CN113180520A - Toilet structure with integrated chassis combined with traditional process and construction process thereof - Google Patents

Toilet structure with integrated chassis combined with traditional process and construction process thereof Download PDF

Info

Publication number
CN113180520A
CN113180520A CN202110350048.5A CN202110350048A CN113180520A CN 113180520 A CN113180520 A CN 113180520A CN 202110350048 A CN202110350048 A CN 202110350048A CN 113180520 A CN113180520 A CN 113180520A
Authority
CN
China
Prior art keywords
toilet
wall
waterproof
wall brick
mounting surface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110350048.5A
Other languages
Chinese (zh)
Inventor
罗亮
李剑
刘志宏
陈仕明
方君
李鹏
吴雅晖
龙俊介
刘恋
金通
张泽栋
芦明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Xiwu Housing Technology Co ltd
Shenzhen Haizhichuang Technology Co ltd
Original Assignee
Suzhou Xiwu Housing Technology Co ltd
Shenzhen Haizhichuang Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Xiwu Housing Technology Co ltd, Shenzhen Haizhichuang Technology Co ltd filed Critical Suzhou Xiwu Housing Technology Co ltd
Publication of CN113180520A publication Critical patent/CN113180520A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • AHUMAN NECESSITIES
    • A47FURNITURE; DOMESTIC ARTICLES OR APPLIANCES; COFFEE MILLS; SPICE MILLS; SUCTION CLEANERS IN GENERAL
    • A47KSANITARY EQUIPMENT NOT OTHERWISE PROVIDED FOR; TOILET ACCESSORIES
    • A47K3/00Baths; Douches; Appurtenances therefor
    • A47K3/28Showers or bathing douches
    • A47K3/40Pans or trays
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03CDOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER; SINKS
    • E03C1/00Domestic plumbing installations for fresh water or waste water; Sinks
    • E03C1/12Plumbing installations for waste water; Basins or fountains connected thereto; Sinks
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/04Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
    • E03F5/0407Floor drains for indoor use
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Water Supply & Treatment (AREA)
  • Epidemiology (AREA)
  • General Health & Medical Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Residential Or Office Buildings (AREA)

Abstract

The invention discloses a toilet structure combining an integral chassis and a traditional process and a construction process thereof, wherein the toilet structure comprises a waterproof disc, the waterproof disc is arranged on the ground of a wet area of a toilet, and a floor drain is arranged in the waterproof disc; the side edge of the waterproof disc close to the dry area of the toilet is provided with a shower screen mounting surface, a shower screen is mounted on the shower screen mounting surface, the outer side of the shower screen mounting surface is provided with a lap joint part, a mortar cushion layer is paved on the ground of the dry area of the toilet, floor tiles are paved on the mortar cushion layer, and the floor tiles connected with the waterproof disc are lapped at the top of the lap joint part; the side edge of the waterproof disc close to the toilet wall surface is provided with a wall brick mounting surface, the outer side of the wall brick mounting surface is provided with a vertical flanging which is turned upwards, a wall brick is laid on the toilet wall surface, the lower end of the wall brick is abutted against the wall brick mounting surface, and the vertical flanging is clamped between the toilet wall surface and the wall brick. The invention combines the integral chassis with the traditional construction process, and achieves the aim of considering both the water resistance and the manufacturing cost of the toilet.

Description

Toilet structure with integrated chassis combined with traditional process and construction process thereof
Technical Field
The invention relates to the technical field of bathroom equipment, in particular to a bathroom structure with an integrated chassis combined with a traditional process and a construction process thereof.
Background
The bathroom of current house, apartment, hotel etc. generally adopts the design of dry wet separation, at present, the technology of bathroom construction mainly has two kinds, the first kind is whole adopts traditional technology construction, another kind of whole use system bathroom construction, the bathroom adopts traditional technology construction to do waterproof requirement than higher, in case waterproof does not do the ash deposit and the condition that bathroom percolating water appears, whole use system bathroom construction is waterproof leak protection's effect is better, but the cost is than higher relatively, because the bathroom is dry district and the wet district service function's of bathroom difference, both are also different to waterproof requirement, therefore how to combine whole chassis and traditional construction technology with the waterproof and the cost of compromise bathroom be a problem of waiting to solve urgently.
Disclosure of Invention
Aiming at the defects in the prior art, the invention provides a toilet structure combining an integral chassis and a traditional process and a construction process thereof, so that the integral chassis and the traditional construction process are combined to achieve the aim of considering both the water resistance and the manufacturing cost of a toilet.
On one hand, the invention provides a toilet structure combining an integral chassis and a traditional process, which is divided into a toilet dry area and a toilet wet area, wherein a toilet wall surface is arranged around the toilet structure and comprises a waterproof disc, the waterproof disc is arranged on the ground of the toilet wet area, and a floor drain is arranged at the low point of the waterproof disc;
the side edge of the waterproof disc close to the dry area of the toilet is provided with a shower screen mounting surface, the shower screen mounting surface is provided with a shower screen for separating the dry area of the toilet from the wet area of the toilet, the outer side of the shower screen mounting surface is provided with a lap joint part, the lap joint part is higher than the shower screen mounting surface, a mortar cushion layer is paved on the ground of the dry area of the toilet, floor tiles are paved on the mortar cushion layer, and the floor tiles connected with the waterproof disc are lapped on the top of the lap joint part;
the side edge of the waterproof disc close to the toilet wall surface is provided with a wall brick mounting surface, the outer side of the wall brick mounting surface is provided with a vertical flanging which is turned upwards, a wall brick is laid on the toilet wall surface, the lower end of the wall brick abuts against the wall brick mounting surface, and the vertical flanging is clamped between the toilet wall surface and the wall brick.
Furthermore, a leakage-proof paste is arranged between the lap joint part and the floor tile.
Furthermore, one side of the lap joint part close to the shower screen is provided with a convex edge, and the floor tiles connected with the waterproof disc are abutted against the side part of the convex edge.
Furthermore, the convex edge is 2-3mm lower than the floor tile, so that a first glue sealing groove is formed between the floor tile and the shower screen, and sealant is filled in the first glue sealing groove.
Furthermore, the outer side of the lap joint part is provided with an outward flange which is turned downwards and then outwards, and the outward flange is inserted into the mortar cushion layer.
Furthermore, waterproof collodion is arranged between the wall brick mounting surface and the lower end of the wall brick.
Furthermore, the side edge of the waterproof plate is positioned at the inner side edge of the wall brick mounting surface and is recessed inwards, so that a second glue sealing groove is formed between the inner side edge of the wall brick mounting surface and the lower end of the wall brick, and sealant is filled in the second glue sealing groove.
Furthermore, a foaming agent is filled in a gap between the outer part of the waterproof plate and the wall surface of the toilet.
On the other hand, the invention provides a construction process of the toilet structure combining the integral chassis and the traditional process, which comprises the following steps:
step S10, installing the waterproof disc on the ground of the wet area of the toilet;
step S20, paving a mortar cushion layer on the ground of the dry area of the toilet, pasting floor tiles on the mortar cushion layer, and pressing the floor tiles connected with the waterproof disc on the lap joint part of the waterproof disc;
step S30, wall bricks are pasted on the wall surface of the toilet, the wall bricks on the wall surface of the toilet in the wet area of the toilet adopt the sequence from bottom to top, when the wall brick of the lowest layer is pasted, the lower end of the wall brick is pressed on the wall brick mounting surface of the waterproof disc, and the back surface of the wall brick is abutted against the vertical flanging of the waterproof disc;
and step S40, mounting the shower screen on the shower screen mounting surface of the waterproof plate.
Further, in step S40, when the shower screen is installed, glue is applied to the installation surface of the shower screen, the shower screen is immediately placed on the installation surface of the shower screen, the vertical section of the shower screen is fixed to the wall surface of the toilet, and finally, the gap between the vertical frame section of the shower screen and the wall brick, and the gap between the bottom frame section of the shower screen and the floor tile of the dry area of the toilet are subjected to caulking treatment by using silicone glue.
The invention has the beneficial effects that: this application sets up waterproof dish in the wet district of bathroom, traditional tiling technology is adopted to dry district of bathroom and bathroom wall, each side of waterproof dish can be respectively with the ceramic tile in the dry district of bathroom and the wall brick perfect adaptation in the wet district of bathroom to realize whole chassis and traditional construction process and combine, when guaranteeing the wet waterproof requirement in district of bathroom, reduced the holistic cost of bathroom, reached the waterproof and cost's of compromise bathroom purpose.
Drawings
In order to more clearly illustrate the detailed description of the invention or the technical solutions in the prior art, the drawings that are needed in the detailed description of the invention or the prior art will be briefly described below. Throughout the drawings, like elements or portions are generally identified by like reference numerals. In the drawings, elements or portions are not necessarily drawn to scale.
FIG. 1 is a top view of an embodiment of the present invention;
FIG. 2 is a longitudinal cross-sectional view of FIG. 1;
FIG. 3 is an enlarged view of portion A of FIG. 2;
FIG. 4 is an enlarged view of portion B of FIG. 2;
fig. 5 is a schematic structural view of a waterproof tray according to an embodiment of the present invention.
In the drawings, 100-toilet structure; 110-the dry toilet area; 120-wet toilet area; 130-toilet wall; 200-a waterproof tray; 210-floor drain; 220-shower screen mounting surface; 230-a lap joint; 231-leak-proof paste; 232-convex edge; 233-first glue sealing groove; 234-flanging; 240-wall brick installation surface; 241-waterproof collodion; 242-second glue sealing groove; 250-vertical flanging; 260-wall brick; 270-a blowing agent; 300-shower screen; 400-mortar cushion layer; 500-floor tile.
Detailed Description
Embodiments of the present invention will be described in detail below with reference to the accompanying drawings. The following examples are only for illustrating the technical solutions of the present invention more clearly, and therefore are only examples, and the protection scope of the present invention is not limited thereby.
It is to be noted that, unless otherwise specified, technical or scientific terms used herein shall have the ordinary meaning as understood by those skilled in the art to which the invention pertains.
As shown in fig. 1 to 5, the embodiment of the present invention provides a toilet structure in which an integrated chassis is combined with a conventional art, and the toilet structure 100 is divided into a toilet dry area 110 and a toilet wet area 120, and a toilet wall 130 is provided around the toilet dry area and the toilet wet area.
The toilet structure 100 includes a waterproof tray 200, the waterproof tray 200 is installed on the ground of the toilet wet area 120, and a floor drain 210 is provided at a low point of the waterproof tray 200.
Referring to fig. 2 and 3, a shower screen installation surface 220 is provided at a side of the waterproof tray 200 adjacent to the dry area 110 of the toilet, a shower screen 300 for separating the dry area 110 of the toilet from the wet area 120 of the toilet is installed on the shower screen installation surface 220, an overlapping part 230 is provided at an outer side of the shower screen installation surface 220, the overlapping part 230 is higher than the shower screen installation surface 220, a mortar bed 400 is laid on the ground of the dry area 110 of the toilet, a floor tile 500 is laid on the mortar bed 400, and the floor tile 500 connected to the waterproof tray 200 is overlapped on the top of the overlapping part 230.
In order to prevent water from entering mortar bed 400 between bridge 230 and floor tile 500, anti-leakage paste 231 is provided between bridge 230 and floor tile 500.
In a preferred embodiment, the bridge 230 is provided with a protruding rim 232 at a side thereof adjacent to the shower screen 300, and the floor tile 500 connected to the waterproof tray 200 is abutted against a side of the protruding rim 232, so that the floor tile 500 can be positioned by the protruding rim 232 of the bridge 230. Furthermore, the protruding edge 232 is lower than the floor tile 5002-3mm, so that a first glue sealing groove 233 is formed between the floor tile 500 and the shower screen 300, and the first glue sealing groove 233 is filled with a sealant to further achieve sealing between the floor tile 500 and the shower screen 300.
In a preferred embodiment, the outer side of the bridge part 230 is provided with a flange 234 which is turned downwards and outwards, and the flange 234 is inserted into the mortar bed 400 to reinforce the bridge part 230 of the waterproof tray 200 and prevent the floor tiles 500 pressed on the bridge part 230 from being stepped loose.
Referring to fig. 2 and 4, the waterproof tray 200 is provided with a wall brick mounting surface 240 at a side close to the toilet wall surface 130, a vertical flange 250 which is turned upwards is provided at an outer side of the wall brick mounting surface 240, a wall brick 260 is laid on the toilet wall surface 130, a lower end of the wall brick 260 abuts against the wall brick mounting surface 240, and the vertical flange 250 is sandwiched between the toilet wall surface 130 and the wall brick 260.
In a preferred embodiment, a waterproof glue cotton 241 is arranged between the wall brick mounting surface 240 and the lower end of the wall brick 260, and the waterproof glue cotton 241 not only can play a waterproof role, but also can play a buffer role between the wall brick mounting surface 240 and the wall brick 260, so as to avoid the looseness of the wall brick 260 caused by the vibration of stepping on the waterproof disc 200.
In a preferred embodiment, the side edge of the waterproof disk 200 is recessed in the inner edge of the wall brick mounting surface 240 to form a second sealant groove 242 between the inner edge of the wall brick mounting surface 240 and the lower end of the wall brick 260, and the second sealant groove 242 is filled with sealant to further seal the waterproof disk 200 and the wall brick 260.
In a preferred embodiment, a foaming agent 270 is filled in a gap between the outside of the waterproof tray 200 and the toilet wall 130, and the foaming agent 270 can increase a waterproof effect, and reduce the vibration of the waterproof tray 200 when stepping on, thereby preventing the wall bricks 260 from loosening due to the vibration of the waterproof tray 200.
The construction process of the toilet structure combining the integral chassis and the traditional process comprises the following steps:
the waterproof tray 200 is installed on the floor of the toilet wet zone 120 at step S10.
In order to improve the installation stability of the waterproof tray 200 and prevent the wall bricks 260 from loosening due to vibration generated by treading the waterproof tray 200, the foaming agent 270 may be filled in the gap between the waterproof tray 200 and the toilet wall 130 after the waterproof tray 200 is installed in place, and of course, in other embodiments, the gap between the waterproof tray 200 and the toilet wall 130 may be grouted.
Step S20, a mortar bed 400 is laid on the floor of the dry toilet area 110, and tiles 500 are attached to the mortar bed 400, and the tiles 500 connected to the waterproof tray 200 are pressed against the lap portion 230 of the waterproof tray 200.
When the floor tiles 500 are attached in a conventional manner from the doorway toward the waterproof tray 200, the floor tiles 500 connected to the waterproof tray 200 are attached to the bridge 230 of the waterproof tray 200 by the leakage preventing paste 231, so that water is prevented from entering the mortar bed 400 from between the bridge 230 and the floor tiles 500.
Step S30, the wall tiles 260 are attached to the toilet wall 130 of the wet area 120 in the toilet from bottom to top, and when the wall tile 260 of the lowest layer is attached, the lower end of the wall tile 260 is pressed against the wall tile installation surface 240 of the waterproof tray 200, and the back surface of the wall tile 260 abuts against the standing flange 250 of the waterproof tray 200.
The method of laying tiles 260 is in a conventional manner (cement mortar or tile glue, etc.). The paving sequence of the wall bricks 260 is as follows: the wet toilet area 120 is arranged first, the dry toilet area 110 is arranged later, the wet toilet area 120 is arranged from bottom to top, and the dry toilet area 110 is arranged from top to bottom. Before the wall tiles 260 are laid on the wet area 120 of the toilet, the protective film of the waterproof plate 200 must be checked to see whether the phenomena of glue failure, falling, damage and the like exist, otherwise, the protective film must be replaced, and cement mortar cannot contact the waterproof plate 200 when the tiles are laid on the wall 130 of the toilet. When the wall bricks 260 are horizontally paved, the waterproof plate side edges at the junction of the dry area 110 and the wet area 120 of the toilet are used as boundaries to respectively pave the dry area 110 and the wet area 120 of the toilet, and the horizontal seams of the dry area 110 and the wet area 120 of the toilet need to be aligned when paving.
In step S40, the shower screen 300 is mounted on the shower screen mounting surface 220 of the waterproof tray 200.
When the shower screen 300 is installed, firstly, glue is applied to the shower screen installation surface 220, then the shower screen 300 is placed on the shower screen installation surface 220, the vertical section of the shower screen 300 is fixed on the toilet wall surface 130, and finally, the gap between the vertical frame section of the shower screen 300 and the wall brick 260 and the gap between the bottom frame section of the shower screen 300 and the floor tile 500 of the toilet dry area 110 are subjected to gap filling treatment by using silicone glue.
This application sets up waterproof dish 200 in wet district 120 of bathroom, dry district 110 of bathroom and bathroom wall 130 adopt traditional tiling technology, each side of waterproof dish 200 can be respectively with the dry district 110's of bathroom ceramic tile 500 and the wet district 120's of bathroom wall brick 260 perfect adaptation, thereby realize whole chassis and traditional construction process and combine, when guaranteeing wet district 120 waterproof requirement of bathroom, the holistic cost of bathroom has been reduced, reached and compromise the waterproof and cost's of bathroom purpose.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solution of the present invention, and not to limit the same; while the invention has been described in detail and with reference to the foregoing embodiments, it will be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some or all of the technical features may be equivalently replaced; such modifications and substitutions do not depart from the spirit and scope of the present invention, and they should be construed as being included in the following claims and description.

Claims (10)

1. The utility model provides a bathroom structure that whole chassis and traditional handicraft combined together, this bathroom structure divide into bathroom dry district and bathroom wet district, is equipped with bathroom wall around, its characterized in that: the toilet comprises a waterproof disc, wherein the waterproof disc is arranged on the ground of a wet area of a toilet, and a floor drain is arranged at the low point of the waterproof disc;
the side edge of the waterproof disc close to the dry area of the toilet is provided with a shower screen mounting surface, the shower screen mounting surface is provided with a shower screen for separating the dry area of the toilet from the wet area of the toilet, the outer side of the shower screen mounting surface is provided with a lap joint part, the lap joint part is higher than the shower screen mounting surface, a mortar cushion layer is paved on the ground of the dry area of the toilet, floor tiles are paved on the mortar cushion layer, and the floor tiles connected with the waterproof disc are lapped on the top of the lap joint part;
the side edge of the waterproof disc close to the toilet wall surface is provided with a wall brick mounting surface, the outer side of the wall brick mounting surface is provided with a vertical flanging which is turned upwards, a wall brick is laid on the toilet wall surface, the lower end of the wall brick abuts against the wall brick mounting surface, and the vertical flanging is clamped between the toilet wall surface and the wall brick.
2. The integrated chassis and traditional art combined toilet structure according to claim 1, characterized in that: and a leakage-proof paste is arranged between the lap joint part and the floor tile.
3. The integrated chassis and traditional art combined toilet structure according to claim 1, characterized in that: one side of the lap joint part, which is close to the shower screen, is provided with a convex edge, and the floor tiles connected with the waterproof disc are abutted against the side part of the convex edge.
4. A lavatory structure having an integrated floor pan in combination with conventional technology as claimed in claim 3, wherein: the convex edge is 2-3mm lower than the floor tile, so that a first glue sealing groove is formed between the floor tile and the shower screen, and sealant is filled in the first glue sealing groove.
5. The integrated chassis and traditional art combined toilet structure according to claim 1, characterized in that: the outer side of the lap joint part is provided with an outward flange which is turned downwards and outwards, and the outward flange is inserted into the mortar cushion layer.
6. The integrated chassis and traditional art combined toilet structure according to claim 1, characterized in that: and waterproof collodion is arranged between the wall brick mounting surface and the lower end of the wall brick.
7. The integrated chassis and traditional art combined toilet structure according to claim 1, characterized in that: the side edge of the waterproof plate is positioned at the inner side edge of the wall brick mounting surface and is recessed inwards, so that a second glue sealing groove is formed between the inner side edge of the wall brick mounting surface and the lower end of the wall brick, and sealant is filled in the second glue sealing groove.
8. The integrated chassis and traditional art combined toilet structure according to claim 1, characterized in that: and a foaming agent is filled in a gap between the outside of the waterproof plate and the wall surface of the toilet.
9. A process for constructing a toilet structure with an integrated floor according to any one of claims 1 to 8 in combination with conventional processes, comprising the steps of:
step S10, installing the waterproof disc on the ground of the wet area of the toilet;
step S20, paving a mortar cushion layer on the ground of the dry area of the toilet, pasting floor tiles on the mortar cushion layer, and pressing the floor tiles connected with the waterproof disc on the lap joint part of the waterproof disc;
step S30, wall bricks are pasted on the wall surface of the toilet, the wall bricks on the wall surface of the toilet in the wet area of the toilet adopt the sequence from bottom to top, when the wall brick of the lowest layer is pasted, the lower end of the wall brick is pressed on the wall brick mounting surface of the waterproof disc, and the back surface of the wall brick is abutted against the vertical flanging of the waterproof disc;
and step S40, mounting the shower screen on the shower screen mounting surface of the waterproof plate.
10. The process of constructing a bathroom structure having an integrated floor panel in combination with a conventional process in accordance with claim 9, wherein the shower panel is installed by applying adhesive to the shower panel installation surface, placing the shower panel on the shower panel installation surface, fixing the vertical section of the shower panel to the bathroom wall surface, and caulking the gap between the vertical frame section of the shower panel and the wall tile, and the gap between the bottom frame section of the shower panel and the dry area floor tile of the bathroom with silicone adhesive in step S40.
CN202110350048.5A 2020-11-06 2021-03-31 Toilet structure with integrated chassis combined with traditional process and construction process thereof Pending CN113180520A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN202022571565 2020-11-06
CN2020225715659 2020-11-06

Publications (1)

Publication Number Publication Date
CN113180520A true CN113180520A (en) 2021-07-30

Family

ID=76974271

Family Applications (2)

Application Number Title Priority Date Filing Date
CN202110350048.5A Pending CN113180520A (en) 2020-11-06 2021-03-31 Toilet structure with integrated chassis combined with traditional process and construction process thereof
CN202120666429.XU Active CN219000135U (en) 2020-11-06 2021-03-31 Integral chassis mounting structure for toilet structure

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN202120666429.XU Active CN219000135U (en) 2020-11-06 2021-03-31 Integral chassis mounting structure for toilet structure

Country Status (1)

Country Link
CN (2) CN113180520A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114856259A (en) * 2022-05-12 2022-08-05 杭州良工装饰有限公司 Shower room construction process
CN115030328A (en) * 2022-06-09 2022-09-09 惠达住宅工业设备(唐山)有限公司 Toilet SMC waterproof disc rear-mounted mounting structure and construction process

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114856259A (en) * 2022-05-12 2022-08-05 杭州良工装饰有限公司 Shower room construction process
CN114856259B (en) * 2022-05-12 2024-03-29 杭州良工装饰有限公司 Shower room construction process
CN115030328A (en) * 2022-06-09 2022-09-09 惠达住宅工业设备(唐山)有限公司 Toilet SMC waterproof disc rear-mounted mounting structure and construction process
CN115030328B (en) * 2022-06-09 2024-06-11 惠达住宅工业设备(唐山)有限公司 Rear-mounted installation structure of toilet SMC waterproof disc and construction process

Also Published As

Publication number Publication date
CN219000135U (en) 2023-05-12

Similar Documents

Publication Publication Date Title
US10292539B2 (en) Carrier body for sanitary surface material
CN113180520A (en) Toilet structure with integrated chassis combined with traditional process and construction process thereof
US8181288B1 (en) Waterproof base and methods of fabrication and installation thereof
CN102725456B (en) Water closet flange seal
US5845347A (en) Method of manufacturing shower foundation
EP2299014B1 (en) Floor drain assembly and method of installation of a floor drain
US20150026879A1 (en) Under mud shower pan
KR101059736B1 (en) The waterproof construction method which uses the non-exposure rooftop waterproof construction method crack prevention sheet and that crack prevention sheet
CN211646670U (en) Floor drain waterproof structure
CN110725573B (en) Bathroom bottom plate
CN210067252U (en) Clerestory gable connection node structure
TWI685608B (en) Water-repellent window structure
JPH09256488A (en) Waterproofing structure for building
CN214272795U (en) Waterproof floor structure of bathroom
CN212506806U (en) Bathroom threshold department waterproof construction
CN213143733U (en) Stone floor system
CN219323374U (en) Integrated bathroom with integrated chassis
CN220978224U (en) Assembly type decoration toilet bowl side drainage structure
CN213418357U (en) Floor waterproof structure of interlayer drainage toilet
CN215106136U (en) Shower area manger plate seepage prevention structure
CN210032468U (en) Waterproof sealing's marble laying structure
CN210049412U (en) Toilet waterproof structure
CN109915662B (en) Plugging method for drainage hole of integral bathroom
CN221118689U (en) Anti-leakage drainage system for house decoration and integral bathroom chassis
CN217232166U (en) Assembled bathroom ground makes level and waterproof construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination