CN113202057B - Rapid embankment breach plugging construction method combining trestle and steel sheet pile - Google Patents

Rapid embankment breach plugging construction method combining trestle and steel sheet pile Download PDF

Info

Publication number
CN113202057B
CN113202057B CN202110532840.2A CN202110532840A CN113202057B CN 113202057 B CN113202057 B CN 113202057B CN 202110532840 A CN202110532840 A CN 202110532840A CN 113202057 B CN113202057 B CN 113202057B
Authority
CN
China
Prior art keywords
pile
trestle
driving
steel sheet
plugging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110532840.2A
Other languages
Chinese (zh)
Other versions
CN113202057A (en
Inventor
邵飞
李志刚
徐倩
白林越
申玫
赵慧爽
高磊
谢兴坤
何立翔
严心彤
马青娜
焦经纬
王儒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Army Engineering University of PLA
Original Assignee
Army Engineering University of PLA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Army Engineering University of PLA filed Critical Army Engineering University of PLA
Priority to CN202110532840.2A priority Critical patent/CN113202057B/en
Publication of CN113202057A publication Critical patent/CN113202057A/en
Application granted granted Critical
Publication of CN113202057B publication Critical patent/CN113202057B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/10Dams; Dykes; Sluice ways or other structures for dykes, dams, or the like
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D18/00Bridges specially adapted for particular applications or functions not provided for elsewhere, e.g. aqueducts, bridges for supporting pipe-lines
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • E02D5/04Prefabricated parts, e.g. composite sheet piles made of steel
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • E02D5/04Prefabricated parts, e.g. composite sheet piles made of steel
    • E02D5/08Locking forms; Edge joints; Pile crossings; Branch pieces

Abstract

A rapid large dike breach plugging construction method combining a trestle and a steel sheet pile relates to the technical field of earthwork construction methods. Inserting and driving the plugging steel sheet piles into the river bottom to a certain depth, connecting the plugging steel sheet piles with each other by using a tongue-and-groove structure, connecting the plugging steel sheet piles by using a supporting beam after the plugging steel sheet piles are plugged, supporting one end of a supporting rod system behind the supporting beam, and supporting the other end of the supporting rod system on a lower structure of a piling trestle, inserting and driving the piles of the lower structure of the piling trestle into the soil to a certain depth under the stability of a piling positioning frame, and arranging a longitudinal reinforcing structure and a transverse reinforcing structure on the lower structure of the piling trestle to provide reliable support for the plugging steel sheet piles and provide shielding for inserting and driving the piles of the lower structure of the piling trestle. The plugging steel sheet piles and the pile piles of the lower structure of the pile driving trestle are alternately shielded and supported, so that safe and reliable work of the plugging steel sheet piles at a high flow speed is guaranteed, and smooth plugging construction of the pile piles of the lower structure of the pile driving trestle is guaranteed.

Description

Rapid embankment breach plugging construction method combining trestle and steel sheet pile
Technical Field
The invention relates to the technical field of earthwork construction methods, in particular to the technical field of dam breach plugging construction methods.
Background
The existing method for blocking the breach of the levee uses sand and stone materials, and a large amount of sand and stone materials are needed for each breach. The sand and stone materials transported to the breach are pushed into the water and mostly washed away by the flood, i.e. the filling is carried out by using the reinforcing mesh for a plurality of times. At present, there are three main types in dike breach plugging technology: vertical plugging method, horizontal plugging method and mixed plugging method.
1) The vertical blocking method is to make the water enter from one or two ends of the breach door according to the planned blocking dyke line, and gradually narrow the breach door, and finally realize closure.
2) The block method is to fill the river bottom with stuffing material, such as willow stone pillow, stone, sand bag, etc. along the width of the gate layer by layer until the stuffing material is higher than the water surface to block the water flow.
3) The mixed plugging method is characterized in that a vertical plugging method and a horizontal plugging method are comprehensively applied according to local conditions according to the specific conditions of a port door during plugging.
However, the technical methods all consume a long time, when the large river makes a breach at a high water level in a flood season, the breach flow rate is large, the wrapping head is seriously flushed, the breach is rapidly enlarged, the filler of the conventional plugging technology cannot be fixed, the breach cannot be plugged in time, and the method often causes serious threats to lives and properties of people.
Disclosure of Invention
The invention aims to provide a rapid large levee breach plugging construction method combining a trestle and a steel sheet pile.
A rapid large dike breach plugging construction method combining a trestle and a steel sheet pile is characterized by comprising the following steps:
step 1, inserting and driving plugging steel sheet piles to the breach at the water feeding edge of a large dike on the water side at the rear part of wrapping heads on two sides of the breach to prevent the breach from further washing the wrapping heads by water flow, arranging a supporting beam behind the inserted and driven plugging steel sheet piles, and continuously inserting and driving the plugging steel sheet piles to the breach along the supporting beam to form protection for pile driving trestle piles;
step 2, cleaning the front end of the wrapping head, inserting and driving a first row of pile columns of the pile driving trestle, setting a corresponding transverse structure, setting one end of a temporary support rod system to be supported on a support cross beam, and the other end of the temporary support rod system to be supported on the pile columns of the lower structure of the pile driving trestle, and continuously inserting and driving plugging steel sheet piles beyond the position of the next row of pile columns of the pile driving trestle so as to provide protection for inserting and driving of the next row of pile columns of the pile driving trestle;
step 3, assembling the upper structure of the pile driving trestle, arranging a pile driving positioning frame, inserting and driving pile columns of the pile driving trestle, and arranging a longitudinal reinforcing structure and a transverse reinforcing structure of the lower structure of the pile driving trestle;
step 4, arranging a temporary support rod system, wherein one end of the temporary support rod system is supported on the support cross beam, the other end of the temporary support rod system is supported on the pile column of the lower structure of the pile trestle, and plugging steel plate piles are continuously inserted and driven to exceed the position of the pile column of the next row of the pile trestle, so that protection is provided for inserting and driving the pile column of the next row of the pile trestle;
step 5, repeating the step 3 and the step 4 until the distance between pile trestle pile columns on two sides of the breach is less than 2 pile trestle spans, enabling supporting cross beams on two sides of the breach to be folded, arranging temporary supporting rod systems on two sides of the breach, supporting one end of each supporting cross beam and the other end of each supporting cross beam on a pile trestle lower structure pile, continuously inserting plugging steel plate piles from two sides until the pile trestles are folded, inserting pile trestle pile columns in the middle of the folded spans of the pile trestles on two ends or at a position less than one span, and enabling the pile trestle upper structure to be folded on a pile trestle middle bridge foot;
and 6, setting a longitudinal reinforcing structure and a transverse reinforcing structure of the lower part structure of the pile driving trestle folding span, and constructing an upper part structure of the pile driving trestle folding span to finish the operation.
Preferably, the pile driving trestle is used as a pile driving platform, the plugging steel sheet piles are inserted and driven to the breach, and the plugging steel sheet piles are connected with each other by a tongue-and-groove structure.
Preferably, in step 1 of the invention, plugging steel sheet piles are inserted and driven continuously along the support beam to the breach, and the inserted and driven steel sheet piles form protection for pile driving trestle pile columns
Preferably, the pile driving trestle is a pile driving platform, and simultaneously, the lower structure of the pile driving trestle is used as a component of a supporting structure of the plugging steel sheet pile, and the plugging steel sheet pile inserting and driving and the pile column inserting and driving the lower structure of the pile driving trestle are alternately shielded and supported.
During construction, the plugging steel sheet piles are inserted into the river bottom to a certain depth, so that the plugging steel sheet piles are connected with each other by a tongue-and-groove structure, after the steel sheet piles are plugged, the steel sheet piles are connected by using a supporting beam, one end of a supporting rod system is supported behind the supporting beam, the other end is supported on the lower structure of the piling trestle, the pile column of the lower structure of the piling trestle is inserted into the soil for a certain depth under the stability of the piling positioning frame, and the longitudinal reinforcing structure and the transverse reinforcing structure are arranged on the lower structure of the pile driving trestle to provide reliable support for the plugging steel sheet pile, the inserted and driven steel sheet pile also provides shielding for the insertion and driving of the pile column of the lower structure of the pile driving trestle, the insertion and driving of the plugging steel sheet pile and the insertion and driving of the pile column of the lower structure of the pile driving trestle are alternately performed for shielding and supporting, and the safe and reliable work of the plugging steel sheet pile under the large flow speed and the smooth insertion and driving construction of the pile column of the lower structure of the pile driving trestle are ensured.
In order to improve the breach blocking time efficiency, blocking construction can be selected to be simultaneously carried out from one side of the breach or from two sides of the breach according to the size of the breach, the construction steps are carried out simultaneously from two sides of the breach, and when construction is carried out from one side of the breach, except that the construction steps 1 and 2 are carried out simultaneously from two sides of the breach, other construction steps can be simplified into unilateral construction.
The invention utilizes the trestle as a piling trestle to insert and pile the steel sheet pile, simultaneously utilizes the steel sheet pile to protect the trestle from construction, and utilizes the lower structure of the piling trestle as a steel sheet pile supporting system, thereby solving the problems of wrapping head scouring, filler fixation at high flow speed, breach plugging aging and the like.
Drawings
FIG. 1 is a rear elevational view of the occluding device of the present invention;
FIG. 2 is a rear plan view of the occluding device of the present invention;
FIG. 3 is an exemplary cross-section of an occluding device of the present invention;
FIG. 4a is a front view of a first step of the plugging operation of the present invention;
FIG. 4b is a top view of the first step of the plugging operation of the present invention;
FIG. 5a is a front view of a second step of the plugging operation of the present invention;
FIG. 5b is a top view of a second step of the plugging operation of the present invention;
FIG. 6a is a front view of a third step of the plugging operation of the present invention;
FIG. 6b is a top view of a third step in the plugging operation of the present invention;
FIG. 7a is a front view of a fourth step of the plugging operation of the present invention;
FIG. 7b is a top view of the fourth step of the plugging operation of the present invention;
FIG. 8a is a front view of a fifth step of the plugging construction operation of the present invention;
FIG. 8b is a top view of a fifth step of the plugging operation of the present invention;
figure 9a is a front view of the sixth step of the plugging construction operation of the present invention.
Figure 9b is a top view of the sixth step of the plugging operation of the present invention.
Detailed Description
A rapid large dike breach plugging construction method combining a trestle and a steel sheet pile comprises the following steps:
step 1, inserting and driving a plugging steel sheet pile 2 to a breach at the water feeding edge of a large dike at the water side of the rear part of a wrapping head on two sides of the breach to prevent the breach from further washing the wrapping head by water flow, arranging a supporting cross beam 31 behind the inserted and driven plugging steel sheet pile 2, and continuously inserting and driving the plugging steel sheet pile 2 to the breach along the supporting cross beam 31 to form protection for pile columns of a pile driving trestle 1;
step 2, clearing the front end of the wrapping head, inserting and driving a first row of pile columns of the pile driving trestle 1, setting a corresponding transverse structure, setting one end of a temporary support rod system 32 to be supported on a support cross beam 31, and the other end of the temporary support rod system to be supported on a pile column 12 of the lower structure of the pile driving trestle, and continuously inserting and driving plugging steel plate piles 2 to exceed the position of the next row of pile columns of the pile driving trestle 1 so as to provide protection for inserting and driving of the next row of pile columns of the pile driving trestle 1;
step 3, assembling the upper structure 11 of the pile driving trestle, arranging a pile driving positioning frame 4, inserting and driving pile columns of the pile driving trestle 1, and arranging a longitudinal reinforcing structure 121 and a transverse reinforcing structure 122 of the lower structure of the pile driving trestle;
step 4, arranging a temporary support rod system 32, wherein one end of the temporary support rod system is supported on the support cross beam 31, the other end of the temporary support rod system is supported on the pile column of the lower structure 12 of the pile driving trestle, and the plugging steel sheet piles 2 are continuously inserted and driven to exceed the position of the pile column of the next row of the pile driving trestle, so that protection is provided for inserting and driving the pile columns of the next row of the pile driving trestle 1;
step 5, repeating the step 3 and the step 4 until the distance between pile columns of the pile trestles 1 on two sides of the breach is less than 2 spans of the pile trestles 1, enabling supporting cross beams 31 on two sides of the breach to be folded, arranging temporary supporting rod systems 32 on two sides of the breach, supporting one end of each supporting cross beam 31 and the other end of each supporting cross beam on a pile trestle lower structure 12 pile, continuously inserting and plugging steel plate piles 2 from two sides until the pile trestles are folded, inserting and driving pile trestle 1 piles in the middle of the folded span of the pile trestles 1 on two ends or at a position less than one span, and enabling an upper structure 11 of the pile trestle to be folded on the middle bridge foot of the pile trestle 1;
and 6, arranging a longitudinal reinforcing structure 121 and a transverse reinforcing structure 122 of the closure span lower part structure of the pile driving trestle 1, and constructing the closure span upper part structure of the pile driving trestle 1, thereby finishing the operation.
The invention takes a pile driving trestle 1 as a pile driving platform, plugging steel sheet piles 2 are inserted and driven to breach, and the plugging steel sheet piles 2 are connected with each other by a tongue-and-groove structure.
In the step 1 of the invention, plugging steel sheet piles 2 are inserted and driven continuously along the supporting beam 31 to the breach to form protection for piles of the pile driving trestle 1
The invention takes the pile driving trestle 1 as a pile driving platform, simultaneously, the lower structure of the pile driving trestle is taken as a component part of a supporting structure 3 of the plugging steel sheet pile 2, and the pile columns of the plugging steel sheet pile 2 and the pile driving trestle lower structure 12 are alternately shielded and supported.
The rapid large dike breach plugging system combining the trestle and the steel sheet pile consists of a piling trestle 1, a plugging steel sheet pile 2 and a steel sheet pile supporting structure 3.
The piling trestle 1 consists of a piling trestle upper structure 11 and a piling trestle lower structure 12, the piling trestle upper structure is mainly used for bearing piling machines and conveying steel sheet piles, and the piling trestle lower structure is a pile column type structure inserted into the bottom of a breach and is also used as a part of a steel sheet pile supporting structure 3 besides bearing loads transmitted by the upper structure.
The plugging steel sheet piles 2 are general steel sheet piles with tongue-and-groove structures, the steel sheet piles are driven into the river bottom, the steel sheet piles are connected with each other through the tongue-and-groove structures, the steel sheet piles are connected with each other through a cross beam, and the steel sheet piles are supported through a steel sheet pile supporting structure 3.
The steel sheet pile supporting structure 3 is composed of one or more supporting beams 31 for connecting steel sheet piles, a supporting rod system 32 and a lower structure 12 of the piling trestle.
When the system works, plugging steel sheet piles 2 which are inserted and driven into the river bottom to a certain depth are connected with each other by a tongue-and-groove structure, the steel sheet piles are connected by a supporting beam 31, one end of a supporting rod system 32 is connected with the supporting beam 31, the other end of the supporting rod system is supported on a lower structure 12 of a piling trestle, pile columns of the lower structure 12 of the piling trestle are inserted and driven into the soil to a certain depth, and a longitudinal reinforcing structure 121 and a transverse reinforcing structure 122 are arranged between the lower structures, so that reliable support can be provided for plugging burst water flow by the steel sheet piles.
As shown in fig. 1, 2 and 3, in the construction operation of the invention, the plugging steel sheet piles 2 are inserted into the river bottom to a certain depth, so that the plugging steel sheet piles 2 are connected with each other by using the tongue-and-groove structure, the plugging steel sheet piles 2 are connected with each other by using the supporting beams 31, one ends of the supporting rod systems 32 are supported behind the supporting beams 31, the other ends of the supporting rod systems are supported on the lower pile driving trestle structure 12, the pile columns of the lower pile driving trestle structure 12 are inserted into the soil to a certain depth under the stability of the pile driving positioning frame 4, and the longitudinal reinforcing structure 121 and the transverse reinforcing structure 122 are arranged on the lower pile driving trestle structure 12, so that the invention provides reliable support for the plugging steel sheet piles 2 and provides shielding for the insertion and the driving of the pile driving trestle lower pile structure 12. The plugging steel sheet pile 2 and the pile of the lower structure 12 of the pile driving trestle are alternately shielded and supported, so that safe and reliable work of the plugging steel sheet pile 2 at a high flow speed and smooth plugging construction of the pile of the lower structure 12 of the pile driving trestle are ensured.
The construction steps are as follows:
step 1, as shown in fig. 4a and 4b, inserting and driving the plugging steel sheet piles 2 to the breach at the water feeding edge of the large dam at the water side of the rear part of the wrapping head at two sides of the breach to prevent the bursting head from being further washed by bursting water flow, arranging a supporting beam 31 behind the inserted and driven plugging steel sheet piles 2, and continuously inserting and driving the plugging steel sheet piles 2 to the breach along the supporting beam 31 to form protection for the piles of the piling trestle 1.
Step 2, as shown in fig. 5a and 5b, cleaning the front end of the wrapping head, inserting and driving the first row of pile columns of the pile driving trestle 1, setting a corresponding transverse structure, setting one end of a temporary support rod system 32 to be supported on a support cross beam 31, and the other end of the temporary support rod system to be supported on the pile columns of the lower structure 12 of the pile driving trestle, and continuously inserting and driving the plugging steel plate piles 2 to exceed the position of the next row of pile columns of the pile driving trestle 1, so as to provide protection for the insertion and driving of the next row of pile columns of the pile driving trestle 1.
And 3, assembling the upper pile driving trestle structure 11, arranging the pile driving positioning frame 4, inserting and driving the pile columns of the pile driving trestle 1, and arranging the longitudinal reinforcing structure 121 and the transverse reinforcing structure 122 of the lower pile driving trestle structure as shown in fig. 6a and 6 b.
And 4, as shown in fig. 7a and 7b, arranging a temporary support rod system 32, wherein one end of the temporary support rod system is supported on the support cross beam 31, the other end of the temporary support rod system is supported on the pile columns of the lower structure 12 of the pile driving trestle, and continuously inserting and driving the plugging steel plate piles 2 beyond the position of the pile columns of the next row of the pile driving trestle to provide protection for inserting and driving the pile columns of the next row of the pile driving trestle 1.
And 5, as shown in fig. 8a and 8b, repeating the steps 3 and 4 until the distance between the pile columns of the pile trestles 1 on the two sides of the breach is less than 2 spans of the pile trestles 1, enabling the supporting cross beams 31 on the two sides of the breach to be folded, arranging temporary supporting rod systems 32 on the two sides of the breach, enabling one end of each temporary supporting rod system to be supported on the supporting cross beam 31, enabling the other end of each temporary supporting rod system to be supported on the pile trestle lower part structure 12 pile, continuously inserting the plugging steel plate piles 2 from the two sides until the pile trestles are folded, inserting the pile trestle 1 pile in the middle of the folded trestles 1 at the two ends or at a position less than one span, and enabling the pile trestle upper part structure 11 to be folded on the middle bridge foot of the pile trestle 1.
And 6, as shown in fig. 9a and 9b, arranging a longitudinal reinforcing structure 121 and a transverse reinforcing structure 122 of the pile driving trestle 1 folded span lower structure, and constructing the pile driving trestle 1 folded span upper structure to finish the operation.
The invention utilizes the trestle as a piling trestle to insert and pile the steel sheet pile, simultaneously utilizes the steel sheet pile to protect the trestle from construction, and utilizes the lower structure of the piling trestle as a steel sheet pile supporting system, thereby solving the problems of wrapping head scouring, filler fixation at high flow speed, breach plugging aging and the like.

Claims (4)

1. A rapid large dike breach plugging construction method combining a trestle and a steel sheet pile is characterized by comprising the following steps:
step 1, inserting and driving a plugging steel sheet pile (2) to a breach at the water feeding edge of a large dike at the water side of the rear part of a wrapping head at two sides of the breach, preventing the breach water flow from further washing the wrapping head, arranging a supporting cross beam (31) behind the inserted and driven plugging steel sheet pile (2), and continuously inserting and driving the plugging steel sheet pile (2) to the breach along the supporting cross beam (31) to form protection for pile columns of a pile driving trestle (1);
step 2, clearing the front end of the wrapping head, inserting and driving a first row of pile columns of the pile driving trestle (1), setting a corresponding transverse structure, setting one end of a temporary supporting rod system (32) to be supported on a supporting cross beam (31), and the other end of the temporary supporting rod system to be supported on the pile columns of a lower structure (12) of the pile driving trestle, and continuously inserting and driving plugging steel plate piles (2) to exceed the position of the next row of pile columns of the pile driving trestle (1) so as to provide protection for inserting and driving of the next row of pile columns of the pile driving trestle (1);
step 3, assembling an upper structure (11) of the piling trestle, arranging a piling positioning frame (4), inserting and piling pile columns of the piling trestle (1), and arranging a longitudinal reinforcing structure (121) and a transverse reinforcing structure (122) of a lower structure of the piling trestle;
step 4, arranging a temporary support rod system (32), wherein one end of the temporary support rod system is supported on a support cross beam (31), the other end of the temporary support rod system is supported on a pile column of a lower structure (12) of the pile driving trestle, and plugging steel plate piles (2) are continuously plugged and driven to exceed the position of the pile column of the next row of the pile driving trestle, so that protection is provided for plugging and driving of the pile columns of the next row of the pile driving trestle (1);
step 5, repeating the step 3 and the step 4 until the distance between the pile columns of the piling trestles (1) at two sides of the breach is less than the span of 2 piling trestles (1), enabling the supporting cross beams (31) at two sides of the breach to be folded, arranging temporary supporting rod systems (32) at two sides of the breach, supporting one end of each temporary supporting rod system on the supporting cross beam (31) and the other end of each temporary supporting rod system on the pile column of the lower structure (12) of the piling trestle, continuously inserting and driving the plugging steel sheet piles (2) from two sides until the pile piles are folded, inserting and driving the pile trestles (1) at the middle part of the folded span of the piling trestles (1) at two ends or at a position less than one span, and enabling the upper structures (11) of the piling trestles to be folded on the middle bridge foot of the piling trestles (1);
and 6, arranging a longitudinal reinforcing structure (121) and a transverse reinforcing structure (122) of the closure span lower structure of the pile driving trestle (1), and constructing the closure span upper structure of the pile driving trestle (1), thereby finishing the operation.
2. The rapid levee breach blocking construction method combining the trestle and the steel sheet pile according to claim 1, characterized in that the piling trestle (1) is taken as a piling platform, the blocking steel sheet pile (2) is inserted and driven to the breach, and the blocking steel sheet piles (2) are connected with each other by a tongue-and-groove structure.
3. The rapid levee breach plugging construction method combining a trestle and a steel plate pile according to claim 1, characterized in that in the step 1, plugging and driving the plugged steel plate pile (2) to the breach is continued along the supporting beam (31), and the plugged steel plate pile (2) forms protection for the pile column of the piled trestle (1).
4. The rapid levee breach sealing construction method combining trestle and steel plate pile as claimed in claim 1, characterized in that the piling trestle (1) is a piling platform, and the lower structure thereof is a component of the supporting structure (3) for sealing the steel plate pile (2), and the pile columns of the plugging steel plate pile (2) and the pile-inserting trestle lower structure (12) are alternately covered and supported.
CN202110532840.2A 2021-05-17 2021-05-17 Rapid embankment breach plugging construction method combining trestle and steel sheet pile Active CN113202057B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110532840.2A CN113202057B (en) 2021-05-17 2021-05-17 Rapid embankment breach plugging construction method combining trestle and steel sheet pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110532840.2A CN113202057B (en) 2021-05-17 2021-05-17 Rapid embankment breach plugging construction method combining trestle and steel sheet pile

Publications (2)

Publication Number Publication Date
CN113202057A CN113202057A (en) 2021-08-03
CN113202057B true CN113202057B (en) 2022-04-15

Family

ID=77031502

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110532840.2A Active CN113202057B (en) 2021-05-17 2021-05-17 Rapid embankment breach plugging construction method combining trestle and steel sheet pile

Country Status (1)

Country Link
CN (1) CN113202057B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101122124A (en) * 2007-08-27 2008-02-13 陈台胜 Steel sheet row pile embankment-protecting river-dredging method
CN101974893A (en) * 2010-09-28 2011-02-16 张照华 Tripod plug cage for river closure of flood-resisting buster and watercourse
CN102493401A (en) * 2011-12-15 2012-06-13 邱世军 Method for rapidly plugging dike breach
CN109322285A (en) * 2018-11-05 2019-02-12 吕震伟 Breach plugging system and method for blocking
CN112195779A (en) * 2020-08-11 2021-01-08 中国建筑第七工程局有限公司 Multifunctional trestle construction method suitable for thick pebble layer

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101122124A (en) * 2007-08-27 2008-02-13 陈台胜 Steel sheet row pile embankment-protecting river-dredging method
CN101974893A (en) * 2010-09-28 2011-02-16 张照华 Tripod plug cage for river closure of flood-resisting buster and watercourse
CN102493401A (en) * 2011-12-15 2012-06-13 邱世军 Method for rapidly plugging dike breach
CN109322285A (en) * 2018-11-05 2019-02-12 吕震伟 Breach plugging system and method for blocking
CN112195779A (en) * 2020-08-11 2021-01-08 中国建筑第七工程局有限公司 Multifunctional trestle construction method suitable for thick pebble layer

Also Published As

Publication number Publication date
CN113202057A (en) 2021-08-03

Similar Documents

Publication Publication Date Title
CN113202058B (en) Quick levee breach plugging device that landing stage and steel sheet pile combined together
US20100054859A1 (en) Hydraulic Sliding Insertion Panel and Its Using Method
CN108316339B (en) Construction method of water-permeable geological large arch bridge foundation
JP4932748B2 (en) Riverbed protection structure
CN107620316B (en) Rock riverbed large-volume deepwater foundation construction method
CN113202057B (en) Rapid embankment breach plugging construction method combining trestle and steel sheet pile
CN107675698B (en) Larsen steel sheet pile underwater cofferdam closing structure and operation method
CN210395378U (en) Slope protection device
KR100711602B1 (en) Temporary levee protector using crossed pile for repairing underwater structure
CN101122124A (en) Steel sheet row pile embankment-protecting river-dredging method
CN102277879B (en) Construction protection method for existing foundation with over crossing railway bridge
CN110485366A (en) A kind of section space-efficient interlocking docking Ecological Retaining Wall structure and its construction method
CN217517481U (en) Novel river bank protection structure for penetrating through underground space
CN215977330U (en) Cofferdam support and water pressure self-stabilizing cantilever water-covering cofferdam comprising same
CN215925986U (en) Protection architecture under influence of adjacent underground works of existing tunnel
US11767653B2 (en) Geosynthetic reinforced wall panels comprising soil reinforcing hoop members and retaining wall system formed therewith
CN218027765U (en) Cofferdam device suitable for bank protection construction
CN217399524U (en) Dam break and fill device for blocking dam
KR102400780B1 (en) Retaining Wall System usable as a building underground wall and it's Construction Method
CN217378752U (en) Check dam type dike foot scour protection structure
CN219671360U (en) Port foundation pit structure
CN211773328U (en) Dykes and dams protective structure
TW201016930A (en) Regulation method for river with the function of protecting bridge pier and dike, and with the function of forming sand and stone collecting specific area
JPH04302612A (en) Double sheet pile type cofferdam construction and plate anchor device for deformation inbition of fill-in sand
CN113700015A (en) Vacuum preloading assembly type water pressure self-stabilizing cantilever water-covering cofferdam and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant