CN113236857A - 一种定向钻施工的防拉脱漏液的管道连接方法 - Google Patents
一种定向钻施工的防拉脱漏液的管道连接方法 Download PDFInfo
- Publication number
- CN113236857A CN113236857A CN202110313915.8A CN202110313915A CN113236857A CN 113236857 A CN113236857 A CN 113236857A CN 202110313915 A CN202110313915 A CN 202110313915A CN 113236857 A CN113236857 A CN 113236857A
- Authority
- CN
- China
- Prior art keywords
- pipeline
- directional drilling
- pulling
- steps
- preventing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/024—Laying or reclaiming pipes on land, e.g. above the ground
- F16L1/028—Laying or reclaiming pipes on land, e.g. above the ground in the ground
- F16L1/036—Laying or reclaiming pipes on land, e.g. above the ground in the ground the pipes being composed of sections of short length
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
本发明提供了一种定向钻施工的防拉脱漏液的管道连接方法,包括如下步骤:待安装管道置入钻孔内;对待安装管道内进行注液;静置下沉;待安装管道的两端分别与设定管道连接。本发明定向钻施工的防拉脱漏液的管道连接方法,通过对待安装管道内进行注液,静置下沉后再进行连接,解决了现有施工方法中存在的拉脱漏液问题。本发明所公开的方法尤其适用于城市给水管道施工,为保证管道施工质量、保证供水安全具有重要的意义。
Description
技术领域
本发明涉及管道施工工艺技术领域,尤其是一种定向钻施工的防拉脱漏液的管道连接方法。
背景技术
管道施工工程中,管道施工质量的好坏直接影响整体工程的安全性和稳定性。而管道施工质量的关键点在于多管道的连接,定向钻施工后的管道两端承插或焊接易受力脱出,从而导致漏液事故。从而导致管道施工质量下降。
发明内容
本发明的目的是提供一种定向钻施工的防拉脱漏液的管道连接方法,解决现有定向钻施工的管道连接施工质量差,稳定性低的技术问题。
为了达到上述目的,本发明提供如下技术方案:
一种定向钻施工的防拉脱漏液的管道连接方法,包括如下步骤:
待安装管道置入钻孔内;
对待安装管道内进行注液;
静置下沉;
待安装管道的两端分别与设定管道连接。
其中,所述待安装管道的两端分别与设定管道连接之后还包括步骤:
对待安装管道的两端进行浇铸形成混凝土支墩。
其中,所述对待安装管道的两端进行浇铸混凝土支墩之后还包括步骤:
待混凝土支墩凝固后,通液。
其中,所述静置下沉的步骤中:
静置下沉时长为1-8日。
其中,所述静置下沉的步骤中:
静置下沉时长为3日。
其中,所述待安装管道置入钻孔内的步骤之前还包括:
确定管道位置,开挖基坑。
其中,所述确定管道位置,开挖基坑的步骤中:
开挖基坑后采用定向钻机进行扩孔。
其中,待安装管道的材质为PE。
其中,待安装管道为PE给水管道。
本发明的定向钻施工的防拉脱漏液的管道连接方法,通过对待安装管道内进行注液,静置下沉后再进行连接,解决了现有施工方法中存在的拉脱漏液问题。本发明所公开的方法尤其适用于城市给水管道施工,为保证管道施工质量、保证供水安全具有重要的意义。
附图说明
为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。
图1是本发明的流程框图;
图2是本发明的PE给水管道安装结构示意图。
具体实施方式
下面将结合本发明的附图,对本发明的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
说明本发明的一种定向钻施工的防拉脱漏液的管道连接方法,如图1所示,包括如下步骤:
确定管道位置,开挖基坑,开挖基坑后采用定向钻机进行扩孔。
待安装管道置入钻孔内。
对待安装管道内进行注液。
静置下沉;静置下沉时长为1-8日。优选的静置下沉时长为3日。
待安装管道的两端分别与设定管道连接。
对待安装管道的两端进行浇铸形成混凝土支墩。
待混凝土支墩凝固后,通液。
注液和通液可为任意液体,根据实际情况进行选择即可,如待安装管道作为市政污水管则注液可选为清水,通液就为排污水。若安装管道为其他用途管道,注液可注入对应管道用途的液体,通液也为通入对应管道用途的液体进行正常使用。因此在此不再一一举例赘述。
实施例1:根据图2所示,一种定向钻施工的防拉脱漏液的管道连接方法,待安装管道的材质为PE。具体可优选为PE给水管道1。PE为polyethylene的简称,是乙烯经聚合制得的一种热塑性树脂。在城市供水系统中,供水管道是自来水运输的重要载体,管道施工质量的好坏直接影响到供水的稳定安全。而城市供水管道施工时,多埋设在市区街道内,部分管道不可避免需要穿过马路和障碍物等,PE给水管道由于弯曲性好、热熔连接可靠等优点,广泛用于供水管道定向钻施工。在躲避障碍的同时,又可以保证管道的供水质量。但在PE给水管道定向钻施工时,和其他管道进行连接,由于PE给水管道本身的热胀冷缩特性和定向钻施工的特性,容易使PE给水管道的承插和焊接受力脱出,保证不了管道的施工质量,造成管道的漏水事故。针对城市供水管道施工时,PE给水管道定向钻施工与设定管道连接,易造成管道脱出漏水的问题,采用本发明的一种定向钻施工的防拉脱漏液的管道连接方法,避免PE给水管道与其他管道连接,出现的漏水事故。
具体的:
确定管道位置,开挖基坑,开挖基坑后根据PE给水管道1的管径大小,采用定向钻机进行扩孔。
扩孔完成后,把PE给水管道1使用定向钻机拉进钻孔内;由于定向钻扩孔的孔径会大于PE给水管道的管径,PE给水管道在定向钻孔里面悬空,如果在两端和别的管道连接,正式通水时,会受通水重力的影响,PE给水管道下沉,导致管道两端受拉力影响,承插管道等连接方式易拉脱从而漏水。
对PE给水管道内进行注水,优选为住满城市用水;
静置下沉至PE给水管道1不在产生下沉量;优选的静置下沉时长为3日。如图2所示,PE给水管道1由于注水下沉中间向下弯曲,待不再产生下沉量后即可与设定管道2连接。
PE给水管道1的两端分别与设定管道2连接连通。
由于PE给水管道受温度的影响会产生热胀冷缩的特性,如果温度下降,管道受冷缩短,产生PE给水管道1拉力,传递到设定管道2,连接管道之间易造成管道拉脱漏水,对PE给水管道1的两端进行浇铸形成混凝土支墩3,以固定PE给水管道抵消PE给水管道受冷伸缩的拉力。防止传递到设定管道,造成管道拉脱漏水。
待混凝土支墩3凝固后,进行正常的通水等工作。该发明适用于城市给水管道施工中,PE给水管道与其他不同管道连接出现的问题,通过该方法能够解决由于PE给水管道特性造成的管道受力拉开漏水问题,对保证管道施工质量、保证供水安全具有重要的意义。
实施例2:一种定向钻施工的防拉脱漏液的管道连接方法,其他步骤与实施例1相同,其中待安装管道的材质为PVC-U。
实施例3:一种定向钻施工的防拉脱漏液的管道连接方法,其他步骤与实施例1相同,其中待安装管道的材质为ABS。
实施例4:一种定向钻施工的防拉脱漏液的管道连接方法,其他步骤与实施例1相同,其中待安装管道的材质为PPR。
以上所述,仅为本发明的具体实施方式,但本发明的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明揭露的技术范围内,可轻易想到变化或替换,都应涵盖在本发明的保护范围之内。因此,本发明的保护范围应所述以权利要求的保护范围为准。
Claims (9)
1.一种定向钻施工的防拉脱漏液的管道连接方法,其特征在于:包括如下步骤:
待安装管道置入钻孔内;
对待安装管道内进行注液;
静置下沉;
待安装管道的两端分别与设定管道连接。
2.根据权利要求1所述的一种定向钻施工的防拉脱漏液的管道连接方法,其特征在于:所述待安装管道的两端分别与设定管道连接之后还包括步骤:
对待安装管道的两端进行浇铸形成混凝土支墩。
3.根据权利要求2所述的一种定向钻施工的防拉脱漏液的管道连接方法,其特征在于:所述对待安装管道的两端进行浇铸混凝土支墩之后还包括步骤:
待混凝土支墩凝固后,通液。
4.根据权利要求3所述的一种定向钻施工的防拉脱漏液的管道连接方法,其特征在于:所述静置下沉的步骤中:
静置下沉时长为1-8日。
5.根据权利要求4所述的一种定向钻施工的防拉脱漏液的管道连接方法,其特征在于:所述静置下沉的步骤中:
静置下沉时长为3日。
6.根据权利要求5所述的一种定向钻施工的防拉脱漏液的管道连接方法,其特征在于:所述待安装管道置入钻孔内的步骤之前还包括:
确定管道位置,开挖基坑。
7.根据权利要求6所述的一种定向钻施工的防拉脱漏液的管道连接方法,其特征在于:所述确定管道位置,开挖基坑的步骤中:
开挖基坑后采用定向钻机进行扩孔。
8.根据权利要求1所述的一种定向钻施工的防拉脱漏液的管道连接方法,其特征在于:待安装管道的材质为PE。
9.根据权利要求8所述的一种定向钻施工的防拉脱漏液的管道连接方法,其特征在于:待安装管道为PE给水管道。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110313915.8A CN113236857A (zh) | 2021-03-24 | 2021-03-24 | 一种定向钻施工的防拉脱漏液的管道连接方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110313915.8A CN113236857A (zh) | 2021-03-24 | 2021-03-24 | 一种定向钻施工的防拉脱漏液的管道连接方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN113236857A true CN113236857A (zh) | 2021-08-10 |
Family
ID=77130465
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110313915.8A Pending CN113236857A (zh) | 2021-03-24 | 2021-03-24 | 一种定向钻施工的防拉脱漏液的管道连接方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113236857A (zh) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070104541A1 (en) * | 2005-11-08 | 2007-05-10 | Copperhead Industries, Llc | Method of installing tracer wire with pipeline utilizing horizontal directional drilling |
WO2007124789A1 (de) * | 2006-04-28 | 2007-11-08 | Herrenknecht Ag | Verfahren und vorrichtungen zur grabenlosen verlegung von rohrleitungen |
CN102434716A (zh) * | 2011-09-26 | 2012-05-02 | 武汉地网非开挖科技有限公司 | 一种软管辅助式管道回拖方法 |
DE102012017720A1 (de) * | 2012-09-07 | 2014-03-13 | mts Perforator GmbH | Vorrichtung zum Verlegen zumindest einer aus Einzelrohren zusammengesetzten Rohrleitung in einem Bohrloch und Verfahren zum Verlegen zumindest einer Rohrleitung in einem Bohrloch |
CN107606305A (zh) * | 2017-08-18 | 2018-01-19 | 新地能源工程技术有限公司 | 一种地下水丰水区燃气管道架设方法 |
CN107763307A (zh) * | 2017-09-27 | 2018-03-06 | 广西建工集团第五建筑工程有限责任公司 | 一种注水自然沉管过江管道的安装方法 |
CN208982789U (zh) * | 2018-08-31 | 2019-06-14 | 云南省建设投资控股集团有限公司 | 一种地下综合管廊用给水管道支墩 |
CN110847325A (zh) * | 2019-12-12 | 2020-02-28 | 南通华新建工集团有限公司 | 水平定向钻在乡镇污水管网施工工艺 |
CN111306360A (zh) * | 2020-02-24 | 2020-06-19 | 广东省第四建筑工程有限公司 | 一种非开挖管道拉顶铺设施工方法 |
-
2021
- 2021-03-24 CN CN202110313915.8A patent/CN113236857A/zh active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070104541A1 (en) * | 2005-11-08 | 2007-05-10 | Copperhead Industries, Llc | Method of installing tracer wire with pipeline utilizing horizontal directional drilling |
WO2007124789A1 (de) * | 2006-04-28 | 2007-11-08 | Herrenknecht Ag | Verfahren und vorrichtungen zur grabenlosen verlegung von rohrleitungen |
CN102434716A (zh) * | 2011-09-26 | 2012-05-02 | 武汉地网非开挖科技有限公司 | 一种软管辅助式管道回拖方法 |
DE102012017720A1 (de) * | 2012-09-07 | 2014-03-13 | mts Perforator GmbH | Vorrichtung zum Verlegen zumindest einer aus Einzelrohren zusammengesetzten Rohrleitung in einem Bohrloch und Verfahren zum Verlegen zumindest einer Rohrleitung in einem Bohrloch |
CN107606305A (zh) * | 2017-08-18 | 2018-01-19 | 新地能源工程技术有限公司 | 一种地下水丰水区燃气管道架设方法 |
CN107763307A (zh) * | 2017-09-27 | 2018-03-06 | 广西建工集团第五建筑工程有限责任公司 | 一种注水自然沉管过江管道的安装方法 |
CN208982789U (zh) * | 2018-08-31 | 2019-06-14 | 云南省建设投资控股集团有限公司 | 一种地下综合管廊用给水管道支墩 |
CN110847325A (zh) * | 2019-12-12 | 2020-02-28 | 南通华新建工集团有限公司 | 水平定向钻在乡镇污水管网施工工艺 |
CN111306360A (zh) * | 2020-02-24 | 2020-06-19 | 广东省第四建筑工程有限公司 | 一种非开挖管道拉顶铺设施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9353888B2 (en) | Polymer bag grouting method for repairing settlement of underground pipelines | |
CN105673935B (zh) | 裂插法地下管线更换方法 | |
CN110878697A (zh) | 高富水砂卵石地层中紧邻城市主干道的盾构水下接收方法 | |
CN108590752B (zh) | 一种暗沟式隧道衬砌后排水修复系统及其施工方法 | |
CN110206071A (zh) | 一种地下连续墙接缝加固方法与装置 | |
CN113236857A (zh) | 一种定向钻施工的防拉脱漏液的管道连接方法 | |
CN212225238U (zh) | 一种控制顶管施工沉降的装置 | |
CN115653499A (zh) | 隧道仰拱底部排水管道的非开挖水平定向钻施工方法 | |
CN208136954U (zh) | 预制拼装式管廊结构 | |
CN212453000U (zh) | 一种用于连接排水管道与检查井的止水结构 | |
CN204551551U (zh) | 一种地连墙接缝渗漏检测及注浆堵漏装置 | |
CN201129585Y (zh) | 双向承插管件 | |
KR100333024B1 (ko) | 그라우팅 지향식 수평 굴착 방법 | |
CN110905065B (zh) | 塑料排水管道不断管连续施工方法 | |
CN218760017U (zh) | 一种盾构隧道泵房顶出排水结构 | |
CN108457357A (zh) | 一种流塑状淤泥土层管道施工方法 | |
CN114382157B (zh) | 一种混凝土透气井施工方法 | |
CN218787367U (zh) | 一种出户管线抗沉降装置 | |
CN218116468U (zh) | 一种防止固化膨胀的注浆管道 | |
CN215949527U (zh) | 一种巷道淋水区锚索孔的封孔注浆堵水加固装置 | |
US20160178109A1 (en) | In-situ installable replacement pipeline and method of installation thereof | |
Bascom et al. | Technical considerations for applying trenchless technology methods to underground power cables | |
Garza et al. | Decision making process for identifying optimum trenchless method for corrugated metal pipe rehabilitation in stormwater | |
CN117627134A (zh) | 沙砾土质长距离hdpe柔性排水管拖、顶共进方法 | |
Wu et al. | Research on the Application of Small Caliber Pilot Jacking Method Under Silt Geology |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |