CN113152412A - Foundation pit slope karst seepage-proofing reinforcing treatment method - Google Patents

Foundation pit slope karst seepage-proofing reinforcing treatment method Download PDF

Info

Publication number
CN113152412A
CN113152412A CN202110483470.8A CN202110483470A CN113152412A CN 113152412 A CN113152412 A CN 113152412A CN 202110483470 A CN202110483470 A CN 202110483470A CN 113152412 A CN113152412 A CN 113152412A
Authority
CN
China
Prior art keywords
grouting
karst
hole
foundation pit
drilling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110483470.8A
Other languages
Chinese (zh)
Inventor
杨盛海
李航雨
刘娟
裴佩
吕淼
卢杨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group No 1 Engineering Co Ltd
Original Assignee
China Gezhouba Group No 1 Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group No 1 Engineering Co Ltd filed Critical China Gezhouba Group No 1 Engineering Co Ltd
Priority to CN202110483470.8A priority Critical patent/CN113152412A/en
Publication of CN113152412A publication Critical patent/CN113152412A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02CSHIP-LIFTING DEVICES OR MECHANISMS
    • E02C1/00Locks or dry-docks; Shaft locks, i.e. locks of which one front side is formed by a solid wall with an opening in the lower part through which the ships pass
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/16Sealings or joints
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/30Flood prevention; Flood or storm water management, e.g. using flood barriers

Abstract

A foundation pit side slope karst seepage prevention reinforcement treatment method comprises the steps of treating karst seepage water parts of a foundation pit side slope through curtain grouting, and grouting non-karst development parts by adopting cement paste; filling the semi-half filled and non-filled large karst caves and the karst caves below the underground water level by fine aggregate concrete or mortar, and then grouting from top to bottom in sections; and (4) grouting the karst development area above the underground water level and the full-filling karst cave by adopting paste. By adopting the method, the disastrous water inrush risk of the side slope of the foundation pit can be effectively blocked, the method is used as a flood prevention project, aims at reducing the water inrush of the foundation pit and reducing the foundation pit risk in the flood season, can ensure short construction period, and does not influence the overall construction progress of a lock chamber.

Description

Foundation pit slope karst seepage-proofing reinforcing treatment method
Technical Field
The invention relates to the technical field of gate protection chamber slope construction, in particular to a karst seepage-proofing reinforcing treatment method for a foundation pit slope.
Background
In the ship lock foundation pit construction process, along with the water delivery corridor and the excavation of the water collecting wells on the left and right banks, the water collecting wells can cause large water burst, so that the foundation pit displacement is large, and under the condition, the risk of catastrophic karst water burst is very likely to exist. In order to avoid the foundation pit from disastrous karst water inrush to cause foundation pit flooding and ensure the safety of engineering construction, the emergency rescue of the karst water inrush of the foundation pit and the comprehensive treatment of the karst water seepage of the right bank are required.
Disclosure of Invention
The invention aims to solve the technical problem of providing a foundation pit side slope karst seepage-proofing reinforcing treatment method, which can effectively block the disastrous water inrush risk of the foundation pit side slope, is used as flood prevention engineering, aims to reduce the water inrush risk of the foundation pit and the foundation pit risk in the flood season, can ensure short construction period, and does not influence the overall construction progress of a lock chamber.
In order to solve the technical problems, the technical scheme adopted by the invention is as follows: a foundation pit side slope karst seepage prevention reinforcement treatment method is characterized in that a foundation pit side slope karst seepage water part is treated through curtain grouting, and the method specifically comprises the following steps:
grouting non-karst development parts with cement paste;
filling the semi-half filled and non-filled large karst caves and the karst caves below the underground water level by fine aggregate concrete or mortar, and then grouting from top to bottom in sections;
and (4) grouting the karst development area above the underground water level and the full-filling karst cave by adopting paste.
In a preferred embodiment, the method specifically comprises the following steps:
1) construction preparation;
2) drilling and lofting;
3) constructing a pilot hole;
4) detecting a geophysical prospecting;
5) sequentially arranging and constructing curtain grouting holes;
6) and (5) constructing an inspection hole.
In a preferred scheme, the construction method of the pilot hole specifically comprises the following steps:
1) drilling and positioning;
2) the machine tool enters the field and is fixed;
3) drilling along with the pipe at the non-irrigation section;
4) drilling the grouting section to a position of at least 2m below the rock surface;
5) casting the orifice pipe in an embedding way;
6) drilling a first section and coring;
7) washing holes and performing a pressurized water test;
8) drilling core and water pressing tests to a designed elevation from top to bottom in sections;
9) detecting a geophysical prospecting;
10) the pilot hole is also used as a curtain grouting hole and is grouted to the surface of the bedrock in a segmented manner from bottom to top;
11) finishing grouting of the final hole section;
12) and (6) sealing the holes.
In a preferred embodiment, in step 4), the physical detection is performed through a pilot hole.
In a preferable scheme, in the step 5), the single-hole construction of the curtain grouting hole specifically comprises the following steps:
1) drilling and positioning;
2) the machine tool enters the field and is fixed;
3) drilling along with the pipe at the non-irrigation section;
4) drilling the grouting section to a position of at least 2m below the rock surface;
5) cast-in of orifice pipe
6) Taking 5m as a section, performing segmented drilling and grouting;
7) drilling to a bottom elevation;
8) and finishing grouting the final hole section.
In a preferred embodiment, in step 6), the construction of the inspection hole specifically includes the following steps:
1) drilling and positioning;
2) the machine tool enters the field and is fixed;
3) drilling along with the pipe at the non-irrigation section;
4) casting the orifice pipe in an embedding way;
5) drilling a first section and coring;
6) drilling and coring from top to bottom in sections, and carrying out a pressurized water test to a grouting elevation;
7) grouting to a bedrock surface from bottom to top in a segmented manner;
8) finishing grouting of the final hole section;
9) and (6) sealing the holes.
In the preferable scheme, after the pilot hole enters a height of-15 m, a water pressing test is carried out every 5.0-6 m of the pilot hole, and the pilot hole can be finished when the water permeability is not more than 10 Lu.
In a preferred scheme, the final hole depth of the curtain grouting hole is determined according to the depth of a pilot hole.
In the preferred scheme, the construction of the pilot hole, the curtain grouting hole and the inspection hole comprises the installation of an orifice pipe, the orifice pipe is made of a hard pipe, the height of the exposed construction surface is 10cm, the length of the orifice pipe penetrating into the complete bedrock surface is not less than 2.0m, the orifice pipe is filled with 0.5:1 thick cement slurry after the installation is finished so as to realize the pre-embedding of the orifice pipe, and the next construction is carried out after the cement slurry is solidified for 48 hours.
In the preferable scheme, in the construction process of the inspection hole, measure holes are added in the large cavity type and the main water flow channel direction, the measure holes are reamed on the original inspection hole, the diameter of the final drilled measure hole is not less than 150mm, and fine aggregate concrete is adopted for backfilling and plugging.
By adopting the method, non-karst development parts are poured through cement paste, the fine aggregate concrete or mortar is poured into a semi-filled and non-filled large karst cave and a karst cave below the underground water level, and a karst development area above the underground water level and a full-filled karst cave are poured through plaster, so that the problem of foundation pit flooding caused by catastrophic karst water gushing in a lock chamber is effectively solved, and the engineering construction safety is guaranteed.
Detailed Description
Example 1:
a foundation pit side slope karst seepage prevention reinforcement treatment method is characterized in that a foundation pit side slope karst seepage water part is treated through curtain grouting, and the method specifically comprises the following steps:
grouting non-karst development parts with cement paste;
for the semi-filled and non-filled large karst caves and the karst caves below the underground water level, firstly, fine stone concrete or M7.5 mortar is adopted for filling, the slump of the mortar is controlled according to 180-fold sand with the thickness of 200mm, the holes are swept in place again after the mortar filling reaches the end standard, and the grouting is performed in sections from bottom to top;
and grouting the karst development area above the underground water level and the full-filling karst cave by adopting paste, wherein the fluidity of the paste is not more than 110 mm. The fluidity of the paste can be adjusted by the adding proportion of the additive according to the pressure and the pulp suction amount so as to meet the requirements under different conditions.
Example 2:
on the basis of the embodiment 1, the method specifically comprises the following steps:
1) construction preparation;
2) drilling and lofting;
3) constructing a pilot hole;
4) geophysical detection through pilot holes
5) Sequentially arranging and constructing curtain grouting holes;
6) and (5) constructing an inspection hole.
In the embodiment, the construction of the pilot hole, the curtain grouting hole and the inspection hole comprises the installation of the orifice pipe, the orifice pipe is made of hard pipes, the height of the exposed construction surface is 10cm, the length of the orifice pipe penetrating into the complete bedrock surface is not less than 2.0m, the orifice pipe is filled with 0.5:1 thick cement slurry after the installation is finished so as to realize the pre-embedding of the orifice pipe, and the next construction is carried out after the solidification is carried out for 48 hours.
Example 3:
the method for constructing the pilot hole in step 3) of embodiment 2 specifically includes:
1) drilling and positioning;
2) the machine tool enters the field and is fixed;
3) drilling along with the pipe at the non-irrigation section;
4) drilling the grouting section to a position of at least 2m below the rock surface;
5) casting the orifice pipe in an embedding way;
6) drilling a first section and coring;
7) washing holes and performing a pressurized water test;
8) drilling core and water pressing tests to a designed elevation from top to bottom in sections;
9) detecting a geophysical prospecting;
10) the pilot hole is also used as a curtain grouting hole and is grouted to the surface of the bedrock in a segmented manner from bottom to top;
11) finishing grouting of the final hole section;
12) and (6) sealing the holes.
In the preferable scheme, after the pilot hole enters a height of-15 m, a water pressing test is carried out every 5.0-6 m of the pilot hole, and the pilot hole can be finished when the water permeability is not more than 10 Lu.
Example 4:
the single-hole construction of the curtain grouting hole in the step 5) of the embodiment 2 specifically comprises the following steps:
1) drilling and positioning;
2) the machine tool enters the field and is fixed;
3) drilling along with the pipe at the non-irrigation section;
4) drilling the grouting section to a position of at least 2m below the rock surface;
5) cast-in of orifice pipe
6) Taking 5m as a section, performing segmented drilling and grouting;
7) drilling to a bottom elevation;
8) and finishing grouting the final hole section.
Example 5:
the construction of the inspection hole in step 6) of embodiment 2 specifically includes the following steps:
1) drilling and positioning;
2) the machine tool enters the field and is fixed;
3) drilling along with the pipe at the non-irrigation section;
4) casting the orifice pipe in an embedding way;
5) drilling a first section and coring;
6) drilling and coring from top to bottom in sections, and carrying out a pressurized water test to a grouting elevation;
7) grouting to a bedrock surface from bottom to top in a segmented manner;
8) finishing grouting of the final hole section;
9) and (6) sealing the holes.
In a preferred scheme, the final hole depth of the curtain grouting hole is determined according to the depth of a pilot hole.
In the preferable scheme, in the construction process of the inspection hole, measure holes are added in the large cavity type and the main water flow channel direction, the measure holes are reamed on the original inspection hole, the diameter of the final drilled measure hole is not less than 150mm, and fine aggregate concrete is adopted for backfilling and plugging.
Example 6:
on the basis of the embodiment 2, the pilot holes are partial I-order holes, the interval between every two adjacent pilot holes is 16.0m, and the drill holes are drilled and cored during the construction process. The drilling process of the pilot hole is recorded in detail, a single-point water pressure test is carried out every 5-6 m after the pilot hole enters the rock, if the water permeability of the last section of water pressure test is more than 10Lu (-15 m-20 m), supervision and design are informed in time, and a treatment scheme is determined on site. After the pilot hole drilling is completed, a CT geophysical prospecting test is required to be carried out in time, and grouting construction is forbidden before the CT geophysical prospecting test is completed.
Example 7:
on the basis of the embodiment 2, the construction material control specifically comprises the following steps:
(1) grouting materials: mainly comprises fine aggregate concrete, M7.5 mortar, ordinary portland cement (P.O 42.5), clay, bentonite, water glass, an additive, a modifier and the like.
(2) Fine aggregate concrete and M7.5 mortar: the slump is controlled at 180-200mm after being mixed by a mixing plant.
(3) Cement: adopting bagged P.O 42.5 ordinary portland cement; the cement for grouting must meet the quality standard, the screen allowance of the fineness passing through the 80um square hole sieve is less than 5 percent; and a cement storage shed is arranged on the grouting site, and damp and caked cement cannot be used for grouting construction.
(4) Clay: taking soil near the field, adding water into the soil through a clay pulping machine, crushing and uniformly stirring to form clay slurry.
The plasticity index is required to be more than 10, the content of clay particles (the particle size is less than 0.005mm) is not less than 20%, the content of powder particles (the particle size is 0.005-0.05 mm) is not more than 60-70%, the content of sand (0.05-0.25 mm) is not more than 8%, and the content of organic matters is not more than 2%.
(5) Water glass: the modulus of the acidic water glass (such as HS acidic water glass) is 2.8-3.4, and the concentration is preferably 35-45 Baume degrees.
(6) Water: the grouting water is directly taken from surface water, and the water quality meets the requirement of the grouting water.
(7) Additive: in the pulping process, the early strength type-structuring agent and the early coagulation type-structuring agent are added into the pulp, and the quality of the pulp meets the relevant regulations.
(8) Modifying agent: in order to make the performance of the clay cement paste material meet the controllable requirement of the paste, a modifier is required to be added so as to achieve the purposes that the paste material basically does not generate water separation and the setting time of the paste material is controllable.

Claims (10)

1. A foundation pit side slope karst seepage prevention reinforcement treatment method is characterized in that a foundation pit side slope karst seepage water part is treated through curtain grouting, and the method comprises the following steps: grouting non-karst development parts with cement paste;
filling the semi-half filled and non-filled large karst caves and the karst caves below the underground water level by fine aggregate concrete or mortar, and then grouting from top to bottom in sections;
and (4) grouting the karst development area above the underground water level and the full-filling karst cave by adopting paste.
2. The foundation pit side slope karst seepage-proofing reinforcing treatment method according to claim 1, characterized by comprising the following steps:
1) construction preparation;
2) drilling and lofting;
3) constructing a pilot hole;
4) detecting a geophysical prospecting;
5) sequentially arranging and constructing curtain grouting holes;
6) and (5) constructing an inspection hole.
3. The foundation pit side slope karst seepage-proofing reinforcing treatment method according to claim 2, wherein in the step 3), the construction method of the pilot hole specifically comprises the following steps:
1) drilling and positioning;
2) the machine tool enters the field and is fixed;
3) drilling along with the pipe at the non-irrigation section;
4) drilling the grouting section to a position of at least 2m below the rock surface;
5) casting the orifice pipe in an embedding way;
6) drilling a first section and coring;
7) washing holes and performing a pressurized water test;
8) drilling core and water pressing tests to a designed elevation from top to bottom in sections;
9) detecting a geophysical prospecting;
10) the pilot hole is also used as a curtain grouting hole and is grouted to the surface of the bedrock in a segmented manner from bottom to top;
11) finishing grouting of the final hole section;
12) and (6) sealing the holes.
4. The foundation pit side slope karst seepage-proofing reinforcing treatment method according to claim 2, characterized in that: in the step 4), the geophysical prospecting detection is carried out through the pilot hole.
5. The foundation pit side slope karst seepage-proofing reinforcing treatment method according to claim 2, wherein in the step 5), the single-hole construction of the curtain grouting hole specifically comprises the following steps:
1) drilling and positioning;
2) the machine tool enters the field and is fixed;
3) drilling along with the pipe at the non-irrigation section;
4) drilling the grouting section to a position of at least 2m below the rock surface;
5) cast-in of orifice pipe
6) Taking 5m as a section, performing segmented drilling and grouting;
7) drilling to a bottom elevation;
8) and finishing grouting the final hole section.
6. The foundation pit side slope karst seepage-proofing reinforcing treatment method according to claim 2, wherein in the step 6), the construction of the inspection hole specifically comprises the following steps:
1) drilling and positioning;
2) the machine tool enters the field and is fixed;
3) drilling along with the pipe at the non-irrigation section;
4) casting the orifice pipe in an embedding way;
5) drilling a first section and coring;
6) drilling and coring from top to bottom in sections, and carrying out a pressurized water test to a grouting elevation;
7) grouting to a bedrock surface from bottom to top in a segmented manner;
8) finishing grouting of the final hole section;
9) and (6) sealing the holes.
7. The foundation pit side slope karst seepage-proofing reinforcing treatment method according to claim 3, characterized in that: after the pilot hole enters a height of-15 m, a water pressing test is carried out every 5.0-6 m of the pilot hole, and the pilot hole can be drilled when the water permeability is not more than 10 Lu.
8. The foundation pit side slope karst seepage-proofing reinforcing treatment method according to claim 7, characterized in that: and the final hole depth of the curtain grouting hole is determined according to the depth of the pilot hole.
9. The foundation pit side slope karst seepage-proofing reinforcing treatment method according to claim 2, characterized in that: the construction of the pilot hole, the curtain grouting hole and the inspection hole comprises the installation of an orifice pipe, the orifice pipe is made of hard pipes, the height of the exposed construction surface is 10cm, the length of the orifice pipe penetrating into the complete bedrock surface is not less than 2.0m, the orifice pipe is filled with 0.5:1 thick cement slurry after the installation is finished so as to realize the pre-embedding of the orifice pipe, and the next construction is carried out after the cement slurry is solidified for 48 hours.
10. The foundation pit side slope karst seepage-proofing reinforcing treatment method according to claim 6, characterized in that: in the construction process of the inspection hole, a measure hole is added in the direction of a large cavity type and a main water flow channel, the measure hole is reamed on the original inspection hole, the diameter of the final hole of the drilled measure hole is not less than 150mm, and fine aggregate concrete is adopted for backfilling and plugging.
CN202110483470.8A 2021-04-30 2021-04-30 Foundation pit slope karst seepage-proofing reinforcing treatment method Pending CN113152412A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110483470.8A CN113152412A (en) 2021-04-30 2021-04-30 Foundation pit slope karst seepage-proofing reinforcing treatment method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110483470.8A CN113152412A (en) 2021-04-30 2021-04-30 Foundation pit slope karst seepage-proofing reinforcing treatment method

Publications (1)

Publication Number Publication Date
CN113152412A true CN113152412A (en) 2021-07-23

Family

ID=76872982

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110483470.8A Pending CN113152412A (en) 2021-04-30 2021-04-30 Foundation pit slope karst seepage-proofing reinforcing treatment method

Country Status (1)

Country Link
CN (1) CN113152412A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080260473A1 (en) * 2007-04-17 2008-10-23 Smith Eric W Underground filling and sealing method
CN104594370A (en) * 2014-11-27 2015-05-06 中国电建集团贵阳勘测设计研究院有限公司 High-pressure combined washing grouting method and structure in karst region
CN105862722A (en) * 2016-04-07 2016-08-17 中建交通建设集团有限公司 Three-dimensional treatment method of subway deep foundation pit in karst intense development region
CN105887886A (en) * 2016-06-16 2016-08-24 中国水利水电第十工程局有限公司 Strong karst development stratum curtain grouting construction method
CN109083682A (en) * 2018-08-28 2018-12-25 辽宁工程技术大学 A kind of construction method of mine working antiseepage high intensity fire dam
CN109339068A (en) * 2018-09-12 2019-02-15 郑楚英 A kind of ecological slope protection plant measures method for concrete and the high steep slope of rock
CN111042146A (en) * 2019-11-11 2020-04-21 中铁七局集团第二工程有限公司 Construction method of deep foundation pit supporting anti-seepage system of coastal karst stratum
CN112523170A (en) * 2020-11-25 2021-03-19 上海勘测设计研究院有限公司 Seepage-proofing treatment method for deep-buried karst seepage channel of reservoir

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080260473A1 (en) * 2007-04-17 2008-10-23 Smith Eric W Underground filling and sealing method
CN104594370A (en) * 2014-11-27 2015-05-06 中国电建集团贵阳勘测设计研究院有限公司 High-pressure combined washing grouting method and structure in karst region
CN105862722A (en) * 2016-04-07 2016-08-17 中建交通建设集团有限公司 Three-dimensional treatment method of subway deep foundation pit in karst intense development region
CN105887886A (en) * 2016-06-16 2016-08-24 中国水利水电第十工程局有限公司 Strong karst development stratum curtain grouting construction method
CN109083682A (en) * 2018-08-28 2018-12-25 辽宁工程技术大学 A kind of construction method of mine working antiseepage high intensity fire dam
CN109339068A (en) * 2018-09-12 2019-02-15 郑楚英 A kind of ecological slope protection plant measures method for concrete and the high steep slope of rock
CN111042146A (en) * 2019-11-11 2020-04-21 中铁七局集团第二工程有限公司 Construction method of deep foundation pit supporting anti-seepage system of coastal karst stratum
CN112523170A (en) * 2020-11-25 2021-03-19 上海勘测设计研究院有限公司 Seepage-proofing treatment method for deep-buried karst seepage channel of reservoir

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
《水利水电工程施工实用手册》编委会: "《灌浆工程》", 31 December 2017, 北京:中国环境出版社, pages: 188 - 198 *
国网新源控股有限公司基建部: "《国网新源控股有限公司抽水蓄能电站工程施工工艺示范手册:2019年版.土建分册》", 31 December 2019, 北京:中国水利水电出版社, pages: 181 - 183 *

Similar Documents

Publication Publication Date Title
CN100591866C (en) Drifting sand layer and gravel stratum water-moving double-liquid high pressure slip-casting water-blocking construction method
CN102705005B (en) Technology for plugging water bursting in mine by directional diversion grouting
CN106381840B (en) Fracture plugging grouting method under a kind of high pressure moving water state
CN106988302B (en) A kind of high inclination-angle competent bed rotary digging pile driving construction engineering method
CN104453913A (en) Vertical shaft working face ahead pre-grouting method
CN206667278U (en) Lava crack Tunnel gushing treatment constructing structure
CN105484269B (en) Foundation pit enclosure structure seepage prevention and treatment construction method under blasting condition
CN111946367B (en) Grouting reinforcement method for tunnel passing through water-rich fault
CN113236117B (en) Water control method for southwest corrosion stratum shaft by ground and underground combined grouting
CN110469332B (en) Advanced support consolidation method for tunnel penetrating through debris flow accumulation body
CN110130936B (en) Construction method for sudden encountering untreated karst cave or crack in shield tunneling process
CN112482347B (en) Construction method of soft soil treatment reinforcing layer and soft soil treatment reinforcing layer
CN110593807A (en) Water plugging method suitable for shallow-surface large-opening-degree fractured rock mass roadway
CN113374440A (en) Rapid plugging method and construction method for water inrush channel of hidden collapse column
CN107178077B (en) karst area karst cave overburden grouting reinforcement structure and design method thereof
CN107587502B (en) Construction method for rotary drilling hole-forming pressure-grouting cement soil occlusion curtain pile
CN112144559A (en) Well construction method in high water-rich loess sandy gravel stratum transformer tube well
CN102174818A (en) Controlled impermeable leaking stoppage grout-extruding water-stopping technology of strong water permeable stratum of quaternary system
CN111946355B (en) Construction method for long-distance rock jacking pipe to penetrate through water-rich fault
CN113445527A (en) Method for treating leakage of grouting waterproof curtain in underground platform of rail transit
CN112523170A (en) Seepage-proofing treatment method for deep-buried karst seepage channel of reservoir
CN108571330A (en) A method of processing subway bottom plate rear pouring tape percolating water
CN114737979B (en) Construction method for continuously passing large-diameter water conveying pipeline downwards in shield region
CN113152412A (en) Foundation pit slope karst seepage-proofing reinforcing treatment method
CN112482415B (en) Consolidation grouting method for underground cavern under high external water pressure and flowing water condition

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination