. The body of rod of fastening bolt is used for fixing a position secondary stand unit, makes it aim at primary stand unit, improves epidemic prevention passageway structural stability.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings needed to be used in the embodiments will be briefly described below, it should be understood that the following drawings only illustrate some embodiments of the present invention and therefore should not be considered as limiting the scope, and for those skilled in the art, other related drawings can be obtained according to the drawings without inventive efforts.
Fig. 1 is a schematic structural view of a fast-assembly epidemic prevention passage structure with stable and breathable structure.
Fig. 2 is a partially enlarged view of a portion a in fig. 1.
FIG. 3 is a schematic view of the structure of the fast-assembly epidemic prevention passage with stable and air-permeable structure.
FIG. 4 is a schematic structural view of a skeleton in a fast-assembly epidemic prevention passage structure with a stable and air-permeable structure.
Fig. 5 is a schematic view of the installation of gypsum boards in a fast-assembly design epidemic prevention passageway structure with stable structure and ventilation.
Fig. 6 is a schematic structural view of a keel in a fast-assembly epidemic prevention passage structure with stable and breathable structure.
Illustration of the drawings:
1. a channel sidewall; 11. a framework; 111. a main upright post; 112. a cross beam; 113. a secondary upright post; 1131. a first secondary column unit; 1132. a second secondary column unit; 12. a veneer; 2. a top wall; 3. a connecting member; 4. a keel; 41. a kidney-shaped hole; 5. a thermal insulation material; 6. a gypsum board; 61. a notch; 7. fastening a bolt; 8. and a nut.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all, embodiments of the present invention. The components of embodiments of the present invention generally described and illustrated in the figures herein may be arranged and designed in a wide variety of different configurations.
Thus, the following detailed description of the embodiments of the present invention, presented in the figures, is not intended to limit the scope of the invention, as claimed, but is merely representative of selected embodiments of the invention. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
It should be noted that: like reference numbers and letters refer to like items in the following figures, and thus, once an item is defined in one figure, it need not be further defined and explained in subsequent figures.
In the description of the embodiments of the present invention, it should be noted that the terms "upper", "inner", and the like refer to orientations or positional relationships based on the orientations or positional relationships shown in the drawings or orientations or positional relationships that are conventionally arranged when the products of the present invention are used, and are used only for convenience in describing the present invention and simplifying the description, but do not indicate or imply that the devices or elements referred to must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention.
In the description of the present invention, it should also be noted that, unless otherwise explicitly specified or limited, the terms "disposed," "mounted," "connected," and "connected" are to be construed broadly and may, for example, be fixedly connected, detachably connected, or integrally connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-5, the present invention provides a technical solution: a firm and ventilative ready-package design epidemic prevention access structure of structure includes: two passageway lateral walls 1 and roof 2, 1 parallel arrangement of two passageway lateral walls, passageway lateral wall 1 includes skeleton 11 and decorative board 12, skeleton 11 includes main upright 111, crossbeam 112 and inferior upright 113, two main upright 111 and two crossbeams 112 are fixed and form the rectangular frame structure through connecting piece 3, be provided with a plurality of parallel arrangement's inferior upright 113 between two main upright 111, skeleton 11 both sides are provided with symmetrical arrangement's decorative board 12, decorative board 12 passes through fossil fragments 4 fixed mounting on skeleton 11, skeleton 11 intussuseption between two decorative board 12 is filled with insulation material 5, 2 both sides of roof are fixed mounting respectively at 1 top of two passageway lateral walls. The fixing mode of the secondary upright post 113 (using the connecting piece 3) is the same as that of the main upright post 111, the secondary upright post 113 is arranged on two beams 112 (two ends of the secondary upright post abut against the beams 112), one side of the connecting piece 3 is fixedly arranged on the secondary upright post 113, and the other side of the connecting piece 3 is fixedly arranged on the beams 112.
Connecting piece 3 includes mutually perpendicular's first connecting plate and second connecting plate, and first connecting plate fixed mounting is on head mast 111, and second connecting plate fixed mounting is on crossbeam 112 for skeleton 11 adopts the assembly process of assembled, realizes building fast and can dismantle reuse.
Secondary upright 113 includes a first secondary upright unit 1131 and a second secondary upright unit 1132 arranged in parallel. Be provided with gypsum board 6 between first time stand unit 1131 and the second time stand unit 1132, gypsum board 6 passes through fastening bolt 7 fixed mounting on skeleton 11, and gypsum board 6 separates double-deck heat preservation rock wool, makes epidemic prevention passageway stable in structure not rock on the one hand, and on the other hand makes epidemic prevention passageway can not sultry.
Head sliding connection of fastening bolt 7 is in first spout of first time stand unit 1131, and fastening bolt 7 is fixed through nut 8, is provided with the breach 61 that the position corresponds nut 8 on the side of gypsum board 6, and the breach 61 amalgamation of two adjacent gypsum boards 6 forms the round hole, and 8 joints of nut are in the round hole, and the body of rod of fastening bolt 7 stretches into in the first spout of second time stand unit 1132. The gypsum board 6 is mainly fixed through the centre gripping formation of two time stand units, and the structure of gypsum board 6 itself is not destroyed, is convenient for realize building fast and can dismantle reuse. The body of rod of fastening bolt 7 is used for fixing a position second time stand unit 1132, makes it aim at first time stand unit 1131, improves epidemic prevention passageway structural stability.
The gypsum board 6 is a perforated gypsum board, and improves the sound insulation effect and the ventilation effect of the epidemic prevention channel.
The veneer 12 is a calcium silicate board, and the structural stability of the epidemic prevention passage is improved.
The heat insulation material 5 is double-layer heat insulation rock wool, so that the interior of the epidemic prevention channel is prevented from being sultry.
The keel 4 is a light steel keel, and a plurality of waist-shaped holes 41 which are equidistantly arranged along the length direction of the keel 4 are arranged on the keel 4. The setting of waist type hole 41 on fossil fragments 4 is convenient for adjust the mounted position that fossil fragments 4 installed on skeleton 11, reduces the construction degree of difficulty, realizes building fast and can dismantle reuse.
The top wall 2 is arranged obliquely. The structure of roof 2 is the same with the structure of passageway lateral wall 1, also supports the skeleton by the aluminum alloy ex-trusions and passes through fossil fragments with decorative board fixed mounting on the skeleton, finally forms roof 2. Two passageway lateral walls 1 are high one low for roof 2 forms the slope setting that a side is high, one side is low, avoids rubbish or rainwater to pile up on roof 2, the reuse epidemic prevention passageway of being convenient for.
The working principle is as follows: the main upright post, the cross beam and the secondary upright post which are components of the channel side wall framework are all made of aluminum alloy sections and are fixed through connecting pieces, so that the rapid building and the detachable and reusable are realized, the heat-preservation rock wool filled between the calcium silicate veneer on the framework structure and the calcium silicate veneer on two sides effectively solves the problems that the interior of the epidemic prevention channel is stuffy and hot and is easy to breed bacteria and viruses, and the epidemic prevention channel is stable in structure and does not shake. The structure of roof is the same with the structure of passageway lateral wall, also supports the skeleton by aluminum alloy ex-trusions and passes through fossil fragments with decorative board fixed mounting on the skeleton, finally forms the roof. Two passageway lateral walls one is high one low for the roof forms the slope setting that one side is high, one side is low, avoids rubbish or rainwater to pile up on the roof, the reuse epidemic prevention passageway of being convenient for. The secondary upright post comprises a first secondary upright post unit and a second secondary upright post unit which are arranged in parallel, so that the independence is higher when the calcium silicate veneer on the inner side and the outer side of the side wall of the channel is installed, the secondary upright post is convenient to detach and replace, and the installation difficulty is reduced. In addition, the gypsum board between the first-time stand column unit and the second-time stand column unit is fixed through clamping of the first-time stand column unit and the second-time stand column unit, the structure of the gypsum board is not damaged, and quick building and detachable recycling are facilitated. The body of rod of fastening bolt is used for fixing a position secondary stand unit, makes it aim at primary stand unit, improves epidemic prevention passageway structural stability.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and the technical solutions and the inventive concepts thereof according to the present invention should be equivalent or changed within the scope of the present invention.

Claims (10)

1. The utility model provides a firm and ventilative ready-package design epidemic prevention access structure of structure which characterized in that includes: two channel side walls (1) and a top wall (2), the two channel side walls (1) being arranged in parallel, the channel side wall (1) comprises a framework (11) and a veneer (12), the framework (11) comprises main upright posts (111), cross beams (112) and secondary upright posts (113), the two main upright posts (111) and the two cross beams (112) are fixed through connecting pieces (3) to form a rectangular frame structure, a plurality of secondary upright posts (113) which are arranged in parallel are arranged between the two main upright posts (111), the decorative panels (12) are symmetrically arranged on two sides of the framework (11), the veneer boards (12) are fixedly arranged on the framework (11) through keels (4), the framework (11) between the two veneer boards (12) is filled with heat insulation materials (5), and two sides of the top wall (2) are respectively and fixedly arranged at the tops of the two channel side walls (1).
2. A stable and breathable ready-to-assemble designed epidemic prevention corridor structure according to claim 1, wherein the connectors (3) comprise a first and a second perpendicular connection plates, the first connection plate being fixedly mounted on the main upright (111) and the second connection plate being fixedly mounted on the cross beam (112).
3. A structurally sound and breathable quick-fit design epidemic prevention channel structure according to claim 1, characterized in that the secondary uprights (113) comprise a first secondary upright unit (1131) and a second secondary upright unit (1132) arranged in parallel.
4. A fast-assembled epidemic prevention channel structure with stable structure and ventilation according to claim 3, wherein a gypsum board (6) is arranged between the first secondary upright unit (1131) and the second secondary upright unit (1132), and the gypsum board (6) is fixedly installed on the framework (11) through a fastening bolt (7).
5. The fast-assembling epidemic prevention passageway structure that a structure is firm and ventilative according to claim 4, characterized in that, the head sliding connection of fastening bolt (7) is in the first spout of first time stand unit (1131), fastening bolt (7) are fixed through nut (8), be provided with position on the side of gypsum board (6) and correspond breach (61) of nut (8), two adjacent gypsum board (6) breach (61) amalgamation forms the round hole, nut (8) joint is in the round hole, the body of rod of fastening bolt (7) stretches into in the first spout of second time stand unit (1132).
6. A stable and breathable ready-to-assemble epidemic prevention channel structure according to claim 5, wherein the gypsum board (6) is perforated gypsum board.
7. A stable and breathable ready-to-assemble epidemic prevention channel structure, according to claim 1, wherein the veneer (12) is a calcium silicate board.
8. A stable and breathable ready-to-assemble epidemic prevention road structure according to claim 1, wherein the insulation material (5) is double-layer insulation rock wool.
9. The fast-assembly epidemic prevention channel structure with stable and breathable structure according to claim 1, wherein the keel (4) is a light steel keel, and the keel (4) is provided with a plurality of waist-shaped holes (41) which are equidistantly arranged along the length direction of the keel.
10. A stable and breathable ready-to-assemble designed epidemic prevention corridor structure according to claim 1, characterized in that the top wall (2) is arranged obliquely.
CN202110563129.3A 2021-05-24 2021-05-24 Firm and ventilative ready-package design epidemic prevention access structure of structure Pending CN113323450A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110563129.3A CN113323450A (en) 2021-05-24 2021-05-24 Firm and ventilative ready-package design epidemic prevention access structure of structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110563129.3A CN113323450A (en) 2021-05-24 2021-05-24 Firm and ventilative ready-package design epidemic prevention access structure of structure

Publications (1)

Publication Number Publication Date
CN113323450A true CN113323450A (en) 2021-08-31

Family

ID=77416448

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110563129.3A Pending CN113323450A (en) 2021-05-24 2021-05-24 Firm and ventilative ready-package design epidemic prevention access structure of structure

Country Status (1)

Country Link
CN (1) CN113323450A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1688553A1 (en) * 2005-02-08 2006-08-09 Placoplatre Facing panel provided with sound insulation
CN102031827A (en) * 2009-09-29 2011-04-27 王广武 Outer filling decorative surface material wood plastic and metal combination building
CN102535643A (en) * 2012-01-17 2012-07-04 湖南省金为型材有限公司 Connecting component for connecting stand column and cross beam
CN210257558U (en) * 2019-07-26 2020-04-07 徐州安联木业有限公司 Customized household flame retardant substrate
CN111734015A (en) * 2020-08-26 2020-10-02 广州三乐集成房屋科技有限公司佛山分公司 Honeycomb calcium silicate board keel wall assembly system
CN212154271U (en) * 2020-03-18 2020-12-15 上海开装建筑科技有限公司 Disinfection epidemic prevention device of quick installation

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1688553A1 (en) * 2005-02-08 2006-08-09 Placoplatre Facing panel provided with sound insulation
CN102031827A (en) * 2009-09-29 2011-04-27 王广武 Outer filling decorative surface material wood plastic and metal combination building
CN102535643A (en) * 2012-01-17 2012-07-04 湖南省金为型材有限公司 Connecting component for connecting stand column and cross beam
CN210257558U (en) * 2019-07-26 2020-04-07 徐州安联木业有限公司 Customized household flame retardant substrate
CN212154271U (en) * 2020-03-18 2020-12-15 上海开装建筑科技有限公司 Disinfection epidemic prevention device of quick installation
CN111734015A (en) * 2020-08-26 2020-10-02 广州三乐集成房屋科技有限公司佛山分公司 Honeycomb calcium silicate board keel wall assembly system

Similar Documents

Publication Publication Date Title
WO2011140935A1 (en) Combined isolation fence
CN204627112U (en) A kind of air-supported membrane structure used water as counterweight
CN110863680A (en) Steel construction factory building and roof structure thereof
CN200969791Y (en) Anti-strong wind greenhouse
CN106930571B (en) Assembled three-dimensional structure farm and construction method thereof
CN113323450A (en) Firm and ventilative ready-package design epidemic prevention access structure of structure
CN206600028U (en) A kind of assembled stereoscopic structure plant
CN206128442U (en) Integrated house of aluminium alloy floorbar
CN105660059A (en) Corn ear natural drying grain bin
CN206053269U (en) Bamboo ferrum mixing frame for building
CN205369970U (en) Reinforcing apparatus of no collar tie beam grange
CN213174408U (en) Novel steel construction building roof structure
CN210164201U (en) Roofing transformation engineering protection outrigger
CN208981510U (en) A kind of intersecting parallels double beams
CN210636873U (en) Safe detachable steel construction building factory building
CN109384122B (en) Template formula concatenation elevator steel construction well
CN215891378U (en) Box house roof tuber pipe support
CN219622076U (en) Roof quick-release structure and photovoltaic greenhouse with same
CN214034470U (en) Indoor guardrail structure
CN214090358U (en) Waterproof integrated house convenient to transportation equipment
CN213539817U (en) Horizontal frame of frame type safety ladder cage
CN212898579U (en) Anti-blocking structure for wartime ventilation opening
CN203788808U (en) Large-span intelligent greenhouse
CN212376229U (en) Inserted lift scaffold modularization protection net piece
CN113668852B (en) Parapet wall formwork structure of steel structure roof and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20210831

RJ01 Rejection of invention patent application after publication