CN113283712A - Drainage basin cascade power plant maintenance monitoring management system and use method - Google Patents

Drainage basin cascade power plant maintenance monitoring management system and use method Download PDF

Info

Publication number
CN113283712A
CN113283712A CN202110501402.XA CN202110501402A CN113283712A CN 113283712 A CN113283712 A CN 113283712A CN 202110501402 A CN202110501402 A CN 202110501402A CN 113283712 A CN113283712 A CN 113283712A
Authority
CN
China
Prior art keywords
maintenance
work
power plant
overhaul
control center
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110501402.XA
Other languages
Chinese (zh)
Inventor
董峰
吴云
李甍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Qingjiang Hydroelectric Development Co ltd
Original Assignee
Hubei Qingjiang Hydroelectric Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Qingjiang Hydroelectric Development Co ltd filed Critical Hubei Qingjiang Hydroelectric Development Co ltd
Priority to CN202110501402.XA priority Critical patent/CN113283712A/en
Publication of CN113283712A publication Critical patent/CN113283712A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Quality & Reliability (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Educational Administration (AREA)
  • Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Testing And Monitoring For Control Systems (AREA)

Abstract

The invention provides a watershed cascade power plant maintenance monitoring management system and a using method thereof. The drainage basin cascade power plant overhaul information sending module, the power grid production data receiving module, the public service module, the centralized control center worker workstation and the overhaul information monitoring management display module are connected with the centralized control center host, and the centralized control center host transmits data of all the modules to the drainage basin cascade power plant overhaul monitoring management database for storage. The system monitors and manages the whole process from the application of the overhaul ticket to the completion of overhaul of the watershed step power plant overhaul work, and ensures that the overhaul work does not have a task problem. All modules are managed and coordinated through a centralized control center, and the system monitors and manages the whole process from the application of a maintenance ticket to the completion of maintenance of the power plant maintenance work of the drainage basin cascade, so that no problem is caused in the maintenance work.

Description

Drainage basin cascade power plant maintenance monitoring management system and use method
Technical Field
The invention relates to the field of power plant maintenance monitoring management systems, in particular to a drainage basin step power plant maintenance monitoring management system and a using method thereof.
Background
At present, each large watershed and watershed cascade power plant adopts a centralized control mode, namely a centralized control center is arranged to remotely control the power generation operation of each watershed cascade power plant and is responsible for work items such as overhaul, defect elimination and the like of the watershed power plants, and the central control center of the watershed cascade power plants is responsible for the overhaul work of a plurality of generator sets at the same time, so that the condition that the supervision and management of the overhaul work are not in place easily occurs.
Disclosure of Invention
The invention mainly aims to provide a watershed cascade power plant maintenance monitoring management system and a using method thereof, and solves the problems that due to the fact that fewer operators are needed in a working site, a centralized control center of a watershed cascade power plant is simultaneously responsible for the maintenance of a plurality of generator sets, and the maintenance work supervision management is not in place easily.
In order to solve the technical problems, the technical scheme adopted by the invention is as follows: a watershed step power plant overhaul monitoring management system is characterized in that a watershed step power plant overhaul information sending module, a power grid production data receiving module, a public service module, a centralized control center worker workstation and an overhaul information monitoring management display module are connected with a centralized control center host, and the centralized control center host transmits data of all modules to a watershed step power plant overhaul monitoring management database for storage.
In the preferred scheme, a drainage basin step power plant maintenance information sending module: the cascade power plants are positioned in each drainage basin and used for applying for maintenance work and registering various maintenance work information to the centralized control center;
the watershed cascade power plant sends all information of maintenance work to the centralized control center through the watershed cascade power plant maintenance information sending module, and the watershed cascade power plant maintenance information sending module can send sound, video and image files.
In the preferred scheme, the power grid production data receiving module: receiving relevant work information of power grid dispatching, mainly including power grid system maintenance condition, power generation operation condition, power generation plan and important work;
the maintenance work of the watershed step power plant needs to make a maintenance plan according to power grid production information, and after relevant information is extracted by the power grid production data receiving module, the maintenance plan of the watershed step power plant is compiled and the maintenance work content is determined by combining the actual power grid production condition.
In the preferred scheme, the main machine of the centralized control center is mainly used for application, restoration and monitoring management of maintenance work of the cascade power plant in the drainage basin;
the central control center host computer sets up two host computer modes, and two host computers independently work simultaneously.
In the preferred scheme, a drainage basin cascade power plant overhaul monitoring management database: the system is used for storing all the overhaul work contents sent by the drainage basin cascade power plant to the centralized control center and the monitoring management work information of the drainage basin cascade power plant centralized control center on overhaul of each drainage basin cascade power plant.
In a preferred scheme, the public service module: the system is mainly used for displaying external information and collecting information;
the public service module can collect work suggestions and work information of all departments for the overhaul work.
In the preferred scheme, the centralized control center staff workstation: the method is mainly used for monitoring and managing the overhaul work of the cascade power plant in the drainage basin by centralized control center workers, and a plurality of workstations or a single workstation is arranged;
the staff carries out the work of examining and verifying, wholesale, monitoring, management to the maintenance work that basin step power plant proposed in the workstation, is responsible for receiving, takes notes maintenance work information.
In the preferred scheme, the maintenance information monitoring management display module: the display device is mainly used for displaying the development condition, the completion condition and each specific working condition of the overhauling work of the cascade power plant in the drainage basin and detailed work display equipment.
The method comprises the following steps of maintenance application, auditing, batch replication, execution, monitoring and management:
s1, application of maintenance work: the method comprises the steps that a basin step power plant applies for a centralized control center of the basin step power plant according to a maintenance plan, and fills in a maintenance request form, wherein the maintenance request form mainly comprises maintenance construction period, maintenance content, test content, maintenance requirements and information of all working responsible persons, and the maintenance request form is pushed to the centralized control center after being filled;
s2, examining and verifying overhaul work: after receiving the maintenance application, the centralized control center checks the maintenance information, if the maintenance application is not passed, optimizes and modifies the maintenance work application, and after the maintenance application is passed, the centralized control center applies the maintenance work to the power grid dispatching, and after the power grid dispatching agrees, the centralized control center returns the maintenance work ticket to each basin cascade power plant;
s3, maintenance execution: after the power plant in the river basin cascade receives the overhaul approval, beginning to take overhaul safety measures, and after the measures are finished, formally starting the overhaul work after the permission of the centralized control center is obtained;
s4, maintenance monitoring and management: after the maintenance work is executed, the central control center of the river basin cascade power plant monitors and manages the whole maintenance work process, records the execution time, the executive personnel, the execution condition, the work content and the work standard of each work, timely corrects the abnormal or non-conforming items, and collects the work information and data, the maintenance report and the test report in the maintenance process;
s5, completing maintenance: after all the maintenance work and the test work are finished, reporting the power grid dispatching, and restoring the maintenance unit to a standby state;
s6, after the overhaul work is finished, all overhaul related information is stored in the database, so that the later-stage query and use are facilitated, and the database supports a time period query mode, a basin cascade power plant query mode, a unit query mode and a work leader query mode.
The invention provides a watershed step power plant maintenance monitoring management system and a use method thereof, wherein a watershed step power plant maintenance information sending module is positioned in each watershed step power plant and is used for the watershed step power plant to apply maintenance work and register various maintenance work information to a centralized control center, the watershed step power plant maintenance information sending module is used for receiving relevant work information of power grid dispatching, a host of the centralized control center is used for applying, repeating and monitoring management of the watershed step power plant maintenance work, a watershed step power plant maintenance monitoring management database is used for storing the content of all maintenance work sent by the watershed step power plant to the centralized control center and the monitoring management work information of the watershed step power plant centralized control center on the step maintenance of each watershed step power plant, a public service module is used for monitoring and managing the watershed step power plant work by centralized control center workers and can be provided with a plurality of work stations, a single workstation can also be arranged, and the workstation is specifically arranged according to the actual situation. The maintenance information monitoring management display module is used for displaying development conditions, completion conditions and specific working conditions of maintenance work of the power plant in the drainage basin step, namely detailed work display equipment. All modules are managed and coordinated through a centralized control center, and the system monitors and manages the whole process from the application of a maintenance ticket to the completion of maintenance of the power plant maintenance work of the drainage basin cascade, so that no problem is caused in the maintenance work.
Drawings
The invention is further illustrated by the following examples in conjunction with the accompanying drawings:
FIG. 1 is a view of a cascade power plant overhaul monitoring management system of the invention;
fig. 2 is a flow chart of the basin cascade power plant overhaul work flow of the invention.
Detailed Description
Example 1
As shown in figures 1-2, a watershed cascade power plant overhaul and monitoring management system is characterized in that a watershed cascade power plant overhaul information sending module, a power grid production data receiving module, a public service module, a centralized control center worker workstation and an overhaul information monitoring management display module are connected with a centralized control center host, and the centralized control center host transmits data of all modules to a watershed cascade power plant overhaul and monitoring management database for storage. The system monitors and manages the whole process from the application of the overhaul ticket to the completion of overhaul of the watershed step power plant overhaul work, and ensures that the overhaul work does not have a task problem.
In the preferred scheme, a drainage basin step power plant maintenance information sending module: and the cascade power plants are positioned in each drainage basin and used for applying for maintenance work and registering various maintenance work information to the centralized control center. The watershed cascade power plant sends all information of maintenance work to the centralized control center through the watershed cascade power plant maintenance information sending module, and the watershed cascade power plant maintenance information sending module can send sound, video and image files and can check maintenance work information more visually.
In the preferred scheme, the power grid production data receiving module: and receiving related work information of power grid dispatching, which mainly refers to the maintenance condition, the power generation running condition, the power generation plan and important work of a power grid system. The maintenance work of the watershed step power plant needs to make a maintenance plan according to power grid production information, and after relevant information is extracted by the power grid production data receiving module, the maintenance plan of the watershed step power plant is compiled and the maintenance work content is determined by combining the actual power grid production condition.
In the preferred scheme, the main machine of the centralized control center is mainly used for application, restoration and monitoring management of maintenance work of the cascade power plant in the drainage basin. The central control center host computer sets up the mode of two host computers, and two host computers are independent work simultaneously, and each other is for one standby, and under the condition of a host computer trouble, all work business are not influenced.
In the preferred scheme, a drainage basin cascade power plant overhaul monitoring management database: the system is used for storing all the overhaul work contents sent by the drainage basin cascade power plant to the centralized control center and the monitoring management work information of the drainage basin cascade power plant centralized control center on overhaul of each drainage basin cascade power plant.
In a preferred scheme, the public service module: the method is mainly used for displaying external information and collecting information. The public service module can collect work suggestions and work information of all departments for the overhaul work. The cascade overhaul and maintenance work relates to relevant management departments, power grid dispatching, a centralized control center, each supervision functional department and an overhaul work execution unit, the public service device is mainly used for displaying external information and collecting information, each external department can only check corresponding work content, if more overhaul information needs to be checked, an application needs to be made to a centralized control center worker, and the centralized control center worker gives higher authority to the centralized control center worker. Meanwhile, the device can collect work suggestions and work information provided by all the departments for overhauling work, and is used for better completing the overhauling work of the cascade power plant in the drainage basin.
In the preferred scheme, the centralized control center staff workstation: the method is mainly used for monitoring and managing the overhauling work of the cascade power plant in the drainage basin by centralized control center workers, and a plurality of workstations or a single workstation is arranged, and the method is specifically arranged according to the actual condition. The staff carries out the work of examining and verifying, wholesale, monitoring, management to the maintenance work that basin step power plant proposed in the workstation, is responsible for receiving, takes notes maintenance work information.
In the preferred scheme, the maintenance information monitoring management display module: the display device is mainly used for displaying the development condition, the completion condition and each specific working condition of the overhauling work of the cascade power plant in the drainage basin and detailed work display equipment.
Example 2
As further illustrated in connection with example 1, as shown in figures 1-2,
the method comprises the following steps of maintenance application, auditing, batch replication, execution, monitoring and management:
the maintenance work application: the method comprises the steps that a basin step power plant applies for a centralized control center of the basin step power plant according to a maintenance plan, and fills in a maintenance request form, wherein the maintenance request form mainly comprises maintenance construction period, maintenance content, test content, maintenance requirements and information of all working responsible persons, and the maintenance request form is pushed to the centralized control center after being filled;
examining and verifying the overhaul work: after receiving the maintenance application, the centralized control center checks the maintenance information, if the maintenance application is not passed, optimizes and modifies the maintenance work application, and after the maintenance application is passed, the centralized control center applies the maintenance work to the power grid dispatching, and after the power grid dispatching agrees, the centralized control center returns the maintenance work ticket to each basin cascade power plant;
and (3) maintenance execution: after the power plant in the river basin cascade receives the overhaul approval, beginning to take overhaul safety measures, and after the measures are finished, formally starting the overhaul work after the permission of the centralized control center is obtained;
maintenance monitoring and management: after the maintenance work is executed, the central control center of the river basin cascade power plant monitors and manages the whole maintenance work process, records the execution time, the executive personnel, the execution condition, the work content and the work standard of each work, timely corrects the abnormal or non-conforming items, and collects the work information and data, the maintenance report and the test report in the maintenance process;
finishing maintenance: after all the maintenance work and the test work are finished, reporting the power grid dispatching, and restoring the maintenance unit to a standby state;
after the maintenance work is finished, all maintenance related information can be stored in the database, later-stage query and use are facilitated, and the database supports time period query, basin step power plant query, unit query and work leader query modes.
And the centralized control center has personnel authority. The centralized control center staff has the highest working authority and can check, audit, examine and approve, monitor and manage the whole process of the maintenance work. And the centralized control center manages the production leader authority. The branch management production leader has authority management authority, and the working authority of related personnel can be set. And the authority of staff of the drainage basin step power plant. The staff of the cascade power plant in the drainage basin has the authority of applying for maintenance, uploading maintenance information, checking, maintaining work records and the like. Other related personnel rights. Only has the right to view.
A monitoring management function: the central control center of the basin cascade power plant is responsible for monitoring and managing the whole overhaul process so as to ensure the safe and stable operation of the basin cascade power plant. After the maintenance work is started, after each worker of the cascade power plant in the drainage basin executes one work, the worker needs to register in the system, and after the worker of the centralized control center confirms the next work can be executed. When the working condition does not meet the safe and stable operation of the basin cascade power plant, the staff of the centralized control center can arrange the follow-up maintenance work in the system according to the operation condition, and the basin cascade power plant receives new maintenance information and then executes the maintenance work according to the requirements of the centralized control center. When the overhaul work content influences the operation of the basin cascade power plant or the operation of the power grid, the operation of the basin cascade power plant is required to be scheduled and applied to the power grid, and after permission is obtained, the work can be approved in the system, so that the basin cascade power plant is allowed to continue to execute the overhaul work.
The above-described embodiments are merely preferred embodiments of the present invention, and should not be construed as limiting the present invention, and the scope of the present invention is defined by the claims, and equivalents including technical features described in the claims. I.e., equivalent alterations and modifications within the scope hereof, are also intended to be within the scope of the invention.

Claims (9)

1. The utility model provides a basin step power plant overhauls monitoring management system which characterized by: the drainage basin cascade power plant overhaul information sending module, the power grid production data receiving module, the public service module, the centralized control center worker workstation and the overhaul information monitoring management display module are connected with the centralized control center host, and the centralized control center host transmits data of all the modules to the drainage basin cascade power plant overhaul monitoring management database for storage.
2. The watershed cascade power plant overhaul monitoring management system as claimed in claim 1, wherein: the maintenance information sending module of the watershed step power plant: the cascade power plants are positioned in each drainage basin and used for applying for maintenance work and registering various maintenance work information to the centralized control center;
the watershed cascade power plant sends all information of maintenance work to the centralized control center through the watershed cascade power plant maintenance information sending module, and the watershed cascade power plant maintenance information sending module can send sound, video and image files.
3. The watershed cascade power plant overhaul monitoring management system as claimed in claim 1, wherein: the power grid production data receiving module: receiving relevant work information of power grid dispatching, mainly including power grid system maintenance condition, power generation operation condition, power generation plan and important work;
the maintenance work of the watershed step power plant needs to make a maintenance plan according to power grid production information, and after relevant information is extracted by the power grid production data receiving module, the maintenance plan of the watershed step power plant is compiled and the maintenance work content is determined by combining the actual power grid production condition.
4. The watershed cascade power plant overhaul monitoring management system as claimed in claim 1, wherein: the centralized control center host is mainly used for application, restoration and monitoring management of maintenance work of the river basin cascade power plant;
the central control center host computer sets up two host computer modes, and two host computers independently work simultaneously.
5. The watershed cascade power plant overhaul monitoring management system as claimed in claim 1, wherein: a drainage basin step power plant overhaul monitoring management database: the system is used for storing all the overhaul work contents sent by the drainage basin cascade power plant to the centralized control center and the monitoring management work information of the drainage basin cascade power plant centralized control center on overhaul of each drainage basin cascade power plant.
6. The watershed cascade power plant overhaul monitoring management system as claimed in claim 1, wherein: a public service module: the system is mainly used for displaying external information and collecting information;
the public service module can collect work suggestions and work information of all departments for the overhaul work.
7. The watershed cascade power plant overhaul monitoring management system as claimed in claim 1, wherein: centralized control center staff workstation: the method is mainly used for monitoring and managing the overhaul work of the cascade power plant in the drainage basin by centralized control center workers, and a plurality of workstations or a single workstation is arranged;
the staff carries out the work of examining and verifying, wholesale, monitoring, management to the maintenance work that basin step power plant proposed in the workstation, is responsible for receiving, takes notes maintenance work information.
8. The watershed cascade power plant overhaul monitoring management system as claimed in claim 1, wherein: maintenance information monitoring management display module: the display device is mainly used for displaying the development condition, the completion condition and each specific working condition of the overhauling work of the cascade power plant in the drainage basin and detailed work display equipment.
9. Use of a cascade power plant overhaul monitoring management system according to any one of claims 1 to 8, wherein:
the method comprises the following steps of maintenance application, auditing, batch replication, execution, monitoring and management:
s1, application of maintenance work: the method comprises the steps that a basin step power plant applies for a centralized control center of the basin step power plant according to a maintenance plan, and fills in a maintenance request form, wherein the maintenance request form mainly comprises maintenance construction period, maintenance content, test content, maintenance requirements and information of all working responsible persons, and the maintenance request form is pushed to the centralized control center after being filled;
s2, examining and verifying overhaul work: after receiving the maintenance application, the centralized control center checks the maintenance information, if the maintenance application is not passed, optimizes and modifies the maintenance work application, and after the maintenance application is passed, the centralized control center applies the maintenance work to the power grid dispatching, and after the power grid dispatching agrees, the centralized control center returns the maintenance work ticket to each basin cascade power plant;
s3, maintenance execution: after the power plant in the river basin cascade receives the overhaul approval, beginning to take overhaul safety measures, and after the measures are finished, formally starting the overhaul work after the permission of the centralized control center is obtained;
s4, maintenance monitoring and management: after the maintenance work is executed, the central control center of the river basin cascade power plant monitors and manages the whole maintenance work process, records the execution time, the executive personnel, the execution condition, the work content and the work standard of each work, timely corrects the abnormal or non-conforming items, and collects the work information and data, the maintenance report and the test report in the maintenance process;
s5, completing maintenance: after all the maintenance work and the test work are finished, reporting the power grid dispatching, and restoring the maintenance unit to a standby state;
s6, after the overhaul work is finished, all overhaul related information is stored in the database, so that the later-stage query and use are facilitated, and the database supports a time period query mode, a basin cascade power plant query mode, a unit query mode and a work leader query mode.
CN202110501402.XA 2021-05-08 2021-05-08 Drainage basin cascade power plant maintenance monitoring management system and use method Pending CN113283712A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110501402.XA CN113283712A (en) 2021-05-08 2021-05-08 Drainage basin cascade power plant maintenance monitoring management system and use method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110501402.XA CN113283712A (en) 2021-05-08 2021-05-08 Drainage basin cascade power plant maintenance monitoring management system and use method

Publications (1)

Publication Number Publication Date
CN113283712A true CN113283712A (en) 2021-08-20

Family

ID=77278342

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110501402.XA Pending CN113283712A (en) 2021-05-08 2021-05-08 Drainage basin cascade power plant maintenance monitoring management system and use method

Country Status (1)

Country Link
CN (1) CN113283712A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114217565A (en) * 2021-11-11 2022-03-22 湖北清江水电开发有限责任公司 Intelligent OnCall system of drainage basin cascade power plant centralized control center and use method
CN114255002A (en) * 2021-12-14 2022-03-29 深圳供电局有限公司 Unit outage management system
CN115016419A (en) * 2022-06-29 2022-09-06 湖北清江水电开发有限责任公司 Automatic point aligning method and point aligning device for central control center monitoring system of drainage basin cascade power plant
CN116207855A (en) * 2023-02-13 2023-06-02 湖北清江水电开发有限责任公司 Production management system of centralized control center of river basin step power plant

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101763583A (en) * 2009-09-17 2010-06-30 宁波北电源兴电力工程有限公司 Work sheet management module for EAM system of power plant
CN106127605A (en) * 2016-06-20 2016-11-16 国网上海市电力公司 A kind of electric power overhaul system based on wearable smart machine
CN107885170A (en) * 2016-09-30 2018-04-06 珠海优特电力科技股份有限公司 The method of safety in production control device, system and management and control of keeping the safety in production
CN109858725A (en) * 2018-11-20 2019-06-07 华电电力科学研究院有限公司 Collect regimental hydraulic power plant group economical operation integral system platform architecture
CN111369020A (en) * 2020-03-06 2020-07-03 国电大渡河流域水电开发有限公司 Automatic control system and method for cascade hydropower station group control signals
CN112435140A (en) * 2020-11-12 2021-03-02 国网湖北省电力有限公司宜昌供电公司 Intelligent billing method for power system
CN112633758A (en) * 2020-12-31 2021-04-09 重庆电子工程职业学院 Intelligent on-line management system for maintainers

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101763583A (en) * 2009-09-17 2010-06-30 宁波北电源兴电力工程有限公司 Work sheet management module for EAM system of power plant
CN106127605A (en) * 2016-06-20 2016-11-16 国网上海市电力公司 A kind of electric power overhaul system based on wearable smart machine
CN107885170A (en) * 2016-09-30 2018-04-06 珠海优特电力科技股份有限公司 The method of safety in production control device, system and management and control of keeping the safety in production
CN109858725A (en) * 2018-11-20 2019-06-07 华电电力科学研究院有限公司 Collect regimental hydraulic power plant group economical operation integral system platform architecture
CN111369020A (en) * 2020-03-06 2020-07-03 国电大渡河流域水电开发有限公司 Automatic control system and method for cascade hydropower station group control signals
CN112435140A (en) * 2020-11-12 2021-03-02 国网湖北省电力有限公司宜昌供电公司 Intelligent billing method for power system
CN112633758A (en) * 2020-12-31 2021-04-09 重庆电子工程职业学院 Intelligent on-line management system for maintainers

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
刘兴举: "梯级水电站集中调度管理模式和发展方向", 《贵州水力发电》 *
刘兴举: "梯级水电站集中调度管理模式和发展方向", 《贵州水力发电》, no. 01, 15 February 2009 (2009-02-15) *
林婵: "乌江公司电力调度业务集中管理系统建设", 《红水河》 *
林婵: "乌江公司电力调度业务集中管理系统建设", 《红水河》, no. 06, 25 December 2019 (2019-12-25) *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114217565A (en) * 2021-11-11 2022-03-22 湖北清江水电开发有限责任公司 Intelligent OnCall system of drainage basin cascade power plant centralized control center and use method
CN114255002A (en) * 2021-12-14 2022-03-29 深圳供电局有限公司 Unit outage management system
CN115016419A (en) * 2022-06-29 2022-09-06 湖北清江水电开发有限责任公司 Automatic point aligning method and point aligning device for central control center monitoring system of drainage basin cascade power plant
CN116207855A (en) * 2023-02-13 2023-06-02 湖北清江水电开发有限责任公司 Production management system of centralized control center of river basin step power plant
CN116207855B (en) * 2023-02-13 2024-05-31 湖北清江水电开发有限责任公司 Production management system of centralized control center of river basin step power plant

Similar Documents

Publication Publication Date Title
CN113283712A (en) Drainage basin cascade power plant maintenance monitoring management system and use method
CN108320069B (en) Production and manufacturing execution system
CN110505102B (en) Power information communication fusion monitoring and service standardization management platform system and method
US20150263522A1 (en) Powergrid operation and supervision system
CN104638764A (en) Intelligent state diagnosis and overhauling system for power distribution network equipment
CN108418849A (en) A kind of oil-gas pipeline SCADA system
CN107545519B (en) Power grid enterprise operation and inspection management and control method
CN112613066A (en) Internet information management system based on large-scale wind power plant
CN110570109A (en) Data center full life cycle integrated service test process supervision system
CN105761008A (en) Intelligent production management method for signal equipment maintenance
Shuang et al. Intelligent mobile operation and maintenance technology and its application of for relay protection based on power wireless virtual private network
CN103106555B (en) Maintaining-managing system based on the integration of online off-line and method
CN117078209A (en) Method, system and device for managing supervision project and computer storage medium
CN201974848U (en) Management system for comprehensively arranging and executing maintenance plan of production equipment
CN201298172Y (en) Data synchronization fault diagnosis device for centralized control station
CN109087013A (en) A kind of facility diagnosis method and system based on technical supervision data
CN115511131A (en) Rail transit multi-professional operation and maintenance data processing method and system
CN111008787B (en) Active power outage planning monitoring and scheduling method based on metering terminal alarm technology
CN114722628A (en) Configuration risk evaluation method based on PSA model and modeling software
CN108491303A (en) A method of based on the O&M automation of acceptance of the bid kylin operating system software
CN109409907B (en) Intelligent product defect tracing system and method for wind turbine generator monitoring system
CN118175012A (en) Automatic operation and maintenance management system for network information equipment in power distribution network
CN116308266A (en) Nuclear power plant KIC platform auxiliary overhaul specialized tool
CN115619179A (en) Equipment maintenance method and device and readable storage medium
Sun et al. Research on the architecture of modern radar support information management system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210820