CN113128051A - 一种用于船厂生产设施的仿真验证系统 - Google Patents
一种用于船厂生产设施的仿真验证系统 Download PDFInfo
- Publication number
- CN113128051A CN113128051A CN202110431815.5A CN202110431815A CN113128051A CN 113128051 A CN113128051 A CN 113128051A CN 202110431815 A CN202110431815 A CN 202110431815A CN 113128051 A CN113128051 A CN 113128051A
- Authority
- CN
- China
- Prior art keywords
- simulation
- module
- process data
- typical
- shipyard
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/15—Vehicle, aircraft or watercraft design
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Geometry (AREA)
- General Physics & Mathematics (AREA)
- Evolutionary Computation (AREA)
- General Engineering & Computer Science (AREA)
- Computer Hardware Design (AREA)
- Automation & Control Theory (AREA)
- Aviation & Aerospace Engineering (AREA)
- Computational Mathematics (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
本发明公开一种用于船厂生产设施的仿真验证系统,其特点是仿真验证系统由典型分段收集及处理模块、工艺数据统计及推断模块、建造周期及数据分解模块和仿真分析与迭代改进模块组成,基于船舶典型分段工艺数据的有限样本,统计推断全船分段的工艺数据,按制定的船舶建造周期线表和工艺流向对工艺数据进行分解,利用工艺仿真软件对分解结果进行仿真分析,并根据仿真结果进行迭代改进工艺方案。本发明与现有技术相比具有通过仿真实验得到各种动态活动及其过程的瞬间仿效记录,进而研究生产系统的性能和输出效果,为船厂生产设施的规划设计提供了一种使用方便的仿真工具,降低生产成本,发挥最大的经济效益。
Description
技术领域
本发明涉及计算机仿真技术领域,尤其是一种用于船厂生产设施的仿真验证系统。
背景技术
生产设施规划设计是工业工程学科的一个重要分支,其内容是通过综合分析、设计、规划、论证、评价、改进,使工厂的车间布局、生产设备得到合理配置,实现工厂制定的预期目标。
仿真技术是借助计算机技术、网络技术和数学手段,采用虚拟现实方法,对生产设施进行实际模仿的一项应用技术,它需要借助计算机仿真技术对现实生产系统进行系统建模与求解算法分析,通过仿真实验得到各种动态活动及其过程的瞬间仿效记录,进而研究生产系统的性能和输出效果。仿真技术在复杂生产系统的分析和决策中已发挥重大作用。
目前,国内的船厂规划设计,尚无根据船舶建造周期线表,利用仿真手段进行工艺数据分解,检验工艺方案的方法工具。
发明内容
发明的目的是针对现有技术的不足而设计的一种用于船厂生产设施的仿真验证系统,采用功能模块以及借助计算机仿真技术对现实生产系统进行系统建模与求解算法分析,通过仿真实验得到各种动态活动及其过程的瞬间仿效记录,进而研究生产系统的性能和输出效果,方法简单,使用方便,降低生产成本,发挥最大的经济效益。
本发明的目的是这样实现的:一种用于船厂生产设施的仿真验证系统,其特点是仿真验证系统由典型分段收集及处理模块、工艺数据统计及推断模块、建造周期及数据分解模块和仿真分析与迭代改进模块组成,所述典型分段收集及处理模块根据建造工艺特征将全船分为艏部上、艏部下、舯部上、舯部下、艉部上、艉部下和上层建筑的不同区域,为每个区域选择典型分段,根据该典型分段的装配结构信息统计和分析工艺数据;所述工艺数据统计及推断模块根据全船不同区域选定典型分段,制定典型分段的权重系数,以此统计并推断目标船型全船分段的工艺数据;所述建造周期及数据分解模块根据目标船厂的设计规范编制船舶建造周期线表和工艺方案,并将工艺数据按月度数据分解至各个工序;所述仿真分析与迭代改进模块对分解至各个工序的工艺数据进行各月度的仿真分析,并根据仿真结果进行迭代改进工艺方案。
本发明与现有技术相比具有通过仿真实验得到各种动态活动及其过程的瞬间仿效记录,进而研究生产系统的性能和输出效果,为船厂生产设施的规划设计提供了一种使用方便的仿真工具,降低生产成本,发挥最大的经济效益。
附图说明
图1为本发明结构示意图;
图2为本发明建立的仿真模型;
图3为本发明的评估仿真结果。
具体实施方式
参阅附图1,本发明由典型分段收集及处理模块、工艺数据统计及推断模块、建造周期及数据分解模块和仿真分析与迭代改进模块组成,所述典型分段收集及处理模块根据建造工艺特征将全船分为艏部上、艏部下、舯部上、舯部下、艉部上、艉部下和上层建筑的不同区域,为每个区域选择典型分段,根据该典型分段的装配结构信息统计和分析工艺数据;所述工艺数据统计及推断模块根据全船不同区域选定典型分段,制定典型分段的权重系数,以此统计并推断目标船型全船分段的工艺数据;所述建造周期及数据分解模块根据目标船厂的设计规范编制船舶建造周期线表和工艺方案,并将工艺数据按月度数据分解至各个工序;所述仿真分析与迭代改进模块对分解至各个工序的工艺数据进行各月度的仿真分析,并根据仿真结果进行迭代改进工艺方案。
下面以某船厂生产设施规划设计的实施例对本发明作进一步的详细说明。
实施例1
本发明基于船舶典型分段工艺数据的有限样本,统计推断全船分段的工艺数据,按制定的船舶建造周期线表和工艺流向对工艺数据进行分解,利用工艺仿真软件对分解结果进行仿真分析,其具体仿真验证按下述步骤进行:
a步骤:根据全船不同区域的建造工艺特征,将全船分为艏部上、艏部下、舯部上、舯部下、艉部上、艉部下、上层建筑等区域;为每个区域选择典型分段,根据该典型分段的装配结构信息,统计分析工艺数据。其主数据表包含典型分段、分段数量、分段类型、结构种类、零件清单、原材料重量、原材料表、装配结构等字段,以典型分段字段作为主键,其中零件清单、原材料表、装配结构字段的数据类型为table,可内嵌子表。每一行的记录包括某一类分段的名称、数量、类型等数据。整理的典型分段的工艺数据见下表1:
表1 典型分段的工艺数据
b步骤:统计推断目标船型全船分段的工艺数据
为全船不同区域选定的典型分段,制定对应的权重系数,进而统计推断全船分段的工艺数据,设定的典型分段的百分比权重见下表2:
表2 典型分段的权重系数
典型分段名 | B904 | B602 | B102 | B610 |
数量(个/艘) | 18 | 8 | 6 | 1 |
占比 | 47.37% | 21.05% | 15.79% | 2.63% |
c步骤:制定船舶建造周期线表分解工艺数据
根据目标船厂的设计生产纲领,编制船舶建造周期线表,将工艺数据按照月度数据分解至各个工序。设定的周期线表见下表3:
表3 周期线表
按月度分解工艺数据见下表4:
表4 月度分解工艺数据
d步骤:仿真分析与迭代改进
参阅附图2,建立船厂的仿真模型,对分解得到的工艺数据进行仿真。
参阅附图3,分析各个月度的仿真结果,评估仿真结果,检验工艺方案的合理性并迭代改进。
以上只是对本发明作进一步的说明,并非用以限制本专利,凡为本发明等效实施,均应包含于本专利的权利要求范围之内。
Claims (1)
1.一种用于船厂生产设施的仿真证系统,其特征在于仿真验证系统由典型分段收集及处理模块、工艺数据统计及推断模块、建造周期及数据分解模块和仿真分析与迭代改进模块组成,所述典型分段收集及处理模块根据建造工艺特征将全船分为艏部上、艏部下、舯部上、舯部下、艉部上、艉部下和上层建筑的不同区域,为每个区域选择典型分段,根据该典型分段的装配结构信息统计和分析工艺数据;所述工艺数据统计及推断模块根据全船不同区域选定典型分段,制定典型分段的权重系数,以此统计并推断目标船型全船分段的工艺数据;所述建造周期及数据分解模块根据目标船厂的设计规范编制船舶建造周期线表和工艺方案,并将工艺数据按月度数据分解至各个工序;所述仿真分析与迭代改进模块对分解至各个工序的工艺数据进行各月度的仿真分析,并根据仿真结果进行迭代改进工艺方案。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110431815.5A CN113128051A (zh) | 2021-04-21 | 2021-04-21 | 一种用于船厂生产设施的仿真验证系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110431815.5A CN113128051A (zh) | 2021-04-21 | 2021-04-21 | 一种用于船厂生产设施的仿真验证系统 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN113128051A true CN113128051A (zh) | 2021-07-16 |
Family
ID=76778703
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110431815.5A Pending CN113128051A (zh) | 2021-04-21 | 2021-04-21 | 一种用于船厂生产设施的仿真验证系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113128051A (zh) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103136704A (zh) * | 2013-01-06 | 2013-06-05 | 中交天航滨海环保浚航工程有限公司 | 一种分析绞吸船疏浚施工操作工艺的方法及系统 |
CN103440384A (zh) * | 2013-09-04 | 2013-12-11 | 上海东方申信科技发展有限公司 | 支持船舶建造过程仿真的树形目录结构数据及仿真系统 |
CN106294965A (zh) * | 2016-08-04 | 2017-01-04 | 江苏科技大学 | 一种船体分段装配序列规划系统及其规划方法 |
CN111815191A (zh) * | 2020-07-15 | 2020-10-23 | 上海船舶工艺研究所(中国船舶工业集团公司第十一研究所) | 一种船体分段智能车间数据模型构建方法 |
-
2021
- 2021-04-21 CN CN202110431815.5A patent/CN113128051A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103136704A (zh) * | 2013-01-06 | 2013-06-05 | 中交天航滨海环保浚航工程有限公司 | 一种分析绞吸船疏浚施工操作工艺的方法及系统 |
CN103440384A (zh) * | 2013-09-04 | 2013-12-11 | 上海东方申信科技发展有限公司 | 支持船舶建造过程仿真的树形目录结构数据及仿真系统 |
CN106294965A (zh) * | 2016-08-04 | 2017-01-04 | 江苏科技大学 | 一种船体分段装配序列规划系统及其规划方法 |
CN111815191A (zh) * | 2020-07-15 | 2020-10-23 | 上海船舶工艺研究所(中国船舶工业集团公司第十一研究所) | 一种船体分段智能车间数据模型构建方法 |
Non-Patent Citations (1)
Title |
---|
李军等: "基于虚拟仿真技术的船体分段制造计划管理研究", 《船舶工程》, vol. 42, no. 11, 30 November 2020 (2020-11-30), pages 0 - 2 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110824110B (zh) | 一种基于拉格朗日轨迹模式和化学盒子模式的区域臭氧污染溯源系统 | |
CN109886830B (zh) | 一种基于用户投诉信息的供水管网污染源追踪定位方法 | |
CN107169628B (zh) | 一种基于大数据互信息属性约简的配电网可靠性评估方法 | |
CN103473408B (zh) | 一种融合时空信息的气温缺失记录重建方法 | |
CN114858976A (zh) | 一种工业园区大气质量智能分析方法及系统 | |
CN106650141A (zh) | 一种预测周期性材料性能的不确定性分析方法 | |
CN110716512A (zh) | 一种基于燃煤电站运行数据的环保装备性能预测方法 | |
CN115420854B (zh) | 一种基于正后向模型结合的大气污染物溯源方法 | |
CN103577676A (zh) | 污水处理工艺综合评价的灰色加权法 | |
CN110705080A (zh) | 一种数字孪生模型精准组装方法及装置 | |
CN111581792A (zh) | 一种基于两阶段非负Lasso模型的大气PM2.5浓度预测方法及系统 | |
CN113128052A (zh) | 一种用于船厂生产设施的仿真验证方法 | |
CN104951798A (zh) | 基于emd的lssvm非平稳脉动风速预测方法 | |
CN110705841A (zh) | 一种基于改进模糊层次分析法的化工生产安全评估方法 | |
CN113128051A (zh) | 一种用于船厂生产设施的仿真验证系统 | |
CN117352088A (zh) | 一种基于卷积神经网络的空间污染物分布的预测方法 | |
CN114741793B (zh) | 飞机部件框梁间隙设计方法、装置、设备和存储介质 | |
CN114722635A (zh) | 一种化工园区大气污染物监测传感器布局方法 | |
CN112506903B (zh) | 采用标本线的数据质量表示方法 | |
CN114117790A (zh) | 一种复杂混联系统的可靠性仿真评估方法和系统 | |
CN115310227A (zh) | 齿轮动力传播数字孪生模型构建方法 | |
CN114840591A (zh) | 一种分段开关功率数据的确定方法及装置 | |
CN103927431A (zh) | 基于pyramid时间框架的电站锅炉运行状态监测方法 | |
Alam | On Comparing Different Methods of Estimation for the Parameters of a Pathological Distribution with Application to Climate Data | |
CN109685453B (zh) | 智能识别工作流有效路径的方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20210716 |