CN113123594A - Early-dismantling supporting equipment for constructional engineering - Google Patents

Early-dismantling supporting equipment for constructional engineering Download PDF

Info

Publication number
CN113123594A
CN113123594A CN202110454213.1A CN202110454213A CN113123594A CN 113123594 A CN113123594 A CN 113123594A CN 202110454213 A CN202110454213 A CN 202110454213A CN 113123594 A CN113123594 A CN 113123594A
Authority
CN
China
Prior art keywords
early
piece
constructional engineering
splint
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110454213.1A
Other languages
Chinese (zh)
Inventor
楚万强
赵信峰
袁瑞英
曹明伟
姜楠
李欢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yellow River Conservancy Technical Institute
Original Assignee
Yellow River Conservancy Technical Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yellow River Conservancy Technical Institute filed Critical Yellow River Conservancy Technical Institute
Priority to CN202110454213.1A priority Critical patent/CN113123594A/en
Publication of CN113123594A publication Critical patent/CN113123594A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/48Supporting structures for shutterings or frames for floors or roofs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G25/00Shores or struts; Chocks

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses early-dismantling supporting equipment for constructional engineering, which structurally comprises: the invention can avoid splicing the connecting branch pipes by the fastener device, the connecting branch pipes, the connecting plate block and the beam support frame through the arranged fastener mechanism when the device is used, because the outer pipe wall of the branch pipe structure is easy to rust, the problem of insufficient buckling degree can be caused, so that the looseness is easy to generate, certain danger is caused, the unset part in the concrete can seep into the connecting piece to form solidification, the subsequent disassembly can bring certain trouble, the equipment can be more stably buckled with the connecting branch pipes through the matching of the special clamping plate devices, the danger hidden danger of looseness caused by rusting is reduced, and the device is safer and more convenient, simultaneously through the cooperation of separation cover, can effectively separate the thick liquid that upper end oozes down toward the next door, the protection main connecting piece is not disturbed, and then the dismouting of carrying out the connecting piece that can be more convenient.

Description

Early-dismantling supporting equipment for constructional engineering
Technical Field
The invention relates to early-dismantling supporting equipment for constructional engineering, and belongs to the field of supporting tool equipment.
Background
At present, in building construction, when concrete members such as floor slabs and the like are cast on site, the concrete members are mostly assembled by adopting templates, battens, round steel pipes, traditional steel pipe supports and the like, but due to the technical limitation of a support system, the templates can be dismantled only when the strength of concrete reaches over 75 percent, the time required by concrete setting time is at least over 20 days, and therefore the templates, the reinforced steel pipes and other materials are required to be matched for use.
The prior art has the following defects: when being in charge of to connecting and splicing, because the outer pipe wall of the branch pipe structure rusts easily, consequently the fastener is when connecting, just can probably produce the not enough problem of degree of buckling, consequently it is not hard up to produce easily, certain danger, simultaneously because the top template concatenation seam is great more and the seam below does not have the stupefied support of the back of the body and can lead to the hourglass thick liquid serious, the part that does not solidify in this part concrete can ooze out the connecting piece, and then form and solidify, can bring certain trouble to following dismantlement work.
Disclosure of Invention
Aiming at the defects in the prior art, the invention aims to provide early-dismantling supporting equipment for constructional engineering so as to solve the existing problems.
In order to achieve the purpose, the invention is realized by the following technical scheme: the utility model provides a support equipment is torn early in building engineering, its structure includes: fastener device, connection tubulation, linking plate, support roof beam frame, top layer board, the top layer board install in support roof beam frame top and with support roof beam frame lock joint, the support roof beam frame middle part is run through there is the connection tubulation, it carries out the across block through fastener device to connect the tubulation, the lock joint in fastener device below has linked up the plate, fastener device detains including separation cover, bearing piece, stopper, splint device, threaded rod, the separation cover is installed in splint device top and is welded with the splint device, splint device front side is equipped with the bearing piece, splint device rear side is equipped with the threaded rod and detains, the threaded rod is detained and is connected with splint device lock, the stopper is installed in splint device side surface.
Preferably, the separation cover comprises a fitting ferrule device, an assembling sleeve and a pair of pipe hole grooves, the fitting ferrule device is installed at the upper end of the pair of pipe hole grooves and is buckled with the pair of pipe hole grooves, and the pair of pipe hole grooves are embedded in the middle side of the assembling sleeve.
Preferably, the fitting ring device comprises a sealing ring, a flow guide block and a rubber ring, wherein the flow guide block is arranged above the sealing ring and is fastened with the sealing ring, and the rubber ring is fastened in the middle of the sealing ring.
Preferably, the clamping plate device comprises an abutting block, a contact ring device, a connecting buckle and a loading arc block, the contact ring device is installed on the inner side face of the loading arc block and is fastened with the loading arc block, the connecting buckle is arranged at the front end of the loading arc block, and the abutting block is arranged at the rear end of the loading arc block.
Preferably, the contact ring device comprises a laminating plate, a groove strip and a stabilizing strip, wherein the stabilizing strip is arranged on the surface of the laminating plate, and the middle side of the laminating plate is buckled with the groove strip.
Preferably, the stabilizing strip is a long strip structure made of rubber materials and has strong deformation capacity and friction force.
Preferably, the assembly is a trapezoidal cylinder structure, wherein the outer diameter of the lower surface of the assembly is larger than the inner diameter of the clamping plate device, so that slurry leaked at the upper end can be discharged outwards.
Preferably, the rubber ring can be compressed correspondingly when being subjected to the extrusion force, and the sealing ring is matched to play an effective isolation role in the connection part of the clamping plate device.
Preferably, a user can connect each group of connecting branch pipes by matching the fastener device with the connecting plate, the joist frame is matched with the top supporting plate to jack up the template above, so that the supporting effect is achieved, when the connecting branch pipes are assembled, the butt-joint blocks are matched with the connecting buckles through the matching of the bearing blocks and the threaded rod buckles and are used for connecting the coaxial bearing blocks and the threaded rod buckles, the outer walls of the connecting branch pipes can be fixed with high laminating degree through the groove strips and the stabilizing strips on the surfaces of the laminating plates, the looseness caused by rusting is not easy to generate, the arc blocks are matched and loaded to support the connecting branch pipes more safely, in the concrete pouring process, certain concrete slurry is prevented from seeping down along the gaps of the template, in the prior art, through the mutual matching of the sealing rings and the rubber rings, the pipe hole grooves and the connecting branch pipes are more closely attached, and under the mutual matching of the flow guide blocks and the assembling sleeve, can flow the cement thick liquid that oozes down toward the outside, and then prevent that below splint device from receiving the influence of thick liquid infiltration.
Advantageous effects
Compared with the prior art, the invention has the beneficial effects that: in-process to being connected to the branch pipe, through the cooperation of distinctive splint device, can be more firm carry out the lock to connecting the branch pipe, reduce because rusty and produce not hard up dangerous hidden danger, more safety and convenience, simultaneously through the cooperation of separation cover, can effectively separate the thick liquid of upper end infiltration toward the next door, the protection main connecting piece is not disturbed, and then can be more convenient carry out the dismouting of connecting piece.
Drawings
Other features, objects and advantages of the invention will become more apparent upon reading of the detailed description of non-limiting embodiments with reference to the following drawings:
fig. 1 is an appearance structure schematic diagram of an early-dismantling supporting device for constructional engineering.
FIG. 2 is a schematic top view of the fastening device of the present invention.
FIG. 3 is a side view of the separating hood of the present invention.
Fig. 4 is a schematic view of the internal structure of the fitting ferrule device of the present invention.
Fig. 5 is a schematic top view of the clamping device of the present invention.
FIG. 6 is a side view of the contact ring assembly of the present invention.
In the figure: the device comprises a fastener device-1, a connecting branch pipe-2, a connecting plate-3, a beam supporting frame-4, a top supporting plate-5, a separating cover-a, a bearing block-b, a limiting block-c, a splint device-d, a threaded rod buckle-e, a joint ferrule device-a 1, an assembly sleeve-a 2, a pair of pipe hole grooves-a 3, a sealing ring-a 11, a flow guide block-a 12, a rubber ring-a 13, a butt joint block-d 1, a contact ring device-d 2, a connecting buckle-d 3, a loading arc block-d 4, a joint plate-d 21, a groove strip-d 22 and a stabilizing strip-d 23.
Detailed Description
In order to make the technical means, the creation characteristics, the achievement purposes and the effects of the invention easy to understand, the invention is further described with the specific embodiments.
The first embodiment:
referring to fig. 1-4, the present invention provides a technical solution of an early-dismantling support device for construction engineering: the structure includes: fastener device 1, connect the takeover 2, link up plate 3, joist frame 4, top layer board 5 is installed in 4 tops of joist frame and with 4 lock joints of joist frame, 4 middle parts of joist frame run through and connect the takeover 2, connect the takeover 2 and carry out the intergroup through fastener device 1 and connect, 1 below lockings of fastener device has linked up plate 3, fastener device 1 includes separation cover a, bearing block b, stopper c, splint device d, threaded rod detain e, separation cover a is installed in splint device d top and is welded with splint device d, splint device d front side is equipped with bearing block b, splint device d rear side is equipped with threaded rod detain e, threaded rod detain and splint device d lock joint, stopper c is installed in splint device d side surface.
The separation cover a comprises a joint ferrule device a1, a fitting sleeve a2 and a pair of pipe hole grooves a3, wherein the joint ferrule device a1 is installed at the upper end of the pair of pipe hole grooves a3 and is buckled with the pair of pipe hole grooves a3, and the pair of pipe hole grooves a3 are embedded in the middle side of the fitting sleeve a 2.
Laminating lasso device a1 includes sealing ring a11, water conservancy diversion piece a12, rubber ring a13, water conservancy diversion piece a12 install in sealing ring a11 top and with sealing ring a11 lock joint, sealing ring a11 middle part lock joint has rubber ring a13, laminating lasso device a1 is through the cooperation of sealing ring a11 with rubber ring a13, and then plays a comparatively suitable isolation to splint device d.
The invention is mainly characterized in that: user's accessible is with fastener device 1 and the cooperation that links up plate 3, and then be connected in charge of 2 to each group's connection, joist frame 4 cooperation top layer board 5 carries out the jack-up to the template of top, thereby play the effect of support, when connecting in charge of 2 equipment, through the cooperation of bearing block b with threaded rod knot e, and then make splint device d can be comparatively firm fix connecting in charge of 2 tube heads, at concrete placement's in-process, it has some concrete thick liquids to ooze along the template gap inevitably, past mutually supporting through sealing ring a11 and rubber ring a13, to the more inseparable laminating of tube hole groove a3 with connecting in charge of 2, simultaneously under the mutually supporting of water conservancy diversion piece a12 and assembly cover a2, can be with the cement thick liquids of oozing toward outside side lateral flow, and then prevent that below splint device d from receiving the influence of thick liquids infiltration.
Second embodiment:
referring to fig. 5-6, the present invention provides a technical solution of an early-dismantling support device for construction engineering: the structure includes: splint device d includes butt joint piece d1, contact ring device d2, connector link d3, loads arc piece d4, contact ring device d2 install in the medial surface that loads arc piece d4 and with load arc piece d4 lock joint, load arc piece d4 front end is equipped with connector link d3, load arc piece d4 rear end is equipped with butt joint piece d 1.
The contact ring device d2 includes rigging board d21, recess strip d22, stable strip d23, stable strip d23 installs in rigging board d21 surface, the inboard lock joint of rigging board d21 has recess strip d22, contact ring device d2 is through recess strip d22 and the cooperation of stable strip d23, and then makes it possess higher laminating degree and can connect to connecting the branch pipe 2.
The invention is mainly characterized in that: butt joint piece d1 mutually supports with connector link d3 for coaxial bearing piece b and threaded rod buckle be connected between the e, through recess strip d22 and the stable strip d23 on rigging plate d21 surface, and then can be to connecting the fixed that the minute pipe 2 outer wall carries out a laminating degree height, more be difficult to because rusty the production is not hard up, the matching loads arc piece d4 and supports safer.
The invention can avoid the problem that the buckling degree is not enough when the buckling pieces are connected due to the fact that the outer pipe wall of the branch pipe structure is easy to rust when the connecting branch pipes are spliced when the equipment is used through the mutual combination of the components, the invention is easy to loosen and has certain danger because the buckling pieces are connected because the outer pipe wall of the branch pipe structure is easy to rust, and simultaneously, the problem that slurry leakage is serious because the splicing seams of the upper template are large and the lower parts of the seams are not supported by the back arris is solved, the unset part of the concrete seeps into the connecting pieces to form solidification, and certain trouble is brought to the following disassembly work, so that the equipment can be more stably buckled through the matching of the special clamping plate devices, the danger hidden danger of loosening caused by rusting is reduced, and the equipment is safer and more convenient, simultaneously through the cooperation of separation cover, can effectively separate the thick liquid that upper end oozes down toward the next door, the protection main connecting piece is not disturbed, and then the dismouting of carrying out the connecting piece that can be more convenient.
While there have been shown and described what are at present considered the fundamental principles and essential features of the invention and its advantages, it will be apparent to those skilled in the art that the invention is not limited to the details of the foregoing exemplary embodiments, but is capable of other specific forms without departing from the spirit or essential characteristics thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (8)

1. The utility model provides a support equipment is torn early in building engineering, its structure includes: fastener device (1), connect and be in charge of (2), link up plate (3), support roof beam structure (4), top supporting plate (5), install in support roof beam structure (4) top and with support roof beam structure (4) lock joint top supporting plate (5), it has connection to be in charge of (2), its characterized in that to run through in support roof beam structure (4) middle part:
the connecting branch pipes (2) are connected in groups through fastener devices (1), and connecting plates (3) are locked below the fastener devices (1);
fastener device (1) detains (e) including separation cover (a), bearing piece (b), stopper (c), splint device (d), threaded rod, install in splint device (d) top separation cover (a), splint device (d) front side is equipped with bearing piece (b), splint device (d) rear side is equipped with the threaded rod and detains (e), the threaded rod is detained (e) and is connected with splint device (d) lock, stopper (c) are installed in splint device (d) side surface.
2. The early-dismantling supporting device for constructional engineering as claimed in claim 1, wherein: the separation cover (a) comprises an attaching ferrule device (a 1), an assembling sleeve (a 2) and a pair of pipe hole grooves (a 3), wherein the attaching ferrule device (a 1) is installed at the upper end of the pair of pipe hole grooves (a 3) and is buckled with the pair of pipe hole grooves (a 3), and the pair of pipe hole grooves (a 3) are embedded in the middle side of the assembling sleeve (a 2).
3. The early-dismantling supporting device for constructional engineering as claimed in claim 2, wherein: laminating lasso device (a 1) includes sealing ring (a 11), water conservancy diversion piece (a 12), rubber ring (a 13), water conservancy diversion piece (a 12) are installed in sealing ring (a 11) top and with sealing ring (a 11) lock joint, rubber ring (a 13) have been detained in sealing ring (a 11) middle part.
4. The early-dismantling supporting device for constructional engineering as claimed in claim 1, wherein: splint device (d) are including butt joint piece (d 1), contact ring device (d 2), connector link (d 3), load arc piece (d 4), contact ring device (d 2) are installed in the medial surface that loads arc piece (d 4), load arc piece (d 4) front end and be equipped with connector link (d 3), it is equipped with butt joint piece (d 1) to load arc piece (d 4) rear end.
5. The early-dismantling supporting device for constructional engineering as claimed in claim 4, wherein: the contact ring device (d 2) comprises an attaching plate (d 21), a groove strip (d 22) and a stabilizing strip (d 23), wherein the stabilizing strip (d 23) is installed on the surface of the attaching plate (d 21), and the groove strip (d 22) is buckled on the middle side of the attaching plate (d 21).
6. The early-dismantling supporting device for constructional engineering as claimed in claim 5, wherein: the stabilizing strip (d 23) is a long strip structure made of rubber materials and has strong deformation capacity and friction force.
7. The early-dismantling supporting device for constructional engineering as claimed in claim 2, wherein: the assembly sleeve (a 2) is in a trapezoidal cylindrical structure, the outer diameter of the lower surface of the assembly sleeve is larger than the inner bore diameter of the clamping plate device (d), and the slurry leaked at the upper end can be discharged outwards.
8. The early-dismantling supporting device for constructional engineering as claimed in claim 3, wherein: the rubber ring (a 13) can be compressed correspondingly when being pressed, and the rubber ring (a 11) is matched to play an effective isolation role on the connection part of the splint device (d).
CN202110454213.1A 2021-04-26 2021-04-26 Early-dismantling supporting equipment for constructional engineering Pending CN113123594A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110454213.1A CN113123594A (en) 2021-04-26 2021-04-26 Early-dismantling supporting equipment for constructional engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110454213.1A CN113123594A (en) 2021-04-26 2021-04-26 Early-dismantling supporting equipment for constructional engineering

Publications (1)

Publication Number Publication Date
CN113123594A true CN113123594A (en) 2021-07-16

Family

ID=76780060

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110454213.1A Pending CN113123594A (en) 2021-04-26 2021-04-26 Early-dismantling supporting equipment for constructional engineering

Country Status (1)

Country Link
CN (1) CN113123594A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19858453A1 (en) * 1998-12-18 2000-06-21 Plettac Ag Geschaeftsbereich G Method for joining scaffold poles has profiled ends which interlock and which are secured by clamping flanges
CA2334126A1 (en) * 2001-02-02 2002-08-02 Aluma Enterprises Inc. Scaffold clamp
CN206859646U (en) * 2017-07-05 2018-01-09 台州市森磊环境建设有限公司 A kind of construction(al)steel pipe connection
CN210263889U (en) * 2019-05-17 2020-04-07 中交第四公路工程局有限公司 Novel scaffold is fixed device
CN212613695U (en) * 2020-04-27 2021-02-26 合肥新坞岩机械科技有限公司 Angle-adjustable steel pipe connecting piece

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19858453A1 (en) * 1998-12-18 2000-06-21 Plettac Ag Geschaeftsbereich G Method for joining scaffold poles has profiled ends which interlock and which are secured by clamping flanges
CA2334126A1 (en) * 2001-02-02 2002-08-02 Aluma Enterprises Inc. Scaffold clamp
CN206859646U (en) * 2017-07-05 2018-01-09 台州市森磊环境建设有限公司 A kind of construction(al)steel pipe connection
CN210263889U (en) * 2019-05-17 2020-04-07 中交第四公路工程局有限公司 Novel scaffold is fixed device
CN212613695U (en) * 2020-04-27 2021-02-26 合肥新坞岩机械科技有限公司 Angle-adjustable steel pipe connecting piece

Similar Documents

Publication Publication Date Title
CN203393848U (en) Connection node structure of reinforced concrete column and steel I-beam
CN206189455U (en) Piping lane
CN111022072A (en) Combined joint for reinforcing secondary lining of tunnel constructed by mining method and mounting method
CN108729564A (en) Assembled architecture system
CN201128881Y (en) Preformed supporting structure in bent cap construction
CN106677162B (en) A kind of stiffness composite precast slab stake building enclosure
CN206189454U (en) Piping lane
CN111321654A (en) Stiff skeleton arch steel pipe segment quick locking temporary connection structure
CN212294298U (en) Stiff skeleton arch steel pipe segment quick locking temporary connection structure
CN113123594A (en) Early-dismantling supporting equipment for constructional engineering
CN210975898U (en) Prefabricated template system of basement outer wall post-cast strip
CN109441016B (en) Assembled concrete structure column steel tube sleeve joint and manufacturing method thereof
CN110952994A (en) Bent bolt combined joint for secondary lining of mine method construction tunnel and reinforcing method
CN216195411U (en) Assembled steel frame structure
CN109723460A (en) A kind of Deformation control supporting construction suitable for serious deformation
CN210530849U (en) Sealing device for station structure wall and shield tunnel portal
JP4970061B2 (en) Plate-like panel for floor slab or lining plate using channel member and method for producing the same
CN212743307U (en) Steel construction work platform of assembled
CN205244621U (en) Pipeline attaches wall fixing device
CN211285968U (en) Novel prefabricated concrete column connected node of prefabricated building
CN209873602U (en) Corrugated steel culvert pipe tip reinforcing structure
CN211258628U (en) Shield segment splicing structure
CN211285967U (en) Prefabricated section steel concrete column joint adopting half-lock anchor type sleeve
CN209924152U (en) Waterproof node of assembled antiknock structure combination skeleton and panel
CN207685999U (en) PC fabricated construction bean column node dry type connection structures

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210716