CN113094800B - Engineering quality supervision method and system in municipal engineering supervision - Google Patents
Engineering quality supervision method and system in municipal engineering supervision Download PDFInfo
- Publication number
- CN113094800B CN113094800B CN202110477092.2A CN202110477092A CN113094800B CN 113094800 B CN113094800 B CN 113094800B CN 202110477092 A CN202110477092 A CN 202110477092A CN 113094800 B CN113094800 B CN 113094800B
- Authority
- CN
- China
- Prior art keywords
- engineering
- construction
- supervision
- data
- model
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 94
- 238000010276 construction Methods 0.000 claims abstract description 215
- 230000008569 process Effects 0.000 claims abstract description 58
- 238000013461 design Methods 0.000 claims abstract description 44
- 238000007689 inspection Methods 0.000 claims description 47
- 238000012544 monitoring process Methods 0.000 claims description 25
- 230000000694 effects Effects 0.000 abstract description 5
- 230000009286 beneficial effect Effects 0.000 description 6
- 238000010586 diagram Methods 0.000 description 5
- 238000012552 review Methods 0.000 description 5
- 230000000007 visual effect Effects 0.000 description 4
- 238000003326 Quality management system Methods 0.000 description 2
- 230000008901 benefit Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 230000008719 thickening Effects 0.000 description 2
- 238000004891 communication Methods 0.000 description 1
- 238000005094 computer simulation Methods 0.000 description 1
- 238000012937 correction Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000008520 organization Effects 0.000 description 1
- 239000002243 precursor Substances 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 238000003908 quality control method Methods 0.000 description 1
- 238000004088 simulation Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q10/06395—Quality analysis or management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/26—Government or public services
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Strategic Management (AREA)
- General Physics & Mathematics (AREA)
- Economics (AREA)
- Tourism & Hospitality (AREA)
- Geometry (AREA)
- General Business, Economics & Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Marketing (AREA)
- Development Economics (AREA)
- Computer Hardware Design (AREA)
- Educational Administration (AREA)
- Primary Health Care (AREA)
- General Health & Medical Sciences (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- General Engineering & Computer Science (AREA)
- Evolutionary Computation (AREA)
- Health & Medical Sciences (AREA)
- Data Mining & Analysis (AREA)
- Structural Engineering (AREA)
- Computational Mathematics (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Civil Engineering (AREA)
- Architecture (AREA)
- Game Theory and Decision Science (AREA)
- Testing And Monitoring For Control Systems (AREA)
Abstract
The application relates to the field of municipal engineering management, and aims to provide a method and a system for managing engineering quality in municipal engineering supervision, wherein the method comprises the steps of obtaining data; building an engineering construction model; marking the engineering construction model to generate a construction drawing deepening design model; decomposing municipal engineering construction contents according to the progress plans, respectively listing construction contents corresponding to the progress plans, determining logic relations of the progress plans based on the construction plans, generating a preliminary construction progress plan, and then associating a construction drawing deepening design model and the preliminary construction progress plan to generate an engineering quality supervision model so as to dynamically simulate the whole process of municipal engineering construction and quality supervision; based on the engineering quality supervision model, engineering quality data are monitored in real time, and an alarm is given when the engineering quality data do not meet preset conditions. The application solves the problem that the supervision link is easy to be missed, and has the effect of reducing the omission of the supervision link and closely tracking the supervision objects.
Description
Technical Field
The application relates to the field of municipal engineering management, in particular to a method and a system for managing engineering quality in municipal engineering supervision.
Background
The engineering quality supervision is carried out by establishing a sound quality management system, a construction quality inspection system and a comprehensive construction quality level assessment and assessment system, carefully examining construction organization designs and construction schemes, examining the quality of engineering materials and equipment, and supervising and urging construction units to be in place so as to prevent quality accidents. During supervision, quality units can be divided firstly, quality monitoring is carried out, pre-prevention and construction operation are carried out in advance, quality control is carried out through careful examination in the past, signature check ports of strictly control project projects are checked, and quality hidden danger is found to be corrected to a construction party in time.
Specifically, the construction unit prepares for start-up and submits an engineering start-up approval list; the supervision unit examines the starting conditions, and re-starting preparation is carried out on the returned construction units which do not meet the starting conditions, and starting is approved if the returned construction units meet the starting conditions; carrying out separate engineering procedure construction on the engineering approved by the supervision unit for the construction unit; the construction units of each sub-project carry out self-inspection on quality, unqualified sub-projects of the corresponding construction units are returned, and the qualified construction units fill in project report sheets; and signing the engineering report and inspection list by the qualified supervision units according to the quality of the engineering report and inspection list inspection process, and returning the unqualified supervision units to the sub engineering process of the construction unit for construction.
Aiming at the related technology, the applicant considers that the existing engineering quality supervision method has the defects that the existing engineering quality supervision method is easy to be overlooked in the supervision link and is difficult to closely track the supervision objects.
Disclosure of Invention
In order to reduce the omission of the supervision link and closely track the supervision objects, the application provides a supervision method and system for the engineering quality in municipal engineering supervision.
In a first aspect, the application provides a supervision method for engineering quality in municipal engineering supervision, which has the characteristics of reducing omission of supervision links and closely tracking supervision objects.
The application is realized by the following technical scheme:
The engineering quality supervision method in municipal engineering supervision comprises obtaining design drawings, construction schemes and engineering quality supervision data,
Building an engineering construction model for simulating municipal engineering construction content based on the design drawing;
Identifying the engineering construction model according to the engineering quality supervision data to generate a construction drawing deepening design model for simulating the municipal engineering quality supervision process;
Decomposing municipal engineering construction contents according to a progress plan, respectively listing construction contents corresponding to the progress plans, determining logic relations of the progress plans based on the construction schemes, generating a preliminary construction progress plan, and then associating the construction map deepening design model with the preliminary construction progress plan to generate an engineering quality supervision model so as to dynamically simulate the whole process of municipal engineering construction and quality supervision;
And monitoring engineering quality data in real time based on the engineering quality supervision model, and alarming when the engineering quality data does not meet preset conditions.
By adopting the technical scheme, the construction model is built based on the design drawing to simulate the construction content of municipal engineering, so that the construction content of the municipal engineering is intuitively and vividly known, and the engineering quality supervision is facilitated; marking the engineering construction model according to engineering quality supervision data, generating a construction diagram deepened design model to simulate the municipal engineering quality supervision process, thereby being beneficial to overall engineering quality supervision, improving supervision efficiency and being convenient to operate; generating an engineering quality supervision model by using the construction diagram deepening design model and the preliminary construction progress plan, dynamically simulating the whole process of municipal engineering construction and quality supervision, and monitoring engineering quality data in real time based on the engineering quality supervision model so as to comprehensively control engineering quality supervision links, alarming when the engineering quality data does not meet preset conditions, and reminding workers to review and control in time; and the supervision method of the engineering quality in municipal engineering supervision achieves the effect of reducing the omission of supervision links and closely tracking supervision objects.
The present application may be further configured in a preferred example to: and when the engineering quality data does not meet the preset conditions, returning and displaying municipal engineering construction progress planning content and corresponding engineering quality supervision data associated with the engineering quality data by the engineering quality supervision model.
By adopting the technical scheme, when the engineering quality problem alarms, the municipal engineering construction progress plan content related to the engineering quality data and the corresponding engineering quality supervision data are returned and displayed so as to remind the staff to timely review and control, so that the traceability of the construction quality problem is improved, and supervision is more convenient.
The present application may be further configured in a preferred example to: and when the engineering quality supervision model dynamically simulates the whole process of municipal engineering construction and quality supervision, automatically identifying key working procedures based on the engineering quality supervision data and the preliminary construction progress plan.
By adopting the technical scheme, the engineering quality supervision model automatically identifies key working procedures based on engineering quality supervision data and the preliminary construction progress plan in dynamic simulation, is visual and image, enables workers to perform key inspection on the key working procedures, and is beneficial to improving supervision efficiency after municipal engineering construction is completed.
The present application may be further configured in a preferred example to: the method also comprises the steps of obtaining a project Application for Inspection single form;
when the engineering quality supervision model dynamically simulates the whole process of municipal engineering construction and quality supervision, automatically grabbing data associated with each item of information based on each item of information of the engineering report inspection list;
inputting the grabbed associated data into the engineering report form;
and outputting and displaying the engineering report form until filling of various information in the engineering Application for Inspection form is completed.
By adopting the technical scheme, the engineering quality supervision model automatically grabs data related to each item of information and inputs the data into the engineering Application for Inspection single form based on each item of information of the engineering report and inspection list while dynamically simulating, so that the engineering Application for Inspection single form is not required to be filled manually, the supervision efficiency is improved, and the operation is convenient.
The present application may be further configured in a preferred example to: alarming when the engineering quality data does not meet the preset condition, and judging whether the engineering quality data is positioned in the engineering Application for Inspection single form;
When the engineering quality data is located in the engineering report sheet table, the engineering quality data and the corresponding item information are identified in the engineering report sheet table.
By adopting the technical scheme, the engineering quality data which appear in the engineering Application for Inspection single form and do not meet the preset conditions and the corresponding item information are identified, so that the method is visual and image, is beneficial to a worker to quickly check and correct the appearing engineering quality problem, and improves the supervision efficiency of the engineering quality.
The present application may be further configured in a preferred example to: the engineering quality supervision model dynamically simulates the whole municipal engineering construction and quality supervision process, and acquires data of the municipal engineering construction process in real time;
And periodically correcting the engineering construction model based on the municipal engineering construction process data.
By adopting the technical scheme, the engineering quality supervision model acquires the data of the municipal engineering construction process in real time while dynamically simulating, and periodically corrects the engineering construction model, so that the engineering construction model can more accurately simulate the construction content of municipal engineering, and the generated engineering quality supervision model can more accurately simulate the whole process of municipal engineering construction and quality supervision, thereby being beneficial to more comprehensively controlling engineering quality supervision links, reducing the omission of supervision links and closely tracking supervision objects.
In a second aspect, the application provides a supervision system for engineering quality in municipal engineering supervision, which has the characteristics of reducing omission of supervision links and closely tracking supervision objects.
The application is realized by the following technical scheme:
the engineering quality supervision system in municipal engineering supervision is based on the engineering quality supervision method in municipal engineering supervision, and comprises,
The data acquisition module is used for acquiring design drawings, construction schemes and engineering quality supervision data;
The engineering construction model module is used for constructing an engineering construction model based on the design drawing and simulating municipal engineering construction content;
The construction drawing deepening design model module is used for identifying the engineering construction model according to the engineering quality supervision data, and generating a construction drawing deepening design model to simulate the municipal engineering quality supervision process;
The project quality supervision model module is used for decomposing municipal engineering construction contents according to a progress plan, respectively listing construction contents corresponding to the progress plans, determining logic relations of the progress plans based on the construction schemes, generating a preliminary construction progress plan, and then associating the construction drawing deepening design model with the preliminary construction progress plan to generate an engineering quality supervision model so as to dynamically simulate the whole process of municipal engineering construction and quality supervision;
and the supervision module is used for monitoring engineering quality data in real time based on the engineering quality supervision model and giving an alarm when the engineering quality data does not meet preset conditions.
By adopting the technical scheme, the data acquisition module acquires the design drawing, the construction scheme and the engineering quality supervision data, and the engineering construction model module builds an engineering construction model based on the design drawing to simulate the construction content of municipal engineering so as to intuitively and vividly know the construction content of the municipal engineering and facilitate the engineering quality supervision; the construction map deepening design model module marks the engineering construction model according to engineering quality supervision data, and generates a construction map deepening design model to simulate the municipal engineering quality supervision process, so that overall engineering quality supervision is facilitated, supervision efficiency is improved, and operation is convenient; the engineering quality supervision model module generates an engineering quality supervision model by using the construction drawing deepening design model and the preliminary construction progress plan, dynamically simulates the whole process of municipal engineering construction and quality supervision, and monitors engineering quality data in real time based on the engineering quality supervision model so as to comprehensively control engineering quality supervision links; the supervision module alarms when the engineering quality data do not meet the preset conditions, and reminds workers to review and control in time; and then the supervision system of engineering quality in municipal engineering supervision has the advantage of reducing the omission of supervision link, closely tracking supervision object.
The present application may be further configured in a preferred example to: and the traceability module is used for enabling the engineering quality supervision model to return and display municipal engineering construction progress planning content and corresponding engineering quality supervision data associated with the engineering quality data when the engineering quality data do not meet preset conditions.
By adopting the technical scheme, when the engineering quality problem alarms, the traceability module returns and displays the municipal engineering construction progress plan content associated with the engineering quality data and the corresponding engineering quality supervision data so as to remind the staff to timely consult and control, thereby improving the traceability of the construction quality problem and facilitating supervision.
The present application may be further configured in a preferred example to: the system also comprises a key process identification module which is used for automatically identifying key processes in the municipal engineering construction process.
By adopting the technical scheme, the key process identification module enables the engineering quality supervision model to dynamically simulate and simultaneously automatically identify the key process, so that the key process is visual and image, workers can carry out key inspection on the key process, and the supervision efficiency after municipal engineering construction is finished is improved.
The present application may be further configured in a preferred example to: the system also comprises an engineering report form input module, which is used for automatically grabbing data associated with each item of information based on each item of information of the engineering report form and inputting the data into the engineering report form when the engineering quality supervision model dynamically simulates the whole process of municipal engineering construction and quality supervision.
By adopting the technical scheme, the engineering Application for Inspection single form input module enables the engineering quality supervision model to automatically capture data related to each item of information and input the data into the engineering Application for Inspection single form based on each item of information of the engineering report and inspection list while dynamically simulating, so that a manual machine is not required to fill in the engineering report and inspection list, the supervision efficiency is improved, and the operation is convenient.
In summary, the present application includes at least one of the following beneficial technical effects:
1. Generating an engineering quality supervision model by using a construction diagram deepening design model and a preliminary construction progress plan, dynamically simulating the whole process of municipal engineering construction and quality supervision, monitoring engineering quality data in real time based on the engineering quality supervision model, alarming when the engineering quality data do not meet preset conditions, reminding a worker to timely perform consulting and controlling so as to comprehensively control engineering quality supervision links, and further achieving the effects of reducing omission of supervision links and tightly tracking supervision objects by using the engineering quality supervision method in municipal engineering supervision;
2. When the engineering quality problem alarms, municipal engineering construction progress plan content and corresponding engineering quality supervision data associated with the engineering quality data are returned and displayed, so that the traceability of the construction quality problem is improved;
3. the engineering quality supervision model automatically identifies key working procedures while dynamically simulating, is visual and vivid, so that workers can carry out key inspection on the key working procedures;
4. The engineering quality supervision model automatically captures data related to various information and inputs the data into an engineering Application for Inspection single form while dynamically simulating, so that the engineering Application for Inspection single form is not required to be filled manually, supervision efficiency is improved, and operation is convenient;
5. the engineering quality data which appear in the engineering Application for Inspection single form and do not meet the preset conditions and the corresponding item information are marked, so that workers can check and correct the engineering quality problems rapidly;
6. And the engineering construction model is regularly corrected, so that the engineering construction model can more accurately simulate the construction content of municipal engineering, and the generated engineering quality supervision model can more accurately simulate the whole process of municipal engineering construction and quality supervision.
Drawings
Fig. 1 is a flow chart of a method for managing engineering quality in municipal engineering supervision according to an embodiment of the application.
Fig. 2 is a block diagram of a system for managing engineering quality in municipal engineering supervision according to an embodiment of the application.
Detailed Description
The present embodiment is only for explanation of the present application and is not to be construed as limiting the present application, and modifications to the present embodiment, which may not creatively contribute to the present application as required by those skilled in the art after reading the present specification, are all protected by patent laws within the scope of claims of the present application.
For the purpose of making the objects, technical solutions and advantages of the embodiments of the present application more apparent, the technical solutions of the embodiments of the present application will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present application, and it is apparent that the described embodiments are some embodiments of the present application, but not all embodiments of the present application. All other embodiments, which can be made by those skilled in the art based on the embodiments of the application without making any inventive effort, are intended to be within the scope of the application.
In addition, the term "and/or" herein is merely an association relationship describing an association object, and means that three relationships may exist, for example, a and/or B may mean: a exists alone, A and B exist together, and B exists alone. In this context, unless otherwise specified, the term "/" generally indicates that the associated object is an "or" relationship.
Embodiments of the application are described in further detail below with reference to the drawings.
Referring to fig. 1, an embodiment of the present application provides a method for managing engineering quality in municipal engineering supervision, and main steps of the method are described as follows.
And obtaining design drawings, construction schemes and engineering quality supervision data.
And building an engineering construction model for simulating municipal engineering construction contents based on the design drawing.
And marking the engineering construction model according to the engineering quality supervision data to generate a construction drawing deepening design model for simulating the municipal engineering quality supervision process.
Decomposing municipal engineering construction contents according to the progress plans, respectively listing construction contents corresponding to the progress plans, determining logic relations of the progress plans based on the construction plans, generating a preliminary construction progress plan, and then associating a construction drawing deepening design model and the preliminary construction progress plan to generate an engineering quality supervision model so as to dynamically simulate the whole process of municipal engineering construction and quality supervision.
Based on the engineering quality supervision model, engineering quality data are monitored in real time, and an alarm is given when the engineering quality data do not meet preset conditions.
Specifically, according to the legend, the scale and the number information of the design drawing, the construction content of the three-dimensional simulation municipal engineering of the engineering construction model is built, so that the construction content of the municipal engineering can be intuitively and vividly known, and the engineering quality supervision is facilitated.
The engineering quality supervision data comprise a municipal engineering related quality management system, a construction quality inspection system and a comprehensive construction quality level assessment and assessment system, so as to be used for carefully inspecting the quality of engineering materials, equipment and municipal engineering. And the engineering construction model is identified according to engineering quality supervision data, so that a construction diagram deepened design model is generated to simulate the municipal engineering quality supervision process, thereby being beneficial to comprehensively planning municipal engineering quality supervision work, improving supervision efficiency and being convenient to operate.
And generating an engineering quality supervision model based on the preliminary construction progress plan and the construction drawing deepening design model, dynamically simulating the whole process of municipal engineering construction and quality supervision, and comprehensively controlling engineering quality supervision links.
When the engineering quality supervision model dynamically simulates the whole process of municipal engineering construction and quality supervision, key working procedures are automatically identified based on engineering quality supervision data and a preliminary construction progress plan, so that workers can carry out key inspection on the key working procedures, and the supervision efficiency after municipal engineering construction is finished is improved. The key process can be marked in any combination form of highlighting the background picture where the key process is located, color marking or thickening the description font of the key process.
And monitoring engineering quality data in real time based on the engineering quality supervision model. The engineering quality data are set according to engineering quality supervision data and comprise a pre-quality monitoring parameter category, a construction operation quality monitoring parameter category and an acceptance quality parameter category. According to the historical data of municipal engineering construction. And simultaneously presetting reference values of all parameters of the quality monitoring in advance, reference values of all parameters of the construction operation quality monitoring and reference values of all parameters of the acceptance quality as preset conditions. And comparing the prior quality monitoring parameter, the construction operation quality monitoring parameter and the acceptance quality parameter with corresponding prior quality monitoring parameter reference values, construction operation quality monitoring parameter reference values and acceptance quality parameter reference values respectively. When the precursor quality monitoring parameter, the construction operation quality monitoring parameter and the acceptance quality parameter are respectively located in the corresponding numerical ranges of the prior quality monitoring parameter reference value, the construction operation quality monitoring parameter reference value and the acceptance quality parameter reference value or equal to the corresponding prior quality monitoring parameter reference value, the construction operation quality monitoring parameter reference value and the acceptance quality parameter reference value, the preset condition is satisfied.
Further, the engineering quality supervision method in municipal engineering supervision further comprises the step of obtaining an engineering Application for Inspection single form. The project Application for Inspection single form is designed according to project category and project quality supervision data and is manually input.
When the engineering quality supervision model dynamically simulates the whole process of municipal engineering construction and quality supervision, based on each item of information of an engineering report and inspection sheet, automatically capturing data associated with each item of information, and inputting the captured associated data into an engineering report and inspection sheet form. Specifically, data associated with each item of information in a single form of the project Application for Inspection is obtained from the whole process of dynamically simulating municipal engineering construction and quality supervision of an engineering quality supervision model in a mode of a web crawler tool or a website public API (application program interface) and the like, the obtained data are stored into a unified local data file, and each item of information corresponding to the engineering report and inspection form is filled in a structured mode.
When filling of various information in the engineering Application for Inspection single form is completed, the engineering report form is output and displayed, so that filling of the engineering Application for Inspection single form is not needed to be performed manually, supervision efficiency is improved, and operation is convenient.
When the engineering quality data does not meet the preset conditions, the alarm is given, and meanwhile, the engineering quality supervision model returns municipal engineering construction progress planning content and corresponding engineering quality supervision data which are related to the engineering quality data and displays the municipal engineering construction progress planning content and the corresponding engineering quality supervision data on a screen of the field communication equipment or a screen of a rear-end platform, so that workers are reminded to review and control in time, traceability of construction quality problems is improved, and supervision is more convenient. In this embodiment, the alarm mode may be any combination mode such as repeating a pop-up window alarm for a preset number of times, sounding a beep or highlighting a mark.
And when the engineering quality data does not meet the preset conditions, judging whether the engineering quality data is positioned in an engineering Application for Inspection single table. Specifically, the engineering quality data category which does not meet the preset condition is obtained, and whether the engineering quality data category which does not meet the preset condition belongs to item information of an engineering report inspection list is judged. When the engineering quality data category which does not meet the preset condition belongs to the item information of the engineering report sheet, namely the engineering quality data which does not meet the preset condition is located in the engineering Application for Inspection sheet form, and the engineering quality data and the item information corresponding to the engineering quality data are identified in the engineering report sheet form. The mark can be any combination form of highlighting setting, color marking or thickening of engineering quality data and corresponding item information of the background picture where the engineering quality data and the corresponding item information are located.
The engineering quality supervision method in municipal engineering supervision further comprises the steps of acquiring data of municipal engineering construction process in real time while the engineering quality supervision model dynamically simulates the whole process of municipal engineering construction and quality supervision, and periodically correcting the engineering construction model based on the municipal engineering construction process data so that the engineering construction model can more accurately simulate the construction content of municipal engineering, and the generated engineering quality supervision model can more accurately simulate the whole process of municipal engineering construction and quality supervision.
Referring to fig. 2, the embodiment of the application further provides a supervision system for engineering quality in municipal engineering supervision, which comprises the following modules.
The data acquisition module is used for acquiring design drawings, construction schemes and engineering quality supervision data.
And the engineering construction model module is used for building an engineering construction model based on the design drawing and simulating municipal engineering construction content.
And the construction drawing deepening design model module is used for identifying the engineering construction model according to engineering quality supervision data, and generating a construction drawing deepening design model to simulate the municipal engineering quality supervision process.
And the engineering quality supervision model module is used for decomposing municipal engineering construction contents according to the progress plans, respectively listing construction contents corresponding to the progress plans, determining the logic relation of each progress plan based on the construction plans, generating a preliminary construction progress plan, and then correlating the construction map deepening design model with the preliminary construction progress plan to generate an engineering quality supervision model so as to dynamically simulate the whole process of municipal engineering construction and quality supervision.
And the correction module is used for dynamically simulating the whole process of municipal engineering construction and quality supervision by the engineering quality supervision model, simultaneously acquiring the data of the municipal engineering construction process and periodically correcting the engineering construction model.
The engineering quality supervision model module is connected with a supervision module, and the supervision module is used for monitoring engineering quality data in real time based on the engineering quality supervision model and giving an alarm when the engineering quality data does not meet preset conditions.
The engineering quality supervision model module is also connected with a key procedure identification module, and the key procedure identification module is used for automatically identifying key procedures in the municipal engineering construction process.
The supervision module is connected with a tracing module, and the tracing module is used for enabling the engineering quality supervision model to return and display municipal engineering construction progress plan content and corresponding engineering quality supervision data associated with the engineering quality data when the engineering quality data do not meet preset conditions.
The supervision module is also connected with an engineering report and inspection sheet form input module, and the engineering report and inspection sheet form input module is used for automatically grabbing data associated with each item of information based on each item of information of the engineering report and inspection sheet and inputting the data into an engineering Application for Inspection sheet form when the engineering quality supervision model dynamically simulates the whole process of municipal engineering construction and quality supervision.
The engineering Application for Inspection single form entry module is also connected with engineering quality data and a corresponding item information identification module, and the engineering quality data and the corresponding item information identification module are used for identifying engineering quality data and corresponding item information which do not meet preset conditions in the engineering Application for Inspection single form.
The implementation principle of the embodiment is as follows: and (5) building an engineering construction model.
And marking the engineering construction model to generate a construction drawing deepening design model.
Decomposing municipal engineering construction contents according to the progress plans, respectively listing construction contents corresponding to the progress plans, determining the logic relation of each progress plan based on the construction schemes, and generating a preliminary construction progress plan.
And generating an engineering quality supervision model by using the construction drawing deepening design model and the preliminary construction progress plan, dynamically simulating the whole process of municipal engineering construction and quality supervision, monitoring engineering quality data in real time based on the engineering quality supervision model, and comparing the engineering quality data with preset data parameter values. Meanwhile, key working procedures are automatically identified based on engineering quality supervision data and a preliminary construction progress plan; based on each item of information of the engineering report sheet, automatically capturing data associated with each item of information and inputting the data into an engineering Application for Inspection sheet form.
And alarming when the project quality data is monitored to not meet the preset conditions, returning municipal engineering construction progress plan content related to the project quality data and corresponding project quality supervision data, and displaying the project quality supervision data on a screen so as to remind a worker to timely review and control the project quality supervision link comprehensively.
And identifying the engineering quality data which do not meet the conditions and the item information corresponding to the engineering quality data in the engineering report sheet table.
Furthermore, the method and the system for managing the engineering quality in municipal engineering supervision achieve the effects of reducing the omission of the supervision link and closely tracking the supervision objects, and have traceability on the municipal engineering quality problem.
Claims (5)
1. The engineering quality supervision method in municipal engineering supervision comprises the steps of obtaining design drawings, construction schemes and engineering quality supervision data, and is characterized in that,
Building an engineering construction model for simulating municipal engineering construction content based on the design drawing;
Identifying the engineering construction model according to the engineering quality supervision data to generate a construction drawing deepening design model for simulating the municipal engineering quality supervision process;
Decomposing municipal engineering construction contents according to a progress plan, respectively listing construction contents corresponding to the progress plans, determining logic relations of the progress plans based on the construction schemes, generating a preliminary construction progress plan, and then associating the construction map deepening design model with the preliminary construction progress plan to generate an engineering quality supervision model so as to dynamically simulate the whole process of municipal engineering construction and quality supervision;
acquiring data of municipal engineering construction process in real time;
periodically correcting the engineering construction model based on the municipal engineering construction process data;
automatically identifying key procedures based on the engineering quality supervision data and the preliminary construction progress plan;
Acquiring a project Application for Inspection single form;
Automatically capturing data associated with each item of information based on each item of information of the engineering report form;
inputting the grabbed associated data into the engineering report form;
until the filling of various information in the engineering Application for Inspection single form is completed, outputting and displaying the engineering Application for Inspection single form;
Based on the engineering quality supervision model, engineering quality data are monitored in real time, and an alarm is given when the engineering quality data do not meet preset conditions;
when the engineering quality data does not meet the preset conditions, judging whether the engineering quality data is positioned in the engineering Application for Inspection single table;
When the engineering quality data is positioned in the engineering report form table, marking the engineering quality data and the corresponding item information thereof in the engineering report form table;
and when the engineering quality data does not meet the preset conditions, returning and displaying municipal engineering construction progress planning content and corresponding engineering quality supervision data associated with the engineering quality data by the engineering quality supervision model.
2. The engineering quality supervision system in municipal engineering supervision is based on the engineering quality supervision method in municipal engineering supervision according to claim 1, and is characterized by comprising,
The data acquisition module is used for acquiring design drawings, construction schemes and engineering quality supervision data;
The engineering construction model module is used for constructing an engineering construction model based on the design drawing and simulating municipal engineering construction content;
The construction drawing deepening design model module is used for identifying the engineering construction model according to the engineering quality supervision data, and generating a construction drawing deepening design model to simulate the municipal engineering quality supervision process;
The project quality supervision model module is used for decomposing municipal engineering construction contents according to a progress plan, respectively listing construction contents corresponding to the progress plans, determining logic relations of the progress plans based on the construction schemes, generating a preliminary construction progress plan, and then associating the construction drawing deepening design model with the preliminary construction progress plan to generate an engineering quality supervision model so as to dynamically simulate the whole process of municipal engineering construction and quality supervision;
and the supervision module is used for monitoring engineering quality data in real time based on the engineering quality supervision model and giving an alarm when the engineering quality data does not meet preset conditions.
3. The system for monitoring engineering quality in municipal engineering supervision according to claim 2, further comprising a traceability module for enabling the engineering quality supervision model to return and display municipal engineering construction progress plan content and corresponding engineering quality supervision data associated with the engineering quality data when the engineering quality data does not meet a preset condition.
4. The system for monitoring engineering quality in municipal engineering supervision according to claim 2, further comprising a key process identification module for automatically identifying key processes in the municipal engineering construction process.
5. The system for supervising engineering quality in municipal engineering according to claim 2, further comprising an engineering report form entry module for automatically grabbing data associated with each item of information based on each item of information of the engineering report form and entering the data into the engineering report form when the engineering quality supervision model dynamically simulates the whole process of municipal engineering construction and quality supervision.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110477092.2A CN113094800B (en) | 2021-04-29 | 2021-04-29 | Engineering quality supervision method and system in municipal engineering supervision |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110477092.2A CN113094800B (en) | 2021-04-29 | 2021-04-29 | Engineering quality supervision method and system in municipal engineering supervision |
Publications (2)
Publication Number | Publication Date |
---|---|
CN113094800A CN113094800A (en) | 2021-07-09 |
CN113094800B true CN113094800B (en) | 2024-05-28 |
Family
ID=76680881
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110477092.2A Active CN113094800B (en) | 2021-04-29 | 2021-04-29 | Engineering quality supervision method and system in municipal engineering supervision |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113094800B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114739843B (en) * | 2022-03-10 | 2023-05-02 | 内蒙古锐信工程项目管理有限责任公司 | Construction monitoring method for building engineering supervision based on big data |
CN116797179B (en) * | 2023-07-06 | 2024-05-24 | 宁波市盛达工程管理咨询有限公司 | Monitoring system, method and readable storage medium for whole life cycle of building engineering |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109214670A (en) * | 2018-08-24 | 2019-01-15 | 温州市宏业建设监理有限公司 | A kind of construction quality supervision method in project supervision |
CN111062084A (en) * | 2019-12-30 | 2020-04-24 | 广东海外建设咨询有限公司 | Municipal bridge engineering construction supervision system |
CN111144783A (en) * | 2019-12-31 | 2020-05-12 | 重庆西恒工程咨询有限公司 | Construction management method applying intelligent construction site system |
CN111626896A (en) * | 2020-05-07 | 2020-09-04 | 滨州市诚信建设工程检测有限公司 | Automatic acquisition and information management system for building engineering quality detection data |
CN111695173A (en) * | 2019-03-14 | 2020-09-22 | 上海易智链智能科技发展有限公司 | BIM-based wood structure safety electricity utilization management method and system |
CN112288302A (en) * | 2020-11-05 | 2021-01-29 | 江苏燕宁工程科技集团有限公司 | Engineering quality control method and system based on BIM |
CN112396349A (en) * | 2020-12-07 | 2021-02-23 | 国网物资有限公司 | Data quality monitoring method based on business entity |
WO2021072921A1 (en) * | 2019-10-18 | 2021-04-22 | 青岛理工大学 | Disaster occurrence backtracing method based on bim + gis fusion technology |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10846640B2 (en) * | 2017-06-01 | 2020-11-24 | Autodesk, Inc. | Architecture, engineering and construction (AEC) risk analysis system and method |
-
2021
- 2021-04-29 CN CN202110477092.2A patent/CN113094800B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109214670A (en) * | 2018-08-24 | 2019-01-15 | 温州市宏业建设监理有限公司 | A kind of construction quality supervision method in project supervision |
CN111695173A (en) * | 2019-03-14 | 2020-09-22 | 上海易智链智能科技发展有限公司 | BIM-based wood structure safety electricity utilization management method and system |
WO2021072921A1 (en) * | 2019-10-18 | 2021-04-22 | 青岛理工大学 | Disaster occurrence backtracing method based on bim + gis fusion technology |
CN111062084A (en) * | 2019-12-30 | 2020-04-24 | 广东海外建设咨询有限公司 | Municipal bridge engineering construction supervision system |
CN111144783A (en) * | 2019-12-31 | 2020-05-12 | 重庆西恒工程咨询有限公司 | Construction management method applying intelligent construction site system |
CN111626896A (en) * | 2020-05-07 | 2020-09-04 | 滨州市诚信建设工程检测有限公司 | Automatic acquisition and information management system for building engineering quality detection data |
CN112288302A (en) * | 2020-11-05 | 2021-01-29 | 江苏燕宁工程科技集团有限公司 | Engineering quality control method and system based on BIM |
CN112396349A (en) * | 2020-12-07 | 2021-02-23 | 国网物资有限公司 | Data quality monitoring method based on business entity |
Also Published As
Publication number | Publication date |
---|---|
CN113094800A (en) | 2021-07-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN113094800B (en) | Engineering quality supervision method and system in municipal engineering supervision | |
CN111539923B (en) | Digital ray detection method, system and server for weld defects | |
CN108074032B (en) | Engineering quality acceptance device and method | |
CN111861358A (en) | Building information integration platform based on BIM technology | |
CN111967077A (en) | Engineering construction management digital platform based on BIM technology | |
CN110472858B (en) | Construction engineering supervision information management method | |
CN106022619A (en) | Automobile repair and maintenance process monitoring and displaying system and method based on internet of things | |
CN113673967A (en) | BIM technology-based ultrahigh tower construction progress management system and method | |
CN110471381B (en) | Printing and dyeing industry internet platform, equipment and system | |
CN113780900B (en) | Welding detection system and method based on edge calculation | |
CN117035691B (en) | Engineering construction digital project management method and system based on BIM technology | |
CN114519498A (en) | Quality evaluation method and system based on BIM (building information modeling) | |
CN111105167A (en) | Steel structure engineering visual testing and accepting method based on BIM technology | |
CN117829754B (en) | Intelligent engineering construction whole process number management method and platform based on BIM and GIS | |
CN115907060A (en) | Safety production early warning device and method for petrochemical enterprises | |
Idrissi Gartoumi et al. | Implementing lean construction to improve quality and megaproject construction: a case study | |
CN116993286B (en) | Test management system and method based on test progress reverse project progress | |
CN117787885A (en) | Enterprise safety production management method and system | |
CN112214820A (en) | BIM-based engineering inspection method and device, storage medium and equipment | |
CN115423133A (en) | Power plant maintenance platform and maintenance method | |
CN117114412A (en) | Safety pre-control method and device for dangerous chemical production enterprises | |
CN113052557B (en) | Three-dimensional model generation analysis system and method for approval | |
CN116703178A (en) | Production capacity analysis method, analysis device, non-transitory computer readable medium, and computer program product | |
CN115933477A (en) | Centralized display system for production state of storage battery | |
CN114240211A (en) | Intelligent production management system and management method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |