Method and system for supervising engineering quality in municipal engineering supervision Download PDFInfo
- Publication number
- CN113094800A CN113094800A CN202110477092.2A CN202110477092A CN113094800A CN 113094800 A CN113094800 A CN 113094800A CN 202110477092 A CN202110477092 A CN 202110477092A CN 113094800 A CN113094800 A CN 113094800A
- Authority
- CN
- China
- Prior art keywords
- engineering
- construction
- supervision
- quality
- data
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 103
- 238000010276 construction Methods 0.000 claims abstract description 220
- 230000008569 process Effects 0.000 claims abstract description 72
- 238000013461 design Methods 0.000 claims abstract description 44
- 238000012544 monitoring process Methods 0.000 claims abstract description 32
- 238000007689 inspection Methods 0.000 claims description 16
- 230000000694 effects Effects 0.000 abstract description 5
- 230000000875 corresponding effect Effects 0.000 description 28
- 238000005094 computer simulation Methods 0.000 description 5
- 230000009286 beneficial effect Effects 0.000 description 3
- 230000000007 visual effect Effects 0.000 description 3
- 238000003326 Quality management system Methods 0.000 description 2
- 230000002596 correlated effect Effects 0.000 description 2
- 230000008719 thickening Effects 0.000 description 2
- 238000004891 communication Methods 0.000 description 1
- 238000012937 correction Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000002349 favourable effect Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000008520 organization Effects 0.000 description 1
- 238000003908 quality control method Methods 0.000 description 1
- 238000004088 simulation Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q10/06395—Quality analysis or management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/26—Government or public services
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Human Resources & Organizations (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Economics (AREA)
- General Business, Economics & Management (AREA)
- Geometry (AREA)
- Marketing (AREA)
- Entrepreneurship & Innovation (AREA)
- Development Economics (AREA)
- Computer Hardware Design (AREA)
- Educational Administration (AREA)
- Evolutionary Computation (AREA)
- Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- General Engineering & Computer Science (AREA)
- General Health & Medical Sciences (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Game Theory and Decision Science (AREA)
- Mathematical Analysis (AREA)
- Computational Mathematics (AREA)
- Data Mining & Analysis (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Testing And Monitoring For Control Systems (AREA)
Abstract
The application relates to the field of municipal engineering management, and aims to provide a method and a system for monitoring engineering quality in municipal engineering monitoring, wherein the method comprises the steps of obtaining data; building an engineering construction model; identifying the engineering construction model to generate a construction drawing deepened design model; decomposing the municipal engineering construction content according to the progress plans, respectively listing the construction content corresponding to the progress plans, determining the logical relationship of each progress plan based on the construction scheme, generating a preliminary construction progress plan, associating the construction drawing deepening design model with the preliminary construction progress plan to generate an engineering quality supervision model, and dynamically simulating the whole process of municipal engineering construction and quality supervision; and monitoring the engineering quality data in real time based on the engineering quality supervision model, and giving an alarm when the engineering quality data does not meet the preset conditions. The problem of the oversight easily takes place for the link of prison reason is solved, this application has the effect that reduces the oversight of the link of prison reason, closely trails the object of prison reason.
Description
Technical Field
The application relates to the field of municipal engineering management, in particular to a method and a system for supervising engineering quality in municipal engineering supervision.
Background
The project quality supervision carefully examines the construction organization design and the construction scheme, examines the quality of engineering materials and equipment and supervises and urges construction units to put in place by establishing a sound quality management system, a construction quality inspection system and a comprehensive construction quality level assessment and assessment system so as to prevent quality accidents. When in supervision, the quality units can be divided firstly, quality monitoring precaution and construction operation guidance are carried out in advance, quality control is carried out by careful inspection in the process, and the sign acceptance pass of project engineering is strictly checked, so that quality hidden troubles are found and rectified and improved in time for a construction party.
Specifically, a construction unit carries out start preparation and submits a project start examination and approval table; the supervision unit examines the start condition, performs restart preparation on the returned construction units which do not accord with the start condition, and approves the start if the return construction units accord with the start condition; performing project process construction on projects approved to be started by a supervision unit for a construction unit; the construction units of all the project branches carry out self-checking on the quality, unqualified project branches are returned to corresponding construction units, and qualified construction units fill in project report and check lists; and the supervision unit checks the process quality according to the project report check list, the qualified supervision unit signs the project report check list, and the unqualified supervision unit returns to the construction unit for the project process construction.
For the related technologies, the applicant considers that the defects that the existing engineering quality supervision method is easy to miss in the supervision link and is difficult to closely track the supervised object exist.
Disclosure of Invention
In order to reduce the omission of the supervision link and closely track the supervision object, the application provides a supervision method and a supervision system for engineering quality in municipal engineering supervision.
In a first aspect, the application provides a method for supervising engineering quality in municipal engineering supervision, which has the characteristics of reducing careless omission in supervision links and closely tracking supervised objects.
The application is realized by the following technical scheme:
the method for supervising the engineering quality in municipal engineering supervision comprises the steps of obtaining a design drawing, a construction scheme and engineering quality supervision data,
building an engineering construction model for simulating municipal engineering construction content based on the design drawing;
identifying the engineering construction model according to the engineering quality supervision data to generate a construction drawing deep design model for simulating the municipal engineering quality supervision process;
decomposing municipal engineering construction contents according to a progress plan, respectively listing construction contents corresponding to the progress plan, determining the logical relationship of each progress plan based on the construction scheme, generating a preliminary construction progress plan, associating the construction drawing deepening design model with the preliminary construction progress plan to generate a project quality supervision model, and dynamically simulating the whole process of municipal engineering construction and quality supervision;
and monitoring the engineering quality data in real time based on the engineering quality supervision model, and giving an alarm when the engineering quality data does not meet the preset conditions.
By adopting the technical scheme, the engineering construction model is built based on the design drawing to simulate the construction content of the municipal engineering, so that the construction content of the municipal engineering can be visually known, and the engineering quality supervision is facilitated; the engineering construction model is identified according to the engineering quality supervision data, and a construction drawing deep design model is generated to simulate the municipal engineering quality supervision process, so that overall engineering quality supervision is facilitated, supervision efficiency is improved, and operation is convenient; generating an engineering quality supervision model by the construction drawing deepening design model and the preliminary construction progress plan, dynamically simulating the whole process of municipal engineering construction and quality supervision, monitoring engineering quality data in real time based on the engineering quality supervision model to comprehensively monitor engineering quality supervision links, alarming when the engineering quality data does not meet preset conditions, and reminding workers to look up and control in time; and the supervision method of the engineering quality in municipal engineering supervision achieves the effects of reducing careless omission in the supervision link and closely tracking the supervised object.
The present application may be further configured in a preferred example to: and when the engineering quality data does not meet the preset conditions, the engineering quality supervision model returns the municipal engineering construction progress plan content and the corresponding engineering quality supervision data related to the engineering quality data and displays the municipal engineering construction progress plan content and the corresponding engineering quality supervision data.
Through adopting above-mentioned technical scheme, when the engineering quality problem reports to the police, return the municipal works construction progress plan content and the engineering quality management data that corresponds that are correlated with engineering quality data and show to remind the staff in time to look up and control, promoted the traceability of construction quality problem, it is more convenient to manage.
The present application may be further configured in a preferred example to: and when the engineering quality supervision model dynamically simulates the whole process of municipal engineering construction and quality supervision, automatically identifying key processes based on the engineering quality supervision data and the preliminary construction progress plan.
Through adopting above-mentioned technical scheme, the key process is based on engineering quality prison data and preliminary construction progress plan automatic identification key process, directly perceived image to engineering quality prison mode in dynamic simulation for the staff can carry out key inspection to the key process, is favorable to improving the efficiency of prison after the municipal works construction is accomplished.
The present application may be further configured in a preferred example to: obtaining a project report form;
when the engineering quality supervision model dynamically simulates the whole process of municipal engineering construction and quality supervision, automatically capturing data associated with various information based on the various information of the engineering report and check sheet;
inputting the captured associated data into the project report and inspection list table;
and outputting and displaying the project report form until the completion of the filling of each item of information in the project report form.
By adopting the technical scheme, the project quality supervision model automatically captures data associated with each item of information and inputs the data into the project report form on the basis of each item of information of the project report form during dynamic simulation, and the project report form is not required to be manually filled in, so that supervision efficiency is improved, and operation is convenient.
The present application may be further configured in a preferred example to: when the engineering quality data do not meet the preset conditions, alarming, and judging whether the engineering quality data are located in the engineering report form;
and when the project quality data are located in the project report and check sheet table, identifying the project quality data and the corresponding item information in the project report and check sheet table.
By adopting the technical scheme, the project quality data which do not meet the preset conditions and appear in the project report form and the corresponding item information are identified, so that the project quality data are visual and vivid, workers can check and correct the appearing project quality problems rapidly, and the supervision efficiency of the project quality is improved.
The present application may be further configured in a preferred example to: the engineering quality supervision model dynamically simulates the whole process of municipal engineering construction and quality supervision, and acquires the data of the municipal engineering construction process in real time;
and periodically correcting the engineering construction model based on the municipal engineering construction process data.
By adopting the technical scheme, the engineering quality supervision model acquires the data of the municipal engineering construction process in real time during dynamic simulation and corrects the engineering construction model regularly, so that the engineering construction model can more accurately simulate the construction content of the municipal engineering, and the generated engineering quality supervision model can more accurately simulate the whole process of municipal engineering construction and quality supervision, thereby being beneficial to more comprehensively monitoring the engineering quality supervision link, reducing the omission of the supervision link and closely tracking the supervision object.
In a second aspect, the application provides a supervision system for engineering quality in municipal engineering supervision, and the supervision system has the characteristics of reducing careless omission of supervision links and closely tracking supervision objects.
The application is realized by the following technical scheme:
the supervision system of the engineering quality in the municipal engineering supervision is based on the supervision method of the engineering quality in the municipal engineering supervision and comprises the following steps,
the data acquisition module is used for acquiring design drawings, construction schemes and engineering quality supervision data;
the engineering construction model module is used for building an engineering construction model based on the design drawing and simulating municipal engineering construction content;
the construction drawing deepening design model module is used for identifying the engineering construction model according to the engineering quality supervision data to generate a construction drawing deepening design model to simulate the municipal engineering quality supervision process;
the engineering quality supervision model module is used for decomposing municipal engineering construction contents according to progress plans, respectively listing construction contents corresponding to the progress plans, determining the logical relationship of each progress plan based on the construction scheme to generate a preliminary construction progress plan, then associating the construction drawing deepening design model with the preliminary construction progress plan to generate an engineering quality supervision model, and dynamically simulating the whole process of municipal engineering construction and quality supervision;
and the supervision module is used for monitoring the engineering quality data in real time based on the engineering quality supervision model and giving an alarm when the engineering quality data does not meet the preset conditions.
By adopting the technical scheme, the data acquisition module acquires design drawings, construction schemes and engineering quality supervision data, and the engineering construction model module builds an engineering construction model based on the design drawings to simulate the construction content of municipal engineering so as to visually and vividly know the construction content of the municipal engineering and facilitate the engineering quality supervision; the construction drawing deepening design model module identifies the engineering construction model according to the engineering quality supervision data, generates a construction drawing deepening design model and simulates the municipal engineering quality supervision process, overall engineering quality supervision is facilitated, supervision efficiency is improved, and operation is convenient; the engineering quality supervision model module generates an engineering quality supervision model by using the construction drawing deep design model and the preliminary construction progress plan, dynamically simulates the whole process of municipal engineering construction and quality supervision, and monitors engineering quality data in real time based on the engineering quality supervision model so as to comprehensively monitor engineering quality supervision links; the supervision module gives an alarm when the engineering quality data does not meet the preset conditions, and reminds workers to look up and control in time; and then the supervision system of engineering quality in municipal engineering supervision has the advantages of reducing the careless omission of supervision links and closely tracking supervision objects.
The present application may be further configured in a preferred example to: and the tracing module is used for enabling the engineering quality supervision model to return and display municipal engineering construction progress plan content and corresponding engineering quality supervision data associated with the engineering quality data when the engineering quality data does not meet the preset conditions.
Through adopting above-mentioned technical scheme, when the engineering quality problem reports to the police, the module of traceing back returns the municipal works construction progress plan content and the engineering quality management data that corresponds that are correlated with engineering quality data and shows to remind the staff in time to look up and control, promoted the traceability of construction quality problem, it is more convenient to manage.
The present application may be further configured in a preferred example to: the system also comprises a key procedure identification module which is used for automatically identifying key procedures in the municipal engineering construction process.
By adopting the technical scheme, the key process identification module can automatically identify the key process while dynamically simulating the engineering quality supervision model, is visual and vivid, so that the staff can perform key inspection on the key process, and the supervision efficiency after municipal engineering construction is finished is improved.
The present application may be further configured in a preferred example to: the engineering quality supervision model is used for dynamically simulating the whole process of municipal engineering construction and quality supervision, automatically capturing data related to various information based on the various information of the engineering quality supervision list and recording the data into the engineering quality supervision list.
By adopting the technical scheme, the project report and inspection list form input module enables the project quality supervision model to automatically capture data associated with each item of information and input the data into the project report and inspection list form based on each item of information of the project report and inspection list while dynamically simulating, and a manual machine is not needed to fill in the project report and inspection list form, so that supervision efficiency is improved, and operation is convenient.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the construction drawing deep design model and the preliminary construction progress plan are generated into an engineering quality supervision model, the whole process of municipal engineering construction and quality supervision is dynamically simulated, the engineering quality data are monitored in real time based on the engineering quality supervision model, an alarm is given when the engineering quality data do not meet preset conditions, workers are reminded to look up and control in time, so that the engineering quality supervision link is comprehensively supervised, and the engineering quality supervision method in the municipal engineering supervision achieves the effects of reducing careless omission of the supervision link and closely tracking a supervision object;
2. when the engineering quality problem alarm occurs, the municipal engineering construction progress plan content and the corresponding engineering quality supervision data related to the engineering quality data are returned and displayed, so that the traceability of the construction quality problem is improved;
3. the engineering quality supervision model automatically identifies key procedures during dynamic simulation, and is visual and vivid, so that workers can perform key inspection on the key procedures;
4. the project quality supervision model automatically captures data associated with various information and records the data into the project report form while dynamically simulating, and the project report form is not required to be manually filled, so that supervision efficiency is improved, and operation is convenient;
5. the method has the advantages that the engineering quality data which do not meet the preset conditions and appear in the engineering report form and the corresponding item information are identified, so that the method is beneficial for workers to quickly check and correct the appearing engineering quality problems;
6. the engineering construction model is corrected regularly, so that the engineering construction model can more accurately simulate the construction content of municipal engineering, and the generated engineering quality supervision model can more accurately simulate the whole process of municipal engineering construction and quality supervision.
Drawings
FIG. 1 is a flow chart of a method for monitoring engineering quality in municipal engineering monitoring according to an embodiment of the present application.
FIG. 2 is a block diagram of a construction of a supervision system of engineering quality in municipal engineering supervision according to an embodiment of the present application.
Detailed Description
The present embodiment is only for explaining the present application, and it is not limited to the present application, and those skilled in the art can make modifications of the present embodiment without inventive contribution as needed after reading the present specification, but all of them are protected by patent law within the scope of the claims of the present application.
In order to make the objects, technical solutions and advantages of the embodiments of the present application clearer, the technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application, and it is obvious that the described embodiments are some embodiments of the present application, but not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present application.
In addition, the term "and/or" herein is only one kind of association relationship describing an associated object, and means that there may be three kinds of relationships, for example, a and/or B, which may mean: a exists alone, A and B exist simultaneously, and B exists alone. In addition, the character "/" herein generally indicates that the former and latter related objects are in an "or" relationship, unless otherwise specified.
The embodiments of the present application will be described in further detail with reference to the drawings attached hereto.
Referring to fig. 1, the embodiment of the application provides a method for monitoring engineering quality in municipal engineering monitoring, and the main steps of the method are described as follows.
And acquiring a design drawing, a construction scheme and project quality supervision data.
And building an engineering construction model for simulating municipal engineering construction content based on the design drawing.
And identifying the engineering construction model according to the engineering quality supervision data to generate a construction drawing deep design model for simulating the municipal engineering quality supervision process.
Decomposing the municipal engineering construction content according to the progress plans, respectively listing the construction content corresponding to the progress plans, determining the logical relationship of each progress plan based on the construction scheme, generating a preliminary construction progress plan, associating the construction drawing deepening design model with the preliminary construction progress plan to generate an engineering quality supervision model, and dynamically simulating the whole process of municipal engineering construction and quality supervision.
And monitoring the engineering quality data in real time based on the engineering quality supervision model, and giving an alarm when the engineering quality data does not meet the preset conditions.
Specifically, according to the legend, the scale and the numerical information of the design drawing, the construction content of the engineering construction model three-dimensional simulation municipal engineering is built, so that the construction content of the municipal engineering can be visually known, and the engineering quality supervision is facilitated.
The engineering quality supervision data comprise a quality management system, a construction quality inspection system and a comprehensive construction quality level assessment and assessment system related to municipal engineering, and are used for carefully examining the quality of engineering materials, the quality of equipment and the quality of municipal engineering. According to engineering quality supervision data, the engineering construction model is identified, a construction drawing deepened design model is generated to simulate the municipal engineering quality supervision process, the municipal engineering quality supervision work is favorably planned overall, the supervision efficiency is improved, and the operation is convenient.
And generating an engineering quality supervision model based on the preliminary construction progress plan and the construction drawing deep design model, dynamically simulating the whole process of municipal engineering construction and quality supervision, and comprehensively supervising the engineering quality supervision link.
When the engineering quality supervision model dynamically simulates the whole process of municipal engineering construction and quality supervision, key processes are automatically identified based on engineering quality supervision data and a preliminary construction progress plan, so that workers can perform key inspection on the key processes, and the supervision efficiency after the municipal engineering construction is completed is improved. The key process identification can be in any combination form such as highlight setting of a background picture where the key process is located, color identification or thickening of a description font of the key process.
And monitoring the engineering quality data in real time based on the engineering quality supervision model. The engineering quality data are set according to engineering quality supervision data and comprise a quality monitoring parameter type, a construction operation quality monitoring parameter type and an acceptance quality parameter type in advance. According to the historical data of municipal engineering construction. And simultaneously presetting the reference values of the parameters for monitoring the quality in advance, the reference values of the parameters for monitoring the construction operation quality and the reference values of the parameters for inspecting the quality as preset conditions. And comparing the prior quality monitoring parameter, the construction operation quality monitoring parameter and the acceptance quality parameter with the corresponding prior quality monitoring parameter reference value, the construction operation quality monitoring parameter reference value and the acceptance quality parameter reference value respectively. When the preliminary quality monitoring parameter, the construction operation quality monitoring parameter and the acceptance quality parameter are respectively located in the numerical ranges of the corresponding preliminary quality monitoring parameter reference value, the construction operation quality monitoring parameter reference value and the acceptance quality parameter reference value or are equal to the corresponding preliminary quality monitoring parameter reference value, the construction operation quality monitoring parameter reference value and the acceptance quality parameter reference value, the preset condition is met.
Further, the method for supervising the engineering quality in municipal engineering supervision also comprises the step of acquiring an engineering report form. The project report and inspection form is designed according to the project category and the project quality supervision data and is manually input.
When the engineering quality supervision model dynamically simulates the whole process of municipal engineering construction and quality supervision, the data associated with each item of information are automatically grabbed based on each item of information of the engineering report and checklist, and the grabbed associated data are recorded into an engineering report and checklist form. Specifically, data associated with each item of information in the project report form is acquired from the whole process of the engineering quality supervision model dynamic simulation municipal engineering construction and quality supervision in a network crawler tool or a website public API mode and the like, the acquired data is stored as a uniform local data file, and the data is filled into each item of information corresponding to the project report form in a structured mode.
When the information in the project report form is filled, the project report form is output and displayed, and further the project report form is not required to be manually filled, so that the supervision efficiency is improved, and the operation is convenient.
When the engineering quality data do not meet the preset conditions, an alarm is given, and meanwhile, the engineering quality supervision model returns municipal engineering construction progress plan content associated with the engineering quality data and corresponding engineering quality supervision data and displays the municipal engineering construction progress plan content and the corresponding engineering quality supervision data on a screen of the field communication equipment or a screen of a rear-end platform so as to remind workers to look up and control in time, so that the traceability of construction quality problems is improved, and the supervision is more convenient. In this embodiment, the alarm mode may be any combination of repeated preset times of pop-up window warning, beeping sound or highlighting identification, and the like.
And when the engineering quality data does not meet the preset conditions, judging whether the engineering quality data is located in an engineering report form. Specifically, the engineering quality data category which does not meet the preset condition is obtained, and whether the engineering quality data category which does not meet the preset condition belongs to the item information of the engineering report checklist or not is judged. And when the engineering quality data category which does not meet the preset condition belongs to the item information of the engineering report form, namely the engineering quality data which does not meet the preset condition is positioned in the engineering report form, and the engineering quality data and the corresponding item information are identified in the engineering report form. The identification can be in any combination form of highlighting the background picture of the engineering quality data and the corresponding item information, color identification or thickening the engineering quality data and the corresponding item information.
The method for supervising the engineering quality in the municipal engineering supervision further comprises the steps of acquiring the data of the construction process of the municipal engineering in real time while dynamically simulating the whole process of the municipal engineering construction and the quality supervision by the engineering quality supervision model, and periodically correcting the engineering construction model based on the data of the construction process of the municipal engineering so that the construction content of the municipal engineering can be simulated by the engineering construction model more accurately, and the whole process of the municipal engineering construction and the quality supervision can be simulated by the generated engineering quality supervision model more accurately.
Referring to fig. 2, the embodiment of the present application further provides a system for supervising the engineering quality in municipal engineering supervision, which includes the following modules.
And the data acquisition module is used for acquiring design drawings, construction schemes and engineering quality supervision data.
And the engineering construction model module is used for building an engineering construction model based on the design drawing and simulating municipal engineering construction content.
And the construction drawing deepened design model module is used for identifying the engineering construction model according to the engineering quality supervision data to generate a construction drawing deepened design model to simulate the municipal engineering quality supervision process.
And the engineering quality supervision model module is used for decomposing the municipal engineering construction content according to the progress plans, respectively listing the construction content corresponding to the progress plans, determining the logical relationship of each progress plan based on the construction scheme, generating a preliminary construction progress plan, associating the construction drawing deepening design model with the preliminary construction progress plan to generate an engineering quality supervision model, and dynamically simulating the whole process of municipal engineering construction and quality supervision.
And the correction module is used for acquiring the municipal engineering construction process data while dynamically simulating the whole process of municipal engineering construction and quality supervision by the engineering quality supervision model, and regularly correcting the engineering construction model.
The project quality supervision model module is connected with a supervision module, and the supervision module is used for monitoring project quality data in real time based on the project quality supervision model and giving an alarm when the project quality data does not meet preset conditions.
The engineering quality supervision model module is also connected with a key process identification module, and the key process identification module is used for automatically identifying key processes in the municipal engineering construction process.
The supervision module is connected with a tracing module, and the tracing module is used for enabling the engineering quality supervision model to return and display municipal engineering construction progress plan content and corresponding engineering quality supervision data associated with the engineering quality data when the engineering quality data do not meet preset conditions.
The supervision module is also connected with an engineering report form input module, and the engineering report form input module is used for automatically capturing data associated with various information and inputting the data into an engineering report form based on the various information of the engineering report form when the engineering quality supervision model dynamically simulates the whole process of municipal engineering construction and quality supervision.
The project report and check list form input module is also connected with project quality data and a corresponding item information identification module, and the project quality data and the corresponding item information identification module are used for identifying the project quality data which do not meet the preset conditions and the corresponding item information in the project report and check list form.
The implementation principle of the embodiment is as follows: and (5) building an engineering construction model.
And identifying the engineering construction model to generate a construction drawing deepened design model.
Decomposing the municipal engineering construction content according to the progress plans, respectively listing the construction content corresponding to the progress plans, determining the logical relationship of each progress plan based on the construction scheme, and generating a preliminary construction progress plan.
And generating an engineering quality supervision model by the construction drawing deepening design model and the preliminary construction progress plan, dynamically simulating the whole process of municipal engineering construction and quality supervision, monitoring engineering quality data in real time based on the engineering quality supervision model, and comparing the engineering quality data with preset data parameter values. Meanwhile, automatically identifying key processes based on project quality supervision data and a preliminary construction progress plan; and automatically capturing data associated with each item of information and recording the data into a project report and inspection list table based on each item of information of the project report and inspection list.
And when the monitored engineering quality data does not meet the preset conditions, alarming, returning the municipal engineering construction progress plan content associated with the engineering quality data and the corresponding engineering quality supervision data, and displaying the contents on a screen to remind workers to look up and supervise the engineering quality in time and comprehensively supervise the engineering quality.
And identifying the project quality data which do not meet the conditions and the corresponding item information in the project report form.
And the method and the system for supervising the engineering quality in municipal engineering supervision achieve the effects of reducing careless omission in a supervision link and closely tracking a supervised object, and have traceability on the municipal engineering quality problem.
Claims (10)
1. The method for supervising the engineering quality in municipal engineering supervision comprises the steps of obtaining a design drawing, a construction scheme and engineering quality supervision data, and is characterized in that,
building an engineering construction model for simulating municipal engineering construction content based on the design drawing;
identifying the engineering construction model according to the engineering quality supervision data to generate a construction drawing deep design model for simulating the municipal engineering quality supervision process;
decomposing municipal engineering construction contents according to a progress plan, respectively listing construction contents corresponding to the progress plan, determining the logical relationship of each progress plan based on the construction scheme, generating a preliminary construction progress plan, associating the construction drawing deepening design model with the preliminary construction progress plan to generate a project quality supervision model, and dynamically simulating the whole process of municipal engineering construction and quality supervision;
and monitoring the engineering quality data in real time based on the engineering quality supervision model, and giving an alarm when the engineering quality data does not meet the preset conditions.
2. The method for supervising engineering quality in municipal engineering supervision according to claim 1, wherein when the engineering quality data does not satisfy the preset conditions, the engineering quality supervision model returns and displays the municipal engineering construction progress plan content and the corresponding engineering quality supervision data associated with the engineering quality data.
3. The method for supervising engineering quality in municipal engineering supervision according to claim 1, wherein the engineering quality supervision model automatically identifies key processes based on the engineering quality supervision data and the preliminary construction progress plan when dynamically simulating the overall process of municipal engineering construction and quality supervision.
4. The method of claim 1, further comprising obtaining a project report form;
when the engineering quality supervision model dynamically simulates the whole process of municipal engineering construction and quality supervision, automatically capturing data associated with various information based on the various information of the engineering report and check sheet;
inputting the captured associated data into the project report and inspection list table;
and outputting and displaying the project report form until the completion of the filling of each item of information in the project report form.
5. The method for supervising engineering quality in municipal engineering supervision according to claim 4, wherein when the engineering quality data does not meet a preset condition, an alarm is given to judge whether the engineering quality data is in the engineering report form;
and when the project quality data are located in the project report and check sheet table, identifying the project quality data and the corresponding item information in the project report and check sheet table.
6. The method for supervising the engineering quality in municipal engineering supervision according to claim 1, wherein the engineering quality supervision model acquires the data of the municipal engineering construction process in real time when dynamically simulating the whole process of municipal engineering construction and quality supervision;
and periodically correcting the engineering construction model based on the municipal engineering construction process data.
7. The supervision system of the engineering quality in municipal engineering supervision is based on the supervision method of the engineering quality in municipal engineering supervision as claimed in any one of claims 1 to 6, and is characterized by comprising,
the data acquisition module is used for acquiring design drawings, construction schemes and engineering quality supervision data;
the engineering construction model module is used for building an engineering construction model based on the design drawing and simulating municipal engineering construction content;
the construction drawing deepening design model module is used for identifying the engineering construction model according to the engineering quality supervision data to generate a construction drawing deepening design model to simulate the municipal engineering quality supervision process;
the engineering quality supervision model module is used for decomposing municipal engineering construction contents according to progress plans, respectively listing construction contents corresponding to the progress plans, determining the logical relationship of each progress plan based on the construction scheme to generate a preliminary construction progress plan, then associating the construction drawing deepening design model with the preliminary construction progress plan to generate an engineering quality supervision model, and dynamically simulating the whole process of municipal engineering construction and quality supervision;
and the supervision module is used for monitoring the engineering quality data in real time based on the engineering quality supervision model and giving an alarm when the engineering quality data does not meet the preset conditions.
8. The system for supervising the engineering quality in the municipal engineering supervision according to claim 7, further comprising a tracing module for returning and displaying the municipal engineering construction progress plan content and the corresponding engineering quality supervision data associated with the engineering quality data by the engineering quality supervision model when the engineering quality data does not satisfy the preset conditions.
9. The system of claim 7, further comprising a key process identification module for automatically identifying key processes in the municipal construction process.
10. The supervision system of engineering quality in municipal engineering supervision according to claim 7, further comprising an engineering report form entry module for automatically capturing data associated with each item of information and entering into the engineering report form based on each item of information of the engineering report form when the engineering quality supervision model dynamically simulates the overall process of municipal engineering construction and quality supervision.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110477092.2A CN113094800B (en) | 2021-04-29 | 2021-04-29 | Engineering quality supervision method and system in municipal engineering supervision |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110477092.2A CN113094800B (en) | 2021-04-29 | 2021-04-29 | Engineering quality supervision method and system in municipal engineering supervision |
Publications (2)
Publication Number | Publication Date |
---|---|
CN113094800A true CN113094800A (en) | 2021-07-09 |
CN113094800B CN113094800B (en) | 2024-05-28 |
Family
ID=76680881
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110477092.2A Active CN113094800B (en) | 2021-04-29 | 2021-04-29 | Engineering quality supervision method and system in municipal engineering supervision |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113094800B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114739843A (en) * | 2022-03-10 | 2022-07-12 | 内蒙古锐信工程项目管理有限责任公司 | Construction monitoring method for building engineering supervision based on big data |
CN116797179A (en) * | 2023-07-06 | 2023-09-22 | 宁波市盛达工程管理咨询有限公司 | Monitoring system, method and readable storage medium for whole life cycle of building engineering |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20180349817A1 (en) * | 2017-06-01 | 2018-12-06 | Autodesk, Inc. | Architecture, engineering and construction (aec) risk analysis system and method |
CN109214670A (en) * | 2018-08-24 | 2019-01-15 | 温州市宏业建设监理有限公司 | A kind of construction quality supervision method in project supervision |
CN111062084A (en) * | 2019-12-30 | 2020-04-24 | 广东海外建设咨询有限公司 | Municipal bridge engineering construction supervision system |
CN111144783A (en) * | 2019-12-31 | 2020-05-12 | 重庆西恒工程咨询有限公司 | Construction management method applying intelligent construction site system |
CN111626896A (en) * | 2020-05-07 | 2020-09-04 | 滨州市诚信建设工程检测有限公司 | Automatic acquisition and information management system for building engineering quality detection data |
CN111695173A (en) * | 2019-03-14 | 2020-09-22 | 上海易智链智能科技发展有限公司 | BIM-based wood structure safety electricity utilization management method and system |
CN112288302A (en) * | 2020-11-05 | 2021-01-29 | 江苏燕宁工程科技集团有限公司 | Engineering quality control method and system based on BIM |
CN112396349A (en) * | 2020-12-07 | 2021-02-23 | 国网物资有限公司 | Data quality monitoring method based on business entity |
WO2021072921A1 (en) * | 2019-10-18 | 2021-04-22 | 青岛理工大学 | Disaster occurrence backtracing method based on bim + gis fusion technology |
-
2021
- 2021-04-29 CN CN202110477092.2A patent/CN113094800B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20180349817A1 (en) * | 2017-06-01 | 2018-12-06 | Autodesk, Inc. | Architecture, engineering and construction (aec) risk analysis system and method |
CN109214670A (en) * | 2018-08-24 | 2019-01-15 | 温州市宏业建设监理有限公司 | A kind of construction quality supervision method in project supervision |
CN111695173A (en) * | 2019-03-14 | 2020-09-22 | 上海易智链智能科技发展有限公司 | BIM-based wood structure safety electricity utilization management method and system |
WO2021072921A1 (en) * | 2019-10-18 | 2021-04-22 | 青岛理工大学 | Disaster occurrence backtracing method based on bim + gis fusion technology |
CN111062084A (en) * | 2019-12-30 | 2020-04-24 | 广东海外建设咨询有限公司 | Municipal bridge engineering construction supervision system |
CN111144783A (en) * | 2019-12-31 | 2020-05-12 | 重庆西恒工程咨询有限公司 | Construction management method applying intelligent construction site system |
CN111626896A (en) * | 2020-05-07 | 2020-09-04 | 滨州市诚信建设工程检测有限公司 | Automatic acquisition and information management system for building engineering quality detection data |
CN112288302A (en) * | 2020-11-05 | 2021-01-29 | 江苏燕宁工程科技集团有限公司 | Engineering quality control method and system based on BIM |
CN112396349A (en) * | 2020-12-07 | 2021-02-23 | 国网物资有限公司 | Data quality monitoring method based on business entity |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114739843A (en) * | 2022-03-10 | 2022-07-12 | 内蒙古锐信工程项目管理有限责任公司 | Construction monitoring method for building engineering supervision based on big data |
CN116797179A (en) * | 2023-07-06 | 2023-09-22 | 宁波市盛达工程管理咨询有限公司 | Monitoring system, method and readable storage medium for whole life cycle of building engineering |
CN116797179B (en) * | 2023-07-06 | 2024-05-24 | 宁波市盛达工程管理咨询有限公司 | Monitoring system, method and readable storage medium for whole life cycle of building engineering |
Also Published As
Publication number | Publication date |
---|---|
CN113094800B (en) | 2024-05-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109543992B (en) | Intelligent inspection method and device, intelligent terminal and server | |
CN113094800A (en) | Method and system for supervising engineering quality in municipal engineering supervision | |
CN111967077A (en) | Engineering construction management digital platform based on BIM technology | |
CN110471381B (en) | Printing and dyeing industry internet platform, equipment and system | |
CN116664001B (en) | Student skill assessment method and system based on artificial intelligence | |
CN114519498A (en) | Quality evaluation method and system based on BIM (building information modeling) | |
CN114882589A (en) | Granary safety operation early warning system and method based on intelligent video analysis | |
CN113437801B (en) | Method and device for alarming abnormal equipment in digital twin system of transformer substation | |
CN115760018A (en) | Intelligent construction site management method, device and system and computer readable storage medium | |
CN117787885A (en) | Enterprise safety production management method and system | |
CN116993286B (en) | Test management system and method based on test progress reverse project progress | |
CN113947303A (en) | Intelligent quantification method for fire-fighting acceptance check | |
CN110266811B (en) | Workshop abnormal information pushing device and method based on MQTT technology | |
CN117114412A (en) | Safety pre-control method and device for dangerous chemical production enterprises | |
CN115481941B (en) | Multifunctional area combined intelligent security management method and system | |
CN116245274A (en) | Hydropower station operation process management method and system, electronic equipment and storage medium | |
CN110737936A (en) | full-process project management platform based on BIM technology | |
CN115762728A (en) | Medical medicament storage cabinet reminding method and device | |
CN115933477A (en) | Centralized display system for production state of storage battery | |
TWM503595U (en) | Production progress monitoring system | |
CN115456453A (en) | Engineering safety information closed-loop control method and system | |
CN110161729B (en) | Display panel testing method and system | |
CN114240211A (en) | Intelligent production management system and management method | |
CN114022125A (en) | Engineering quantity calculation method, storage medium, and apparatus | |
CN113052557A (en) | Three-dimensional model generation and analysis system and method for approval |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |