CN113186824A - Rollover construction method for round-end-shaped solid pier - Google Patents

Rollover construction method for round-end-shaped solid pier Download PDF

Info

Publication number
CN113186824A
CN113186824A CN202110394228.3A CN202110394228A CN113186824A CN 113186824 A CN113186824 A CN 113186824A CN 202110394228 A CN202110394228 A CN 202110394228A CN 113186824 A CN113186824 A CN 113186824A
Authority
CN
China
Prior art keywords
template
section
pier
construction
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110394228.3A
Other languages
Chinese (zh)
Inventor
梁小平
宋雨欣
田亚博
贾学龙
王超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Sixth Group Co Ltd
Taiyuan Railway Construction Co Ltd of China Railway Sixth Group Co Ltd
Original Assignee
China Railway Sixth Group Co Ltd
Taiyuan Railway Construction Co Ltd of China Railway Sixth Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Sixth Group Co Ltd, Taiyuan Railway Construction Co Ltd of China Railway Sixth Group Co Ltd filed Critical China Railway Sixth Group Co Ltd
Priority to CN202110394228.3A priority Critical patent/CN113186824A/en
Publication of CN113186824A publication Critical patent/CN113186824A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention belongs to the field of bridge construction, and particularly relates to construction of a pier, in particular to a rollover construction method of a round-end-shaped solid pier. When the pier body template is processed, the arc templates at two ends are completely processed according to the maximum pier body height, and only one part of the straight line part is processed. The pier body is poured step by step during construction. The pier shaft formwork supporting arc-shaped formworks are installed from bottom to top in a layered mode, and the straight line portion formwork is lifted to the upper layer from the lower layer and is continuously turned over until the pier top. And after the pouring is finished, the template is dismantled from bottom to top, the arc-shaped template is used for turnover of other piers after being dismantled, the topmost template is not dismantled on the straight line part, and other templates are turned to the upper layer. The invention effectively improves the construction efficiency, ensures the construction safety and the engineering quality, passes the engineering acceptance and has obvious social benefit and economic benefit.

Description

Rollover construction method for round-end-shaped solid pier
Technical Field
The invention belongs to the field of bridge construction, and particularly relates to construction of a pier, in particular to a rollover construction method of a round-end-shaped solid pier.
Background
With the rapid development of bridge construction, the round-end-shaped solid pier is widely applied, and usually, a pier with a slope is a round-end-shaped solid pier for 10-30 meters. The construction of round end shape entity pier generally adopts a whole set of design steel form, once formwork erection pours in grades, has the template expense higher, the lower problem of template turnover rate.
Disclosure of Invention
The invention provides a rollover construction method for a round-end-shaped solid pier, aiming at the problems of higher template cost and lower template turnover rate of a construction method for pouring the round-end-shaped solid pier by adopting one-step formwork support in a grading manner.
The invention is realized by adopting the following technical scheme: the rollover construction method of the round end-shaped solid pier comprises the following steps:
(1) when the pier body template is processed, according to the height of the pier body, all the arc templates at two ends of the pier body are processed, and only one part of the pier body linear template is processed;
(2) construction preparation, namely measuring and lofting according to the center of a foundation top to form a vertical mold side line;
(3) binding the 1 st section of steel bar;
(4) installing an arc template and a linear template at two ends of the 1 st section;
(5) pouring concrete of section 1;
(6) binding the 2 nd section of steel bar after the 1 st section of concrete reaches the form removal strength,
(7) installing arc templates at two ends of a section 2, removing the section 1 straight line template and reserving a top layer template of the section 1 straight line template, taking the top layer template of the section 1 straight line template as a supporting platform of the section 2 straight line template, and installing the removed straight line template on the basis of the supporting platform as the section 2 straight line template;
(8) pouring the section 2 concrete;
(9) binding the 3 rd section of steel bar after the 2 nd section of concrete reaches the form removal strength,
(10) installing a 3 rd section of arc-shaped template at two ends, dismantling a 2 nd section of linear template and a supporting platform thereof, and reserving a top layer template of the 2 nd section of linear template, wherein the top layer template of the 2 nd section of linear template is used as the supporting platform of the 3 rd section of linear template, and the dismantled 2 nd section of linear template is installed on the basis of the supporting platform and is used as the 3 rd section of linear template;
(11) pouring the 3 rd section concrete;
(12) after the 3 rd section of concrete reaches the form removal strength, pouring the rest sections of concrete according to the same method until the pier body is capped;
(13) and (5) the pier construction is finished when the pier top is constructed.
When the pier body template is machined, according to the maximum pier body height, the arc templates at two ends are all machined, and only one part of the straight line part is machined. The pier body is poured step by step during construction. The pier shaft formwork supporting arc-shaped formworks are installed from bottom to top in a layered mode, and the straight line portion formwork is lifted to the upper layer from the lower layer and is continuously turned over until the pier top. And after the pouring is finished, the formwork is dismantled from bottom to top, the arc-shaped formwork is used for turnover of other piers after being dismantled, the topmost formwork is not dismantled on the straight line part, and other formworks are turned to the upper layer.
According to the turnover formwork construction method for the round-end-shaped solid pier, the next section of linear formwork can be detached while one section of steel bar is bound.
According to the rollover construction method for the round-end-shaped solid pier, safety facilities in construction comprise an upper platform fence, a transverse safety net and a fence dense mesh net, when a pier body is constructed, a support is erected between pier positions, a zigzag ladder stand is arranged on the support, the width of the ladder stand is 1.2m, the elevation angle of the ladder stand is 45 degrees, a rest platform is arranged at the height of 6m per liter, the platform width is 1m, so that a worker can rest, and the construction and inspection personnel can be guaranteed to be safe and convenient to use up and down.
According to the turnover construction method for the round-end-shaped solid pier, after the templates are assembled and formed, all bolts do not need to be screwed, a small amount of loosening room is reserved, the front and back direction deflection of the templates is adjusted to be pulled to the correct position through the chain block, the left and right deflection adjustment is realized by plugging the gasket at one end of the bottom edge of the template close to the inclination direction, the gap between the templates is plugged with the rubber strip to prevent slurry leakage, and after the adjustment is finished, all the bolts are screwed, so that concrete can be poured.
According to the turnover construction method for the round-end-shaped solid pier, when concrete is poured to the top of the formwork, the height of the concrete is 1-2 cm lower than the opening of the formwork, so that the next section of the formwork is convenient to assemble and turnover, and the slab staggering is avoided.
In the turnover construction method of the round-end-shaped solid pier, the turnover lifting of the straight template is realized by using a truck crane.
In the pier body rollover treatment construction, the pier body formwork supporting arc-shaped formworks are installed from bottom to top in a layered mode, the straight line portion formworks are lifted from the lower layer to the upper layer and are continuously turned over until the pier tops, the construction process is innovated, the construction progress is accelerated, the construction cost is saved, the construction efficiency is effectively improved, the construction safety and the construction quality are ensured, and the pier body rollover treatment construction method has obvious social benefits and economic benefits after passing through engineering acceptance.
Drawings
FIG. 1 is a construction flow chart of the present invention.
Detailed Description
The 10-30 m round end-shaped solid pier is constructed by adopting a turnover formwork, and the turnover formwork is used for a construction system, a lifting mechanism, a formwork system and safety facilities.
Firstly, one truck crane is arranged in each construction pier position of the lifting mechanism, and sufficient space is ensured for the normal work of the truck crane.
And secondly, the outer mold of the pier body of the template system adopts a large integral steel mold, and a steel panel with the thickness of 6mm is selected. The template manufacturing precision is as follows: the size error is less than 2mm, the inclination angle deviation is less than 1.5mm, and the hole site error is less than 1 mm. In order to ensure the engineering quality, the processing is unified in a factory.
The height of each layer of the lifting linear template is 2.0 m. And after the concrete reaches the form removal strength, taking the bottom section template as a supporting main body, and lifting by using an automobile crane for 6-10 m. The upper section of the formwork is supported on the lower section of the formwork and rises circularly and alternately to complete the pouring of the pier body.
And (3) installing and disassembling the template, wherein the vertical transportation of the construction material is completed by a truck crane. After the template is finished, trial assembly is carried out in a processing plant, the trial assembly is divided into trial assembly in the horizontal direction and trial assembly in the vertical direction, and particularly the trial assembly in the vertical direction after the template is turned over for the first time needs to be paid attention to.
And the safety facility comprises an upper platform fence, a transverse safety net, a fence mesh screen and the like. When the pier body is constructed, a bracket is erected between pier positions, a zigzag ladder stand is arranged on the bracket, the width is 1.2m, and the elevation angle is 45 degrees. Every 6 meters rise and establish a rest platform, the platform is wide 1m, supplies personnel to have a rest, guarantees construction and inspection personnel safe convenient from top to bottom.
Fourthly, the step of the construction system
Lower construction
The erection of the template is directly related to the later construction, and the template is required to be correct in size and horizontal in top.
Template position adjustment
After the templates are assembled and formed, all the bolts do not need to be screwed, and a small amount of loosening margin is reserved. The adjustment of the front and back direction deflection of the template is realized by pulling the chain block to a correct position and plugging a gasket at one end of the bottom edge of the template close to the inclined direction for the adjustment of the left and right deflection. Rubber strips are filled in gaps among the templates to prevent slurry leakage. Because the precision of template making and the initial first section template adjustment is very high, the adjustment range of each time is very small. And after the adjustment is finished, all the bolts are screwed down, and then the concrete can be poured.
Binding reinforcing steel bar
And (4) binding the steel bars strictly according to a design drawing, and welding the joints of the steel bars by adopting double-sided lap welding.
Turning over and lifting form
When the reinforcing steel bars are installed, the next section of formwork can be detached. When the form is removed, the lower form and the upper form of the next section are hung up and down by a chain block, and two steel wire ropes are additionally arranged between the upper form and the lower form. The left, right and upper connecting bolts are removed, and then the lower formwork is separated through two simple strippers arranged on the formworks. And (4) loosening the gourd after demoulding, and hanging the disassembled template on the upper layer by a steel wire rope. And then the templates on the periphery are disassembled one by one and hung on the template on the upper layer. Therefore, the form removal work and the steel bar installation work are carried out simultaneously, the time of at least half a day is saved, and the occupation of the working time of the truck crane is reduced to the maximum extent.
And (5) checking the assembling quality of the template, and meeting the design requirement of the pier. And after the inspection is qualified, wood support is placed, and the lacing wire is screwed.
Pouring concrete
The concrete is intensively mixed by a mixing station, the concrete mixing truck is transported to the position below the pier, the concrete is pumped into a mold by a concrete delivery pump, and the concrete is symmetrically and uniformly poured.
When the concrete is poured to the top of the formwork, the concrete is lower than the opening of the formwork by 1-2 cm, the formwork is turned over for the next section of convenient assembly, and the slab staggering is prevented. And when the strength of the concrete is more than 3MPa, removing floating slurry, roughening the surface of the concrete, and performing the next section of construction.
And (3) observing the positions of the embedded parts and the supporting conditions of the templates, the supports and the like at any time by using a measuring instrument in the pouring process, and immediately correcting and reinforcing the embedded parts if deformation and subsidence exist.
Pier top construction
When the pier top is constructed, an external mold is installed firstly, then a through long pull rod is installed, the upper solid section steel bar is bound, and concrete is poured.
Demolishing of the rollover
When constructing the pier body concrete, the quality and the appearance of the lower concrete and the upper concrete are particularly noticed. Particularly, when the volume of the cast concrete is too large, the hydration heat should be reduced by adopting the same measures as those of the bearing platform.
Pier shaft construction linear control
The linear control of the pier body mainly adopts an outer pier plane control net to eliminate the influence of sun light, fog, night and other calibration on the measurement work.
The key points of the construction process are as follows:
preparation for construction
And (4) according to the measurement and lofting of the center of the foundation top, setting out a side line of the vertical mold, and according to the design requirement of the turnover mold, firstly constructing the part with the height of 8m above the pier body foundation.
Demolishing form
(1) When the template is removed, only the template of 0-6m is removed, and the template of 6-8m is used as a platform for supporting the lower section of the template.
(2) And 4 groups of personnel remove the split bolts, the triangular supports and the templates in opposite directions at the symmetrical positions of the pier body, and the removed parts are lifted to the previous section by upper workers to clean and repair the templates.
(3) Blocking the split bolt holes and spraying the curing liquid.
(4) And (5) when the concrete reaches 1.2MPa, performing ground scabbing on the grouting surface, and binding and welding reinforcing steel bars.
Formwork installation
(1) And measuring a center line, controlling the center by using a plumb ball, and checking and adjusting the position of the outer template.
(2) The formworks are connected and fastened by using split bolts, and the sizes of the center line and the section of the pier are adjusted by using a diagonal cable.
Formwork installation pouring concrete
Pumping concrete into the pier body template by using a pump truck, and tamping by using an inserted vibrator.
The turnover working principle is that the formwork is lifted by a truck crane continuously and turned upwards along with the pouring of concrete of each section until the top of the pier. Because the section pier shaft template of having pour has great frictional force with lower part pier shaft, and the pier shaft has certain slope simultaneously and can prevent the template gliding, so can regard lower part pier shaft template as the supporting platform of upper portion pier shaft template. Generally, according to the height of the pier body, the casting height is about 10m in sections, and the construction of one pier body can be completed by turning the template for 2-3 times. During the turnover construction, the operation platform outside the template can be installed at one time, and is suitable for various concrete transportation and lifting modes, and the construction speed is high; the pumping concrete construction can be carried out, the pumping pipeline can be lengthened synchronously along with the upward turning of the template, and the concrete pouring speed is improved; the pier body construction error can be corrected at any time, the template can be cleaned, trimmed and brushed conveniently in time, and the concrete surface is smooth and clean; the concrete surface after the form removal is smooth and clean, and the defect of slip form construction can be overcome.

Claims (7)

1. The rollover construction method of the round end-shaped solid pier is characterized by comprising the following steps of: the method comprises the following steps:
(1) when the pier body template is processed, according to the height of the pier body, all the arc templates at two ends of the pier body are processed, and only one part of the pier body linear template is processed;
(2) construction preparation, namely measuring and lofting according to the center of a foundation top to form a vertical mold side line;
(3) binding the 1 st section of steel bar;
(4) installing an arc template and a linear template at two ends of the 1 st section;
(5) pouring concrete of section 1;
(6) binding the 2 nd section of steel bar after the 1 st section of concrete reaches the form removal strength,
(7) installing arc templates at two ends of a section 2, removing the section 1 straight line template and reserving a top layer template of the section 1 straight line template, taking the top layer template of the section 1 straight line template as a supporting platform of the section 2 straight line template, and installing the removed straight line template on the basis of the supporting platform as the section 2 straight line template;
(8) pouring the section 2 concrete;
(9) binding the 3 rd section of steel bar after the 2 nd section of concrete reaches the form removal strength,
(10) installing a 3 rd section of arc-shaped template at two ends, dismantling the 2 nd section of linear template and a supporting platform thereof, and reserving a top layer template of the 2 nd section of linear template, wherein the top layer template of the 2 nd section of linear template is used as a supporting platform of the 3 rd section of linear template, and the dismantled section of linear template is installed on the basis of the supporting platform and is used as the 3 rd section of linear template;
(11) pouring the 3 rd section concrete;
(12) after the 3 rd section of concrete reaches the form removal strength, pouring the rest sections of concrete according to the same method until the pier body is capped;
(13) and (5) the pier construction is finished when the pier top is constructed.
2. The rollover construction method for the round-ended solid pier according to claim 1, characterized in that: and the next section of linear template can be disassembled while the upper section of steel bar is bound.
3. The rollover construction method for the round-ended solid pier according to claim 1 or 2, characterized in that: safety facilities in the construction include upper portion platform rail, horizontal safety net, the close mesh net of rail, and during pier shaft construction, set up the support between the pier position, go up and establish "it" font cat ladder, the width is 1.2m, and the angle of elevation is 45, and a rest platform is established to 6 meters high per liter, and the platform is wide 1m, supplies personnel to have a rest, guarantees construction and inspection personnel safe convenient from top to bottom.
4. The rollover construction method for the round-ended solid pier according to claim 1 or 2, characterized in that: after the templates are assembled and formed, all the bolts do not need to be screwed, a small amount of loosening room is reserved, the front and back oblique adjustment of the templates is pulled to a correct position through the chain block, the left and right oblique adjustment is realized by plugging a gasket at one end of the bottom edge of the template close to the oblique direction, a gap between the templates is plugged with a rubber strip to prevent slurry leakage, and after the adjustment is finished, all the bolts are screwed, so that the concrete can be poured.
5. The rollover construction method for the round-ended solid pier according to claim 1 or 2, characterized in that: when the concrete is poured to the top of the formwork, the concrete is lower than the opening of the formwork by 1-2 cm, and the formwork is turned over for the convenience of next section assembly, so that slab staggering is prevented.
6. The rollover construction method for the round-ended solid pier according to claim 1 or 2, characterized in that: the linear template turnover lifting is realized by using a truck crane.
7. The rollover construction method for the round-ended solid pier according to claim 1 or 2, characterized in that: when the next section of linear template is demolded, the lower layer template and the upper layer template are hung up and down tightly by a chain block, two steel wire ropes are additionally arranged between the upper layer template and the lower layer template, connecting bolts on the left, the right and the upper sides are demolded, then the lower layer template is separated by two simple demolders arranged on the templates, the hoist is loosened after demolding, the disassembled template is hung on the upper layer template by the steel wire ropes, and then all the templates on the periphery are disassembled one by one and hung on the upper layer template; the removed template is used as the straight template of the previous section.
CN202110394228.3A 2021-04-13 2021-04-13 Rollover construction method for round-end-shaped solid pier Pending CN113186824A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110394228.3A CN113186824A (en) 2021-04-13 2021-04-13 Rollover construction method for round-end-shaped solid pier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110394228.3A CN113186824A (en) 2021-04-13 2021-04-13 Rollover construction method for round-end-shaped solid pier

Publications (1)

Publication Number Publication Date
CN113186824A true CN113186824A (en) 2021-07-30

Family

ID=76975805

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110394228.3A Pending CN113186824A (en) 2021-04-13 2021-04-13 Rollover construction method for round-end-shaped solid pier

Country Status (1)

Country Link
CN (1) CN113186824A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114214954A (en) * 2021-12-23 2022-03-22 广东科能工程管理有限公司 Construction method of municipal elevated bridge cast-in-situ pier

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07233508A (en) * 1994-02-23 1995-09-05 Kajima Corp Pier, and pier-constructing method by means of self-climbing form installation
CN101994292A (en) * 2010-03-05 2011-03-30 安通建设有限公司 Rapid construction of high bridge pier by efficient combination
CN102493341A (en) * 2011-11-14 2012-06-13 中交一航局第四工程有限公司 Construction method for hollow thin-walled high pier non-bracket formwork turnover of railway
CN102561196A (en) * 2012-01-04 2012-07-11 浙江永峰模具制造有限公司 Turnover construction process of high-pier forms
CN105544403A (en) * 2016-01-18 2016-05-04 中交第四公路工程局有限公司 Adjustable inner formwork for construction of bridge variable-cross-section hollow pier and construction method thereof
CN110016867A (en) * 2019-04-16 2019-07-16 中国铁建大桥工程局集团有限公司 A kind of high pier group overmolded cross construction method of variable cross-section

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07233508A (en) * 1994-02-23 1995-09-05 Kajima Corp Pier, and pier-constructing method by means of self-climbing form installation
CN101994292A (en) * 2010-03-05 2011-03-30 安通建设有限公司 Rapid construction of high bridge pier by efficient combination
CN102493341A (en) * 2011-11-14 2012-06-13 中交一航局第四工程有限公司 Construction method for hollow thin-walled high pier non-bracket formwork turnover of railway
CN102561196A (en) * 2012-01-04 2012-07-11 浙江永峰模具制造有限公司 Turnover construction process of high-pier forms
CN105544403A (en) * 2016-01-18 2016-05-04 中交第四公路工程局有限公司 Adjustable inner formwork for construction of bridge variable-cross-section hollow pier and construction method thereof
CN110016867A (en) * 2019-04-16 2019-07-16 中国铁建大桥工程局集团有限公司 A kind of high pier group overmolded cross construction method of variable cross-section

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
中铁电气化局集团有限公司编著: "《铁路工程(桥涵)施工作业操作手册》", 31 December 2014, 中国铁道出版社 *
李飞前: "变 截 面 高 墩 翻 模 施 工 技 术", 《山西建筑》 *
沪昆铁路客运专线浙江有限责任公司编著: "《沪昆铁路客运专线浙江段工程总结 下》", 31 January 2019, 中国铁道出版社 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114214954A (en) * 2021-12-23 2022-03-22 广东科能工程管理有限公司 Construction method of municipal elevated bridge cast-in-situ pier
CN114214954B (en) * 2021-12-23 2023-08-25 广东科能工程管理有限公司 Construction method of municipal viaduct cast-in-situ pier

Similar Documents

Publication Publication Date Title
CN106906758A (en) A kind of culvert fluid pressure type entire combination moving die plate
CN104594204B (en) Urban light rail viaduct mountain type U beam Construction Supporting System and construction method
CN106522104A (en) Construction method for curved surface arc-shaped concrete tower
CN105839985A (en) Hydropower station rectangular high tower hydraulic climb slip form system and construction method
CN112458918A (en) High-pier hydraulic jacking integral steel frame platform formwork turnover construction system and construction method
CN101525871A (en) Multifunctional complete cantilever form and concrete pouring method thereby
CN212176540U (en) Hydraulic climbing formwork system formwork
CN111074950B (en) Pre-closed advanced water stop post-cast strip for basement outer wall and construction method
CN113186824A (en) Rollover construction method for round-end-shaped solid pier
CN110939052A (en) Subway cover beam construction method
CN202064281U (en) Slip form frame
CN204475184U (en) Urban light rail viaduct mountain type U beam Construction Supporting System
CN109457814A (en) Towering and major diameter building top cover construction method based on Bailey bracket structure
CN203200664U (en) Slip-form construction device for variable cross-section hollow high pier
CN109610354B (en) Cast-in-situ slab culvert template system and construction method applying same
CN108677722A (en) Hollow High Pier with Thin Wall stub top section construction technology
CN207957611U (en) A kind of small members are mobile and install equipment
CN115890877A (en) Adjustable diaphragm plate template and construction method thereof
CN210737452U (en) Waterborne assembled berthing pier
CN107792802A (en) A kind of small members movement and mounting system and method
CN210621713U (en) Circular foundation pit inside lining wall template construction system
CN113622328A (en) Box culvert construction assembly, application thereof and box culvert construction method
CN113417213A (en) Integral truss type pull-rod-free turnover formwork system and turnover construction method
CN210117921U (en) Shear wall structure tunnel formwork
CN112482316A (en) Gate dam gate machine beam construction method and gate dam gate machine beam structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20210730

RJ01 Rejection of invention patent application after publication