CN113090306A - Multifunctional anchor rod support construction equipment - Google Patents
Multifunctional anchor rod support construction equipment Download PDFInfo
- Publication number
- CN113090306A CN113090306A CN202110484159.5A CN202110484159A CN113090306A CN 113090306 A CN113090306 A CN 113090306A CN 202110484159 A CN202110484159 A CN 202110484159A CN 113090306 A CN113090306 A CN 113090306A
- Authority
- CN
- China
- Prior art keywords
- anchor rod
- channel
- multifunctional
- construction equipment
- plunger shaft
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 40
- 239000007788 liquid Substances 0.000 claims abstract description 10
- 230000005540 biological transmission Effects 0.000 claims description 40
- 238000007789 sealing Methods 0.000 claims description 13
- 238000002485 combustion reaction Methods 0.000 claims description 3
- 239000000428 dust Substances 0.000 claims 2
- 238000004873 anchoring Methods 0.000 abstract description 18
- 239000003795 chemical substances by application Substances 0.000 abstract description 16
- 238000005553 drilling Methods 0.000 abstract description 15
- 238000000034 method Methods 0.000 abstract description 11
- 239000002893 slag Substances 0.000 abstract description 4
- 239000011435 rock Substances 0.000 description 11
- 239000003245 coal Substances 0.000 description 6
- 238000005086 pumping Methods 0.000 description 5
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 5
- 230000000712 assembly Effects 0.000 description 2
- 238000000429 assembly Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000001816 cooling Methods 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000036316 preload Effects 0.000 description 1
- 239000011347 resin Substances 0.000 description 1
- 229920005989 resin Polymers 0.000 description 1
- 238000003756 stirring Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D20/00—Setting anchoring-bolts
- E21D20/003—Machines for drilling anchor holes and setting anchor bolts
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/10—Valve arrangements in drilling-fluid circulation systems
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B3/00—Rotary drilling
- E21B3/02—Surface drives for rotary drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D20/00—Setting anchoring-bolts
- E21D20/02—Setting anchoring-bolts with provisions for grouting
- E21D20/028—Devices or accesories for injecting a grouting liquid in a bore-hole
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D21/00—Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
- E21D21/0026—Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection characterised by constructional features of the bolts
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D21/00—Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
- E21D21/008—Anchoring or tensioning means
Abstract
The invention discloses a multifunctional anchor rod support construction device, which comprises: base, runner assembly, stock subassembly, flexible subassembly and non return subassembly. The rotating assembly comprises a rotating shaft, a first passage is arranged in the rotating shaft, the telescopic assembly comprises a plunger shaft, the plunger shaft is in sliding fit with the first passage, and a second passage is arranged in the plunger shaft and used for injecting liquid into the anchor rod. When the anchor rod is drilled for construction, liquid can be injected into the drilled hole through the second channel so as to cool the drill bit at the end part of the anchor rod and facilitate the discharge of slag chips in the drilled hole; after the drilling is finished, the anchoring agent can be injected into the drilling hole through the second channel, and then the anchor rod assembly is pre-tightened through the rotating shaft, so that the multifunctional anchor rod support construction equipment can realize multiple steps in a roadway anchor rod support process, reduces the labor intensity of workers, improves the roadway support efficiency, and has lower cost.
Description
Technical Field
The invention relates to the technical field of roadway support devices, in particular to multifunctional anchor rod support construction equipment.
Background
In the fields of domestic and foreign coal mines, metal mines and the like, the deformation of surrounding rocks can be effectively controlled through anchor rod support, so that the anchor rod support is widely applied. Taking coal mine roadway support as an example, the existing anchor bolt support process flow is as follows: drilling a hole in the coal roadway surrounding rock by using a drill rod, manually plugging the resin anchoring agent into the drilled hole, putting the anchor rod into the hole, stirring, and pre-tightening the anchor rod after the anchoring agent is solidified.
However, the existing anchor bolt support construction process has the main problems that: 1. after the holes are drilled, the surrounding rock is easy to collapse under the action of mining stress, the difficulty of manually plugging the anchoring agent into the drilled holes is high, especially when the coal rock is broken or the walls of the drilled holes are uneven, the anchoring agent can be installed within a certain time, and the supporting efficiency is reduced. 2. Drilling, mounting the anchoring agent and pre-tightening are completed by means of different machines, and the switching time for disassembling the drill rod and the different machines is long. In addition, the existing anchor rod construction process machines are various in types, long in time consumption, low in efficiency and high in labor intensity of workers, and the requirement for rapid support of a coal mine roadway cannot be met.
Disclosure of Invention
The present invention is directed to solving, at least to some extent, one of the technical problems in the related art.
Therefore, the embodiment of the invention provides the multifunctional anchor rod supporting construction equipment which is convenient to use, high in supporting efficiency and low in cost.
The multifunctional bolting construction equipment according to an embodiment of the present invention includes: a base; the rotating assembly comprises a rotating shaft and a first driving part, a first channel penetrates through the rotating shaft, the rotating shaft and the driving part are both arranged on the base, and the first driving part is connected with the rotating shaft and used for driving the rotating shaft to rotate; the anchor rod assembly comprises a pre-tightening nut and an anchor rod, a through hole is formed in the anchor rod, the pre-tightening nut is matched on the anchor rod, the pre-tightening nut is matched at the front end of the first channel in a rotation stopping manner, and the rotating shaft can drive the anchor rod to move along the length direction of the first channel; the telescopic assembly comprises a plunger shaft and a second driving part, the plunger shaft and the second driving part are both arranged on the base, the front end of the plunger shaft is in sliding fit in the first channel, the second driving part is connected with the plunger shaft and is used for driving the plunger shaft to move along the length direction of the first channel, a second channel penetrates through the plunger shaft, and the second channel is communicated with the through hole through the first channel; the check assembly is arranged in the second channel and can enable liquid to flow in a single direction only along the direction of the second channel towards the through hole.
According to the multifunctional anchor rod support construction equipment disclosed by the embodiment of the invention, when an anchor rod is drilled for construction, liquid can be injected into a drill hole through the second channel so as to cool a drill bit at the end part of the anchor rod and facilitate the discharge of slag and scraps in the drill hole; after the drilling is finished, the anchoring agent can be injected into the drilling hole through the second channel, and then the anchor rod assembly is pre-tightened through the rotating shaft, so that the multifunctional anchor rod support construction equipment can realize multiple steps in a roadway anchor rod support process, the labor intensity of workers is reduced, the roadway support efficiency is improved, the cost is low, the structure is simple, the multifunctional anchor rod support construction equipment is convenient to install and maintain, in addition, the non-return assembly is arranged in the second channel to avoid the backflow of liquid, and the support efficiency of the multifunctional anchor rod support construction equipment is further improved.
In some embodiments, the number of the second passages is plural, the number of the check assemblies is plural, and the plural check assemblies correspond to the plural second passages one to one.
In some embodiments, the second number of channels is three.
In some embodiments, the multifunctional bolting construction equipment further comprises a seal assembly comprising a first seal and a second seal, the first seal being disposed between the pretension nut and the first channel, the second seal being disposed between the plunger shaft and the first channel.
In some embodiments, the first seal is at least one of an O-ring, a V-ring, a J-ring, and a Y-ring, and/or the second seal is at least one of an O-ring, a V-ring, a J-ring, and a Y-ring.
In some embodiments, the telescopic assembly further comprises a bracket and an adjusting sleeve, the bracket is arranged on the base, the plunger shaft is in sliding fit with the bracket and the adjusting sleeve, the adjusting sleeve is connected with the bracket, and the position of the adjusting sleeve along the length direction of the plunger shaft is adjustable.
In some embodiments, the adjustment sleeve is threadably connected to the bracket.
In some embodiments, the first driving component includes a first transmission member, a second transmission member, and a first driver, the first transmission member is coaxially connected with the first driver, the first transmission member is in transmission fit with the second transmission member, and the second transmission member is coaxially connected with the rotating shaft.
In some embodiments, the first driver is at least one of an electric machine, a hydraulic motor, a cylinder, and an internal combustion engine.
In some embodiments, the second drive component comprises a second drive that is at least one of an electric cylinder, an air cylinder, a linear hydraulic motor.
Drawings
Fig. 1 is a schematic view of a multifunctional bolting construction equipment according to an embodiment of the present invention.
Fig. 2 is a sectional view of the multifunctional bolting construction equipment according to the embodiment of the present invention.
Fig. 3 is a front view of the multifunctional bolting construction equipment according to the embodiment of the present invention.
Fig. 4 is a half sectional view of a bolt assembly of the multifunctional bolting construction equipment according to the embodiment of the present invention.
Fig. 5 is a side view of a plunger shaft of the multifunctional bolting construction equipment according to the embodiment of the present invention.
Reference numerals:
1. a base;
2. a rotating assembly; 21. a rotating shaft; 211. a first channel; 22. a first drive member; 221. a first transmission member; 222. a second transmission member; 223. a first driver;
3. an anchor assembly; 31. pre-tightening the nut; 32. an anchor rod; 321. a through hole; 33. a self-aligning ball pad; 34. a tray; 35. a limited block at the tail part of the anchor rod;
4. a telescoping assembly; 41. a plunger shaft; 411. a second channel; 4111. a first channel; 4112. a second channel; 4113. channel number three; 42. a second drive member; 421. a second driver; 422. a third transmission member; 43. a support; 44. an adjusting sleeve;
5. a check assembly;
6. a seal assembly; 61. a first seal member; 62. a second seal.
Detailed Description
Reference will now be made in detail to embodiments of the present invention, examples of which are illustrated in the accompanying drawings. The embodiments described below with reference to the drawings are illustrative and intended to be illustrative of the invention and are not to be construed as limiting the invention.
A multifunctional bolting construction equipment according to an embodiment of the present invention will be described with reference to the accompanying drawings.
As shown in fig. 1 to 5, the multifunctional bolting construction equipment according to the embodiment of the present invention includes: the base 1, the runner assembly 2, stock subassembly 3, flexible subassembly 4 and non return subassembly 5.
As shown in fig. 1 to 3, the rotating assembly 2 includes a rotating shaft 21 and a first driving part 22, a first channel 211 penetrates through the rotating shaft 21, the rotating shaft 21 and the first driving part 22 are both disposed on the base 1, the first driving part 22 is connected to the rotating shaft 21, and the first driving part 22 is used for driving the rotating shaft 21 to rotate. The anchor rod assembly 3 includes a pre-tightening nut 31 and an anchor rod 32, a through hole 321 is formed in the anchor rod 32, the pre-tightening nut 31 is fitted on the anchor rod 32, the pre-tightening nut 31 is fitted at the front end of the first passage 211 in a rotation-stop manner, and the rotating shaft 21 can drive the pre-tightening nut 31 to rotate, so that the anchor rod 32 moves along the length direction (such as the front-back direction in fig. 2) of the first passage 211. The telescopic assembly 4 comprises a plunger shaft 41 and a second driving part 42, the plunger shaft 41 and the second driving part 42 are both arranged on the base 1, the front end of the plunger shaft 41 is in sliding fit in the first passage 211, a second driving part is connected with the plunger shaft 41 and used for driving the plunger shaft 41 to move along the length direction of the first passage 211, a second passage 411 penetrates through the plunger shaft 41, the second passage 411 is communicated with the through hole 321 through the first passage 211, a check assembly 5 is arranged in the second passage 411, and the check assembly 5 can enable liquid to flow in one direction only along the direction (from back to front direction in fig. 2) of the second passage 411 towards the through hole 321.
According to the multifunctional anchor bolt support construction equipment provided by the embodiment of the invention, when the anchor bolt 32 is drilled, liquid can be injected into the drilled hole through the second channel 411 so as to cool the anchor bolt 32 and facilitate the discharge of slag and scraps in the drilled hole; after the drilling is finished, the anchoring agent can be injected into the drilling hole through the second channel 411, and then the anchor rod assembly 3 is pre-tightened through the rotating shaft 21, so that the multifunctional anchor rod support construction equipment can realize multiple steps in a roadway anchor rod support process, reduces the labor intensity of workers, improves the roadway support efficiency, is low in cost, simple in structure and convenient to install and maintain, and in addition, the non-return assembly 5 is arranged in the second channel 411 to avoid liquid backflow, so that the support efficiency of the multifunctional anchor rod support construction equipment is further improved.
Alternatively, as shown in fig. 2 and 5, the number of the second passages 411 is plural, the number of the check members 5 is plural, and the number of the check members 5 corresponds one-to-one to the number of the second passages 411, for example, the number of the second passages 411 is three, wherein a first second passage 4111 is connected to a pipe for pumping water, a second passage 4112 is connected to a pipe for pumping the a-component of the two-component anchoring agent, and a third second passage 4113 is connected to a pipe for pumping the B-component of the two-component anchoring agent.
Further, as shown in fig. 2, the multifunctional bolting construction equipment further includes a sealing assembly 6, and the sealing assembly 6 includes a first sealing member 61 and a second sealing member 62, for example, the first sealing member 61 and the second sealing member 62 are O-rings, V-rings, J-rings or Y-rings. The first sealing member 61 is disposed between the preload nut 31 and the first passage 211, and the second sealing member 62 is disposed between the plunger shaft 41 and the first passage 211, so that when the multifunctional bolting work apparatus according to the embodiment of the present invention performs drilling, it is possible to ensure that all of the high-pressure water flows into the through-hole 321 in the bolt 32, thereby preventing leakage of liquid.
In some embodiments, as shown in fig. 1 to 3, the telescopic assembly 4 further includes a bracket 43 and an adjusting sleeve 44, the bracket 43 is disposed on the base 1, the plunger shaft 41 is slidably engaged with the bracket 43 and the adjusting sleeve 44, the adjusting sleeve 44 is connected with the bracket 43, and the position of the adjusting sleeve 44 along the length direction of the plunger shaft 41 is adjustable, it can be understood that, since the plunger shaft 41 is slidably engaged with the bracket 43, the plunger shaft 41 does not rotate relative to the rotating shaft 21, and since the position of the adjusting sleeve 44 along the length direction of the plunger shaft 41 is adjustable, the telescopic stroke of the plunger shaft 41 can be controlled by adjusting the position of the adjusting sleeve 44. For example, the adjustment sleeve 44 is threadedly coupled to the bracket 43, so that the relative position of the plunger shaft 41 and the bracket 43 can be adjusted by rotating the adjustment sleeve 44.
In some embodiments, as shown in fig. 1 to 3, the first driving member 22 includes a first transmission member 221, a second transmission member 222 and a first driver 223, the first transmission member 221 is coaxially connected with the first driver 223, the first transmission member 221 is in transmission fit with the second transmission member 222, and the second transmission member 222 is coaxially connected with the rotating shaft 21. For example, the first transmission member 221 and the second transmission member 222 are both gears.
Optionally, the first driver 223 is at least one of an electric motor, a hydraulic motor, a cylinder, and an internal combustion engine. For example, the first driver 223 is a hydraulic motor. Alternatively, the second drive member 42 comprises a second driver 421 and a third transmission member 422, the third transmission member 422 being mounted on a side wall of the plunger shaft 41, and the third transmission member 422 being connected to the second driver 421. The second driver 421 is at least one of an electric cylinder, an air cylinder, and a linear hydraulic motor, for example, the second driver 421 is a linear motor.
As shown in fig. 1 to 5, the multifunctional bolting construction equipment according to an embodiment of the present invention operates as follows:
(1) drilling holes
When the bolting operation cycle begins, the first driver 223 rotates forward to drive the first transmission member 221 to rotate forward, and the first transmission member 221 and the second transmission member 222 are engaged with each other, so that the second transmission member 222 rotates backward under the driving of the first transmission member 221. Since the second transmission member 222 is coaxially installed on the rotating shaft 21, the rotating shaft 21 is reversely rotated. The pre-tightening nut 31 at the rear end of the anchor rod 32 is connected with the rotating shaft 21, the anchor rod tail limiting block 35 is fixedly connected with the anchor rod 32, the anchor rod 32 and the rotating shaft 21 rotate together under the action of the anchor rod tail limiting block 35, and a drill bit at the head of the anchor rod 32 is used for drilling.
During the drilling process, because the inner side and the outer side of the second sealing element 62 respectively contact the rotating shaft 21 and the plunger shaft 41, the plunger shaft 41 is subjected to torque generated by friction force, and the plunger shaft 41 does not rotate under the action of the bracket 43, so that the plunger shaft 41 does not rotate along with the rotating shaft 21. The first second passage 4111 in the plunger shaft 41 delivers water to the head of the bolt 32 for removal of coal slag and cooling of the drill bit, and due to the action of the first and second seals 61, 62, it is ensured that a high pressure water flow enters the through bore 321 of the bolt 32 without leaking out. Specifically, as shown in fig. 4, the anchor bar assembly 3 includes: the anchor rod 32, the anchor rod tail limiting block 35, the pre-tightening nut 31, the self-aligning ball pad 33 and the tray 34 are sequentially arranged along the length direction of the anchor rod 32. When the hole is drilled to a specified depth or when the anchor rod tail limiting block 35 is tightly attached to the pre-tightening nut 31, the pre-tightening nut 31 is tightly attached to the aligning ball pad 33, the aligning ball pad 33 is tightly attached to the tray 34, and the tray 34 is tightly attached to the surrounding rock, the hole drilling is completed.
(2) Anchor grouting
After drilling is completed, the first driver 223 stops rotating, and the first second passage 4111 in the plunger shaft 41 stops pumping water into the through hole 321 of the anchor rod 32; the second passage 4112 and the third passage 4113 of the plunger shaft 41 transmit the component A and the component B of the anchoring agent respectively, the anchoring agent of the two components is transmitted to the through hole 321 of the anchor rod 32 and the gap between the anchor rod 32 and the surrounding rock at the same time, due to the action of the first sealing piece 61 and the second sealing piece 62, the component A and the component B of the anchoring agent can be ensured to enter the through hole 321 of the anchor rod 32 without leakage, after the anchoring agent is pumped to a preset amount, the pumping is stopped, and after the components of the anchoring agent are mixed and reacted, the anchoring function is realized.
(3) Pretightening
After the anchoring is finished and the anchoring agent is solidified, the first driver 223 rotates reversely, the pretightening nut 31 is driven to rotate through the first transmission piece 221 and the second transmission piece 222, the rotating direction of the pretightening nut 31 is opposite to the rotating direction in the drilling process, the pretightening nut 31 continuously extrudes the tray 34 tightly attached to the surrounding rock, and the pretightening of the anchor rod 32 is realized, and in the pretightening process, the anchor rod 32 translates relative to the rotating shaft 21 in the direction far away from the surrounding rock; when the first driver 223 rotates reversely, the second driver 421 starts to work, the second driver 421 drives the third transmission member 422 to translate towards the direction away from the surrounding rock, and because the third transmission member 422 is installed on the side wall of the plunger shaft 41, the third transmission member 422 drives the plunger shaft 41 to translate towards the direction away from the surrounding rock actively, so as to leave a space for pre-tightening the anchor rod 32 until the pre-tightening process is completed. After the pre-tightening is finished, the anchor rod 32 is separated from the rotating shaft 21, the second driver 421 works reversely, the plunger shaft 41 translates relative to the rotating shaft 21 and gradually returns to the original position, and the maximum distance of the plunger shaft 41 moving in the direction away from the surrounding rock can be adjusted through the plunger shaft 41 telescopic stroke adjusting block.
After the above process steps are completed, the next operation cycle is performed according to the construction requirements, and in each operation cycle, the working principle of the multifunctional anchor rod support construction equipment of the embodiment of the invention is consistent, so that the details are not repeated.
In the description of the present invention, it is to be understood that the terms "central," "longitudinal," "lateral," "length," "width," "thickness," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," "clockwise," "counterclockwise," "axial," "radial," "circumferential," and the like are used in the orientations and positional relationships indicated in the drawings for convenience in describing the invention and to simplify the description, and are not intended to indicate or imply that the referenced devices or elements must have a particular orientation, be constructed and operated in a particular orientation, and are therefore not to be considered limiting of the invention.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one such feature. In the description of the present invention, "a plurality" means at least two, e.g., two, three, etc., unless specifically limited otherwise.
In the present invention, unless otherwise expressly stated or limited, the terms "mounted," "connected," "secured," and the like are to be construed broadly and can, for example, be fixedly connected, detachably connected, or integrally formed; may be mechanically coupled, may be electrically coupled or may be in communication with each other; they may be directly connected or indirectly connected through intervening media, or they may be connected internally or in any other suitable relationship, unless expressly stated otherwise. The specific meanings of the above terms in the present invention can be understood by those skilled in the art according to specific situations.
In the present invention, unless otherwise expressly stated or limited, the first feature "on" or "under" the second feature may be directly contacting the first and second features or indirectly contacting the first and second features through an intermediate. Also, a first feature "on," "over," and "above" a second feature may be directly or diagonally above the second feature, or may simply indicate that the first feature is at a higher level than the second feature. A first feature being "under," "below," and "beneath" a second feature may be directly under or obliquely under the first feature, or may simply mean that the first feature is at a lesser elevation than the second feature.
In the present disclosure, the terms "one embodiment," "some embodiments," "an example," "a specific example," or "some examples" and the like mean that a specific feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the present disclosure. In this specification, the schematic representations of the terms used above are not necessarily intended to refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples. Furthermore, various embodiments or examples and features of different embodiments or examples described in this specification can be combined and combined by one skilled in the art without contradiction.
Although embodiments of the present invention have been shown and described above, it is understood that the above embodiments are exemplary and should not be construed as limiting the present invention, and that variations, modifications, substitutions and alterations can be made to the above embodiments by those of ordinary skill in the art within the scope of the present invention.
Claims (10)
1. The utility model provides a multi-functional bolting construction equipment which characterized in that includes:
a base;
the rotating assembly comprises a rotating shaft and a first driving part, a first channel penetrates through the rotating shaft, the rotating shaft and the driving part are both arranged on the base, and the first driving part is connected with the rotating shaft and used for driving the rotating shaft to rotate;
the anchor rod assembly comprises a pre-tightening nut and an anchor rod, a through hole is formed in the anchor rod, the pre-tightening nut is matched on the anchor rod, the pre-tightening nut is matched at the front end of the first channel in a rotation stopping manner, and the rotating shaft can drive the anchor rod to move along the length direction of the first channel;
the telescopic assembly comprises a plunger shaft and a second driving part, the plunger shaft and the second driving part are both arranged on the base, the front end of the plunger shaft is in sliding fit in the first channel, the second driving part is connected with the plunger shaft and is used for driving the plunger shaft to move along the length direction of the first channel, a second channel penetrates through the plunger shaft, and the second channel is communicated with the through hole through the first channel;
the check assembly is arranged in the second channel and can enable liquid to flow in a single direction only along the direction of the second channel towards the through hole.
2. The multifunctional bolting construction equipment according to claim 1, wherein the number of the second passages is plural, the number of the check members is plural, and the plural check members are in one-to-one correspondence with the plural second passages.
3. The multifunctional bolting construction equipment according to claim 2, wherein said second passage is three.
4. The multifunctional bolting construction equipment according to claim 1, further comprising a seal assembly including a first seal and a second seal, said first seal being disposed between said pretension nut and said first channel, said second seal being disposed between said plunger shaft and said first channel.
5. The multifunctional bolting construction equipment according to claim 4, wherein the first sealing member is at least one of an O-ring, a V-ring, a J-shaped frameless dust ring and a Y-ring, and/or the second sealing member is at least one of an O-ring, a V-ring, a J-shaped frameless dust ring and a Y-ring.
6. The multifunctional anchor bolt support construction equipment of claim 1, wherein the telescopic assembly further comprises a support and an adjusting sleeve, the support is arranged on the base, the plunger shaft is in sliding fit with the support and the adjusting sleeve, the adjusting sleeve is connected with the support, and the position of the adjusting sleeve along the length direction of the plunger shaft is adjustable.
7. The multifunctional bolting construction equipment according to claim 6, wherein said adjusting bush is screw-coupled with said bracket.
8. The multifunctional bolting construction equipment according to claim 1, wherein said first driving member comprises a first transmission member, a second transmission member and a first driver, said first transmission member is coaxially connected with said first driver, said first transmission member is in transmission engagement with said second transmission member, and said second transmission member is coaxially connected with said rotation shaft.
9. The multifunctional bolting construction equipment according to claim 8, wherein said first driver is at least one of an electric motor, a hydraulic motor, a cylinder and an internal combustion engine.
10. The multifunctional bolting construction equipment according to claim 1, wherein said second driving means includes a second driver, and said second driver is at least one of an electric cylinder, an air cylinder, and a linear hydraulic motor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110484159.5A CN113090306B (en) | 2021-04-30 | 2021-04-30 | Multifunctional anchor bolt support construction equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110484159.5A CN113090306B (en) | 2021-04-30 | 2021-04-30 | Multifunctional anchor bolt support construction equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN113090306A true CN113090306A (en) | 2021-07-09 |
CN113090306B CN113090306B (en) | 2023-05-12 |
Family
ID=76681134
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110484159.5A Active CN113090306B (en) | 2021-04-30 | 2021-04-30 | Multifunctional anchor bolt support construction equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113090306B (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU2008341002A1 (en) * | 2007-12-21 | 2009-07-02 | Alminco Pty Ltd | Self drilling rock bolting |
CN105637180A (en) * | 2013-05-27 | 2016-06-01 | 奥卡锚杆技术有限公司 | A self-drilling rock bolt assembly and method of installation |
CN107476814A (en) * | 2017-09-28 | 2017-12-15 | 滨州学院 | A kind of self-vibration jet grouted anchor bar integrated construction device and method |
CN109869172A (en) * | 2019-03-29 | 2019-06-11 | 攀枝花学院 | The anchor of drilling anchor high-pressure slip-casting one |
CN110242339A (en) * | 2019-07-17 | 2019-09-17 | 廊坊景隆重工机械有限公司 | Anchor shaft anchor cable blender |
CN210622827U (en) * | 2019-06-19 | 2020-05-26 | 四川新筑智能工程装备制造有限公司 | Anchor rod grouting and nut screwing mechanism for tunnel supporting construction equipment |
CN112360505A (en) * | 2020-09-28 | 2021-02-12 | 中煤科工开采研究院有限公司 | Drilling, grouting, anchoring and pre-tightening integrated anchor rod supporting device and construction method |
CN112360507A (en) * | 2020-09-28 | 2021-02-12 | 中煤科工开采研究院有限公司 | Multi-channel drilling, grouting and pre-tightening integrated anchor rod construction device and construction method |
-
2021
- 2021-04-30 CN CN202110484159.5A patent/CN113090306B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU2008341002A1 (en) * | 2007-12-21 | 2009-07-02 | Alminco Pty Ltd | Self drilling rock bolting |
US20110070035A1 (en) * | 2007-12-21 | 2011-03-24 | Alminco Pty Ltd. | Self drilling rock bolting |
CN105637180A (en) * | 2013-05-27 | 2016-06-01 | 奥卡锚杆技术有限公司 | A self-drilling rock bolt assembly and method of installation |
CN107476814A (en) * | 2017-09-28 | 2017-12-15 | 滨州学院 | A kind of self-vibration jet grouted anchor bar integrated construction device and method |
CN109869172A (en) * | 2019-03-29 | 2019-06-11 | 攀枝花学院 | The anchor of drilling anchor high-pressure slip-casting one |
CN210622827U (en) * | 2019-06-19 | 2020-05-26 | 四川新筑智能工程装备制造有限公司 | Anchor rod grouting and nut screwing mechanism for tunnel supporting construction equipment |
CN110242339A (en) * | 2019-07-17 | 2019-09-17 | 廊坊景隆重工机械有限公司 | Anchor shaft anchor cable blender |
CN112360505A (en) * | 2020-09-28 | 2021-02-12 | 中煤科工开采研究院有限公司 | Drilling, grouting, anchoring and pre-tightening integrated anchor rod supporting device and construction method |
CN112360507A (en) * | 2020-09-28 | 2021-02-12 | 中煤科工开采研究院有限公司 | Multi-channel drilling, grouting and pre-tightening integrated anchor rod construction device and construction method |
Non-Patent Citations (2)
Title |
---|
张小强;魏群;石修灯;: "全液压底板锚杆钻机的研制和试验" * |
潘跃芸;张卫国;夏云;谢赛南;: "液压锚杆钻机的设计与分析" * |
Also Published As
Publication number | Publication date |
---|---|
CN113090306B (en) | 2023-05-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA2913663C (en) | A self-drilling rock bolt assembly and method of installation | |
US8029211B2 (en) | Adaptor for setting a self-drilling, chemically anchored, fastening element | |
CA3014355A1 (en) | Rock drilling, swelling and chiselling integrated machine based on high-pressure foam medium | |
CN112360505A (en) | Drilling, grouting, anchoring and pre-tightening integrated anchor rod supporting device and construction method | |
CA2771661A1 (en) | Rock anchor bolt | |
SE512653C2 (en) | Device for soil reinforcement, tools and method | |
CN101492997A (en) | Hydraulic down-the-hole rock drilling impactor | |
WO2022227509A1 (en) | Automated construction method for anchor bolt | |
CN115822668A (en) | Multifunctional anchor rod support drilling box | |
US7520341B1 (en) | Drill head assembly | |
CN113090306A (en) | Multifunctional anchor rod support construction equipment | |
CN113090307A (en) | Anchor bolt support construction equipment | |
CN113202522B (en) | Automatic construction device for anchor rod | |
CN1213423A (en) | Device for drilling bore hole in the ground | |
CN115929369A (en) | Multifunctional drilling box for anchor rod support | |
CN113294183A (en) | Anchor rod construction assembly | |
CN115788529A (en) | Anchor-grouting supporting equipment | |
CN113202523B (en) | Multifunctional integrated anchor rod construction device | |
CN113090308B (en) | Anchor bolt support construction device | |
CN202544747U (en) | Self-lubricating slurry shaft module and vehicle-mounted drilling machine using same | |
KR100959342B1 (en) | Built-in nozzle for underground propulsion pipe | |
CN115726826A (en) | Anchor grouting device and automatic construction method | |
CN113217051A (en) | Multifunctional anchor rod support construction device | |
CN113107559B (en) | Multifunctional integrated anchor rod construction equipment | |
CN115807683A (en) | Anchor bolt supporting device and construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |