CN113152518A - 富水地层基坑桩板墙桩间砂石反滤防渗漏结构及施工方法 - Google Patents
富水地层基坑桩板墙桩间砂石反滤防渗漏结构及施工方法 Download PDFInfo
- Publication number
- CN113152518A CN113152518A CN202110524000.1A CN202110524000A CN113152518A CN 113152518 A CN113152518 A CN 113152518A CN 202110524000 A CN202110524000 A CN 202110524000A CN 113152518 A CN113152518 A CN 113152518A
- Authority
- CN
- China
- Prior art keywords
- pile
- foundation pit
- gravel reverse
- water
- piles
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/02—Retaining or protecting walls
- E02D29/0258—Retaining or protecting walls characterised by constructional features
- E02D29/0275—Retaining or protecting walls characterised by constructional features cast in situ
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D24/00—Filters comprising loose filtering material, i.e. filtering material without any binder between the individual particles or fibres thereof
- B01D24/02—Filters comprising loose filtering material, i.e. filtering material without any binder between the individual particles or fibres thereof with the filter bed stationary during the filtration
- B01D24/20—Filters comprising loose filtering material, i.e. filtering material without any binder between the individual particles or fibres thereof with the filter bed stationary during the filtration the filtering material being provided in an open container
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/06—Restraining of underground water
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/02—Sheet piles or sheet pile bulkheads
- E02D5/16—Auxiliary devices rigidly or detachably arranged on sheet piles for facilitating assembly
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Hydrology & Water Resources (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Retaining Walls (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110524000.1A CN113152518A (zh) | 2021-05-13 | 2021-05-13 | 富水地层基坑桩板墙桩间砂石反滤防渗漏结构及施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110524000.1A CN113152518A (zh) | 2021-05-13 | 2021-05-13 | 富水地层基坑桩板墙桩间砂石反滤防渗漏结构及施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN113152518A true CN113152518A (zh) | 2021-07-23 |
Family
ID=76874956
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110524000.1A Pending CN113152518A (zh) | 2021-05-13 | 2021-05-13 | 富水地层基坑桩板墙桩间砂石反滤防渗漏结构及施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113152518A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113981984A (zh) * | 2021-11-05 | 2022-01-28 | 中建科工集团有限公司 | 支护结构及其施工方法 |
CN115404908A (zh) * | 2022-10-10 | 2022-11-29 | 中铁二十二局集团第五工程有限公司 | 一种边坡直立桩间挡土墙施工方法 |
-
2021
- 2021-05-13 CN CN202110524000.1A patent/CN113152518A/zh active Pending
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113981984A (zh) * | 2021-11-05 | 2022-01-28 | 中建科工集团有限公司 | 支护结构及其施工方法 |
WO2023077867A1 (zh) * | 2021-11-05 | 2023-05-11 | 中建科工集团有限公司 | 支护结构及其施工方法 |
CN115404908A (zh) * | 2022-10-10 | 2022-11-29 | 中铁二十二局集团第五工程有限公司 | 一种边坡直立桩间挡土墙施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211144503U (zh) | 一种高陡地形桥隧相接段明洞接长结构 | |
CN108316339A (zh) | 一种透水性地质大型拱桥基础的施工方法 | |
CN212866028U (zh) | 河道边污水管网结合桩板式挡墙布置结构 | |
CN112695803B (zh) | 一种海滩上的顶管工作井和管沟的支护、止水施工方法 | |
CN113266392B (zh) | 一种穿越既有锚索群的顶管施工方法 | |
CN110219359A (zh) | 一种沉管式检查井及其施工方法 | |
CN108560536A (zh) | 水泥土搅拌连续桩墙施工方法 | |
CN112064751A (zh) | 一种排水管线的深沟槽施工方法 | |
CN113152518A (zh) | 富水地层基坑桩板墙桩间砂石反滤防渗漏结构及施工方法 | |
CN104164881A (zh) | 一种桩墙叠合悬臂基坑支护施工方法及结构 | |
CN115653000A (zh) | 一种基坑范围内重力管廊原位保护结构体系及施工方法 | |
CN111608174A (zh) | 一种基于冲孔灌注桩的岩溶地区溶洞处理方法 | |
HU226433B1 (en) | Foundation slab of underground passage for road | |
CN112983461B (zh) | 坡积体中偏压隧道洞口的施工方法 | |
CN114575355A (zh) | 一种土护降施工方法 | |
CN113266362B (zh) | 一种穿越既有密集锚索区域的顶管盖挖施工方法 | |
CN115450221A (zh) | 一种地铁穿越河道的施工方法 | |
CN214784160U (zh) | 富水地层基坑桩板墙桩间砂石反滤防渗漏结构 | |
CN114232602A (zh) | 地下连续桩施工工艺 | |
CN111042144B (zh) | 一种寒冷地区河道不断流情况下地系梁基坑开挖方法 | |
CN209816896U (zh) | 一种湿陷性黄土地区地下综合管廊地基结构 | |
CN113550764A (zh) | 盾构混凝土套筒始发进洞方法及建筑结构 | |
CN210315908U (zh) | 一种沉管式检查井 | |
CN111576483A (zh) | 城际铁路隧道临近敏感建筑物段明挖施工工法 | |
CN115419074B (zh) | 一种用于超深基坑的履带式传挖土方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20220613 Address after: 030001 269 Yingze street, Yingze District, Taiyuan, Shanxi. Applicant after: CHINA RAILWAY NO.3 ENGINEERING GROUP Co.,Ltd. Applicant after: CHINA RAILWAY NO.3 ENGINEERING GROUP CONSTRUCTION AND INSTALLATION ENGINEERING Co.,Ltd. Applicant after: GUANGZHOU METRO DESIGN & RESEARCH INSTITUTE Co.,Ltd. Applicant after: HANGZHOU METRO GROUP CO.,LTD. Address before: 030001 No. 269, Yingze Avenue, Taiyuan, Shanxi Applicant before: CHINA RAILWAY NO.3 ENGINEERING GROUP Co.,Ltd. Applicant before: Zhong tie three Bureau construction and Installation Engineering Co., Ltd. |
|
TA01 | Transfer of patent application right |