CN109214670A - A kind of construction quality supervision method in project supervision - Google Patents
A kind of construction quality supervision method in project supervision Download PDFInfo
- Publication number
- CN109214670A CN109214670A CN201810975925.6A CN201810975925A CN109214670A CN 109214670 A CN109214670 A CN 109214670A CN 201810975925 A CN201810975925 A CN 201810975925A CN 109214670 A CN109214670 A CN 109214670A
- Authority
- CN
- China
- Prior art keywords
- construction
- supervisor
- inspection
- quality
- charge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 204
- 238000000034 method Methods 0.000 title claims abstract description 73
- 238000007689 inspection Methods 0.000 claims abstract description 75
- 230000000694 effects Effects 0.000 claims abstract description 15
- 230000001788 irregular Effects 0.000 claims abstract description 5
- 230000008569 process Effects 0.000 claims description 31
- 238000007726 management method Methods 0.000 claims description 16
- 238000012360 testing method Methods 0.000 claims description 8
- 230000003442 weekly effect Effects 0.000 claims description 7
- 239000002994 raw material Substances 0.000 claims description 4
- 230000007547 defect Effects 0.000 claims description 3
- 238000013439 planning Methods 0.000 claims description 3
- 238000012797 qualification Methods 0.000 claims description 3
- 238000001514 detection method Methods 0.000 abstract description 4
- 238000009435 building construction Methods 0.000 abstract description 2
- 230000002262 irrigation Effects 0.000 abstract 1
- 238000003973 irrigation Methods 0.000 abstract 1
- 239000000243 solution Substances 0.000 description 6
- 238000012372 quality testing Methods 0.000 description 5
- 239000000463 material Substances 0.000 description 3
- 230000008901 benefit Effects 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 235000013399 edible fruits Nutrition 0.000 description 2
- 238000003326 Quality management system Methods 0.000 description 1
- 238000012550 audit Methods 0.000 description 1
- 239000003637 basic solution Substances 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000033228 biological regulation Effects 0.000 description 1
- 230000015556 catabolic process Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 239000004035 construction material Substances 0.000 description 1
- 238000000354 decomposition reaction Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000009472 formulation Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 238000003908 quality control method Methods 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q10/06395—Quality analysis or management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- General Business, Economics & Management (AREA)
- Marketing (AREA)
- Physics & Mathematics (AREA)
- Tourism & Hospitality (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Educational Administration (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Data Mining & Analysis (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of construction quality supervision methods in project supervision, it is related to technical field of building construction, it solves the problems, such as to occur to be affected to construction speed when the unqualified situation of construction quality, its drip irrigation device includes the following steps: that unit in charge of construction prepares the required on-stream item of construction and examined by supervisor, subdivisional work is distributed to unit in charge of construction after examination & approval, supervisor carries out irregular inspection to subdivisional work with unit in charge of construction later, other website is established simultaneously carries out engineering record, finally carried out an acceptance inspection by supervisor to engineering, the present invention has the effect of reducing under the unqualified situation of engineering quality detection on project progress influence.
Description
Technical field
The present invention relates to technical field of building construction, and more specifically it is related to the construction quality prison in a kind of project supervision
Reason method.
Background technique
Currently, notification number is the construction quality supervision side in project supervision disclosed in the Chinese patent of CN105956735A
Method includes the following steps:
Step A) unit in charge of construction carries out operating reserves and submitting " commencement of works approval form ";
Step B) supervisor examines requirements for starting construction, the return unit in charge of construction for not meeting requirements for starting construction is gone into operation standard again
Standby, the then approval for meeting requirements for starting construction goes into operation;
Step C) unit in charge of construction's progress subdivisional work process construction is given for the engineering that supervisor's approval goes into operation;
Step D) unit in charge of construction of each subdivisional work carries out self-test, underproof point for returning to corresponding unit in charge of construction to quality
" engineering single inspection " is filled in by item engineering, qualified unit in charge of construction;
Step E) supervisor is according to " engineering single inspection " inspection operation quality, and " engineering is applied for checking and examination for qualified supervisor's signature
It is single ", the underproof subdivisional work process construction for returning to unit in charge of construction;
Step F) engineering is completed for the subdivisional work branch subitem of " engineering single inspection " that supervisor endorsed, and construct
Unit fills in " engineering single inspection ";
Step G) supervisor organizes part-to-item project to check and accept.
It is similar to above-mentioned Supervision in the prior art, mainly includes requirements for starting construction audit, subitem construction, subitem work
Cheng Zijian, subdivisional work quality inspection, engineering are completed and check and accept five processes.Due to there is quality examination ring twice in the construction process
Section is once unit in charge of construction's self-check, and there are also the inspections of supervisor when side, check that underproof result is returned twice
It goes back to unit in charge of construction and not only wastes the manpower and material resources in work progress to being determined as that underproof engineering is constructed again,
Also extend construction period.Direct quality inspection only so is carried out to construction results, so that may when there is unqualified situation
Seriously affect construction speed.
Summary of the invention
In view of the deficiencies of the prior art, the present invention intends to provide the construction quality prison in a kind of project supervision
Reason method the advantage is that the influence reduced under the unqualified situation of engineering quality detection to project progress.
To achieve the above object, the present invention provides the following technical scheme that construction quality prison in a kind of 1. project supervision
Reason method, which comprises the following steps:
On-stream item needed for step 1, unit in charge of construction prepare construction, and the on-stream item is examined by supervisor,
It is ordered to prepare on-stream item again for examining unsanctioned unit in charge of construction;
Step 2, supervisor distribute subdivisional work to the unit in charge of construction for the project examination qualification that goes into operation, and start to be applied according to process
Work;
Step 3, supervisor bear each unit in charge of construction in conjunction with working procedure according to " survey control measure " and " engineering single inspection "
The subdivisional work of duty carries out irregular inspection, and unit in charge of construction assigns quality self-assessment personnel, cooperates the common inspection of supervisor, inspection
By that can enter next working procedure, inspection is not by carrying out rectification of doing over again to current working procedure by unit in charge of construction;
Step 4, supervisor set up other website in each subdivisional work unit in charge of construction according to " engineering sidegating effect scheme ", assign
Supervisor carries out other station, and fills in " sidegating effect record sheet " to record construction key position, construction key process and construction
Overall progress;
Step 5, supervisor check subitem construction quality according to " engineering single inspection ", check by being signed by supervisor
It affixes one's name to " engineering single inspection ", checks not by carrying out rectification of doing over again to subdivisional work by unit in charge of construction;
Step 6, supervisor carry out an acceptance inspection to each subdivisional work according to construction subitem.
By using above-mentioned technical proposal, step 1 to unit in charge of construction construction quality and execution conditions examine
Batch, guarantee basic construction quality from the source of construction.Step 2 by complete engineering according to construction quality, execution conditions with
And sequence of construction is assigned to each unit in charge of construction for being adapted to the subdivisional work, to guarantee that construction efficiency and working sources utilize
The maximization of rate.Inspection handle is carried out to each process in subdivisional work jointly by unit in charge of construction and supervisor in step 3
Control, guarantees the quality of working procedure.Step 4 be used for entire work progress carry out record summarizes, the quality testing after being with
And quality problems parsing provides foundation.Step 5 pair subitem construction carries out complete quality examination comprehensively, guarantees the engineering to have completed
Quality.Step 6 is used to summarize multiple subdivisional works progress inspection of quality structure, and the quality of engineering is delivered needed for guaranteeing.
The decomposition of entire subdivisional work is refine in each process in step 3, process refinement is assigned to construction and management is double
On the quality testing personnel of side, when quality problems occurs in a process, construction can find that immediately quality is asked with management both sides
The source of topic, and solution rectification is carried out before quality problems not yet lead to more quality problems to the expansion of entire engineering level,
For the method that Practical Completion is inspected for acceptance, the rectification of required rectification after there are quality problems is greatly reduced
Amount, so as to shorten the rectification period, there is the influence that construction quality problem may cause construction period in reduction.
The present invention is further arranged to: supervisor and self-test personnel fill in " prison according to inspection result respectively in step 3
Reason personnel's construction quality makes an inspection tour weekly return " and self-inspection record table.
By using above-mentioned technical proposal, " supervisor's construction quality makes an inspection tour weekly return " and self-inspection record table are to side
Just supervisor and self-test personnel completely clearly remember each working procedure details in the construction process and problem
Record summarizes the quality of subdivisional work for the construction later period and provides detection judgment basis, while being also convenient to returning after engineering finishes
Shelves.
The present invention is further arranged to: preferentially carrying out inspection to the concealed work in each subdivisional work in step 3.
By using above-mentioned technical proposal, concealed work with respect to other processes engineering since its structure immutableness is larger,
It is greatly increased so that it rectifies and improves difficulty, thus preferential and emphasis carries out inspection to concealed work, while reinforcing to concealed work
Inspection number guarantees the construction quality of concealed work, avoid concealed work occur quality problems needs do over again rectification and influence work
Cheng Jindu.
The present invention is further arranged to: there is defect in quality examination in step 3, and it is whole management should to be assigned in time by supervisor
Change notice, and checks rectification result after rectification of doing over again.
By using above-mentioned technical proposal, it is logical that management rectification is assigned by the unit in charge of construction that supervisor's confrontation amount goes wrong
Know, the filing record after facilitating engineering to finish, while being conducive to the differentiated control effect in work progress.Again by management after rectification
Unit carries out the basic solution for being checked to ensure that quality problems, avoids the occurrence of leftover problem.
The present invention is further arranged to: holding regularly management according to the process inspection of construction result of subdivisional work in step 3
Regular meeting or quality workshop, analysis, notification construction quality situation, study and improve construction quality.
By using above-mentioned technical proposal, analysis exchange is carried out for the inspection result of each process in subdivisional work, favorably
In the discovery early and prevention of quality problems, the construction quality of each subdivisional work is promoted.
The present invention is further arranged to: the on-stream item in step 1 includes construction raw material, construction equipment and construction text
Part.
By using above-mentioned technical proposal, supervisor examines construction raw material, construction equipment and construction documents
Core monitors construction quality from source and hardware, avoids the occurrence of construction material and equipment goes wrong and influences construction quality
Lower level error.
The present invention is further arranged to: the construction documents includes that arrangement and method for construction, construction drawing and construction allow file,
Preferentially construction documents is examined in step 1.
By using above-mentioned technical proposal, supervisor allows file to examine construction first, guarantees unit in charge of construction
Quality management system, quality certification system and the outfit of full-time quality control personnel at different levels implement, later to arrangement and method for construction with
Construction drawing is audited, and guarantees the basis of construction quality from software.
The present invention is further arranged to: the subdivisional work and process in step 2 are double-deck by unit in charge of construction and supervisor
It formulates and checks on.
By using above-mentioned technical proposal, engineering subitem and process distribution are by the specified handle of unit in charge of construction and supervisor
It closes, promotes the reasonability of engineering distribution, while being also beneficial to be promoted the construction effect of the conformability and engineering between subdivisional work
Rate.
The present invention is further arranged to: common with supervisor by unit in charge of construction while carrying out project planning in step 2
Determine staffing levels' Managed Solution.
By using above-mentioned technical proposal, staffing levels' Managed Solution is determined by unit in charge of construction with supervisor jointly, with
Guarantee smooth solution of the later period on personnel assignment and problem of management, thus the upper stabilization for guaranteeing work progress in terms of personnel
Property, guarantee construction quality.
The present invention is further arranged to: the quality examination in step 5 passes through " supervisor's construction in step 3 and step 4
Quality makes an inspection tour weekly return ", on-the-spot record file the combination construction site progress of self-inspection record table and " sidegating effect record sheet "
It inspects for acceptance.
By using above-mentioned technical proposal, acceptance of subdivisional work is tested by on-the-spot record file combination construction site
It receives, starts with from work progress and construction results, more comprehensively check the construction quality of entire subdivisional work, guarantee detection knot
The accuracy of fruit, thus construction quality when guaranteeing final deliver.
In conclusion the invention has the following advantages that
1, inspection is carried out to the process of projects by the cooperation of unit in charge of construction and supervisor, quality problems occurs to reduce
When rectification project amount, reduce influence to construction period;
2, staffing levels' Managed Solution is determined by unit in charge of construction and supervisor jointly, to guarantee construction personnel's distribution and pipe
Effect is managed, guarantees construction speed and quality;
3, construction quality detects by on-the-spot record file combination construction site in supervisor, promotes quality testing effect
Fruit.
Specific embodiment
Invention is further described in detail below.
Embodiment, a kind of construction quality supervision method in project supervision, comprising the following steps:
On-stream item needed for step 1, unit in charge of construction prepare construction, and the on-stream item is examined by supervisor,
It is ordered to prepare on-stream item again for examining unsanctioned unit in charge of construction.
The on-stream item that unit in charge of construction is prepared includes construction raw material, construction equipment and construction documents, construction documents
It include that arrangement and method for construction, construction drawing and construction allow file, and preferentially examine to construction documents.Supervisor passes through
The on-stream item prepared unit in charge of construction is examined, and to the people of engineering project, machine, material, method, ring etc., factor carries out handle in advance
Control.If examination & approval are unqualified, unit in charge of construction is ordered to prepare on-stream item again, or replace to unit in charge of construction.
Step 2, supervisor distribute subdivisional work to the unit in charge of construction of the project examination qualification that goes into operation, according to process start into
Row construction.
Supervisor carries out the formulation of subdivisional work and process and checks on the qualified unit in charge of construction of on-stream item examination & approval,
Engineering subitem operation break-down is assigned in each unit in charge of construction, while supervisor and unit in charge of construction determine construction personnel and prison jointly
The differentiated control scheme of pipe personnel, plays management effect in construction operation, to guarantee the normal operation of construction speed and management.
Step 3, supervisor are according to " survey control measure " and " engineering single inspection ", in conjunction with working procedure, to each unit in charge of construction
The subdivisional work being responsible for carries out irregular inspection, and unit in charge of construction assigns quality self-assessment personnel, cooperates the common inspection of supervisor,
Inspection is by that can enter next working procedure, and inspection is not by carrying out rectification of doing over again to current working procedure by unit in charge of construction.
Supervisor is equipped with supervisor according to each subdivisional work and unit in charge of construction, the self-test personnel assigned with unit in charge of construction
Irregular inspection is carried out to the process of subdivisional work, the quality of every procedure of subdivisional work, the quality inspection point of technique is examined
It is clear to test division of duty." supervisor's construction quality makes an inspection tour weekly return ", unit in charge of construction are filled according to inspection result by supervisor
Self-inspection record table is voluntarily filled according to inspection result, the details in construction operation is recorded by way of inspection, and applies
Work order position is recorded respectively with supervisor, is distinguished if unit in charge of construction and supervisor play when occurring contradiction in construction quality
Bright directive function.In process inspection arrangement planning, inspection preferentially is carried out to the concealed work in each subdivisional work process, to subtract
Occur a large amount of manpowers spent in concealed work when quality problems and material resources less.
When finding Construction defect during inspection, prison is assigned to the unit in charge of construction of correspondence problem process by supervisor
Reason rectification notice, and test again to the engineering after rectification after unit in charge of construction does over again.And periodically according to subitem work
The inspection result of journey working procedure is summarized, and holds management regular meeting or quality workshop, with each subdivisional work unit in charge of construction
Quality testing personnel's communication exchange, with take precautions against other subitem work progress in there are similar quality problems.
Step 4, supervisor set up other website in each subdivisional work unit in charge of construction according to " engineering sidegating effect scheme ",
Assign supervisor to carry out other station, and fill in " sidegating effect record sheet " with record construction key position, construction key process with
Construction overall progress.
Put the process content and quantity that part-to-item project is included in order in step 2, other station is built in important procedure
In, and the inventory of the important procedure sidegating effect project is enumerated, and carry out stand-by supervision by prison personnel, and do relative recording, just
It, can also be according to the correlation of on-the-spot record if there are quality problems in providing quality testing foundation in the final quality inspection course of receiving
Form document carries out comprehensive analysis to the underproof construction of quality.
Step 5, supervisor check subitem construction quality according to " engineering single inspection ", check by by management list
Position signature " engineering single inspection " checks not by carrying out rectification of doing over again to subdivisional work by unit in charge of construction;
Unit in charge of construction submits " engineering single inspection " after subdivisional work completion to supervisor, and supervisor is receiving " engineering report
Verification certificate " trial inspection is carried out to projects in seven days, check to include data check and two parts of site inspection, data check
Emphasis be engineering data it is whether complete, it is true, specification;Virtual condition after whether meeting completion of works;Whether country is met
Standard, oil pipe Regulations, contract, design etc. requirement.The work for focusing on construction quality and construction of site inspection
Whether skill meets related request, and the self-inspection record table of unit in charge of construction's record and supervisor is combined to record during the inspection process
The on-the-spot records file such as " supervisor's construction quality makes an inspection tour weekly return " and " sidegating effect record sheet ", carries out construction quality comprehensive
Assessment is closed to examine.
Step 6, supervisor carry out an acceptance inspection to each subdivisional work according to construction subitem.
After the completion of supervisor is to each acceptance of subdivisional work, proposes the report of management initial survey and summarizing and reporting is to owner's unit,
It is recommended that carrying out engineering intermediate acceptance.
In this Supervision, working procedure is carried out by construction and the cooperation of management both sides in the construction process real-time
Inspection, and solution rectification is carried out before quality problems not yet lead to more implications to the expansion of entire engineering level, from
And rectifying and improving amount is greatly reduced, the rectification period is shortened, the shadow that construction quality problem may cause construction period is reduced
It rings.
The foregoing is merely presently preferred embodiments of the present invention, is not intended to restrict the invention, all in design structure of the invention
Within think of, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.
Claims (10)
1. a kind of construction quality supervision method in project supervision, which comprises the following steps:
On-stream item needed for step 1, unit in charge of construction prepare construction, and the on-stream item is examined by supervisor,
It is ordered to prepare on-stream item again for examining unsanctioned unit in charge of construction;
Step 2, supervisor distribute subdivisional work to the unit in charge of construction for the project examination qualification that goes into operation, and start to be applied according to process
Work;
Step 3, supervisor bear each unit in charge of construction in conjunction with working procedure according to " survey control measure " and " engineering single inspection "
The subdivisional work of duty carries out irregular inspection, and unit in charge of construction assigns quality self-assessment personnel, cooperates the common inspection of supervisor, inspection
By that can enter next working procedure, inspection is not by carrying out rectification of doing over again to current working procedure by unit in charge of construction;
Step 4, supervisor set up other website in each subdivisional work unit in charge of construction according to " engineering sidegating effect scheme ", assign
Supervisor carries out other station, and fills in " sidegating effect record sheet " to record construction key position, construction key process and construction
Overall progress;
Step 5, supervisor check subitem construction quality according to " engineering single inspection ", check by being signed by supervisor
It affixes one's name to " engineering single inspection ", checks not by carrying out rectification of doing over again to subdivisional work by unit in charge of construction;
Step 6, supervisor carry out an acceptance inspection to each subdivisional work according to construction subitem.
2. the construction quality supervision method in a kind of project supervision according to claim 1, it is characterised in that: in step 3
Supervisor and self-test personnel fill in " supervisor's construction quality makes an inspection tour weekly return " and self-test according to inspection result respectively
Record sheet.
3. the construction quality supervision method in a kind of project supervision according to claim 1, it is characterised in that: in step 3
Inspection preferentially is carried out to the concealed work in each subdivisional work.
4. the construction quality supervision method in a kind of project supervision according to claim 3, it is characterised in that: in step 3
There is defect in quality examination, management rectification notice should be assigned in time by supervisor, and rectification result is checked after rectification of doing over again.
5. the construction quality supervision method in a kind of project supervision according to claim 1, it is characterised in that: in step 3
Management regular meeting or quality workshop, analysis, notification construction quality are held regularly according to the process inspection of construction result of subdivisional work
Situation is studied and improves construction quality.
6. the construction quality supervision method in a kind of project supervision according to claim 1, it is characterised in that: in step 1
On-stream item include construction raw material, construction equipment and construction documents.
7. the construction quality supervision method in a kind of project supervision according to claim 6, it is characterised in that: the construction
File includes that arrangement and method for construction, construction drawing and construction allow file, is preferentially examined to construction documents in step 1.
8. the construction quality supervision method in a kind of project supervision according to claim 1, it is characterised in that: in step 2
Subdivisional work and process formulated and checked on by unit in charge of construction and supervisor's bilayer.
9. the construction quality supervision method in a kind of project supervision according to claim 1, it is characterised in that: in step 2
While carrying out project planning, staffing levels' Managed Solution is determined by unit in charge of construction and supervisor jointly.
10. the construction quality supervision method in a kind of project supervision according to claim 1, it is characterised in that: in step 5
Quality examination pass through " supervisor's construction quality makes an inspection tour weekly return " in step 3 and step 4, self-inspection record table and " other
Stand management record sheet " on-the-spot record file combination construction site inspect for acceptance.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810975925.6A CN109214670A (en) | 2018-08-24 | 2018-08-24 | A kind of construction quality supervision method in project supervision |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810975925.6A CN109214670A (en) | 2018-08-24 | 2018-08-24 | A kind of construction quality supervision method in project supervision |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109214670A true CN109214670A (en) | 2019-01-15 |
Family
ID=64989154
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810975925.6A Pending CN109214670A (en) | 2018-08-24 | 2018-08-24 | A kind of construction quality supervision method in project supervision |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109214670A (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110738397A (en) * | 2019-09-19 | 2020-01-31 | 深圳大尚网络技术有限公司 | management method and device for construction engineering safety and electronic equipment |
CN111539868A (en) * | 2020-05-19 | 2020-08-14 | 广州市水电建设工程有限公司 | Municipal sewage pipeline recommendation method and system |
CN113094800A (en) * | 2021-04-29 | 2021-07-09 | 广东明正项目管理有限公司 | Method and system for supervising engineering quality in municipal engineering supervision |
CN113327068A (en) * | 2021-07-02 | 2021-08-31 | 江苏省苏中建设集团股份有限公司 | BIM-based construction engineering construction quality acceptance method |
CN113327026A (en) * | 2021-05-25 | 2021-08-31 | 西安热工研究院有限公司 | Method for monitoring field installation quality of high-temperature steam-water pipeline system of thermal power plant |
CN113592353A (en) * | 2021-08-13 | 2021-11-02 | 安徽博达项目管理咨询有限公司 | Communication supervision project quality detection method |
CN116028498A (en) * | 2023-02-01 | 2023-04-28 | 蜀道投资集团有限责任公司 | Quality inspection form storage method, device, electronic equipment and medium |
CN116644943A (en) * | 2023-07-26 | 2023-08-25 | 湖南湘江城市运营管理有限公司 | Engineering supervision data management system based on Internet of things |
-
2018
- 2018-08-24 CN CN201810975925.6A patent/CN109214670A/en active Pending
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110738397A (en) * | 2019-09-19 | 2020-01-31 | 深圳大尚网络技术有限公司 | management method and device for construction engineering safety and electronic equipment |
CN111539868A (en) * | 2020-05-19 | 2020-08-14 | 广州市水电建设工程有限公司 | Municipal sewage pipeline recommendation method and system |
CN111539868B (en) * | 2020-05-19 | 2023-09-19 | 广州市水电建设工程有限公司 | Municipal sewage pipeline recommendation method and system |
CN113094800A (en) * | 2021-04-29 | 2021-07-09 | 广东明正项目管理有限公司 | Method and system for supervising engineering quality in municipal engineering supervision |
CN113094800B (en) * | 2021-04-29 | 2024-05-28 | 广东明正项目管理有限公司 | Engineering quality supervision method and system in municipal engineering supervision |
CN113327026A (en) * | 2021-05-25 | 2021-08-31 | 西安热工研究院有限公司 | Method for monitoring field installation quality of high-temperature steam-water pipeline system of thermal power plant |
CN113327068A (en) * | 2021-07-02 | 2021-08-31 | 江苏省苏中建设集团股份有限公司 | BIM-based construction engineering construction quality acceptance method |
CN113592353A (en) * | 2021-08-13 | 2021-11-02 | 安徽博达项目管理咨询有限公司 | Communication supervision project quality detection method |
CN116028498A (en) * | 2023-02-01 | 2023-04-28 | 蜀道投资集团有限责任公司 | Quality inspection form storage method, device, electronic equipment and medium |
CN116644943A (en) * | 2023-07-26 | 2023-08-25 | 湖南湘江城市运营管理有限公司 | Engineering supervision data management system based on Internet of things |
CN116644943B (en) * | 2023-07-26 | 2023-09-29 | 湖南湘江城市运营管理有限公司 | Engineering supervision data management system based on Internet of things |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109214670A (en) | A kind of construction quality supervision method in project supervision | |
CN109118123B (en) | BIM management method for evaluating construction quality of water conservancy and hydropower engineering | |
CN108074032B (en) | Engineering quality acceptance device and method | |
CN105260841B (en) | A kind of distribution network failure repairing receipt auditing system | |
CN111222756A (en) | Construction quality supervision method in engineering supervision | |
CN110619477A (en) | Supervision method for construction quality in project supervision | |
CN112084220B (en) | Abnormality diagnosis method and device for electric energy metering device and readable storage medium | |
CN103745362A (en) | Method and system for automatically generating building project credit system | |
CN103955785A (en) | Emergency capacity assessment method of power grid enterprise | |
CN113689098A (en) | Performance assessment method, system, equipment and storage medium | |
CN105653445B (en) | A kind of implementation method for meeting DO 178C test results | |
CN111639871A (en) | Civil aircraft reliability test assessment method | |
CN109697183A (en) | The management method of actual quantities is surveyed in a kind of work progress | |
CN115456219A (en) | Operation and maintenance monitoring method and device of equipment and related equipment | |
CN115274113A (en) | Evaluation system based on psychological assessment scale scoring algorithm | |
Bekher et al. | Automation of control processes in the non-destructive testing units | |
CN114386003A (en) | Hidden danger checking method and device and storage medium | |
Runeson et al. | Software quality assurance-concepts and misconceptions | |
CN112798887A (en) | Control system and device for operation of ring main unit | |
Lewis et al. | Federal program evaluation from the OMB perspective | |
CN111008753A (en) | EPAs-based responsibility type leading post competence assessment method | |
CN112990708A (en) | Government affair service evaluation processing method and system | |
Angelova et al. | The role of internal audit in risk management system of the companies | |
Chen et al. | Research and application of nuclear power plant in-service inspection information management platform | |
CN112330088A (en) | Construction quality supervision method in engineering supervision |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190115 |
|
RJ01 | Rejection of invention patent application after publication |